Attachment 002 LTT HC Desired Attributes Impact Table_11May26.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- ACC-DTA Commercial Solutions Opening (CSO)
- Solicitation number
- W912CH-26-S-0001
- Issued by
-
Department of the Army
About this file
This is an instruction template and impact assessment table for a Ground Maneuver Commercial Solutions Opening (CSO) related to the Army's Lifting and Tiedown Trailer Heavy Capability (LTT-HC) program. The document provides guidelines for offerors to complete a Desired Attributes Impact Table, which evaluates proposed design features and their associated costs, engineering requirements, and schedule impacts. Offerors must indicate whether each listed attribute exists in their current commercial product without modification, then provide estimated impacts in four categories: Unit Production Cost (UPC), Non-Recurring Engineering (NRE) costs, schedule timeline in months beyond the standard 6-month delivery date, and supporting narrative explanations. The table includes specific design elements such as lifting and tiedown provisions, paint/decontamination capabilities, track width, departure angle, rims/tires/runflat devices, electrical connectors, pintle interfaces, safety chains, landing gear, stabilizer legs, lubricants/fluids, welding specifications, power sources (AMMPS), and mounting kits.
The document is marked as Controlled Unclassified Information (CUI) and is controlled by the Department of the Army (DOA), Army Contracting Command-Detroit Arsenal. This CSO, issued under DFARS Subpart 212-70, seeks innovative commercial technologies for ground vehicle systems to support Army modernization and improve operational readiness. The Government assumes that any attributes marked as existing will be delivered within the proposal delivery date at the proposed price unless otherwise documented in the narrative section. The document serves primarily as a template requiring completion by potential contractors responding to the LTT-HC solicitation (W912CH-26-S-0001).
View the file
Other files
Show 40 more
Latest 50 of 69 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER
CUI
ATTENTION
Controlled by: DOA Controlled by: CPE CS, PM JPO JTWV, PDLTV CUI Categories: CONTRACT, PROCURE Distribution Statement: A then B once attachment is filled in.
POC: JPO JTWV Project Security Manager; (586) 239-3491
| ATTENTION | |
| All individuals handling this information are required to protect it from unauthorized disclosure. |
Handling, storage, reproduction, and disposition of the attached document(s) must be in accordance with 32 CFR Part 2002 and applicable agency policy.
Access to and dissemination of Controlled Unclassified Information shall be allowed as necessary and permissible to any individual(s), organization(s), or grouping(s) of users, provided such access or dissemination is consistent with or in furtherance of a Lawful Government Purpose and in a manner consistent with applicable law, regulations, and Government-wide policies.
Standard Form 901 (11-18) Prescribed by GSA/ISOO | 32 CFR 2002
CUI
Instructions
| Instructions for Completing Impact Table: | |
| Column A | Pre-populated list of Desired Atrributes area and/or elements of Performance-Based Description (as defind in Attachment 001). |
| Column B | Existing Attribute?: Indicate with a "Yes" or "No" if the attribute is part of the offeror's existing, commercially available product without modification. |
| Column C | Estimated Impact on Unit Production Cost (UPC): Indicate the estimated cost of each desired attribute. |
| Column D | Estimated Impact on Non-Recurring Engineering (NRE): Indicate the estimated cost for design, engineering, and testing impact of each desired attribute. |
| Column E | Estimated Impact on Schedule: Indicate the estimated timeline (in months) for design, engineering, and testing impact for each desired attribute beyond the 6-month delivery date. |
| Column F | Narrative to summarize impacts for each desired attribute. |
| Notes: The Government will assume if you answer YES to a Desired Attribute in Column B that this can me met within the proposal delivery date and at the proposal price unless otherwise stated. |
Impact Table Attachment 002: LTT-HC Desired Attributes Impact Table
| Attachment B Desired Attribute (List each one) | Existing Attribute On Your Solution? (Yes/No) | Estimated Impact on Unit Production Cost (UPC) | Estimated Impact on Non-Recurring Engineering (NRE) | Estimated Impact on Schedule | Supporting Narrative |
| Lifting and Tiedown Provisions | |||||
| Paint | |||||
| DS2 Decontamination | |||||
| Track Width | |||||
| Departure Angle | |||||
| Rims, Tires and Runflat Devices | |||||
| Electrical | |||||
| Electrical Connector | |||||
| Pintle Interface | |||||
| Safety Chains | |||||
| Pedestal/Retractable Landing Device | |||||
| Rear Stabilizer Legs | |||||
| Breakaway | |||||
| Lubricants/Fluids | |||||
| Welding | |||||
| Advanced Medium Mobile Power sources (AMMPS) Mounting Kit |
| If Cell is Greyed out, do not put information there. | |
| Yes | |
| No |
File details come from the government source that posted it. Updated .