W912CH24R0036-0002.pdf
PDF 28 KB Posted
- Solicitation number
- W912CH-24-R-0036
- Issued by
-
Department of the Army
About this file
This document is an Amendment of Solicitation (Standard Form 30) for Solicitation W912CH-24-R-0036, issued by the Army Contracting Command - Detroit Arsenal. The amendment (Number 0002) adds two Contract Data Requirements List (CDRL) items: CDRL A004 for a Test Procedure and CDRL A005 for a Test/Inspection Report, both related to pretreatments and Chemical Agent Resistant Coatings (CARC) for painted materiel.
The amendment modifies Section E.6, which provides detailed requirements for pretreatments and coatings, including specifications for pre-production testing, production quality control, and reporting. Key requirements include conducting thickness, adhesion, and salt spray performance tests using ISO 17025 accredited laboratories, using production representative parts for testing, and submitting detailed procedures and test reports within specified timeframes after contract award. The coating requirements apply specifically to metallic substrates, with strict guidelines on coating application, material usage, and quality control processes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912CH24R0036-0005.pdf | ||
| W912CH24R0036-0004.pdf | ||
| W912CH24R0036-0003.pdf | ||
| W912CH24R0036-0001 Amendment.pdf | ||
| Contractor Questions W912CH24R0036.xlsx | XLSX spreadsheet | |
| W912CH24R0036.pdf | ||
| First-Article-Waiver-Worksheet.pdf | ||
| AK10866793 REV F.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0002 2025MAY05
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
JUSTINE BROUGHTON
EMAIL: JUSTINE.R.BROUGHTON.CIV@ARMY.MIL
W912CH-24-R-0036
2025APR14
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 8
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: JUSTINE BROUGHTON
Buyer Office Symbol/Telephone Number: CCTA-APS-B/(586)282-7504
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
SOLICITATION: W912CH-24-R-0036
AMENDMENT: 0002
1. The purpose of this amendment is to:
SECTION E:
Change E.6 REQUIREMENTS FOR PRETREATMENTS AND CHEMICAL AGENT RESISTANT COATINGS LOCAL WARREN - PAINTED MATERIEL
SECTION J:
Add CDRL A004 TEST PROCEDURE
Add CDRL A005 TEST/INSPECTION REPORT
2. All other terms and conditions, except for those addressed above, remain unchanged and are in full force and affect.
*** END OF NARRATIVE A0003 ***
2 8
W912CH-24-R-0036
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
E.1 NOTICE REGARDING FIRST ARTICLE TEST SAMPLE
E.1.1 The approved first article items, as described elsewhere in this contract, consist of a quantity of 2 that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of 2 that successfully passes all specified tests, less the destructive tests, if any, shall serve as a manufacturing standard for the remainder of the contract.
E.1.2 A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) an aid in identifying any process changes, or 3) the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
E.1.3 The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
E.2 NOTICE REGARDING FIRST ARTICLE
E.2.1 Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
E.2.2 When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
E.2.3 Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
E.3 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
E.3.1 The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE) r __________________________________________
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.4 TECHNICAL DATA FOR INSPECTION
E.4.1 When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications, and any applicable
Engineering Exceptions associated to the technical data, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.
E.4.2 If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor technical data is available for review to support the Government's inspection requirements.
3 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.5 USE OF MIL-STD 1916
E.5.1 The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of
Product. The Verification Level (VL) shall be IV for major characteristics and II for minor characteristics.
E.5.2 MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
E.6 REQUIREMENTS FOR PRETREATMENTS AND CHEMICAL AGENT RESISTANT COATINGS LOCAL WARREN - PAINTED MATERIEL
E.6.1 Scope
E.6.1.1 This clause applies to contracts requiring Chemical Conversion Coatings and Pretreatments for Metallic Substrates, Chemical
Agent Resistant Coating (CARC), and their related materials. The requirements in this clause clarify and supplement those in the contract, unless nullified elsewhere in the contract or through an approved Request for Deviation.
E.6.1.2 Coating qualification, spot paint repair, and MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base coatings are not within the scope of this clause.
E.6.2 Definitions
E.6.2.1 The contracting agency, appropriate agency, procuring authority, engineering authority, procuring agency, and procuring activity is the PCO or designee.
E.6.2.2 The prime contractor is the company awarded this contract, and the subcontractors comprise all companies involved in providing coated parts to the prime contractor, including companies that apply the coatings.
E.6.2 General Requirements Clarifications
E.6.2.1 The government retains the right for onsite verification of the prime contractors and its subcontractors products, processes, procedures, and test reports.
E.6.2.2 The prime contractor shall be responsible for itself and its subcontractors to produce and maintain detailed process control plans, process control data, pre-production approval testing, ongoing quality control & quality control testing, and test reports. This information shall be available upon government request.
E.6.2.3 The prime contractor shall immediately notify the PCO and the Defense Contract Management Agency (DCMA) of any failure to meet preproduction and production requirements.
E.6.2.4 When a substrate is cleaned using multiple methods, each cleaning method shall be treated as a separate step in the process documentation.
E.6.2.5 The Gage Repeatability and Reproducibility (Gage R&R) error shall be less than 30 percent for all process and product measurement systems.
E.6.2.6 Products with hexavalent chromium and cadmium, including but not limited to certain fastener finishes, shall not be used.
E.6.2.7 CARC primer and CARC topcoat shall not be applied directly to bare metal or plastic, except as provided for in MIL-DTL-53072.
E.6.2.8 If the contract specifies application of CARC materials over a non-CARC coating, then both CARC primer and CARC topcoat are required. The complete coating system shall meet the requirements for CARC defined in MIL-DTL-53072.
E.6.2.9 Neutral salt spray (NSS) testing shall not be used to validate compliance with materiel life cycle requirements; NSS is a production quality test and does not predict field performance.
E.6.3 Pre-Production Approval Clarifications
E.6.3.1 Pre-production testing shall include:
(i) Thickness of each layer of the coating system;
(ii) Coating system adhesion;
(iii) Salt spray performance;
(iv) For phosphate pretreatments, the phosphate coating weight, crystal size and shape, and scanning electron microscope photos of the phosphate coatings at 500x and 1000x magnification.
E.6.3.2 Pre-production test samples shall be from the material used for production parts, pieces cut from production representative
4 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
parts, or production representative parts. Standardized test coupons shall not be used except when the coupons are of the same substrate material as the production parts.
E.6.3.3 Nine samples shall be produced for the required testing and shall include: three cleaned and pretreated test samples, three samples with the complete paint system and three samples with pretreatment plus primer.
E.6.3.4 One or more ISO 17025 laboratories shall conduct pre-production testing on the nine test samples in accordance with (IAW) the applicable test method accreditations. The applicable ISO 17025 test method accreditations include ASTM B117 Salt Spray, GMW 14872
Cyclic Corrosion, ASTM B244 Thickness of Non-Conductive Coatings on Non-Magnetic Metals, ASTM B487 Measurement of Metal and Oxide
Coating Thickness, ASTM B499 Thickness of Non-Conductive Coatings on Magnetic Metals, and ASTM D3359 Measuring Adhesion by Tape Test.
E.6.3.5 Unless required elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel, and aluminum and its alloys, shall meet a minimum of 1000 hours neutral salt spray resistance IAW ASTM B117.
E.6.3.6 Test procedures shall be submitted IAW the Contract Data Requirements List (CDRL) A004 DI-NDTI-80603A documenting Pretreatment and Chemical Agent Resistant Coating procedures when this CDRL is included in the contract.
E.6.3.7 Test reports from the ISO 17025 accredited labs shall be submitted for Pretreatment and Chemical Agent Resistant Coating testing specified in paragraph E.6.3.4 of this clause IAW the Contract Data Requirements List (CDRL) A005 DI-NDTI-80809B when this CDRL is included in the contract.
E.6.4 Production Testing Clarifications
E.6.4.1 At a minimum, ongoing production quality tests shall conducted and recorded daily for coating adhesion and coating thickness, and monthly for salt spray testing. Use of ISO accredited laboratories is optional for these ongoing tests of production parts.
E.6.4.2 Production parts or pieces cut from production parts shall be used for ongoing production quality testing. Standardized test coupons shall not be used.
E.6.4.3 Unless specified elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel, and aluminum and its alloys shall meet a minimum of 1000 hours neutral salt spray resistance IAW ASTM B117.
E.7 ROUTING OF SPECIAL PROCESS APPROVALS
E.7.1 The Technical Data Package for this contract contains one or more of the following specifications:
MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base
TT-C-490 Chemical Conversion Coatings and Pretreatment for Ferrous Surfaces (Base for Organic Coatings)
MIL-W-12332 Welding Resistance, Spot: Weldable Aluminum Alloys
MIL-W-45210 Welding Resistance, Spot: Weldable Aluminum Alloys
* Drawing 12479550 - Ground Combat Vehicle Welding Code - Steel
* MIL-STD-3057 - Ground Combat Vehicle Welding Code - Aluminum
* Drawings will be found in Section J Attachments (if applicable).
E.7.2 The specifications listed in paragraph 1 may require approval from the Government prior to production for one or more special processes involved in producing the item. The following shall apply, unless stated elsewhere in the contract:
E.7.2.1 The contractor shall prepare the written procedures as the specification requires.
E.7.2.2 Procedures requiring Government approval shall be routed to the Administrative Contracting Officer (ACO) for review and approval. If the ACO is unable to perform a review, the ACO shall forward the procedure to the Procuring Contracting Officer (PCO) for assistance in the review and approval process. The correct address for the PCO is on the face page of this contract.
E.7.2.3 Cite (i) the contract number and (ii) the governing specification or standard on all procedures submitted for approval.
E.7.2.4 The DCMA will provide a copy of their approval/rejection notices to the PCO.
E.7.2.5 DCMA is required to qualify the processes of the major coating subcontractors used by the prime contractors.
5 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE E0001 ***
6 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
F.1 LONG TERM CONTRACTS - FOB DESTINATION
For the purpose of offerors compiling FOB Destination offers, the final destination for the supplies will be one or more of the following destinations; in the following estimated percentages, if listed: 100% to Anniston, AL.
*** END OF NARRATIVE F0001 ***
7 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Exhibit A CONTRACT DATA REQUIREMENTS LIST 01-FEB-2001 004 DATA
8 8
PIIN/SIIN
MOD/AMD
ATT/EXH ID
PAGE
Exhibit A
DD FORM 1423, FEB 2001
CONTRACT DATA REQUIREMENT LIST, PREVIOUS EDITION MAY BE USED Form Approval OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.:
B. EXHIBIT:
C. CATEGORY:
TDP _X_ TM ____ OTHER ____
D. SYSTEM/ITEM:
E. CONTRACT/PR NO.:
F. CONTRACTOR:
1. DATA ITEM NO: A001
2. TITLE: ENGINEERING CHANGE PROPOSAL (ECP)
3. SUBTITLE: N/A
4. AUTHORITY: DI-SESS-80639E
5. CONTRACT REFERENCE: SECTION C
6. REQUIRING OFFICE:
7. DD250 REQ: LT
8. APP CODE: N/A
9. DIST. STATEMENT REQ: SEE ITEM 16
10. FREQUENCY: ASREQ
11. AS OF DATE: N/A
12. DATE OF FIRST SUBMISSION: ASREQ
13. DATE OF SUBS. SUBMISSION: ASREQ
14. DISTRIBUTION: SEE ITEM 16
A. ADDRESSEE:
B. COPIES:
DRAFT:
FINAL:
REG REPRO:
15. TOTAL COPIES: SEE ITEM 16
16. REMARKS: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *UNLESS
OTHERWISE SPECIFIED THE DISTRIBUTION STATEMENT ASSIGNED TO THE ECP SHALL BE THE MOST RESTRICTIVE DISTRIBUTION STATEMENT OF THE AFFECTED
ITEMS IDENTIFIED IN THE ECP. **SUBMIT ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT scott.l.follen2.civ@army.miL; COPY FURNISH
TO THE ADMINISTRATIVE CONTRACTING OFFICE AT (ACO TBD) AND ENGINEERING POC AT Tristan.d.sayers@ARMY.MIL. DOCUMENTATION SHALL BE IN
ACCORDANCE WITH PARAGRAPH 3.3.1 OF SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1692 (CURRENT REVISION) LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/ .
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
1. DATA ITEM NO: A002
2. TITLE: REQUEST FOR VARIANCE (RFV)
3. SUBTITLE: N/A
4. AUTHORITY: DI-SESS-80640E
5. CONTRACT REFERENCE: SECTION C
6. REQUIRING OFFICE:
7. DD250 REQ: LT
8. APP CODE: N/A
9. DIST. STATEMENT REQ: SEE ITEM 16
10. FREQUENCY: ASREQ
11. AS OF DATE: N/A
12. DATE OF FIRST SUBMISSION: ASREQ
ATT/EXH ID
PAGE
Exhibit A
13. DATE OF SUBS. SUBMISSION: ASREQ
14. DISTRIBUTION: SEE ITEM 16
A. ADDRESSEE:
B. COPIES:
DRAFT:
FINAL:
REG REPRO:
15. TOTAL COPIES: SEE ITEM 16
16. REMARKS: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *UNLESS
OTHERWISE SPECIFIED THE DISTRIBUTION STATEMENT ASSIGNED TO THE RFV SHALL BE THE MOST RESTRICTIVE DISTRIBUTION STATEMENT OF THE AFFECTED
ITEMS IDENTIFIED IN THE RFV. **SUBMIT ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT scott.l.follen2.civ@army.miL; COPY FURNISH
TO THE ADMINISTRATIVE CONTRACTING OFFICE AT (ACO TBD) AND ENGINEERING POC AT Tristan.d.sayers.civ@ARMY.MIL. DOCUMENTATION SHALL BE IN
ACCORDANCE WITH PARAGRAPH 3.3.2 OF SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1694 (CURRENT REVISION) LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/ .
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
1. DATA ITEM NO: A003
2. TITLE: NOTICE OF REVISION (NOR)
3. SUBTITLE: N/A
4. AUTHORITY: DI-SESS-80642E
5. CONTRACT REFERENCE: SECTION C
6. REQUIRING OFFICE:
7. DD250 REQ: LT
8. APP CODE: N/A
9. DIST. STATEMENT REQ: SEE ITEM 16
10. FREQUENCY: ASREQ
11. AS OF DATE: N/A
12. DATE OF FIRST SUBMISSION: ASREQ
13. DATE OF SUBS. SUBMISSION: ASREQ
14. DISTRIBUTION: SEE ITEM 16
A. ADDRESSEE:
B. COPIES:
DRAFT:
FINAL:
REG REPRO:
15. TOTAL COPIES: SEE ITEM 16
16. REMARKS: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *UNLESS
OTHERWISE SPECIFIED THE DISTRIBUTION STATEMENT ASSIGNED TO THE NOR SHALL BE THE MOST RESTRICTIVE DISTRIBUTION STATEMENT OF THE AFFECTED
ITEMS IDENTIFIED IN THE NOR. **SUBMIT ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT scott.l.follen2.civ@army.miL; COPY FURNISH
TO THE ADMINISTRATIVE CONTRACTING OFFICE AT (ACO TBD) AND ENGINEERING POC AT Tristan.d.sayers.civ@ARMY.MIL. DOCUMENTATION SHALL BE IN
ACCORDANCE WITH PARAGRAPH 3.3.4 OF SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1695 (CURRENT REVISION) LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/ .
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
1. DATA ITEM NO.: A004
2. TITLE: TEST PROCEDURE
3. SUBTITLE: PRE-PRODUCTION PROCEDURE, PRETREATMENTS AND CHEMICAL AGENT RESISTANT COATINGS LOCAL WARREN - PAINTED MATERIEL
4. AUTHORITY: DI-NDTI-80603A
5. CONTRACT REFERENCE: Section E.6
6. REQUIRING OFFICE: GVSC SUS HCS
7. DD250 REQ: NO
8. APP CODE: A
9. DIST. STATEMENT: D
10. FREQUENCY: ONE/R
11. AS OF DATE: Date of Contract award
12. DATE OF FIRST SUB: 30DAC
13. DATE OF SUBS: N/A
14. DISTRIBUTION:
A. ADDRESSEE:
ATT/EXH ID
PAGE
Exhibit A
B. COPIES: 2
DRAFT:
FINAL: 2
15. TOTAL: 2
16. REMARKS:
BLOCK 8 CONT. - PRIOR TO PRODUCTION, APPROVAL THRU THE CONTRACTING OFFICER IS REQUIRED W/IN 30 DAYS AFTER CONTRACT AWARD. CONTRACTING
OFFICER WILL ROUTE INTERNALLY TO THE APPROVING OFFICE (GVSC SUS HCS) CONTRACTING OFFICER SHALL PROVIDE PROCEDURE REVIEW RESPONSE BACK TO
CONTRACTOR.
The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for painted material including application of supplemental finishes shall be described in detail.
17. PRICE GROUP: N/A
18. ESTIMATED TOTAL PRICE: N/A
1. DATA ITEM NO.: A005
2. TITLE: TEST/INSPECTION REPORT
3. SUBTITLE: PRE-PRODUCTION PROCEDURE, TEST REPORT PRETREATMENTS AND CHEMICAL AGENT RESISTANT COATINGS LOCAL WARREN - PAINTED MATERIEL
4. AUTHORITY: DI-NDTI-80809B
5. CONTRACT REFERENCE: Section E.
6. REQUIRING OFFICE: GVSC SUS HCS
7. DD250 REQ: NO
8. APP CODE: A
9. DIST. STATEMENT: D
10. FREQUENCY: ONE/R
11. AS OF DATE: Date of Contract award
12. DATE OF FIRST SUB: 60DAC
13. DATE OF SUBS: N/A
14. DISTRIBUTION:
A. ADDRESSEE:
B. COPIES: 2
DRAFT:
FINAL: 2
15. TOTAL: 2
16. REMARKS:
BLOCK 8 CONT. - PRIOR TO PRODUCTION, APPROVAL THRU THE CONTRACTING OFFICER IS REQUIRED W/IN 60 DAYS AFTER CONTRACT AWARD. CONTRACTING
OFFICER WILL ROUTE INTERNALLY TO THE APPROVING OFFICE (GVSC SUS HCS) CONTRACTING OFFICER SHALL PROVIDE PROCEDURE REVIEW RESPONSE BACK TO
CONTRACTOR.
The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for painted material including application of supplemental finishes shall be described in detail.
17. PRICE GROUP: N/A
18. ESTIMATED TOTAL PRICE: N/A
G. PREPARED BY: gvsc.mbx.sidm
H: DATE: 2024-07-23
I: APPROVED BY: Tristan Sayers
J: DATE: 2024-07-23
| SECTION A |
| SECTION E |
| SECTION F |
| SECTION J |
File details come from the government source that posted it. Updated .