Amend2-W912C323B0001-ExteriorInteriorPaint-20230125.pdf
PDF 226 KB Posted
- Attached to
- AMENDMENT 0002 - Exterior / Interior Painting at Fort Buchanan, PR Federal contract opportunity
- Solicitation number
- W912C323B0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend1-W912C323B0001-ExteriorInteriorPaint-20230112.pdf | ||
| Amend1-Photos-W912C323B0001-ExteriorInteriorPaint-20230112.pdf | ||
| IFB-W912C323B0001-ExteriorInteriorPaint-20230106.pdf | ||
| Subclin Price Structure_IFB W912C323B0001_20230106.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011888996
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
a. The purpose of the Amendment is to incorporate Answ ers to questions submitted by Vendors.
b. Date and time for receipt of bids and all other terms and conditions remain unchanged
See page Tw o
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jan-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912C323B0001
X 9B. DATED (SEE ITEM 11)
06-Jan-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jan-2023
CODE
MICC - FT BUCHANAN
FT BUCHANAN
DIRECTORATE OF CONTRACTING
34 SOUTH GATE RD, STE 1104
FORT BUCHANAN PR 00934-4206
W912C3 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912C323B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required performance has changed from DESCRIPTION OF REQUIREMENT- Exterior and Interior Painting for Buildings and Department of Defense Education Activity (DODEA) at Fort Buchanan, PR 00934 This Solicitation is issued to 8(a) Firms Certified Program Participants with the SBA on a Competitive Basis NAICS:
238320; Size Standard: $19 MillionsMagnitude of this project is between $5,000,000.00 and $10,000,000.00The Contract will be Firm-Fixed Price Type for one (1) Base Year of 12 months plus four (4) Option Years of twelve months each, if exercised by the Government.Contractor shall submit with their bid package a bid a guarantee in accordance with FAR 52.228-1 of 20% of the total estimated amount of the Base Period. Work under this contract will be issued and funded via individual Task Orders.List of Attachments as follows:Document Description, Document date, Number of PagesBid/CLIN Schedule, 1/06/2023, 5 Pages (Spreadsheet) to DESCRIPTION OF REQUIREMENT- Exterior and Interior Painting for Buildings and Department of Defense Education Activity (DODEA) at Fort Buchanan, PR 00934 This Solicitation is issued to 8(a) Firms Certified Program Participants with the SBA on a Competitive Basis NAICS: 238320; Size Standard: $19 MillionsMagnitude of this project is between $5,000,000.00 and $10,000,000.00The Contract will be Firm-Fixed Price Type for one (1) Base Year of 12 months plus four (4) Option Years of twelve months each, if exercised by the Government.Contractor shall submit w ith their bid package a bid a guarantee in accordance w ith FAR 52.228-1 of 20% of the total estimated amount of the Base Period. Work under this contract will be issued and funded via individual Task Orders.List of Attachments as follows:Document Description, Document date, Number of PagesBid/CLIN Schedule, 1/06/2023, 5 Pages (Spreadsheet).
(End of Summary of Changes)
The following items are applicable to this modification:
QUESTIONS AND ANSWERS
W912C323B0001-Amendment 0001, Interior / Exterior Paint at Fort Buchanan, Puerto Rico Answers to Questions submitted byVendors
1. Q. We are in SBA region 2, I would like to confirm we can still submit a bid, correct?
A. That would be up to your company and SBA. The only set-aside restrictions on this requirement is: the firm has to be Small Business Administration certified 8(a).
2. Q. Is it possible to know how many buildings in total are? And which buildings are you referring to?
A. 114 buildings. Not certain what is meant by “which buildings you are referring to”
However, the work will be completed in future issued Task orders, as the need arises.
3. Q. The description of the contract opportunity includes the following:
This solicitation will be issue to 8(a) Firms on a Competitive Basis for Certified Program Participants within the SBA District of Puerto Rico and U.S. Virgin Island only.
While Section 00010 of the Solicitation Contract Form states:
Note: 8(a) Firms that are not local shall ensure they are familiar with Puerto Rico laws, tax information and any other required for consideration within your bid package. All interested firms (local and non-local) need to ensure proper consideration of all required for successful completion of all work avoiding delays due to not being able to obtain personnel, equipment or materials.
A. Amendment 01 to Solicitation W912C323B0001 was issue to remove “within the
SBA District of Puerto Rico and U.S. Virgin Island only”. See answer to Question 1 above.
4. Q. Section 252.219-7010 (3) of the solicitation is not filled out.
A. This section is filled in the released solicitation.
5. Q. We also need the prevailing wage sheet attached.
A. The Davis-Bacon does not apply to our contracts. It is up to the Vendor to ensure they are properly paying their employees the appropriate amounts to include all required.
Vendors keep in mind the amounts have to be fair and reasonable.
6. Q. Please clarify if a site visit will take place. In the event that a site visit is not contemplated, will the Offerors be allowed to visit the facilities to inspect the site where the work will be performed?
A. No site visits scheduled. See Amendment 01 to Solicitation W912C323B0001. In addition, need to carefully review the requirement. The information on future work is incorporated in the solicitation. The work will be completed in future issued Task orders, as the need arises.
7. Q. According to the Bid document (excel spreadsheets), we have three (3) items: marked as 0001AK, 0001AL, and 0001AN Elevation Setup. Could you define or explain what the quantity column means? Because of the Bid document (Solicitation IFB- W912C323B0001, PDF document), Section 01 11 00, page 58, you define as: "The unit EA (each) for line items associated with “Elevation Setup” is indicative of one (1) use per each Task Order", but in the Spreadsheet the quantity has a number, what does that number mean? but that use (each) means days, weeks or months.
A. The number in the quantity column corresponding to “Elevation Setup” means the total amount of times an elevating method can be used. This quantity will not be counted in days, weeks, or months, but rather per building of each Task Order as need arises.
8. Q. According to the Bid document (excel spreadsheets), we have two (2) items: mark
0001AP, and 0001AQ, Provide Water Tank and Provide Generator respectively;
could you define or explain what the quantity column means? what does that number mean?
A. The number in the quantity column means the total amount of times a water tank or generator can be requested to the Contractor per building of each Task Order where on base water and power are not available. This would be on a case-by-case basis.
9. Q. Items 0001AP, and 0001AQ, Provide Water Tank and Provide Generator; can you clarify are these items are only provided or involve anything installation to existing system?
A. As per Scope of Work “Water and electricity are provided by the Government. In the event that the site does not have water or electricity available, the Subclin may be used. Vendors have to consider any fixture (coupling, fittings, etc) for connection that allows the execution of the work.
10. Q. Item 0001AB Interior Paint (Concrete, Masonry, Drywall Surface); according to the
Bid document who is responsible for moving or removing furniture or desks inside the facilities?
A. The tenants/Government of each facility are responsible of relocating any type of items/furniture.
11. Q. Item 001AH Surface Patch/Repair (Concrete, Masonry, Drywall Surface) is considered a base quantity, or if the area to be patched/repaired is more significant than that established in Bid document, a change order will be used?
A. No Change Orders will be issued. This is a firm-fixed price type contract.
12. Q. Will all square footage be consumed entirely in any given one-year option?
A. This is an Indefinite Delivery/Indefinite Quantity (IDIQ) contract, therefore, the total consumption of any of the quantities in the Sub-clins is unpredictable. The Sub-clins will be used on an as needed basis via Task Orders depending on the work to be completed for the particular building/location.
13. Q. Will line items (0001AK, 0001AL, 0001AM, etc.) be added to actual painting works to be performed for example, those in line items (0001AA, 0001AB, 0001AC, 0001AD,0001AE, etc.) depending on building heights to be painted?
A. Yes, as required.
14. Q. Is the bid bond based on the subtotal of the CLIN I pricing?
A. Bid Bond is 20% of Base Period bid price.
15. Q. Do the workers need escorts outside of normal working hours?
A. Work to be completed outside of normal hours is be completed in same manner as during normal hours. Government personnel will be on site with the Contractor.
16. Q. Can we use on base water/power resources for work equipment (such as water for pressure washers)?
A. As per Scope of Work “Water and electricity are provided by the Government. In the event that the site does not have water or electricity available, the Contractor is responsible to notify the Government in order to incorporate Water and/or Electricity Sub-clin in the individual task order.”
17. Q. What specifically is an elevation setup?
A. Any secure and safe method to execute the work at such elevation (e.g., but not limited to, scaffolding, mechanical scissor lift, articulating boom lift, telescopic boom lifts, cranes, etc.). The selected equipment from the Contractor shall comply with OSHA regulations.
18. Q. Can we email in the bid package?
A. Email of bid package is not authorized. Please review solicitation carefully.
19. Q. Do we need to provide dollar amounts for Performance and Payment Bonds for all years on the Subclin Price Structure excel form? or is it left without it?
A. Performance and Payment Bonds amount shall be incorporated only in the CLIN
Sections 0002, 1002, 2002, 3002 and 4002 as indicated considering the project.
Performance and Payment Bonds shall not be incorporated in the SubClin Price Structure.
20. Q. Are the prices to be given by us as part of the bid supposed to be honored by the 5 year time window that is stipulated in the solicitation documents? or will we have to account for inflation in the duration of the contract if awarded?
A. This requirement is a Firm-Fixed Price type contract. The prices bid will remain fixed for the duration of the contract. Contractor needs to consider all required in their bid.
21. Q. Once awarded and the payment and performance bond is submitted, will a new payment and performance bond be needed in each year of the contract?
A. Yes, Payment and performance bonds will be required each Base and each Option
Period. Options are exercised by the Government, if required.