W912CH-25-R-0130.pdf

PDF 264 KB Posted

Attached to
Solicitation for Gunner Shield Kit; NSN: 2510-01-498-4996
Solicitation number
W912CH-25-R-0130
Issued by

About this file

This is a solicitation (Request for Proposal) issued by the U.S. Army Contracting Command - Detroit Arsenal for a Gunner Shield Kit. The contract is a five-year, firm-fixed price, Lowest Price Technically Acceptable (LPTA) procurement for 48-1,200 Gunner Shield Kits per year, with National Stock Number 2510-01-498-4996. The solicitation is a 100% Small Business set-aside under NAICS code 336211 (Motor Vehicle Body Manufacturing), with a total maximum quantity of 1,200 units over the contract period.

Key requirements include ISO 9001:2015 certification, military packaging specifications, and compliance with export control regulations. Potential offerors must have Joint Certification Program (JCP) certification to access the Technical Data Package, which is marked Distribution Statement D. The contract will involve First Article Testing (FAT) unless waived, and requires submission of a detailed Technical Information Questionnaire. Proposals must be electronically submitted via email, with the total evaluated price determining the award to the lowest technically acceptable offeror.

View the file

Other files

File Type Posted
W912CH25R0130-0002.pdf PDF
W912CH-25-R-0130-0001.pdf PDF
Price Evaluation Spreadsheet.xlsx XLSX spreadsheet
CDRL - OPSEC Training _Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W912CH-25-R-0130

X

DOA4

SEE SCHEDULE

W912CH

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

NIKHIL PATEL

(520)692-8457

CCTA-ABC-D

NIKHIL.A.PATEL2.CIV@ARMY.MIL

1 90

X 1

X 4 X 11

X 16 X 19 X 27

X 35

X 37

X 39

X 61

X 62

X 75

X 86

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: NIKHIL PATEL

Buyer Office Symbol/Telephone Number: CCTA-ABC-D/(520)692-8457

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

1. This solicitation, W912CH-25-R-0130, will result in a five-year LTC Lowest Price Technically Acceptable contract (LPTA) for the following requirement:

NSN: 2510-01-498-4996

Original Part Number: 57K4470

Noun: Gunner Shield Kit

Quantity: 48 (minimum) to 1200 (maximum) per annum

2. Interested offerors shall submit a proposal that meets the required specifications listed in this solicitation to the Contract

Specialist (nikhil.a.patel2.civ@army.mil), the secondary Contract Specialist (robin.a.walker6.civ@army.mil), and cc the Contracting

Officer (katherine.e.macfarland.civ@army.mil) with the subject header: Proposal Submission W912CH-25-R-0130 (Company Name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply to the respective offeror stating receipt of proposal submission.

3. The contractor is authorized to ship early at no cost to the government to the following address:

SR W0MC ARMY GENERAL SUPPLY

DLA DISTRIBUTION RED RIVER

HIGHWAY 82 WEST

TEXARKANA, TX, 75507-5000

*** END OF NARRATIVE A0001 ***

A.001 ACKNOWLEDGEMENT OF AMENDMENTS

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date:

2 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A.002 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON

Information regarding the Ombudsperson for this contract is located at the following website: https://tacom.army.mil/ombudsperson. (Best viewed using Google Chrome or Microsoft Edge)

A.003 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section

2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States

Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD

Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, "Militarily

Critical Technical Data Agreement" certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's

Section C "Technical Data Package" instructions.

(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

A.004 ALL OR NONE

Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.

*** END OF NARRATIVE A0002 ***

3 90

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 FIRST ARTICLE TEST REPORT 1 EA $ $ _________________________ ______________ __________________

NSN: 2510-01-498-4996

COMMODITY NAME: FIRST ARTICLE TEST

Mfr CAGE: 19207

Mfr Part Number: 57K4470

First Article Test (FAT), pursuant to the requirements listed in:

SECTION E:

- E.001 Notice Regarding First Article Test Sample

- E.006 Notice Regarding First Article

SECTION I:

FAR 52.209-3, First Article Approval - Contractor

Testing.

(End of narrative C001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Government Approval/Disapproval Days: 60

Deliveries or Performance _________________________

FOB POINT: Destination

SUPPLIES OR SERVICES AND PRICES/COSTS:

IN THE FOUR DIGIT ITEM NUMBERS (CLINS) THAT FOLLOW,

THE NUMBERING SYSTEM THAT IS USED IS AS FOLLOWS:

THE FIRST THREE DIGITS SIGNIFY ITEM AND

THE FOURTH (LAST) DIGIT SIGNIFIES THE APPLICABLE

CONTRACT YEAR, i.e., CLIN 0011

IS FOR THE FIRST ITEM - FIRST ORDERING

YEAR, CLIN 0012 IS FOR THE FIRST ITEM -

SECOND ORDERING YEAR, CLIN 0013 IS FOR THE

FIRST ITEM - THIRD ORDERING YEAR, ETC.

THE FINAL LINE ITEM(S) ASSOCIATED WITH EACH

PART, SUCH AS FAT, TECHNICAL MANUALS, SERVICES, OR

TRAINING, WILL BECOME THE LAST ITEM NUMBER IN

4 90

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

NUMERICAL SEQUENCE FOR EACH ITEM, e.g. 0016 (5 YEAR

LONG TERM CONTRACT) OR 0014

(3 YEAR LONG TERM CONTRACT). IF MORE THAN

ONE ITEM IS BEING PROCURED, THE NUMBERS WILL BE 0026

OR 0024 DEPENDING ON THE LENGTH OF THE LONG TERM

CONTRACT.

THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE

SOLICITATION AND RESULTING CONTRACT:

FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE

OF AWARD PLUS 364 DAYS.

SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS

THROUGH 729 DAYS AFTER CONTRACT AWARD.

THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS

THROUGH 1,094 DAYS AFTER CONTRACT AWARD.

FOURTH ORDERING YEAR OF THE CONTRACT IS 1,095

DAYS THROUGH 1,459 DAYS AFTER CONTRACT AWARD.

FIFTH ORDERING YEAR OF THE CONTRACT IS 1,460

DAYS THROUGH 1,824 DAYS AFTER CONTRACT AWARD.

NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL

ORDER IS THE PRICE FOR THE ORDERING YEAR IN

WHICH THE ORDER IS ISSUED. THE DELIVERY DATE DOES NOT

DETERMINE THE ORDERING YEAR.

The information presented below applies to Item No.

0011 Through 0015:

Minimum 5-Year Quantity: 48 EACH

Maximum 5 Year Quantity: 1200 EACH

ONLY THE MINIMUM 5 YEAR QUANTITY IS GUARANTEED.

(End of narrative A001)

0011 FIRST ORDERING YEAR EST. 240 EA $ $ ___________________ ______________ __________________

NSN: 2510-01-498-4996

COMMODITY NAME: GUNNER SHIELD KIT

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 19207

Mfr Part Number: 57K4470

Packaging and Marking _____________________

See Packaging Requirements clause and Special

Packaging Instructions document

5 90

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W562RM) SR W0MC ARMY GENERAL SUPPLY

CENTRAL RECIEVING

10TH STREET AND K AVENUE

TEXARKANA,TX,75507-5000

0012 SECOND ORDERING YEAR EST. 240 EA $ $ ____________________ ______________ __________________

NSN: 2510-01-498-4996

COMMODITY NAME: GUNNER SHIELD KIT

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 19207

Mfr Part Number: 57K4470

Packaging and Marking _____________________

See Packaging Requirements clause and Special

Packaging Instructions document

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W562RM) SR W0MC ARMY GENERAL SUPPLY

CENTRAL RECIEVING

10TH STREET AND K AVENUE

TEXARKANA,TX,75507-5000

6 90

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0013 THIRD ORDERING YEAR EST. 240 EA $ $ ___________________ ______________ __________________

NSN: 2510-01-498-4996

COMMODITY NAME: GUNNER SHIELD KIT

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 19207

Mfr Part Number: 57K4470

Packaging and Marking _____________________

See Packaging Requirements clause and Special

Packaging Instructions document

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W562RM) SR W0MC ARMY GENERAL SUPPLY

CENTRAL RECIEVING

10TH STREET AND K AVENUE

TEXARKANA,TX,75507-5000

0014 FOURTH ORDERING YEAR EST. 240 EA $ $ ____________________ ______________ __________________

NSN: 2510-01-498-4996

COMMODITY NAME: GUNNER SHIELD KIT

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 19207

Mfr Part Number: 57K4470

Packaging and Marking _____________________

See Packaging Requirements clause and Special

Packaging Instructions document

(End of narrative D001)

7 90

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W562RM) SR W0MC ARMY GENERAL SUPPLY

CENTRAL RECIEVING

10TH STREET AND K AVENUE

TEXARKANA,TX,75507-5000

0015 FIFTH ORDERING YEAR EST. 240 EA $ $ ___________________ ______________ __________________

NSN: 2510-01-498-4996

COMMODITY NAME: GUNNER SHIELD KIT

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 19207

Mfr Part Number: 57K4470

Packaging and Marking _____________________

See Packaging Requirements clause and Special

Packaging Instructions document

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W562RM) SR W0MC ARMY GENERAL SUPPLY

CENTRAL RECIEVING

10TH STREET AND K AVENUE

TEXARKANA,TX,75507-5000

9000 BASIC CLIN FOR ELIN ___________________

8 90

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

A001 SERVICE DATA ITEM - NOT PRICED $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: ENGINEERING CHANGE PROPOSAL

SERVICE REQUESTED: ENGINEERING CHANGE PROPOSAL

Engineering Change Proposal (ECP) for Gunner Shield

Kit in accordance with:

- Section C.004: Configuration Management

Documentation

(End of narrative B001)

Deliveries or Performance _________________________

A002 DATA ITEM NOT PRICED-- DD 250 NOT REQUIRED $ ** NSP ** __________________________________________ __________________

SERVICE REQUESTED: REQUEST FOR VARIANCE

SERVICE REQUESTED: REQUEST FOR VARIANCE

Request For Variance (RFV)for Gunner Shield Kit in accordance with:

- Section C.004: Configuration Management

Documentation

(End of narrative B001)

Deliveries or Performance _________________________

A003 SERVICE DATA ITEM - NOT PRICED $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: NOTICE OF REVISION

SERVICE REQUESTED: NOTICE OF REVISION

Notice Of Revision (NOR) for Gunner Shield Kit in accordance with:

- Section C.004:

9 90

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Configuration Management

Documentation

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

10 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.001 TECHNICAL DATA PACKAGE INFORMATION

The following "X"d item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[X] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:

W912CH-25-R-0130

Top Drawing Number: 12012065

Version: A

Version Date: 05 March 2003

Distribution Level: D

To access the data through SAM:

a. Log on to the SAM web site: https://SAM.gov.

b. Search for the solicitation number.

c. Click on the attachment you would like to view.

d. If the attachment is restricted, request access to the document.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States

Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).

(2) Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution

Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense

Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

e. If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.

11 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

f. If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.

Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.

g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and Non-

Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.

***ar

C.002 DRAWING LIMITATIONS

(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:

(1) depict the completed (item(s), and

(2) serve as the basis for inspection of the completed item(s).

(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.

(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.

(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.

(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the

Government and no delivery schedule extension.

C.003 USE OF CLASS I and CLASS II OZONE DEPLETING SUBSTANCES

(a) Definitions.

(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean

Air Act, (42 U.S.C. 7671a(a)), complete list provided at: https://www.govinfo.gov/content/pkg/USCODE-2013-title42/html/USCODE-2013-title42-chap85-subchapVI-sec7671a.htm

(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.

12 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that the contractor can meet or produce only by the use of CIODS.

(b) Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of CIODS without the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition

Executive. Thus, no CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

C.004 CONFIGURATION MANAGEMENT DOCUMENTATION

The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).

a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense

Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.

d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.

(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.

(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.

f. The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.

g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the

Administrative Contracting Officer (ACO).

h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.

C.005 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN

13 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(a) The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government

OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

(b) The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.

(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is

OPSEC Level I.

C.006 OPSEC TRAINING REQUIREMENT

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:

https://securityawareness.usalearning.gov/opsec/index.htm. The Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officer's Representative (COR) or Procuring Contracting Officer (PCO) upon request.

C.007 THREAT AWARENESS REPORTING PROGRAM

(a) All contractor employees with security clearances working on any Army contract must receive annual TARP training by a Counter

Intelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat Awareness and

Reporting Program (TARP). The in-person training is the preferred method and is available by contacting the local CI Office to arrange for the conduct of training.

(b) The Contractor shall contact the CI Office within (30) days of contract award to schedule TARP training. Once training is complete, the Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officer's

Representative (COR) or Procuring Contracting Officer (PCO) upon request.

(c) The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session. Upon completion of the TARP training, certification/proof of completion shall be provided as required in paragraph (b).In special circumstances (on deployments or in remote locations) when in-person training is not available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff (DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online TARP training course by utilizing the Army Learning Management

System (ALMS) at: www.lms.army.mil.

C.008 ACQUISITION OF SOURCE-CONTROLLED PART NUMBER

Acquisition under this contract is restricted to:

(1) The manufacturer's part number or numbers set forth in the Schedule or the Technical Data Package; and

(2) Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the Technical Data Package; provided the nonlisted part numbers have been furnished to one of the approved manufacturers listed in the Technical Data Package and that manufacturer has substituted the nonlisted part with one of the approved part numbers, without making any changes in the characteristics or properties of the part.

14 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.009 START OF WORK MEETING

a. The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within

30 days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort. The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.

b. The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel may be invited to the meeting: Contracting Officer's Representative (COR) identified in Section G or in an appointment letter; Quality Assurance personnel; DCMA; etc. All Government invitees shall be given at least 14 days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor shall provide the Government with minutes of the Start of Work Meeting within 7 days after the meeting is held.

*** END OF NARRATIVE C0001 ***

15 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D.001 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)

(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 1

(4) SPECIAL PACKAGING INSTRUCTION NUMBER. AK14984996

(a) REVISION C

(b) DATE OF REVISION 04/23/2020

(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: N/A

(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobe's website (http://get.adobe.com/reader/) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging

Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the

"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")

(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(c) Marking:

(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the

UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), 16 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

"Regulation of Wood Packaging Material in International Trade," current edition, (hereinafter "ISPM 15"), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization's compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees

Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating

(treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org).

The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organization's compliance program.

(e) Hazardous Materials (As applicable):

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United

Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the

SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

17 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(g) SUPPLEMENTAL INSTRUCTIONS: See attached SPI for Packaging Requirements

*** END OF NARRATIVE D0001 ***

18 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2015

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E.001 NOTICE REGARDING FIRST ARTICLE TEST SAMPLE

(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of (zero) that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of (12) that successfully passes all specified tests, less the destructive tests, if any, (12) serve as a manufacturing standard for the remainder of the contract.

(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) an aid in identifying any process changes, or 3) the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.

(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.

E.002 USE OF MIL-STD 1916

(a) The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The

Verification Level (VL) shall be VL (determined based on the standard with contractor input) for major and minor characteristics.

(b) MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.

19 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

E.003 BALLISTIC TESTING

(a) In addition to inspection requirements set forth in applicable drawings and/or specifications, the specification(s) indicated below shall apply to this contract:

(reference QSD attachment that provides all applicable specifications related to the quality requirements based on the TDP)

(b) The above specifications require Ballistic Testing unless specifically waived by drawing or other contractual document. Prior to production and during production, if required by specification, the quantity of test samples required by any of the above specifications shall be accompanied by test data required by individual specification. The test data shall include:

(1) Declared chemical analysis and chemical analysis results representing material for test (if required by specification).

(2) Mechanical Properties Test Results (if required by specification).

(3) Charpy Impact Test results representing material for test (if required by specification).

(4) Brinnel or Rockwell hardness test results representing material for test (if hardness values are required by specification).

(5) Radiographic Inspection Record to include data required by ASTM E1742 including marking and acceptance requirement. (If Radiographic

Inspection is required by the specification.)

(6) Stress Corrosion Resistance Test results required by paragraph 3.4 of MIL-DTL-46063 and paragraph 3.5 of MIL-DTL-46027 (if required by the contract or specification).

(c) In addition to the requirements of paragraph (b), test plates related to qualification of weld procedure or weld repair procedure shall be accompanied by data to include information required by format of specification and shall also identify position of welding. (If

Ballistic Qualification of Weld Procedure is required by specification). Unless otherwise specified by the applicable drawing/specification, or contractual clause, a minimum of one ballistic test specimen shall be prepared for each material thickness, joint design, configuration and weld procedure.

(d) Items to be tested shall be marked to include all marking requirements of the individual specification. Further, Identify P/N(s) which the test item represents.

(e) The Contractor may use its own form to supply required data specified in paragraphs (b) and (c) above. The data shall accompany test samples and shall be forwarded to:

Commander USA ATC

Bldg. 358 (ext 3-4938)

ATTN: CSTE-DTC-AT-SL-V

(D. Gessleman)

400 Colleran Rd.

APG, MD 21005-5059

IMPORTANT: Contractor must obtain approval from PCO prior to shipping test samples to APG. Also, the contractor shall clearly mark the

Developmental Test Command Project Number on the outside of the shipping container.*

20 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*The Developmental Test Command Project Number will be provided by the PCO after the supplier notifies the PCO of the approximate shipping date of the ballistic test samples.

(f) One copy of the required data, (see paragraph (e)), not to include test samples, shall be forwarded to U.S. Army Tank automotive and

Armaments Command, ATTN: AMSRD-TAR-E, Warren, MI 48397-5000. Data shall be verified for accuracy by Government Representatives (QAR) at the Contractor's facility.

(g) In order for the Procuring Activity to obtain ballistic test funds in a timely manner, the contractor shall adhere to the following:

At least 60 days prior to shipment of ballistic test samples, the Contractor shall furnish written notification to the U.S. Army Tank-

Automotive and Armaments Command, ATTN: AMSRD-TAR-E/ -3-, Warren, Michigan 48397-5000, with a copy furnished to the Administrative

Contracting Officer advising of the approximate shipment date. This information shall include:

(1) Prime Contractor:

(2) Prime Contract Number:

(3) Material Specification:

(4) Number of Test Samples:

(5) Heat Numbers:

(6) Sample Weight:

(7) Sample Dimensions:

(8) Steel/Aluminum/Composite Manufacturer

(9) Part Number

(h) Ballistic testing shall be scheduled not later than 10 days after receipt of the contractor test item(s). Testing and the preparation of summary report and findings for the contracting officer shall require an additional 20 days. The contractor shall, at its request, be entitled to a day-for-day extension in the delivery schedule if the Government does not conduct and approve or disapprove the ballistic testing pursuant to the timeframes identified in paragraphs (i) herein.

(i) Within 30 calendar days after receipt by the contracting officer of a report of test results from the test activity, the contracting officer shall provide the contractor with written notice of approval or disapproval of the ballistic test.

(1) Test Approval shall constitute authorization for the contractor to begin full-rate production of items conforming to the approved test sample(s).

(2) Notice of test disapproval shall be accompanied by identification of the special nature of the item failure(s). A failure to pass ballistic testing shall be deemed a failure of the contractor to make delivery within the meaning of the DEFAULT clause in section I of this contract. At its option, the Government many order the contractor to provide one or more additional sample items, with previous deficiencies corrected, for a follow-on ballistic test. All costs for such additional test items, to include costs of transportation to the test site, and all costs of retesting, shall be borne by the contractor, who shall not be entitled to any equitable adjustment on account of such costs. The contractor shall provide the quantity of additional sample items within the time period directed by the

Government, and shall not be entitled to an equitable adjustment in price, or to an extension in delivery schedule, on account of any retesting occasioned by a failure to pass ballistic testing.

(3) Prior to Government approval of ballistic testing, the contractor many not acquire material or components for, or begin production of, the balance of the contractual quantity except at the contractor's sole risk. Such costs, if incurred prior to Government approval of the ballistic test, shall not be allocable to this contract for progress-payment purposes or for termination settlements.

21 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(j) This contract contains FAR 52.209-3 (First Article Approval/Contractor Testing) the approval of ballistic testing is required in addition to the First Article Approval Test Report required by FAR 52.209-3. The ballistic testing approval shall apply for the balance of the contractual quantity, unless the specification requires periodic ballistic testing after the initial production sample. Approval of each successive ballistic test shall be deemed to cover all subsequent production items up to, but not including, the next required ballistic-test item.

E.004 INSPECTION AND ACCEPTANCE POINTS: ORIGIN

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

E.005 ALTERNATIVES TO LOT ACCEPTANCE SAMPLING (INCLUDING STATISTICAL PROCESS CONTROL (SPC))

(a) Offerors are encouraged to propose a defect prevention strategy in lieu of lot acceptance inspection and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .