Subclin Price Structure_IFB W912C323B0001_20230106.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- AMENDMENT 0002 - Exterior / Interior Painting at Fort Buchanan, PR Federal contract opportunity
- Solicitation number
- W912C323B0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend2-W912C323B0001-ExteriorInteriorPaint-20230125.pdf | ||
| Amend1-W912C323B0001-ExteriorInteriorPaint-20230112.pdf | ||
| Amend1-Photos-W912C323B0001-ExteriorInteriorPaint-20230112.pdf | ||
| IFB-W912C323B0001-ExteriorInteriorPaint-20230106.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE YEAR
| SUBCLIN PRICE STRUCTURE: IFB NO: W912C323B0001, EXTERIOR/INTERIOR PAINTING AT FORT BUCHANAN | |
| BASE PERIOD: |
| Line Item | Description | Unit of Issue | Estimated Quantity | Unit Price | Total |
| 0001AA | Exterior Paint (Concrete, Masonry, Drywall Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 200,000 | ||
| 0001AB | Interior Paint (Concrete, Masonry, Drywall Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 100,000 | ||
| 0001AC | Exterior Paint (Wood Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 5,000 | ||
| 0001AD | Interior Paint (Wood Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 10,000 | ||
| 0001AE | Exterior Paint (Metal Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 130,000 | ||
| 0001AF | Interior Paint (Metal Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 7,000 | ||
| 0001AG | Floor Paint (Concrete) | SF | 5,000 | ||
| 0001AH | Surface Patch/Repair (Concrete, Masonry, Drywall Surface) in accordance with 09 90 00, Part 3, Item 3.6.2b. | SF | 1,000 | ||
| 0001AI | Surface Patch/Repair (Steel Surface) | SF | 500 | ||
| 0001AJ | Pressure Wash, Incidental (Sidewalks, Stairs, etc.) | SF | 50,000 | ||
| 0001AK | Elevation Setup, (from 21 ft to 40 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 15 | ||
| 0001AL | Elevation Setup, (from 41 ft to 60 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 15 | ||
| 0001AM | Elevation Setup, (from 61 ft to 80 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 10 | ||
| 0001AN | Exterior Paint (Other than Normal Working Hours) in accordance with Section 01 11 00, Part 1, Item 1.1.3.3 and Item 1.1.3.4 | SF | 20,000 | ||
| 0001AO | Interior Paint (Other than Normal Working Hours) in accordance with Section 01 11 00, Part 1, Item 1.1.3.3 and Item 1.1.3.4 | SF | 20,000 | ||
| 0001AP | Provide Water Tank (Capacity 400 gallons) | EA | 6 | ||
| 0001AQ | Provide Generator (Capacity 5000 Watt) | EA | 6 |
1st Opt. Yr.
| SUBCLIN PRICE STRUCTURE: IFB NO: W912C323B0001, EXTERIOR/INTERIOR PAINTING AT FORT BUCHANAN | |
| FIRST OPTION PERIOD: |
| Line Item | Description | Unit of Issue | Estimated Quantity | Unit Price | Total |
| 1001AA | Exterior Paint (Concrete, Masonry, Drywall Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 200,000 | ||
| 1001AB | Interior Paint (Concrete, Masonry, Drywall Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 100,000 | ||
| 1001AC | Exterior Paint (Wood Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 5,000 | ||
| 1001AD | Interior Paint (Wood Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 10,000 | ||
| 1001AE | Exterior Paint (Metal Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 130,000 | ||
| 1001AF | Interior Paint (Metal Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 7,000 | ||
| 1001AG | Floor Paint (Concrete) | SF | 5,000 | ||
| 1001AH | Surface Patch/Repair (Concrete, Masonry, Drywall Surface) in accordance with 09 90 00, Part 3, Item 3.6.2b. | SF | 1,000 | ||
| 1001AI | Surface Patch/Repair (Steel Surface) | SF | 500 | ||
| 1001AJ | Pressure Wash, Incidental (Sidewalks, Stairs, etc.) | SF | 50,000 | ||
| 1001AK | Elevation Setup, (from 21 ft to 40 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 15 | ||
| 1001AL | Elevation Setup, (from 41 ft to 60 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 15 | ||
| 1001AQ | Elevation Setup, (from 61 ft to 80 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 10 | ||
| 1001AM | Exterior Paint (Other than Normal Working Hours) in accordance with Section 01 11 00, Part 1, Item 1.1.3.3 and Item 1.1.3.4 | SF | 20,000 | ||
| 1001AN | Interior Paint (Other than Normal Working Hours) in accordance with Section 01 11 00, Part 1, Item 1.1.3.3 and Item 1.1.3.4 | SF | 20,000 | ||
| 1001AO | Provide Water Tank (Capacity 400 gallons) | EA | 6 | ||
| 1001AP | Provide Generator (Capacity 5000 Watt) | EA | 6 |
2nd Opt. Yr.
| SUBCLIN PRICE STRUCTURE: IFB NO: W912C323B0001, EXTERIOR/INTERIOR PAINTING AT FORT BUCHANAN | |
| SECOND OPTION PERIOD: |
| Line Item | Description | Unit of Issue | Estimated Quantity | Unit Price | Total |
| 2001AA | Exterior Paint (Concrete, Masonry, Drywall Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 200,000 | ||
| 2001AB | Interior Paint (Concrete, Masonry, Drywall Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 100,000 | ||
| 2001AC | Exterior Paint (Wood Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 5,000 | ||
| 2001AD | Interior Paint (Wood Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 10,000 | ||
| 2001AE | Exterior Paint (Metal Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 130,000 | ||
| 2001AF | Interior Paint (Metal Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 7,000 | ||
| 2001AG | Floor Paint (Concrete) | SF | 5,000 | ||
| 2001AH | Surface Patch/Repair (Concrete, Masonry, Drywall Surface) in accordance with 09 90 00, Part 3, Item 3.6.2b. | SF | 1,000 | ||
| 2001AI | Surface Patch/Repair (Steel Surface) | SF | 500 | ||
| 2001AJ | Pressure Wash, Incidental (Sidewalks, Stairs, etc.) | SF | 50,000 | ||
| 2001AK | Elevation Setup, (from 21 ft to 40 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 15 | ||
| 2001AL | Elevation Setup, (from 41 ft to 60 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 15 | ||
| 2001AQ | Elevation Setup, (from 61 ft to 80 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 10 | ||
| 2001AM | Exterior Paint (Other than Normal Working Hours) in accordance with Section 01 11 00, Part 1, Item 1.1.3.3 and Item 1.1.3.4 | SF | 20,000 | ||
| 2001AN | Interior Paint (Other than Normal Working Hours) in accordance with Section 01 11 00, Part 1, Item 1.1.3.3 and Item 1.1.3.4 | SF | 20,000 | ||
| 2001AO | Provide Water Tank (Capacity 400 gallons) | EA | 6 | ||
| 2001AP | Provide Generator (Capacity 5000 Watt) | EA | 6 |
3rd Opt. Yr.
| SUBCLIN PRICE STRUCTURE: IFB NO: W912C323B0001, EXTERIOR/INTERIOR PAINTING AT FORT BUCHANAN | |
| THIRD OPTION PERIOD: |
| Line Item | Description | Unit of Issue | Estimated Quantity | Unit Price | Total |
| 3001AA | Exterior Paint (Concrete, Masonry, Drywall Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 200,000 | ||
| 3001AB | Interior Paint (Concrete, Masonry, Drywall Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 100,000 | ||
| 3001AC | Exterior Paint (Wood Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 5,000 | ||
| 3001AD | Interior Paint (Wood Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 10,000 | ||
| 3001AE | Exterior Paint (Metal Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 130,000 | ||
| 3001AF | Interior Paint (Metal Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 7,000 | ||
| 3001AG | Floor Paint (Concrete) | SF | 5,000 | ||
| 3001AH | Surface Patch/Repair (Concrete, Masonry, Drywall Surface) in accordance with 09 90 00, Part 3, Item 3.6.2b. | SF | 1,000 | ||
| 3001AI | Surface Patch/Repair (Steel Surface) | SF | 500 | ||
| 3001AJ | Pressure Wash, Incidental (Sidewalks, Stairs, etc.) | SF | 50,000 | ||
| 3001AK | Elevation Setup, (from 21 ft to 40 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 15 | ||
| 3001AL | Elevation Setup, (from 41 ft to 60 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 15 | ||
| 3001AQ | Elevation Setup, (from 61 ft to 80 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 10 | ||
| 3001AM | Exterior Paint (Other than Normal Working Hours) in accordance with Section 01 11 00, Part 1, Item 1.1.3.3 and Item 1.1.3.4 | SF | 20,000 | ||
| 3001AN | Interior Paint (Other than Normal Working Hours) in accordance with Section 01 11 00, Part 1, Item 1.1.3.3 and Item 1.1.3.4 | SF | 20,000 | ||
| 3001AO | Provide Water Tank (Capacity 400 gallons) | EA | 6 | ||
| 3001AP | Provide Generator (Capacity 5000 Watt) | EA | 6 |
4th Opt. Yr.
| SUBCLIN PRICE STRUCTURE: IFB NO: W912C323B0001, EXTERIOR/INTERIOR PAINTING AT FORT BUCHANAN | |
| FOURTH OPTION PERIOD: |
| Line Item | Description | Unit of Issue | Estimated Quantity | Unit Price | Total |
| 4001AA | Exterior Paint (Concrete, Masonry, Drywall Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 200,000 | ||
| 4001AB | Interior Paint (Concrete, Masonry, Drywall Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 100,000 | ||
| 4001AC | Exterior Paint (Wood Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 5,000 | ||
| 4001AD | Interior Paint (Wood Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 10,000 | ||
| 4001AE | Exterior Paint (Metal Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.1 | SF | 130,000 | ||
| 4001AF | Interior Paint (Metal Surface) in accordance with Section 09 90 00, Part 1, Item 1.12.1.2 | SF | 7,000 | ||
| 4001AG | Floor Paint (Concrete) | SF | 5,000 | ||
| 4001AH | Surface Patch/Repair (Concrete, Masonry, Drywall Surface) in accordance with 09 90 00, Part 3, Item 3.6.2b. | SF | 1,000 | ||
| 4001AI | Surface Patch/Repair (Steel Surface) | SF | 500 | ||
| 4001AJ | Pressure Wash, Incidental (Sidewalks, Stairs, etc.) | SF | 50,000 | ||
| 4001AK | Elevation Setup, (from 21 ft to 40 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 15 | ||
| 4001AL | Elevation Setup, (from 41 ft to 60 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 15 | ||
| 4001AQ | Elevation Setup, (from 61 ft to 80 ft.) in accordance with Section 01 11 00, Part 1, Item 1.1.1 | EA | 10 | ||
| 4001AM | Exterior Paint (Other than Normal Working Hours) in accordance with Section 01 11 00, Part 1, Item 1.1.3.3 and Item 1.1.3.4 | SF | 20,000 | ||
| 4001AN | Interior Paint (Other than Normal Working Hours) in accordance with Section 01 11 00, Part 1, Item 1.1.3.3 and Item 1.1.3.4 | SF | 20,000 | ||
| 4001AO | Provide Water Tank (Capacity 400 gallons) | EA | 6 | ||
| 4001AP | Provide Generator (Capacity 5000 Watt) | EA | 6 |