SECTION 02964
COLD MILLING OF BITUMINOUS PAVEMENTS
1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM C 136
Sieve Analysis of Fine and Coarse Aggregates
1.2 UNIT PRICES
1.2.1 Measurement
The quantity of milled pavement shall be the number of square yards completed and accepted as determined by the Contracting Officer. The number of square yards of milled pavement shall be determined by measuring the length and width of the milled surface within the specified work area. Measurement to determine the area shall be to the closest inch for width and the closest foot for length.
1.2.2 Payment
Payment will be to the nearest square yard. No payment will be made for milling outside the specified area of work.
1.3 EQUIPMENT, TOOLS, AND MACHINES
Equipment, tools, and machines used in the performance of the work shall be maintained in a satisfactory working condition.
1.3.1 Cold-Milling Machine
The cold-milling machine shall be a self-propelled machine capable of milling the pavement to a specified depth and smoothness. Pavement milling machine shall be capable of establishing grade control; shall have means of controlling transverse slope; and shall have effective means of controlling dust produced during the pavement milling operation. The machine shall have the ability to [windrow the millings or cuttings] [remove the millings or cuttings from the pavement and load them into a truck]. The milling machine shall not cause damage to any part of the pavement structure that is not to be removed.
1.3.2 Cleaning Equipment
Cleaning equipment shall be suitable for removing and cleaning loose material from the pavement surface.
1.3.3 Straightedge
The Contractor shall furnish and maintain at the site, in good condition, one 12 foot straightedge or other suitable device for each milling machine, for testing the finished surface. Straightedge shall be made available for Government use. Straightedges shall be constructed of aluminum or other lightweight metal, and shall have blades of box or box-girder cross section with flat bottom reinforced to insure rigidity and accuracy. Straightedges shall have handles to facilitate movement on the pavement.
1.4 WEATHER LIMITATIONS
Milling shall not be performed when there is accumulation of snow or ice on the pavement surface.
1.5 GRADE AND SURFACE-SMOOTHNESS REQUIREMENTS
1.5.1 Grade
The finished milled surfaces shall conform to the lines, grades, and cross sections indicated. The finished milled-pavement surfaces shall vary not more than [0.04] [0.06] foot from the established plan grade line and elevation. Finished surfaces at a juncture with other pavements shall coincide with the finished surfaces of the abutting pavements. The deviations from the plan grade line and elevation will not be permitted in areas of pavements where closer conformance with planned grade and elevation is required for the proper functioning of appurtenant structures involved.
1.5.2 Surface Smoothness
Finished surfaces shall not deviate from the testing edge of a straightedge more than 1/4 inch in the transverse or longitudinal direction.
2 PRODUCTS (Not Applicable)
3 EXECUTION
3.1 PREPARATION OF SURFACE
The pavement surface shall be cleaned of excessive dirt, clay, or other foreign material immediately prior to milling the pavement.
3.2 MILLING OPERATION
Sufficient passes shall be made so that the designated area is milled to the grades and cross sections indicated. The milling shall proceed with care and in depth increments that will not damage the pavement below the designated finished grade. Items damaged during milling, such as manholes, valve boxes, utility lines, pavement that is torn, cracked, gouged, broken, or undercut, shall be repaired or replaced as directed. Removed material shall have a minimum of 95 percent by weight passing a 63 mm sieve when tested in accordance with ASTM C 136.
3.3 GRADE AND SURFACE-SMOOTHNESS TESTING
3.3.1 Grade-Conformance Tests
The finished milled surface of the pavement shall be tested for conformance with the plan-grade requirements and will be tested for acceptance. Prior to the start of milling operations, the Contracting Officer's Representative (COR) shall call a meeting with the contractor and the project engineer to determine method of grade control, the length of each milling pass, the method of traffic control to be used and the side of the traveled way from which milling shall begin. The Contractor shall correct variations from the designated grade line and elevation in excess of the plan-grade requirements as directed. Skin patching for correcting low areas will not be permitted. The Contractor shall remove and replace the deficient low area. Sufficient material shall be removed to allow at least 1 inch of asphalt concrete to be placed.
3.3.2 Surface-Smoothness Tests
After completion of the final milling, the finished milled surface will be tested by the Government with a straightedge. Other approved devices may be used, provided that when satisfactorily and properly operated, such devices reveal all surface irregularities exceeding the tolerances specified. Surface irregularities that depart from the testing edge by more than 1/4 inch shall be corrected.
3.4 REMOVAL OF MILLED MATERIAL
Material that is removed shall be placed in the disposal area as specified or stockpiled as specified and in such a manner to prevent segregation or contamination.
3.5 METHOD OF MEASUREMENT AND PAYMENT: All measurements shall be units as identified in the appropriate SLINS in the Unit Price Schedule. Measurements for preparing payments shall be taken jointly with the Government Representative. Payment for these items shall constitute full compensation for completed work including all labor and incidentals necessary to accomplish the work required by this section of the specifications.
END OF SECTION
02964 - 1