SECTION 02721
SUBBASE COURSES
1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)
AASHTO T 180
Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and an 457-mm (18-in) Drop
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM C 29
Unit Weight and Voids in Aggregate
ASTM C 117
Materials Finer Than 75 micrometer (No. 200) Sieve in Mineral Aggregates by Washing
ASTM C 131
Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine
ASTM C 136
Sieve Analysis of Fine and Coarse Aggregates
ASTM D 75
Sampling Aggregates
ASTM D 422
Particle-Size Analysis of Soils
ASTM D 1556
Density and Unit Weight of Soil in Place by the Sand-Cone Method
ASTM D 1557
Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/cu. ft. (2,700 kN-m/cu.m.))
ASTM D 2167
Density and Unit Weight of Soil in Place by the Rubber Balloon Method
ASTM D 2487
Classification of Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D 2922
Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth)
ASTM D 3017
Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth)
ASTM D 4318
Liquid Limit, Plastic Limit, and Plasticity Index of Soils
ASTM E 11
Wire-Cloth Sieves for Testing Purposes
1.2 UNIT PRICES
1.2.1 Measurement
1.2.1.1 Area
The quantity of sub-base and select-material sub-base course completed and accepted as determined by the Contracting Officer shall be measured in square yards.
1.2.1.2 Volume
The quantity of sub-base and select-material sub-base course completed and accepted as determined by the Contracting Officer will be measured in cubic yards. The volume of material in-place and accepted will be determined by the average job thickness obtained in accordance with paragraph THICKNESS CONTROL and the dimensions shown.
1.2.1.3 Weight
The tonnage of sub-base and select-material sub-base course material shall be the number of tons of aggregate, placed and accepted in the completed course OR placed in authorized stockpiles as determined by the Contracting Officer. Deductions will be made for any material wasted, unused, rejected, or used for convenience of the Contractor, and for water exceeding specified amount at time of weighing.
1.2.2 Payment
1.2.2.1 Course Material
Quantities of sub-base and select-material sub-base course, determined as specified in paragraph Measurement, will be paid for at the respective contract unit prices, which shall constitute full compensation for the construction and completion of the sub-base and select-material sub-base course.
1.2.2.2 Stabilization
Cohesion-less sub-grades or select sub-base courses to be stabilized, as specified in paragraph PREPARATION OF UNDERLYING MATERIAL, will be paid as a special item on the tonnage basis including extra manipulation as required.
1.2.3 Waybills and Delivery Tickets
Copies of waybills and delivery tickets shall be submitted during the progress of the work. Before the final statement is allowed, the Contractor shall file certified waybills and certified delivery tickets for all aggregates actually used.
1.3 DEGREE OF COMPACTION
Degree of compaction is a percentage of the maximum density obtained by the test procedure presented in ASTM D 1557 OR AASHTO T 180, Method D. In this specification, degree of compaction shall be a percentage of laboratory maximum density.
1.4 SUBMITTALS
Government approval is required for submittals with a "GA" designation; submittals having an "FIO" designation are for information only. The following shall be submitted in accordance with Section 01330 SUBMITTAL PROCEDURES:
SD-01 Data Equipment; FIO.
List of proposed equipment to be used in performance of construction work, including descriptive data.
SD-09 Reports Sampling and Testing; GA.
Copies of initial and in-place test results.
SD-18 Records Waybills and Delivery Tickets; GA.
Copies of waybills and delivery tickets during the progress of the work. Certified waybills and delivery tickets for all aggregates actually used.
1.5 SAMPLING AND TESTING
Sampling and testing shall be the responsibility of the Contractor. Sampling and testing shall be performed by an approved testing laboratory in accordance with THE APPROVED CONTRACTOR QUALITY CONTROL PROCEDURES. Tests shall be performed at the specified frequency. No work requiring testing will be permitted until the testing laboratory has been inspected and approved. The materials shall be tested to establish compliance with the specified requirements.
1.5.1 Sampling
Samples for laboratory testing shall be taken in conformance with ASTM D 75. When deemed necessary, the sampling will be observed by the Contracting Officer.
1.5.2 Tests
1.5.2.1 Sieve Analysis
Sieve analysis shall be made in conformance with ASTM C 117, ASTM C 136 and ASTM D 422. Sieves shall conform to ASTM E 11.
1.5.2.2 Liquid Limit and Plasticity Index
Liquid limit and plasticity index shall be determined in accordance with ASTM D 4318.
1.5.2.3 Moisture-Density Determinations
The maximum density and optimum moisture shall be determined in accordance with ASTM D 1557 or AASHTO T 180, Method D.
1.5.2.4 Density Tests
Density shall be field measured in accordance with ASTM D 1556. The base plate, as shown in the drawing shall be used. The calibration curves shall be checked and adjusted, if necessary, using only the sand cone method as described in paragraph Calibration, of the ASTM publication. Tests performed in accordance with ASTM D 2922 result in a wet unit weight of soil and, when using this method, ASTM D 3017 shall be used to determine the moisture content of the soil. The calibration curves furnished with the moisture gauges shall also be checked along with density calibration checks as described in ASTM D 3017. The calibration checks of both the density and moisture gauges shall be made by the prepared containers of material method, as described in paragraph Calibration, in ASTM D 2922, on each different type of material to be tested at the beginning of a job and at intervals as directed.
1.5.2.5 Wear Test
Wear tests shall be made on sub-base course material in conformance with ASTM C 131.
1.5.2.6 Weight of Slag
Weight per cubic foot of slag shall be determined in accordance with ASTM C 29 on the sub-base course material.
1.5.3 Testing Frequency
1.5.3.1 Initial Tests
One of each of the following tests shall be performed on the proposed material prior to commencing construction to demonstrate that the proposed material meets all specified requirements prior to installation.
a. Sieve Analysis including 0.02 mm size material
b. Liquid limit and plasticity index moisture-density relationship
c. Wear
d. Weight per cubic foot of Slag
1.5.3.2 In-Place Tests
One of each of the following tests shall be performed on samples taken from the placed and compacted sub-base and select-material sub-base course. Samples shall be taken for each 1,000 square yards of each layer of material placed in each area.
a. Sieve Analysis including 0.02 mm size material
b. Field Density
c. Moisture liquid limit and plasticity index
1.5.4 Approval of Material
The source of the material shall be selected 30 days prior to the time the material will be required in the work. Approval of the materials will be based on tests for gradation, liquid limit, and plasticity index performed on samples taken from the completed and compacted sub-base course.
1.6 WEATHER LIMITATIONS
Construction shall be done when the atmospheric temperature is above 35 degrees F. When the temperature falls below 35 degrees F, the Contractor shall protect all completed areas by approved methods against detrimental effects of freezing. Completed areas damaged by freezing, rainfall, or other weather conditions shall be corrected to meet specified requirements.
1.7 EQUIPMENT
All plant, equipment, and tools used in the performance of the work will be subject to approval before the work is started and shall be maintained in satisfactory working condition at all times. The equipment shall be adequate and shall have the capability of producing the required compaction, meeting grade controls, thickness control, and smoothness requirements as set forth herein.
2 PRODUCTS
2.1 MATERIALS
2.1.1 Sub-base Course
Aggregates shall consist of crushed stone or slag, gravel, shell, sand, or other sound, durable, approved materials processed and blended or naturally combined. Aggregates shall be durable and sound, free from lumps and balls of clay, organic matter, objectionable coatings, and other foreign material. Material retained on the No. 4 sieve shall have a percentage of wear not to exceed 50 percent after 500 revolutions when tested as specified in ASTM C 131. Aggregate shall be reasonably uniform in density and quality. Slag shall be an air-cooled, blast-furnace product having a dry weight of not less than 65 pcf. Aggregates shall have a maximum size of 2 inch and shall be within the limits specified as follows:
Maximum Allowable Percentage by Weight
Passing Square-Mesh Sieve
Sieve Designation No. 1 No.2 No. 3 No.4
No. 10 50 80 -- 85
No. 200 15 15 15 15
Particles having diameters less than 0.0008 inches shall not be in excess of 3 percent by weight of the total sample tested as determined in accordance with ASTM D 422. The portion of any blended component and of the completed course passing the No. 40 sieve shall be either non-plastic or shall have a liquid limit not greater than 25 and a plasticity index not greater than 5.
2.1.2 Select-Material Sub-base Course
Materials shall consist of selected soil or other materials from field excavation, stockpiles, or other sources. Material shall be free from lumps and balls of clay and from organic and other objectionable matter. Not more than 25 percent by weight shall pass the No. 200sieve. The portion of material passing the No. 40 sieve shall have a liquid limit less than 35 and a plasticity index less than 12. The maximum particle size shall not exceed 3 inches. Particles having diameters less than 0.02 millimeter shall not be in excess of 3 percent by weight of the total sample tested as determined in accordance with ASTM D 422.
3 EXECUTION
3.1 OPERATION OF AGGREGATE SOURCES
All clearing, stripping and excavating work involved in the opening or operation of aggregate sources shall be performed by the Contractor. Aggregate sources shall be opened to working depth in a manner that produces excavation faces that are as nearly vertical as practicable for the materials being excavated. Materials excavated from aggregate sources shall be obtained in successive cuts extending through all exposed strata. All pockets or strata of unsuitable materials overlying or occurring in the deposit shall be wasted as directed. The methods of operating aggregate sources and the processing and blending of the material may be changed or modified by the Contracting Officer, when necessary, in order to obtain material conforming to specified requirements. Upon completion of work, aggregate sources on Government reservations shall be conditioned to drain readily, and shall be left in a satisfactory condition. Aggregate sources on private lands shall be conditioned in agreement with local laws and authorities.
3.2 STOCKPILING MATERIAL
Prior to stockpiling of material, storage sites shall be cleared and leveled by the Contractor. All materials, including approved material available from excavation and grading, shall be stockpiled in the manner and at the locations designated. Aggregates shall be stockpiled on the cleared and leveled areas designated by the Contracting Officer so as to prevent segregation. Materials obtained from different sources shall be stockpiled separately.
3.3 PREPARATION OF UNDERLYING MATERIAL
Prior to constructing the sub-base or select-material sub-base course, the underlying course or sub-grade shall be cleaned of all foreign substances. The surface of the underlying course or sub-grade shall meet specified compaction and surface tolerances. Ruts, or soft yielding spots, in the underlying courses, sub-grade areas having inadequate compaction, and deviations of the surface from the specified requirements, shall be corrected by loosening and removing soft or unsatisfactory material and by adding approved material, reshaping to line and grade, and re-compacting to specified density requirements. For cohesion-less underlying courses or sub-grades containing sands or gravels, as defined in ASTM D 2487, the surface shall be stabilized prior to placement of the sub-base course. Stabilization shall be accomplished by mixing sub-base course material into the underlying course, and compacting by approved methods. The stabilized material shall be considered as part of the underlying course and shall meet all requirements for the underlying course. The finished underlying course shall not be disturbed by traffic or other operations and shall be maintained by the Contractor in a satisfactory condition until the sub-base course is placed.
3.4 GRADE CONTROL
The finished and completed sub-base course shall conform to the lines, grades, and cross sections shown. The lines, grades, and cross sections shown shall be maintained by means of line and grade stakes placed by the Contractor at the work site.
3.5 MIXING AND PLACING MATERIALS
The materials shall be mixed and placed to obtain uniformity of the sub-base and select-material sub-base material at the water content specified. The Contractor shall make such adjustments in mixing or placing procedures or in equipment as may be directed to obtain the true grades, to minimize segregation and degradation, to reduce or accelerate loss or increase of water, and to insure a satisfactory sub-base course.
3.6 LAYER THICKNESS
The compacted thickness of the completed course shall be as indicated. When a compacted layer of 6 inches is specified, the material may be placed in a single layer; when a compacted thickness of more than 6 inches is required, no layer shall exceed 6 inches nor be less than 3 inches when compacted.
3.7 COMPACTION
Each layer of the sub-base course and select-material sub-base shall be compacted as specified with approved compaction equipment. Water content shall be maintained during the compaction procedure to within plus or minus five percent of optimum water content, as determined from laboratory tests, as specified in paragraph SAMPLING AND TESTING. In all places not accessible to the rollers, the mixture shall be compacted with hand-operated power tampers. Compaction shall continue until each layer is compacted through the full depth to at least 98 percent of laboratory maximum density. The Contractor shall make such adjustments in compacting or finishing procedures as may be directed to obtain true grades, to minimize segregation and degradation, to reduce or increase water content, and to ensure a satisfactory sub-base course. Any materials that are found to be unsatisfactory shall be removed and replaced with satisfactory material or reworked, as directed, to meet the requirements of this specification.
3.8 PROOF ROLLING
Areas designated on the drawings to be proof rolled shall receive an application of 30 coverages with a heavy pneumatic-tired roller having four or more tires abreast, each tire loaded to a minimum of 30,000 pounds and inflated to a minimum of 150 psi. A coverage is defined as the application of one tire print over the designated area. In the areas designated, proof rolling shall be applied to the top layer of the sub-base course. Water content of the top layer of the sub-base course shall be maintained such that the water content is within plus or minus five percent of optimum water content, as determined from laboratory tests, as specified in paragraph SAMPLING AND TESTING. Any material in the sub-base courses or underlying materials indicated to be unsatisfactory by the proof rolling shall be removed, dried, and re-compacted, or removed and replaced with satisfactory materials.
3.9 EDGES
Approved material shall be placed along the edges of the sub-base and select-material sub-base course in such quantity as will compact to the thickness of the course being constructed. When the course is being constructed in two or more layers, at least a 1 foot width of the shoulder shall be rolled and compacted simultaneously with the rolling and compacting of each layer of the sub-base course, as directed.
3.10 SMOOTHNESS TEST
The surface of each layer shall not show deviations in excess of 3/8 inch when tested with a 12 foot straightedge applied parallel with and at right angles to the centerline of the area to be paved. Deviations exceeding this amount shall be corrected by removing material, replacing with new material, or reworking existing material and compacting, as directed.
3.11 THICKNESS CONTROL
The completed thickness of the sub-base and select-material sub-base course shall be in accordance with the thickness and grade indicated on the drawings. The thickness of each course shall be measured at intervals providing at least one measurement for each 500 square yards or part thereof of sub-base course. The thickness measurement shall be made by test holes, at least 3 inches in diameter through the course. The completed sub-base course shall not be more than 1/2 inch deficient in thickness nor more than 1/2 inch above or below the established grade. Where any of these tolerances are exceeded, the Contractor shall correct such areas by scarifying, adding new material of proper gradation or removing material, and compacting, as directed. Where the measured thickness is 1/2 inch or more thicker than shown, the course will be considered as conforming with the specified thickness requirements plus 1/2 inch. The average job thickness shall be the average of the job measurements as specified above but within 1/4 inch of the thickness shown.
3.12 MAINTENANCE
The sub-base and select-material sub-base course shall be maintained in a satisfactory condition until accepted.
3.13 METHOD OF MEASUREMENT AND PAYMENT: All measurements shall be units as identified in the appropriate SLINS in the Unit Price Schedule. Measurements for preparing payments shall be taken jointly with the Government Representative.
Payment for these items shall constitute full compensation for completed work including all labor and incidentals necessary to accomplish the work required by this section of the specifications.
END OF SECTION
02721 - 9