SECTION 02975
SEALING OF CRACKS IN BITUMINOUS PAVEMENTS
1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in this text by the basic designation only.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM C 509
Elastomeric Cellular Preformed Gasket and Sealing Material
ASTM D 789
Determination of Relative Viscosity, Melting Point, and Moisture Content of Polyamide (PA)
ASTM D 1190
Concrete Joint Sealer, Hot-Poured Elastic Type
ASTM D 3405
Joint Sealants, Hot-Applied, for Concrete and Asphalt Pavements
1.2 UNIT PRICES
1.2.1 Measurement
The quantity of each sealing item to be paid for shall be determined by actual measurement of the number of linear feet of in-place material that has been approved.
1.2.2 Payment
Payment shall be made at the contract unit bid prices per linear foot for the sealing items scheduled. The unit bid prices shall include the cost of all labor, materials, and the use of all equipment and tools required to complete the work.
1.3 SYSTEM DESCRIPTION
Machines, tools, and equipment used in the performance of the work required by this section shall be approved before the work is started and shall be maintained in satisfactory condition at all times.
1.4 SUBMITTALS
Government approval is required for submittals with a "GA" designation; submittals having an "FIO" designation are for information only. The following shall be submitted in accordance with Section 01330 SUBMITTAL PROCEDURES:
SD-06 Instructions Installation of Sealant; GA.
Manufacturer's instructions 30 days prior to the use of the material on the project. Installation of the material will not be allowed until the instructions are received.
SD-09 Reports Test Requirements; GA.
Reports of all tests. Testing of the materials shall be performed in an approval independent laboratory and certified copies of the test reports shall be submitted and approved 30 days prior to the use of the materials at the job site. Samples will be retained by the Government for possible future testing should the materials appear defective during or after application.
SD-14 Samples Materials; GA.
Samples of the materials 60 days prior to their use on the project. No material will be allowed to be used until it has been approved.
1.5 TEST REQUIREMENTS
The crack sealant and backup material, when required, shall be tested for conformance with the referenced applicable material specification. The materials will be tested by the Government. The cost of the first test of samples will be borne by the Government. If the samples fail to meet specification requirements, the Contractor shall replace the materials represented by the sample and the new materials shall be tested at the Contractor's expense. Samples of materials shall be furnished, in sufficient quantity to be tested, upon request. Conformance with the requirements of the laboratory tests specified will not constitute final acceptance of the materials. Final acceptance will be based on the performance of the in-place materials.
1.6 EQUIPMENT
Machines, tools, and equipment used in the performance of the work required by this section shall be approved before the work is started and shall be maintained in satisfactory condition at all times.
1.6.1 Crack Cleaning Equipment
1.6.1.1 Routing Equipment
The routing equipment shall be a self-powered machine operating a power driven tool or bit specifically designed for routing bituminous pavements. The bit shall rotate about a vertical axis at sufficient speed to cut a smooth vertical-walled reservoir in the pavement surface and shall maintain accurate cutting without damaging the sides or top edges of the reservoir. The router shall be capable of following the trace of the crack without deviation. [The use of rotary impact routing devices will not be permitted for cleaning cracks.] [The use of rotary impact routing devices may be permitted if vertical-sided carbide tipped bits are used.]
1.6.1.2 Concrete Saw
A self-propelled power saw with small diameter (6 inches or less) water-cooled diamond or abrasive saw blades shall be provided for cutting cracks to the depths and widths specified and for removing filler that is embedded in the cracks or adhered to the crack faces. The diameter of the saw blade shall be small enough to allow the saw to closely follow the trace of the crack.
1.6.1.3 Sandblasting Equipment
Sandblasting equipment shall include an air compressor, hose, and long-wearing venturi-type nozzle of proper size, shape and opening. The maximum nozzle opening shall not exceed 1/4 inch. The air compressor shall be portable; and shall be capable of furnishing not less than 150 cfm and maintaining a line pressure of not less than 90 psi at the nozzle while in use. Compressor capability under job conditions shall be demonstrated before approval. The compressor shall be equipped with traps that will maintain the compressed air free of oil and water. The nozzle shall have an adjustable guide that will hold the nozzle aligned with the crack about 1 inch above the pavement surface. The height, angle of inclination and the size of the nozzle shall be adjusted as necessary to secure satisfactory results.
1.6.1.4 Water-blasting Equipment
Water-blasting equipment shall include a trailer-mounted water tank, pumps, high-pressure hose, wand with safety release cutoff control, nozzle, and auxiliary water re-supply equipment. The water tank and auxiliary re-supply equipment shall be of sufficient capacity to permit continuous operations. The hose, wand, and nozzle shall be capable of cleaning the crack faces and the pavement surface on both sides of the crack for a width of at least 1/2 inch. A pressure gauge mounted at the pump shall show at all times the pressure in pounds per square inch at which the equipment is operating.
1.6.1.5 Hand Tools
Hand tools may be used, when approved, for removing defective sealant from cracks and repairing or cleaning the crack faces.
1.6.2 Crack Sealing Equipment
The unit applicators used for heating and installing the hot-poured crack sealant materials shall be mobile and shall be equipped with a double-boiler, agitator-type kettle with an oil medium in the outer space for heat transfer; a direct-connected pressure-type extruding device with a nozzle shaped for inserting in the crack to be filled; positive temperature devices for controlling the temperature of the transfer oil and sealant; and a recording type thermometer for indicating the temperature of the sealant. The applicator unit design shall allow the sealant to circulate through the delivery hose and return to the inner kettle when not in use.
1.7 DELIVERY AND STORAGE
Materials delivered to the job site shall be inspected for defects, unloaded, and stored with a minimum of handling to avoid damage. Storage facilities shall be provided at the job site to protect materials from weather and to maintain them at the temperatures recommended by the manufacturer.
1.8 ENVIRONMENTAL CONDITIONS
The ambient air temperature and the pavement temperature within the joint wall shall be a minimum of 50 degrees F and rising at the time of application of the materials. Sealant shall not be applied if moisture is observed in the crack.
2 PRODUCTS
2.1 SEALANTS
Sealants shall conform to ASTM D 3405 or ASTM D 1190. Usage of sealing materials for sealing cracks in the various paved areas indicated on the drawings shall be as follows:
Area Sealing Material
ALL ASTM D 3405
2.2 BACKUP MATERIALS
Backup material shall be a compressible, non-shrinking, non-staining, non-absorptive material and shall be non-reactive with the crack sealant. The melting point of the backing material shall be at least 5 degrees F greater than the maximum pouring temperature of the sealant being used, when tested in accordance with ASTM D 789. The material shall have a water absorption of not more than 5 percent by weight when tested in accordance with ASTM C 509. The backup material shall be 25 percent (plus or minus 5 percent) larger in diameter than the nominal width of the crack.
3 EXECUTION
3.1 PREPARATION OF CRACKS
Immediately before the installation of the crack sealant, the cracks shall be thoroughly cleaned to remove oxidized pavement, loose aggregate and foreign debris. The preparation shall be as follows:
3.1.1 Cracks
3.1.1.1 Hairline Cracks
Cracks that are less than 1/4 inch wide do not need to be sealed.
3.1.1.2 Small Cracks
Cracks that are 1/4 to 3/4 inch wide shall be routed to a nominal width 1/8 inch greater than the existing nominal width and to a depth not less than 3/4 inch, sandblasted, water-blasted or wire brushed and cleaned using compressed air.
3.1.1.3 Medium Cracks
Cracks that are 3/4 to 2 inches wide shall be sandblasted, water-blasted or wire brushed and cleaned using compressed air.
3.1.1.4 Large Cracks
Cracks that are greater than 2 inches wide shall be repaired using pothole repair techniques instead of sealing.
3.1.2 Existing Sealant Removal
The in-place sealant shall be cut loose from both crack faces and to a depth shown on the drawings, using a concrete saw or hand tools as specified in paragraph EQUIPMENT. Depth shall be sufficient to accommodate any backup material that is required to maintain the depth of new sealant to be installed. Prior to further cleaning operations, all old loose sealant remaining in the crack opening shall be removed by blowing with compressed air.
3.1.3 Routing
Routing of the cracks shall be accomplished using a rotary router with a bit that is at least 1/8 inch wider than the nominal width of the crack to remove all residual old sealant (resealing), oxidized pavement and any loose aggregate in the crack wall.
3.1.4 Sawing
Sawing of the cracks shall be accomplished using a power-driving concrete saw as specified in paragraph EQUIPMENT. The blade shall be stiffened as necessary with suitable dummy (or used) blades or washers. Immediately following the sawing operation, the crack opening shall be cleaned using a water jet to remove all saw cuttings and debris.
3.1.5 Sandblasting
The crack faces and the pavement surfaces extending a minimum of 1/2 inch from the crack edges shall be sandblasted clean. A multiple-pass technique shall be used until the surfaces are free of dust, dirt, old sealant residue, or foreign debris that might prevent the sealant material from bonding to the asphalt pavement. After final cleaning and immediately prior to sealing, the cracks shall be blown out with compressed air and left completely free of debris and water. The Contractor shall ensure that sandblasting does not damage the pavement.
3.1.6 Backup Material
Backup material shall be used on all cracks that have a depth greater than 3/4 inch. The backup material shall be inserted into the lower portion of the crack as shown on the drawings. The Contractor shall ensure that the backup material is placed at the specified depth and is not stretched or twisted during installation.
3.1.7 Rate of Progress of Crack Preparation
The stages of crack preparation which include routing, sandblasting of the crack faces, air pressure cleaning and placing of the backup material shall be limited to only that linear footage that can be sealed during the same day.
3.2 PREPARATION OF SEALANT
Hot-poured sealants shall not be heated in excess of the safe heating temperature recommended by the manufacturer as shown on the sealant containers. Sealant that has been overheated or subjected to application temperatures for over 4 hours or that has remained in the applicator at the end of the day's operation shall be withdrawn and wasted.
3.3 INSTALLATION OF SEALANT
3.3.1 Time of Application
Cracks shall be sealed immediately following final cleaning of the crack walls and following the placement of the backup material (when required). Cracks that cannot be sealed under the conditions specified, or when rain interrupts sealing operations, shall be re-cleaned and allowed to dry prior to installing the sealant.
3.3.2 Sealing the Crack
Immediately preceding, but not more than 50 feet ahead of the crack sealing operations, a final cleaning with compressed air shall be performed. The cracks shall be filled from the bottom up to 1/8 inch below the pavement surface. Excess or spilled sealant shall be removed from the pavement by approved methods and shall be discarded. The sealant shall be installed in a manner which prevents the formation of voids and entrapped air. Several passes with the applicator wand may be necessary to obtain the specified sealant depth from the pavement surface. Gravity methods or pouring pots shall not be used to install the sealant material. Traffic shall not be permitted over newly sealed pavement until authorized by the Contracting Officer. Cracks shall be checked frequently to ensure that the newly installed sealant is cured to a tack-free condition within 3 hours.
3.4 CRACK SEALANT INSTALLATION TEST SECTION
Prior to the cleaning and sealing of the cracks for the entire project, a test section at least 200 feet long shall be prepared using the specified materials and approved equipment, to demonstrate the proposed sealing of all cracks of the project. Following the completion of the test section and before any other crack is sealed, the test section will be inspected to determine that the materials and installation meet the requirements specified. If materials or installation do not meet requirements, the materials shall be removed and the cracks re-cleaned and resealed at no cost to the Government. When the test section meets the requirements, it may be incorporated into the permanent work and paid for at the contract unit price per linear foot for sealing items scheduled. All other cracks shall be sealed in the manner approved for sealing the test section.
3.5 CLEANUP
Upon completion of the project, unused materials shall be removed from the site and the pavement shall be left in a clean condition.
3.6 QUALITY CONTROL PROVISIONS
3.6.1 Crack Cleaning
Quality control provisions shall be provided during the crack cleaning process to correct improper equipment and cleaning techniques that damage the bituminous pavement in any manner. Cleaned cracks shall be approved prior to installation of the crack sealant.
3.6.2 Crack Seal Application Equipment
The application equipment shall be inspected to ensure conformance to temperature requirements and proper installation. Evidences of bubbling, improper installing, and failing to cure or set shall be cause to suspend operations until causes of the deficiencies are determined and corrected.
3.6.3 Crack Sealant
The crack sealant shall be inspected for proper cure and set rating, bonding to the bituminous pavement, cohesive separation within the sealant, reversion to liquid, and entrapped air and voids. Sealants exhibiting any of these deficiencies at any time prior to the final acceptance of the project shall be removed from the crack, wasted, and replaced as specified herein at no additional cost to the Government.
3.7 METHOD OF MEASUREMENT AND PAYMENT: All measurements shall be units as identified in the appropriate SLINS in the Unit Price Schedule. Measurements for preparing payments shall be taken jointly with the Government Representative. Payment for these items shall constitute full compensation for completed work including all labor and incidentals necessary to accomplish the work required by this section of the specifications.
END OF SECTION