This is an instruction template and impact assessment table for a Ground Maneuver Commercial Solutions Opening (CSO) related to the Army's Lifting and Tiedown Trailer Heavy Capability (LTT-HC) program. The document provides guidelines for offerors to complete a Desired Attributes Impact Table, which evaluates proposed design features and their associated costs, engineering requirements, and schedule impacts. Offerors must indicate whether each listed attribute exists in their current commercial product without modification, then provide estimated impacts in four categories: Unit Production Cost (UPC), Non-Recurring Engineering (NRE) costs, schedule timeline in months beyond the standard 6-month delivery date, and supporting narrative explanations. The table includes specific design elements such as lifting and tiedown provisions, paint/decontamination capabilities, track width, departure angle, rims/tires/runflat devices, electrical connectors, pintle interfaces, safety chains, landing gear, stabilizer legs, lubricants/fluids, welding specifications, power sources (AMMPS), and mounting kits.

The document is marked as Controlled Unclassified Information (CUI) and is controlled by the Department of the Army (DOA), Army Contracting Command-Detroit Arsenal. This CSO, issued under DFARS Subpart 212-70, seeks innovative commercial technologies for ground vehicle systems to support Army modernization and improve operational readiness. The Government assumes that any attributes marked as existing will be delivered within the proposal delivery date at the proposed price unless otherwise documented in the narrative section. The document serves primarily as a template requiring completion by potential contractors responding to the LTT-HC solicitation (W912CH-26-S-0001).

View the file

Other files

File Type Posted
ACC DTA GROUND MANEUVER CSO_Amendment 40.docx DOCX document
Attachment 1 - Required Domestic Tools.xlsx XLSX spreadsheet
AoI Domestic Hand Measuring Tools.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 39.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 38.docx DOCX document
FALCONS AOI - Amendment 1 v2.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 37.docx DOCX document
FALCONS AOI - Amendment 1.pdf PDF
Attachment 1 - FALCONS Government Performance Specification - Amendment 1.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 36.docx DOCX document
FALCONS AoI Questions - Government Responses 10-16-26.pdf PDF
Rev 01 MCS Area of Interest Armor Formation.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 35.docx DOCX document
AOI CUAS Detection.docx DOCX document
PdM VPS Sensor CSO Questionnaire-(VendorNameHere).xlsx XLSX spreadsheet
ACC DTA GROUND MANEUVER CSO_Amendment 34.docx DOCX document
MCS Area of Interest Armor Formation.docx DOCX document
Attachment 2 - Performance Specification Compliance Matrix.xlsx XLSX spreadsheet
Attachment 1 - FALCONS Government Performance Specification.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 33.docx DOCX document
FALCONS AOI - Posted 06 OCT 2026.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 32.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 31.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 30.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 29.docx DOCX document
Rev 02Area of Interest (AoI) - Phase II TIGER Readiness REV 02.docx DOCX document
TIGER Readiness Q and A 06 AUG 26.docx DOCX document
Average Monthly Demand 166 Critical and Single Source Components.pdf PDF
Aiming Circle CSO AOI.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 28.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 27.docx DOCX document
Area of Interest (AoI) - Phase II TIGER Readiness REV 01.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 26.docx DOCX document
Area of Interest (AoI) - Phase II TIGER Readiness Vendor Response.xlsx XLSX spreadsheet
ACC DTA GROUND MANEUVER CSO_Amendment 25.docx DOCX document
Area of Interest (AoI) - Phase II TIGER Readiness.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 24.docx DOCX document
Revision 03 Area of Interest - TIGER Hackathon.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 23.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 22.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 21.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 20.docx DOCX document
LTT HC_Area of Interest.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 19.docx DOCX document
Attachment 001 LTT-HC Desired Attributes.pdf PDF
Revision 02 Area of Interest - TIGER Hackathon.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 18.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 17.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 16.docx DOCX document
Revision 01 Area of Interest - TIGER Hackathon.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER

CUI

ATTENTION

Controlled by: DOA Controlled by: CPE CS, PM JPO JTWV, PDLTV CUI Categories: CONTRACT, PROCURE Distribution Statement: A then B once attachment is filled in.

POC: JPO JTWV Project Security Manager; (586) 239-3491

ATTENTION
All individuals handling this information are required to protect it from unauthorized disclosure.

Handling, storage, reproduction, and disposition of the attached document(s) must be in accordance with 32 CFR Part 2002 and applicable agency policy.

Access to and dissemination of Controlled Unclassified Information shall be allowed as necessary and permissible to any individual(s), organization(s), or grouping(s) of users, provided such access or dissemination is consistent with or in furtherance of a Lawful Government Purpose and in a manner consistent with applicable law, regulations, and Government-wide policies.

Standard Form 901 (11-18) Prescribed by GSA/ISOO | 32 CFR 2002

CUI

Instructions

Instructions for Completing Impact Table:
Column APre-populated list of Desired Atrributes area and/or elements of Performance-Based Description (as defind in Attachment 001).
Column BExisting Attribute?: Indicate with a "Yes" or "No" if the attribute is part of the offeror's existing, commercially available product without modification.
Column CEstimated Impact on Unit Production Cost (UPC): Indicate the estimated cost of each desired attribute.
Column DEstimated Impact on Non-Recurring Engineering (NRE): Indicate the estimated cost for design, engineering, and testing impact of each desired attribute.
Column EEstimated Impact on Schedule: Indicate the estimated timeline (in months) for design, engineering, and testing impact for each desired attribute beyond the 6-month delivery date.
Column FNarrative to summarize impacts for each desired attribute.
Notes: The Government will assume if you answer YES to a Desired Attribute in Column B that this can me met within the proposal delivery date and at the proposal price unless otherwise stated.

Impact Table Attachment 002: LTT-HC Desired Attributes Impact Table

Attachment B Desired Attribute (List each one)Existing Attribute On Your Solution? (Yes/No)Estimated Impact on Unit Production Cost (UPC)Estimated Impact on Non-Recurring Engineering (NRE)Estimated Impact on ScheduleSupporting Narrative
Lifting and Tiedown Provisions
Paint
DS2 Decontamination
Track Width
Departure Angle
Rims, Tires and Runflat Devices
Electrical
Electrical Connector
Pintle Interface
Safety Chains
Pedestal/Retractable Landing Device
Rear Stabilizer Legs
Breakaway
Lubricants/Fluids
Welding
Advanced Medium Mobile Power sources (AMMPS) Mounting Kit