W912CH25R0053.pdf
PDF 231 KB Posted
- Attached to
- Solicitation, Kit, Electronic Thermal Warning Device (ETWD) Tube Temperature Display, NSN: 1015-01-606-1032
- Solicitation number
- W912CH-25-R-0053
- Issued by
-
Department of the Army
About this file
This is a Request for Proposal (RFP) and Solicitation/Offer/Award form (SF 33) for a three-year Indefinite Delivery/Indefinite Quantity (IDIQ) firm fixed-price contract issued by the U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA). The solicitation, numbered W912CH-25-R-0053, seeks a single contractor to supply the Kit, Electronic Thermal Warning Device (ETWD) Tube Temperature Display (NSN: 1025-01-606-1032, Part Number: 11582731) with a guaranteed minimum quantity of 382 units and maximum quantity of 700 units over three one-year ordering periods. This is a total small business set-aside acquisition under NAICS code 336992 (Military Armored Vehicle, Tank and Tank Component Manufacturing) with a size standard of 1,500 employees. Proposals must be submitted electronically via email to the Contract Specialist (Kaitlyn N. Fruhner at kaitlyn.n.fruhner.civ@army.mil) with the Contracting Officer (Erika J. Dennison II) copied, with a closing date and time of March 2, 2026, at 5:00 PM local time (Detroit Arsenal, Michigan).
The solicitation requires offerors to submit pricing for three contract line items (CLINs) representing each ordering year, plus a First Article Test (FAT) report (CLIN 0014). First-year delivery must commence 210 days after delivery order issuance (or 480 days if FAT is required); subsequent years require delivery within 210 days. Offerors may propose accelerated delivery schedules at no additional cost. A waiver of FAT requirements is available if properly documented. Proposals will be evaluated on delivery schedule (with three equally weighted subfactors corresponding to CLINs 0011, 0012, and 0013) and price, with price being slightly more important than delivery. The contract includes military-level preservation and packing requirements, ISO 9001:2015 quality standards, configuration management documentation requirements (Engineering Change Proposals, Requests for Variance, and Notices of Revision), OPSEC and TARP training requirements, and export control restrictions for the Technical Data Package (Distribution Statement D). Payment will be via Wide Area Workflow (WAWF), and all deliveries are FOB Destination to Army General Supply DLA Distribution in Anniston, Alabama.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question and Answer.docx | DOCX document | |
| W912CH25R0053-0001.pdf | ||
| First Article Waiver Worksheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W912CH-25-R-0053
X
2026JAN30
2026MAR0205:00pm
DOA4
2026JAN30 SEE SCHEDULE
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
KAITLYN N. FRUHNER
(571)644-4382
CCTA-APN-B
KAITLYN.N.FRUHNER.CIV@ARMY.MIL
1 73
X 1
X 5 X 12
X 15 X 17 X 20
X 26
X 28
X 48
X 49
X 62
X 70
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: KAITLYN N. FRUHNER
Buyer Office Symbol/Telephone Number: CCTA-APN-B/(571)644-4382
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A.1 DESCRIPTION OF THE ACTION
A.1.1 This solicitation is intended to result in the award of a Three-year, Indefinite Delivery Indefinite Quantity (IDIQ) type contract under FAR 16.504, Definite-quantity contracts for the estimated supplies specified. The resulting contract will establish pricing to be utilized through issuance of delivery orders for discrete quantities for the period stated in the schedule. For further guidance related to a IDIQ type contract, see FAR clause 52.216-22, Indefinite Quantity.
A.1.2 This solicitation is a Total Small Business Set-Aside in accordance with FAR 19.502-2.
A.1.3 There is a Technical Data Package (TDP) associated with this procurement. The TDP is Distribution Statement D, which limits access to the Department of Defense (DoD) and U.S. DoD contractors only. Please refer to Section C for additional information.
A.2 MINIMUM AND MAXIMUM QUANTITY OF SUPPLIES
A.2.1 In accordance with (IAW) FAR 16.504(a)(4)(ii), the minimum quantity of supplies the Government will acquire under this contract is
382 EA. The Government will satisfy this minimum quantity requirement by issuing the first delivery order for the stated minimum at the time of contract award.
A.2.1.1 The Government is not obligated to purchase any additional requirement beyond the Minimum Guaranteed Quantity.
A.2.2 The minimum quantity is 382 each and the maximum quantity is 700 each for the Kit, Ele Temperature.
A.3 EVALUATION FACTORS FOR AWARD
Offerors are encouraged to review Section M of this solicitation for evaluation factors and basis for award.
A.4 SOLICITATION STRUCTURE
A.4.1 The Government will utilize North American Industry Classification System (NAICS) code 336992 (Military Armored Vehicle, Tank and
Tank Component Manufacturing). This NAICS code will also be assigned to subsequent awarded delivery orders thereunder.
A.5 SYSTEM FOR AWARD MANAGEMENT (SAM), SIZE STANDARDS, AND NAICS CODES
A.5.1 Failure to register in SAM for the corresponding NAICS code identified in paragraph A.4.1 prior to submitting a proposal against this Solicitation may preclude an award being made to your company. Offerors should be aware of how U.S. Small Business (SB) concerns are defined in FAR Part 19, Defense Federal Acquisition Regulation Supplement (DFARS) Part 19, and 13 CFR 121, Small Business Size
Regulations. Offerors are advised to review 13 CFR 121.103, "How does SBA Determine Affiliation".
A.6 ELECTRONIC CONTRACTING
A.6.1 All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website
(https://www.sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
A.6.2 Interested offerors shall submit a proposal via email to the Contract Specialist (kaitlyn.n.fruhner.civ@army.mil) and cc the corresponding Contracting Officer (erika.j.dennison2.civ@army.mil) with the subject header: Proposal Submission W912CH-25-R-0053
(company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
A.6.3 Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, to be received by the Government office designated in the solicitation by the time specified.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are
2 73
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
strongly cautioned when submitting proposals to allow adequate time for submission.
A.6.4 Solicitations may remain posted on HYPERLINK "http://www.SAM.gov" after the solicitation closing date.
A.6.5 Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
A.6.6 Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at HYPERLINK "http://www.aptac-us.org/"http://www.aptac-us.org/ to locate a regional center.
A.7 QUESTION AND ANSWER GUIDELINES
All questions regarding the requirements of this solicitation and applicable attachments must be submitted by February 13, 2026, 12:00
PM EST to kaitlyn.n.fruhner.civ@army.mil. The Government shall review all questions received but is not obligated to answer questions submitted after the date noted above prior to the solicitation close date.
A.8 ACKNOWLEDGEMENT OF AMENDMENTS
A.8.1 Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.9 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON
A.9.1 Information regarding the Ombudsperson for this contract is located at the following website:
https://www.tacom.army.mil/ombudsperson. (Best viewed using Google Chrome or Microsoft Edge)
A.10 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
A.10.1 This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act
(Section 2751 of Title 22, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all
SUBCONTRACTORS at every level.
A.10.2 To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily
Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:
http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's
Section C Technical Data Package instructions.
A.10.3 Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
A.10.4 Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the
TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
A.11 ALL OR NONE
A.11.1 Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
A.11.1.1 ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
3 73
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A.11.1.2 OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
A.12 ORDERING PERIOD
There will be three, one-year ordering periods beginning the date of contract award.
A.13 DELIVERY ORDER AWARDS
Future delivery orders will be awarded IAW FAR clause 52.216-19, Order Limitations, FAR clause 52.216-22, Indefinite Quantity, and
Section B; all included within this solicitation.
*** END OF NARRATIVE A0001 ***
4 73
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
In the four-digit item numbers (CLINS) that follow, the numbering system used is as follows:
The first three digits signifies the item, and fourth
(last) digit signifies the applicable contract year, i.e., CLIN 0011 is for the first item first ordering year, CLIN 0012 is for the first item second ordering year, etc.
The following definitions apply to the entire solicitation and resulting contract:
First ordering year of the contract is the Date of
Award plus 364 days.
Second ordering year of the contract is 365 days through 729 days after Contract Award.
Third ordering year of the contract is 730 days through 1,094 days after Contract Award.
Note: The quantities identified in this solicitation and the resulting contract are estimates only and not a representation that conditions affecting the government's needs will be stable.
The price applicable to an individual order is the price for the ordering year in which the order is issued. The delivery date does not determine the ordering year.
The information presented below applies to Item numbers 0011 through 0013:
Guaranteed Minimum Quantity of 382 EA.
Maximum Quantity of 700 EA.
ONLY THE MINIMUM 3 YEAR QUANTITY IS GUARANTEED.
(End of narrative A001)
0011 FIRST ORDERING YEAR EST 478 EA $ $ ___________________ ______________ __________________
NSN: 1025-01-606-1032
COMMODITY NAME: KIT, ELE TEMPERATURE
Mfr CAGE: 1NUW7
Mfr Part Number: 11582731
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11582731
5 73
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
REVISION: B
DATE: 20-MAR-2024
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE D.1
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
6 73
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0012 SECOND ORDERING YEAR EST 111 EA $ $ ____________________ ______________ __________________
NSN: 1025-01-606-1032
COMMODITY NAME: KIT,ELE TEMPERATURE
Mfr CAGE: 1NUW7
Mfr Part Number: 11582731
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11582731
REVISION: B
DATE: 20-MAR-2024
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE D.1
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
7 73
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0013 THIRD ORDERING YEAR EST 111 EA $ $ ___________________ ______________ __________________
NSN: 1025-01-606-1032
COMMODITY NAME: KIT,ELE TEMPERATURE
Mfr CAGE: 1NUW7
Mfr Part Number: 11582731
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11582731
REVISION: B
DATE: 20-MAR-2024
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE D.1
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
8 73
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0014 FIRST ARTICLE TEST REPORT 1 LO $ _________________________ __________________
SERVICE REQUESTED: FIRST ARTICLE TEST
CLIN CONTRACT TYPE:
Firm Fixed Price
First Article Test (FAT), pursuant to the requirements listed in:
SECTION E:
- E.3, Supplemental Requirements To First Article Approval
(Contractor Testing)
SECTION I:
- FAR 52.209-3, First Article Approval Contractor
Testing.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0240
9 73
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
9000 CONTRACT DATA REQUIREMENTS LIST _______________________________
The Exhibit Line Item Numbers (ELINs) below are associated with specific contract requirements.
Please refer to the citations listed within each ELIN for additional information.
(End of narrative A001)
A001 DATA ITEM NOT PRICED -- DD 250 NOT REQUIRED 1 LO $ ** NSP ** ___________________________________________ __________________
SERVICE REQUESTED: ENGINEERING CHANGE PROPOSAL
Engineering Change Proposal (ECP) for Kit, Ele
Temperature in accordance with:
- Section C.2.: Configuration Management
Documentation; and
- Exhibit A: Contract Data Requirements List - DD
Form 1423, A001.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A002 DATA ITEM NOT PRICED -- DD 250 NOT REQUIRED 1 LO $ ** NSP ** ___________________________________________ __________________
SERVICE REQUESTED: REQUEST FOR VARIANCE
Engineering Change Proposal (ECP) for Kit, Ele
Temperature in accordance with:
- Section C.2.: Configuration Management
Documentation; and
- Exhibit A: Contract Data Requirements List - DD
Form 1423, A002.
(End of narrative B001)
Inspection and Acceptance _________________________
10 73
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A003 DATE ITEM NOT PRICED -- DD 250 NOT REQUIRED 1 LO $ ** NSP ** ___________________________________________ __________________
SERVICE REQUESTED: NOTICE OF REVISION
Engineering Change Proposal (ECP) for Kit, Ele
Temperature in accordance with:
- Section C.2.: Configuration Management
Documentation; and
- Exhibit A: Contract Data Requirements List - DD
Form 1423, A003.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
11 73
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 TECHNICAL DATA PACKAGE INFORMATION
The following "X"d item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ X ] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov ) associated with this solicitation number:
W912CH-25-R-0053
To access the data through SAM:
a. Log on to the SAM web site: https://SAM.gov .
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States
Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).
(2) Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution
Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense
Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and Non-
Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.
C.2 CONFIGURATION MANAGEMENT DOCUMENTATION
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
C.2.1 The Configuration Change Management section of SAE EIA-649-1 (current revision) Configuration Management Requirement for Defense
Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); and the second sentence of paragraph 3.3.1.8.1(1).
C.2.2 Furnished item(s) shall conform to the approved configuration requirements/revision unless an RFV is processed and approved as provided by Paragraph e. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
C.2.3 Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1
(current revision) and should be referred to Section I Clause 52.248-1 VALUE ENGINEERING.
12 73
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.2.4 All ECPs submitted will be deemed routine. The Contractor must include justification for an ECP it considers emergency or urgent in the submittal and include all supporting documentation.
C.2.5 For ECPs, RFVs, and NORs, the Contractor must submit the documentation listed in sub-paragraphs C.2.5.1 through C.2.5.3.
C.2.5.1 for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.
C.2.5.2 for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.
C.2.5.3 for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.
C.2.6 The Governments acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Governments sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
C.2.7 The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO), copy to the Administrative Contracting Officer (ACO).
C.2.8 The submission of an ECP/RFV/NOR does not affect the required delivery date of the contract.
C.3 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN
C.3.1 The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government
OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
C.3.2 The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
C.3.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is
OPSEC Level I.
C.4 OPSEC TRAINING REQUIREMENT
Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https://securityawareness.usalearning.gov/opsec/index.htm . The Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officer's Representative (COR) or Procuring Contracting Officer (PCO) upon request.
C.5 THREAT AWARENESS REPORTING PROGRAM
C.5.1 All contractor employees with security clearances working on any Army contract must receive annual TARP training by a Counter
Intelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat Awareness and
Reporting Program (TARP). The in-person training is the preferred method, and is available by contacting the local CI Office to arrange for the conduct of training.
C.5.2 The Contractor shall contact the CI Office within (30) days of contract award to schedule TARP training. Once training is complete, the Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting
Officer's Representative (COR) or Procuring Contracting Officer (PCO) upon request.
C.5.3 The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session. Upon completion of the TARP training, certification/proof of completion shall be provided as required in paragraph (b).In special circumstances (on deployments or in remote locations) when in-person training is not available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff (DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online TARP training course by utilizing the Army Learning Management
System (ALMS) at: www.lms.army.mil .
C.6 ENGINEERING EXCEPTIONS
There is an engineering exception for the Kit ETWD Tube Temperature Display, NSN: 1025-01-606-1032. Please refer to C.1 Technical Data
Package Information for directions on accessing the TDP/engineering exceptions.
13 73
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE C0001 ***
14 73
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS) _______________________________________________________
(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPECIAL PACKAGING INSTRUCTION NUMBER. 11582731
(a) REVISION A
(b) DATE OF REVISION 2018-12-04
(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: See Section J, Attachment 0001-
Special Packaging Instructions (SPI)
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ ) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging
Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the
"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(c) Marking:
(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
(2) When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html ) for development of the
UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging
Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees
Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating
(treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ).
The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALS
15 73
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organizations compliance program.
(e) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United
Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the
SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
(g) SUPPLEMENTAL INSTRUCTIONS: N/A
*** END OF NARRATIVE D0001 ***
16 73
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.2 REWORK AND REPAIR OF NONCONFORMING MATERIAL
E.2.1 Rework and Repair are defined as follows:
E.2.1.1 Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
E.2.1.2 Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
E.2.2 Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Representative for review and approval prior to implementation. Rework procedures are subject to the Government's disapproval.
E.2.3 Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting
Officer for review and written Government approval prior to implementation.
E.2.4 Whenever the Contractor submits a repair or rework procedure for Government review and approval, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
E.2.5 The Government approved rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
E.3 SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING)
E.3.1 In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
E.3.2 The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
17 73
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.3.3 The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
E.3.3.1 Inspections and tests contained in material specifications provided that the required inspection and tests have been performed within the last year and the results are submitted with the Certificates of Conformance are submitted with the First Article Test
Report.
E.3.3.2 Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
E.3.3.3 Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
E.3.3.4 Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the
First Article Test Report.
E.3.3.5 Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
E.3.4 Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
E.3.5 A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to PCO.
E.3.6 Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the
Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the
Government shall be borne by the Contractor.
*** END OF NARRATIVE E0001 ***
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
18 73
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ISO 9001:2015 (21 Oct 2015) or equivalent
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
19 73
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
F.1 DELIVERY SCHEDULE FOR DELIVER ORDERS (SYSTEMS)
F.1.1 Delivery under this contract must conform to the required schedule specified below, unless no-cost acceleration is acceptable.
F.1.2 DEFINITIONS
F.1.2.1 DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.
F.1.2.2 DELIVERY is defined as follows:
F.1.2.3 DARO (Days After Receipt of Order)
F.1.2.4 FOB Origin- Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(2) by the specified in the individual contract; or
F.1.2.5 FOB Destination- Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract to ensure that the item reaches it destination by the time reflected in the contract.
F.1.3 The Government requires deliveries according to the following schedule on all orders
F.1.3.1 GOVERNMENT REQUIRED DELIVERY SCHEDULE: CLIN 0011
F.1.3.1.1 Start deliveries 210 days after the delivery order date if FAT is Waived; or 480 days with FAT.
F.1.3.2 GOVERNMENT REQUIRED DELIVERY SCHEDULE: CLIN 0012
F.1.3.2.1 Start deliveries 210 days after the delivery order date.
F.1.3.3 GOVERNMENT REQUIRED DELIVERY SCHEDULE: CLIN 0013
F.1.3.3.1 Start deliveries 210 days after the delivery order date.
F.1.3.4 GOVERNMENT REQUIRED DELIVERY SCHEDULE: CLIN 0014
F.1.3.4.1 FAT report is due 240 days after contract award.
F.1.4 Accelerated delivery schedule is acceptable.
F.1.5 If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here.
F.1.5.1 CONTRACTOR PROPOSED ACCELERATED DELIVERY SCHEDULE: CLIN 0011
F.1.5.1.1 If FAT is required, deliveries will start ______ days after the delivery order date; or 240 days less if FAT is Waived.
F.1.5.2 CONTRACTOR PROPOSED ACCELERATED DELIVERY SCHEDULE: CLIN 0012
F.1.5.2.1 If FAT is required, deliveries will start _____days after the delivery order date; or 240 days less if FAT is Waived.
F.1.5.3 CONTRACTOR PROPOSED ACCELERATED DELIVERY SCHEDULE: CLIN 0013
F.1.5.3.1 If FAT is required, deliveries will start ______ days after the delivery order date; or 240 days less if FAT is Waived.
*CLIN 0014: Offerors may not propose an alternative Delivery Schedule for this CLIN.
F.2 LONG TERM CONTRACTS - FOB DESTINATION
For the purpose of offerors compiling FOB Destination offers, the final destination for the supplies will be one or more of the following destinations; in the following estimated percentages, if listed: 100% to Anniston, AL.
20 73
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE F0001 ***
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .