W912CH26B0007.pdf
PDF 196 KB Posted
- Solicitation number
- W912CH-26-B-0007
- Issued by
-
Department of the Army
About this file
This document is a Solicitation/Contract/Order for Commercial Items (Standard Form 1449) issued by the Army Contracting Command - Detroit Arsenal for a five-year indefinite delivery indefinite quantity (IDIQ) contract for the Small Arms Repairman Tool Kit (SARTK), National Stock Number (NSN) 5180-01-670-9469, part number 0631A0000.
The solicitation is a total small business set-aside with a NAICS code 332216 (Saw Blade and Handtool Manufacturing) and is issued as an Invitation for Bid (IFB). The solicitation closing date and time is June 18, 2026, at 1:00 PM local time, with bid opening scheduled for June 22, 2026, at 1:00 PM (Warren, MI). The acquisition includes five contract line item numbers (CLINs) representing the first through fifth ordering years, with estimated annual quantities of 3,404 KT for year one and 750 KT for years two through five, for a total five-year maximum quantity of 6,404 KT; however, only the minimum quantity of 120 KT is guaranteed. The contract type is Firm Fixed Price. Bidders must complete all required sections including Standard Form 1449, pricing for CLINs 0010-0015, inspection and acceptance points, delivery schedules, Technical Data Package (TDP) cover sheet, and annual representations and certifications. Award will be made to the responsible bidder with the lowest evaluated price. Bids must be submitted electronically via email, and all bids must remain valid for a minimum of 90 calendar days. The requisition number is W912CH-26-B-0007, with contact information for Lyndsey M. Pena, Contract Specialist, at (520) 687-3936.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912CH26B0007-0004.pdf | ||
| QA Log W912CH26B0007.docx | DOCX document | |
| QA Log W912CH26B0007 7.8.26.pdf | ||
| W912CH26B0007-0003.pdf | ||
| QA Log W912CH26B0007.docx | DOCX document | |
| QA Log W912CH26B0007.docx | DOCX document | |
| W912CH26B0007-0002.pdf | ||
| QA Log W912CH26B0007.docx | DOCX document | |
| QA Log W912CH26B0007.docx | DOCX document | |
| QA Log W912CH26B0007.docx | DOCX document | |
| QA Log W912CH26B0007.docx | DOCX document | |
| QA Log W912CH26B0007.docx | DOCX document | |
| W912CH26B0007-0001.pdf | ||
| Attachment 0001 TDP 0631A0000.zip | ZIP file |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W912CH-26-B-0007 2026MAY19
LYNDSEY M. PENA (520)687-3936
LYNDSEY.M.PENA.CIV@ARMY.MIL
2026JUN18 01:00pm
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
X
X 100
332216
X DOA4
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 75
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: LYNDSEY M. PENA
Buyer Office Symbol/Telephone Number: CCTA-APS-B/(520)687-3936
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued.
Solicitation number W912CH-26-B-0007 is issued as an invitation for bid (IFB) for the Small Arms Tool Kit.
A.1. DESCRIPTION OF ACTION
(a) This Invitation for Bids (IFB) is intended to result in the award of a single five-year indefinite delivery indefinite quantity
(IDIQ) contract for the TOOL KIT, SMALL ARMS (SARTK), National Stock Number (NSN): 5180-01-670-9469, part number: 0631A0000. The resulting contract will establish pricing to be utilized through issuance of delivery orders, for discrete quantities during the period stated in the Schedule. The minimum quantity is 120 KT and the maximum 5-year quantity is 6,404 KT; only the minimum quantity for this procurement is guaranteed. Further, the quantities listed in this IFB and the resulting contract are estimates only and not a representation they will be ordered, nor is it a representation that conditions affecting Government needs will be stable. Please see
FAR 52.216-22: Indefinite Quantity for additional information.
(b) This IFB is a total small business set-aside in accordance with Revolutionary FAR Overhaul (RFO) 19.104-1.
(c) There is a Technical Data Package (TDP) associated with this procurement. The TDP is Distribution Statement "A", which is approved for public release and distribution is unlimited. Please see Section C.1. TDP Information for instructions on how to access this data.
Please also see Section C.4. Additional Quality Assurance / Quality Engineering Requirements. BIDDERS MUST RETURN A SIGNED COPY OF THE
TDPL COVER SHEET WITH THEIR BID SUBMISSION OR THE BID SUBMISSION MAY BE REJECTED.
(d) Bidders are advised to carefully read and understand this entire IFB, including Sections L and M, prior to submitting a bid for evaluation. The Government will evaluate bids without discussions and does not assume the duty to search for data to cure problems it finds in any bid. Therefore, all information necessary for the review and evaluation of a bid is to be contained within the bid submission.
(e) Bidders must complete all necessary fill-ins and representations throughout this IFB, including but not limited to:
(1) STANDARD FORM 1449 (IFB COVER PAGE) & Amendments (if applicable):
(2) SECTION B: The unit prices and dollar amounts requested for CLINs 0010-0015;
(3) SECTION E: E.1. Inspection and Acceptance Points - Origin;
(4) SECTION F: F.1. TIME OF DELIVERY;
(5) SECTION J: TDPL COVER SHEET in Attachment 0001 - TDP 0631A0000;
(6) SECTION K: DFARS 252.204-7998 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043);
(7) SECTION K: FAR 52.225-18 - Place of Manufacture; and
(8) SECTION K: FAR 52.229-11 - Tax on Certain Foreign Procurements - Notice and Representation
Failure to complete all required fill-ins and representations may result in the rejection of a bid.
(f) Bidders shall acknowledge receipt of all IFB amendments by the date and time indicated for receipt of bids. If this IFB is amended, then all terms and conditions which are not modified remain unchanged. Please see Section A.4. Acknowledgement of Amendments and FAR
52.214-3: Amendments to IFBs for additional information.
(g) All bids received in response to this IFB shall be valid for a minimum of 90 calendar days. Please see FAR 52.214-16: Minimum Bid
Acceptance Period for additional information.
(h) Bid opening will be held with all Bidders and shall commence on Monday, 22-Jun-2026 at 1 p.m. local time (Warren, MI). Due to security protocols at the Detroit Arsenal, bid opening will be held virtually. Bidder attendance at this event is not required. The
2 75
W912CH-26-B-0007
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Government will provide a Microsoft Teams link, teleconference number, and passcode prior to bid opening. Please contact the following personnel via e-mail, after IFB close and at least 24 hours prior to bid opening, to receive this information:
Lyndsey Pena
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: lyndsey.m.pena.civ@army.mil
-and-
Nikhil Patel
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: nikhil.a.patel2.civ@army.mil
(i) Early deliveries are authorized at no additional cost to the Government.
A.2. IFB STRUCTURE
(a) North American Industry Classification System. The Government will utilize North American Industry Classification System (NAICS) code 332216 - Saw Blade and Handtool Manufacturing for this procurement. Failure to register via the System for Award Management (SAM) website for this NAICS code, prior to submitting a bid in response to this IFB, may preclude your firm from receiving an award. Bidders should be aware of how U.S. Small Business concerns are defined in FAR Part 19, Defense Federal Acquisition Regulation Supplement
(DFARS) Part 219, and 13 CFR 121 Small Business Size Regulations. Bidders are advised to review 13 CFR 121.103, "How does SBA determine affiliation?", if applicable to this IFB.
(b) Ordering Periods and Delivery Orders. There will be five one-year ordering periods beginning the date of contract award. Future delivery orders will be awarded pursuant to FAR 52.216-18: Ordering, FAR 52.216-19: Order Limitations, FAR 52.216-22: Indefinite
Quantity, and Section B of this IFB.
A.3. ELECTRONIC CONTRACTING
(a) All Army Contracting Command - Detroit Arsenal IFBs will be publicized on the System for Award Management (SAM) website:
https://www.SAM.gov
Any additional attachments, including the TDP(s) when available electronically, will be separate attachments or links embedded in the
IFB.
(b) Interested Bidders shall submit a completed IFB, including the Standard Form 1449, via e-mail with the subject line "IFB Submission -
W912CH-26-B-0007 (Contractor Name)" to the following personnel:
Lyndsey Pena
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: lyndsey.m.pena.civ@army.mil
-and-
Nikhil Patel
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: nikhil.a.patel2.civ@army.mil
Once a bid is received, the Contract Specialist will reply to the respective Bidder indicating receipt of the submission. NOTE: FAX, HARDCOPY (PAPER), AND DVD/CD-ROM BIDS WILL NOT BE ACCEPTED. HAND-CARRIED BIDS, WHETHER HARDCOPY OR ELECTRONIC, WILL ALSO NOT BE
ACCEPTED.
(c) Please pay close attention to the Issued By block on the cover page of this IFB for a closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, Bidders are responsible for submitting bids, and any revisions/modifications, so as to be received by the Government office designated in the IFB by the date and time specified.
(d) It is the Bidder's responsibility to ensure the bid is received by the date and time specified on the cover page of this IFB. In accordance with FAR 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, if the bid was not received at the initial point of entry to the Government infrastructure (in this case, received via e-mail) by the exact date and time specified on the cover page of this IFB, it will be determined late. Bid is defined to mean ALL volumes or parts required by the IFB are included in the electronic submission.
3 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
NOTE: There is no "expected" or "target" length of time for bid submission; size and content may be factors, therefore Bidders are strongly cautioned when submitting bids to allow adequate time for submission.
(e) IFBs may remain posted on SAM.gov after the IFB closing date. If the response deadline has passed for the IFB, vendors will no longer be able to submit electronic responses.
(f) Any award issued as a result of this IFB will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this IFB, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Government's intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include cost or pricing data/information. If a Bidder objects to such release in the base contract or contract modifications, the Bidder must notify the
Contracting Officer in writing prior to the closing date identified in this IFB and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on the rationale given.
(g) All questions pertaining to this IFB shall be submitted via e-mail to the following personnel by Wednesday, 3-Jun-2026 at 1 p.m.
local time (Warren, MI):
Lyndsey Pena
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: lyndsey.m.pena.civ@army.mil
-and-
Nikhil Patel
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: nikhil.a.patel2.civ@army.mil
Responses will be furnished via a Q&A log posting to SAM.gov or as an IFB amendment, if the information is necessary in submitting bids or if the lack thereof would be prejudicial to other prospective Bidders. Please see FAR 52.214-6: Explanation to Prospective Bidders for additional information. The Government will review all questions received but is not obligated to answer questions submitted after the date/time noted above, prior to IFB close.
(h) For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement
Technical Assistance Center (PTAC) website to locate a regional center at:
http://www.aptac-us.org
A.4. ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.5. ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website: https://tacom.army.mil/ombudsman (Best viewed using Google Chrome or Microsoft Edge).
A.6. ALL OR NONE - COMMERCIAL ITEM ACQUISITION - SEALED BIDDING
(a) This provision serves as official notice that all bid submissions must offer to provide the total quantity of all items identified in this solicitation.
(b) Only one award will be made as a result of this solicitation. Bids submitted for less than the total quantity of all items identified in this solicitation will NOT be considered for award.
(c) Note: This provision supersedes any/all other solicitation language pertaining to multiple awards.
4 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE A0001 ***
5 75
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
The following four digit Contract Line Item Numbers
(CLINs) utilize the numbering system below:
The first three digits signify item and the fourth
(last) digit signifies the applicable contract year, i.e., CLIN 0011 is for the first item - first ordering year, CLIN 0012 is for the first item -second ordering year, CLIN 0013 is for the first item
- third ordering year, etc.
The last digit of zero (0), signifies the CLIN is for
Product Verification Testing (PVT).
The following definitions apply to the entire solicitation and resulting contract:
First ordering year of the contract is the date of award plus 364 days.
Second ordering year of the contract is 365 days through 729 days after contract award.
Third ordering year of the contract is 730 days through 1,094 days after contract award.
Fourth ordering year of the contract is 1,095 days through 1,459 days after contract award.
Fifth ordering year of the contract is 1,460 days through 1,824 days after contract award.
The price applicable to an individual order is the price for the ordering year in which the order is issued. The delivery date does not determine the ordering year.
The information presented below applies to Item No.
0011 Through 0015:
Minimum Five-Year Quantity: 120 KT
Maximum Five- Year Quantity: 6404 KT
Only the minimum five-year quantity is guaranteed.
Each ordering year estimate, is a 12 month average monthly demand with contract factors built in.
(End of narrative A001)
0010 PRODUCT VERIFICATION TEST REPORT (PVTR) $ _______________________________________ __________________
SERVICE REQUESTED: PVTR
6 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
CLIN CONTRACT TYPE:
Firm Fixed Price
PLEASE NOTE:
IAW NARRATIVE E.3. PRODUCT VERIFICATION TESTING
(CONTRACTOR FACILITY), 1 LO is 3 KT
- ALL OFFERORS SHALL IDENTIFY A DOLLAR AMOUNT FOR THE
PVT CLIN. FAILURE TO SEPARATELY IDENTIFY A PVT DOLLAR
AMOUNT SHALL MEAN THAT THE OFFEROR WILL PROVIDE PVT
AT NO ADDITIONAL COST TO THE GOVERNMENT, AND THE
PROPOSAL WILL BE EVALUATED ACCORDINGLY.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
GOVERNMENT APPROVAL/DISAPPROVAL: 30 CALENDAR DAYS
PRODUCT VERIFICATION TEST COMPLETION: 90 CALENDAR
DAYS
(End of narrative E001)
Deliveries or Performance _________________________
Note: The contractor is authorized to deliver PVTR early at no additional cost to the Government.
(End of narrative F001)
0011 FIRST ORDERING YEAR EST 3404 KT $ $ ___________________ ______________ __________________
NSN: 5180-01-670-9469
COMMODITY NAME: TOOL KIT, SMALL ARMS (SARTK)
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: TDP 0631A0000
7 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
0012 SECOND ORDERING YEAR EST 750 KT $ $ ____________________ ______________ __________________
NSN: 5180-01-670-9469
COMMODITY NAME: TOOL KIT, SMALL ARMS (SARTK)
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: TDP 0631A0000
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
0013 THIRD ORDERING YEAR EST 750 KT $ $ ___________________ ______________ __________________
NSN: 5180-01-670-9469
COMMODITY NAME: TOOL KIT, SMALL ARMS (SARTK)
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: TDP 0631A0000
8 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
0014 FOURTH ORDERING YEAR EST 750 KT $ $ ____________________ ______________ __________________
NSN: 5180-01-670-9469
COMMODITY NAME: TOOL KIT, SMALL ARMS (SARTK)
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: TDP 0631A0000
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
0015 FIFTH ORDERING YEAR EST 750 KT $ $ ___________________ ______________ __________________
NSN: 5180-01-670-9469
COMMODITY NAME: TOOL KIT, SMALL ARMS (SARTK)
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: TDP 0631A0000
9 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
0016 BASIC CLIN FOR ELIN ___________________
A001 ENGINEERING CHANGE PROPOSAL (ECP) 1 LO $ ** NSP ** _________________________________ __________________
SERVICE REQUESTED: CDRL A001 - ECP
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A002 REQUEST FOR VARIANCE (RFV) 1 LO $ ** NSP ** __________________________ __________________
SERVICE REQUESTED: CDRL A002 - RFV
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A003 NOTICE OF REVISION (NOR) 1 LO $ ** NSP ** ________________________ __________________
10 75
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: CDRL A003 - NOR
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A004 START OF WORK MEETING MINUTES 1 LO $ ** NSP ** _____________________________ __________________
SERVICE REQUESTED: CDRL A004 - START WORK
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A005 PRODUCT VERIFICATION TEST REPORT (CONTRACTOR ____________________________________________
FACILITY) 1 LO $ ** NSP ** _________ __________________
SERVICE REQUESTED: CDRL A005 - PVTR
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
11 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1. TECHNICAL DATA PACKAGE INFORMATION
The following "X"d item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ X ] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:
W912CH-26-B-0007
(TDP 0631A0000/59678)
To access the data through SAM:
a. Log on to the SAM web site: https://SAM.gov.
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States
Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code).
(2) Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution
Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense
Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and Non-
Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.
C.2. CONFIGURATION MANAGEMENT DOCUMENTATION
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP). The Configuration Change Management section of SAE EIA-649-
1(current revision) Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.
d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/NOR without processing.
(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.
12 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.
f. The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the
Administrative Contracting Officer (ACO).
h. The submission of an ECP/RFV/NOR does not affect the required delivery date of the contract.
C.3. START OF WORK MEETING (CDRL A004)
a. The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within
_30_ days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort.
The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.
b. The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel may be invited to the meeting: Contracting Officer's Representative (COR) identified in Section G or in an appointment letter; Quality Assurance personnel; DCMA; etc. All Government invitees shall be given at least _7_ days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor shall provide the Government with minutes of the Start of Work Meeting within _5_ days after the meeting is held.
C.4. Additional Quality Assurance / Quality Engineering Requirements
1. A quantity of _three (3)_ Small Arms Repairman Tool Kit (SARTK) shall be furnished for 100% inspection (CDRL A005) to ensure compliance with all QAP(s), specification(s), and drawing(s) associated with this contract.
2. 100% visual inspection of all items in tool chest, tray and drawers to be verified with components list for completeness.
3. 100% visual inspection of Identification Plate for legibility and completeness.
4. The following procedures shall be added to Part V of Quality Assurance Provision (QAP) 0631E0002: On Page No. 4, Under STM-4, add:
(f) Visually verify when a tool is removed from a retention feature, a layer of color contrasting foam is exposed to alert that a tool has been removed.
*** END OF NARRATIVE C0001 ***
13 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PACKAGING AND MARKING
D.1. PACKAGING REQUIREMENTS (SPECIFICATIONS/STANDARDS)
The preservation, packaging, packing, and marking requirements for this contract/item shall be accomplished in accordance with the requirements in the specification/standard defined below.
The following requirements shall apply:
LEVEL OF PRESERVATION: COMMERCIAL
LEVEL OF PACKING: COMMERCIAL
QUANTITY PER UNIT PACKAGE: 001
a. Packaging. Preservation, packaging, packing, unitization and marking furnished by the supplier shall provide protection for a minimum of one year, provide for multiple handling, redistribution and shipment by any mode and meet or exceed the following requirements.
(i) Cleanliness. Items shall be free of dirt and other contaminants which would contribute to the deterioration of the item or which would require cleaning by the customer prior to use. Coatings and preservatives applied to the item for protection are not considered contaminants. Cleaning may be any suitable process that is not injurious to the item or the protective finish.
(ii) Preservation. Items susceptible to corrosion or deterioration shall be provided protection by means of preservative coatings, volatile corrosion inhibitors, desiccants, waterproof and or watervaporproof barriers.
(iii) Cushioning. Items requiring protection from physical and mechanical damage (e.g. fragile, sensitive, material critical) or which could cause physical damage to other items shall be protected by wrapping, cushioning, pack compartmentalization, or other means to mitigate shock and vibration to prevent damage during handling and shipment. Items of a delicate nature shall not be subjected to damage from rugged items contained within the kit. Non-critical items of odd shapes or having sharp protrusions will not damage other items or protective barriers.
b. Unit Package. A unit package shall be so designed and constructed that it will contain the contents with no damage to the item(s), and with minimal damage to the unit pack during shipment and storage in the shipping container, and will allow subsequent handling. The outermost component of a unit package shall be a container such as a sealed bag, carton or box.
Unit packs shall be designed to have minimum size and weight while retaining the protection required and enhancing standardization.
c. Unit Package Quantity. Unless otherwise specified, the unit package quantity shall be one each part, set, assembly, kit, etc.
d. Intermediate Package (as applicable) Intermediate packaging is required whenever one or more of the following conditions exist:
(i) the quantity is over one (1) gross of the same national stock number,
(ii) use enhances handling and inventorying,
(iii) the exterior surfaces of the unit pack is a bag of any type, regardless of size,
(iv) the unit pack is less than 64 cubic inches,
(v) the weight of the unit pack is less than five (5) pounds and no dimension is over twelve (12) inches.
Intermediate containers shall be limited to a maximum of 100 unit packs, a net load of 40 pounds, or a maximum volume of 1.5 cubic feet, whichever occurs first.
e. Shipping Containers. Unit packages and intermediate packages not meeting the requirements for a shipping container shall be packed in shipping containers. All shipping containers shall be the most cost effective and shall be of minimum cube to contain and protect the items. The shipping container (including any necessary blocking, bracing, cushioning, or waterproofing) shall comply with the regulations of the carrier used and shall provide safe delivery to the destination at the lowest tariff cost. The shipping container shall be capable of multiple handling, stacking at least ten feet high, and storage under favorable conditions (such as enclosed facilities) for a minimum of one year.
f. Unitization. Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads shall be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two pallet loads high and wide in a conveyance. The weight capacity of the pallet shall be adequate for the load. The preferred commercial expendable pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. All variations must be approved by the contracting office prior to implementation. The load shall be contained in a manner that will permit safe handling during shipment and storage.
14 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
g. Marking. All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause
252.211-7006. Contractors shall check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers' Passive RFID Information Guide and Supplier Implementation Plan.
If the item has Unique Item Identifier (UII) markings then the UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the unit load.
h. Hazardous Materials (as applicable): Hazardous Materials is defined as a substance, or waste which has been determined by the
Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
When applicable, the packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
International Air Transport Association (IATA) Dangerous Goods Regulations
International Maritime Dangerous Goods Code (IMDG)
Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
Joint Service Regulation AFMAN24-604/TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM 4145.3 (for military air shipments).
If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United
Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
i. Heat Treatment and Marking of Wood Packaging Materials. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet.
Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant
Protection Organization's compliance program.
In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
j. Quality Assurance. The contractor is responsible for establishing a quality system. Full consideration to examinations, inspections, and tests will be given to ensure the acceptability of the commercial package. All items, packing configurations, and markings supplied under this contract shall be identical to the first article
k. Supplemental Instructions. The Small Arms Repairman Tool Kit shall be placed into a weather resistant fiberboard container conforming to ASTM D5118/D5118M, RSC. This will serve as the unit and shipping container. Items within foam organizers may not require packaging if placed in a dedicated position within the case, where there is no potential for corrosion or physical damage and can be identified by a layout plan. Items susceptible to corrosion shall be protected with the use of Volatile Corrosion Inhibitors (VCI) or Desiccant packs.
Where VCI is used, electric or battery operated devices, batteries, natural or synthetic rubber, optical systems, or precision moving parts shall be placed in a heat sealed bag to prevent exposure to vapors. Desiccant and VCI shall not be present in the same pack. The exterior unit pack shall be marked for handling to indicate that the load must be shipped and stored in the upright position only.
Manuals, parts lists, and warranty information shall be packed in sealed water proof packaging that is reusable, i.e. zip lock bag.
Packing Lists shall be sealed in water-resistant envelopes and secured to the exterior of the load or crate in the most protected location.
*** END OF NARRATIVE D0001 ***
15 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
_ISO 9001:2015 (21 Oct 2015) or equivalent_
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E.1. INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
PRODUCT VERIFICATION TEST REPORT (PVTR) ACCEPTANCE: DESTINATION
The Government's acceptance of the PVT Report offered under this order shall take place at DESTINATION.
E.2. DESTRUCTIVE TESTING
(a) All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in the contract unit price.
(b) Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to be delivered to the
Government as set forth in the Contract Schedule.
(c) All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.
(d) The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance or in process testing, unless specifically authorized by the Contracting Officer.
(e) The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officer's instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.
E.3. PRODUCT VERIFICATION TESTING (CONTRACTOR FACILITY) (CDRL A005)
16 75
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(a) Subsequent to completion of both contractor and Government inspection/verification actions, a test sample consisting of _3 KT of
0631A0000_ shall be selected by the Government Quality Assurance Representative (QAR) for _Product Verification Testing_.
(b) The test shall be conducted at the contractor's facility _IAW 0631A0000_. A copy of the contractor's inspection/test results shall be provided with the test sample. The contractor shall notify the Contracting Officer in writing at least _15_ calendar days prior to initiation of the (each) test. The contractor shall also provide a copy of such notification to _the Contract Specialist, the PCO, and the QAR_.
(c) The test sample shall be examined and/or tested in accordance with _The Technical Data Package associated QAP's_.
(d) Within _30_ days after completion of the test, the Contracting Officer (or designated representative) shall provide notification to the Contractor as to the approval, disapproval, or conditional approval of the product verification test. Unless authorized by the
Contracting Officer, the lot from which the test sample was taken shall not be shipped from the Contractor's facility, nor shall final acceptance of the lot be made, until such time as notification has been provided by the Contracting Officer that the Product
Verification Test samples have been approved/conditionally approved.
(e) If the Contracting Officer does not provide notification of the approval, conditional approval, or disapproval of the Product
Verification Test sample within the time specified above, the Contracting Officer shall, if applicable, equitably adjust the delivery/performance dates and/or contract price (and any other contractual provision affected by such delay) in accordance with the procedures provided in the Changes clause of this contract.
(f) If any test sample fails to meet any applicable contractual requirement, the lot or batch from which the test sample was drawn shall be considered to be rejected. The contractor shall take immediate corrective action, both to correct the deficiency/nonconformance and to prevent recurrence of the deficiency/nonconformance. Such corrective action shall be taken by the contractor at no increase in contract price. Such corrective action shall apply to all items (to include basic issue items and/or repair parts) either in-process of final assembly, which have been produced or are in production since the last successful Product Verification Test. In addition, the provisions of any warranty clause contained in the contract shall apply. Upon completion of the corrective action, the contractor shall resubmit a sample for Product Verification testing. Any and all costs associated with testing the additional Product Verification Test sample shall be borne by the contractor. The Contracting Officer shall equitably adjust the contract price as applicable for the costs associated with the additional testing resulting from failure of the test sample to meet the applicable contractual requirements.
(g) If the contractor fails to deliver any Product Verification test sample within the time specified, or if the test sample is disapproved and an acceptable replacement is not provided within the time specified, the contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(h) Unless otherwise specified, the initial production/confirmatory test units shall be considered to be destructively tested. At the
Contracting Officer's discretion, the initial production/confirmatory test units, and any unused repair parts, may be returned to the contractor for refurbishing, and may subsequently be shipped as deliverable items under the terms of the contract. Any refurbished test units shall meet all contract requirements; inspection and acceptance of any refurbished test units shall be conducted in accordance with contract requirements. Any costs to refurbish the test units shall be subject to negotiation between the contracting Officer and the contractor.
E.4. INSPECTION AND ACCEPTANCE (FIRST ARTICLE/PVT APPROVAL)
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(a) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with E.3.
PRODUCT VERIFICATION TESTING (CONTRACTOR FACILITY).
(b) The Product Verification Test Report (PVTR) shall be compiled by the contractor to the contractor's own format. The PVTR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The PVTR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .