W912CF09B0001-0003 Paving FtMonmouth.doc This is a clarification of amendment 0002. One Total price for the Base and both option years shall be considered as your bid. Write this in CLIN 0001 of the solicitation. The spreasheet shall include prices for the Base Year and percent differences for the Option Years.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
BIDDING INSTRUCTIONS REV 3
Amendment 0003
Bidding Instructions rev 3
Subject: Bidding schedule and Bid Bond, Performance Bonds
Bidding schedule “C PAV 2008 CONTRACT WITH THREE OPTION YEAR.xls” has been replaced with “C_PAV_2008_CONTRACT_WITH_TWO_OPTION_YEAR.xls”
(24 Feb 09 uploaded to FBO).
Instructions
1. Fill in price for each item in the Base Year on the spreadsheet (C_PAV_2008_CONTRACT_WITH_TWO_OPTION_YEAR.xls)
2. Total the Base Year column
3. Fill in the percentages for Option year One (0002) and Two(0003) (TOTAL EVALUATED BID PRICE).
4. Compute Both Option Years by multiplying Base Year Total by percentage increase.
5. Total the Base Year, Option Year One and Option Year Two.
6. Write this combined total on CLIN 0001 of the solicitation.
7. Leave CLINs 0002 and 0003 BLANK.
Bid Bond
The Bid Bond only needs to cover the minimum for the Base Year.
The Base year minimum is $10,000. (see solicitation, page 60)
Performance Bond
Performance Bonds will be posted for each individual Delivery Order.
Each Delivery Order is a separate award.
(End of Summary of Changes)