Drawings_(Revised)_IFB_W912C3-18-B-0002,_Pad_Mounted_Transformers,_9_Aug_2018.pdf
PDF 3 MB Posted
- Solicitation number
- W912C3-18-B-0002
About this file
Drawings (Revised) Pad Mounted Transformers, 9 Aug 2018 (Final).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A T L A N T I c 0 c E A N
PUNTA BORINQUEN
(FORME..R__fl.AMEY U S AIR FORCE BASE) r ~~-~--'-._~-~--~-;~
FORT BUCHANAN
MAINTAIN /REPLACE PAD MOUNTED TRANSFORMERS,
\ p u E R T 0 R I c 0 ROOSEVELT ROADS f' fl SALINAS / ::,) __,, _ v TRAING AREA ('
(r'----..J'--.,,,_'\ ""~~_./~} ~~~~ _,......,_ ~-~
TRANSCLOSURES, PRIMARY MAIN SWITCHES &
~ ~c;- v '"/~/~ ©-
• TRANSFER SWITCH c A R I B B E A N s E A -·-
N
SHEET NO.
D E x 0 F D R A w N G s
DRAWING NO. TITLE
T-1
E-1 E-2
TITLE SHEET, LOCATION SITE MAPS, AND INDEX OF DRAWINGS
SITE MAP AND WORKING DETAILS FORT BUCHANAN, PUERTO RICO
DETAILS
LOCATION MAP
Project Site
BUCHANAN SITE MAP
400 0 100 !lO
~ 1N FEET
LIST OF ABBREVIATIONS NOTE: SOME ABBREVIATIONS LISTED ARE NOT CONTAINED IN THESE DRAWINGS
A A.B.I.
A/C
AFF
AL, ALUM
ALT
AMP,A
AP
APPROX
ARCH
ARR
AWG
G B, BOT
BD
BLDG, B
BW
C Cl cc.ere
CFM
CKT
CLG
CMU
CND,C
COL
CONC
COND
CONN
CONST
D D
DET, DTL
D, DIAM.
DIM
DWG
ACOUSTICAL BATT INSULATION
AIR CONDITIONING
ABOVE FINISH FLOOR
ALUMINUM
ALTERNATE
AMPERE
ACCESS PANEL
APPROXIMATE
ARCHITECTURAL
ARRESTOR
AMERICAN WIRE GAGE
BOTIOM
BOARD
BUILDING
BOTH WAY
CIRCUIT NUMBER
CENTER TO CENTER
CUBIC FEET PER MINUTE
CIRCUIT
CENTERLINE
CEILING
CONCRETE MASONRY UNITS
CONDUIT
COLUMN
CONCRETE
CONDUCTOR
CONNECTION
CONSTRUCTION
DEPTH, DEEP, DEGREE OF CURVATURE
DETAIL
DIAMETER
DIMENSION
DRAWING
E EA
EF
EL, ELEV
ELEC
EMB
EMT
ETC
EW
EXIST, EX, E
F F
G
FDB
FD
FFE
FIN
FL
FT
FWB
GA, G
GALV
GB
GFCI
GPM
GR
GRD
GW
H H, HGT, HT
HEX
HP
ID
IN
IN C.W.
,J JB
EACH
EACH FACE
ELEVATION
ELECTRIC, ELECTRICAL
EMBBEDED
ELECTRICAL METALLIC TUBING
ETCETERA
EACH WAY
EXISTING
FARENHEIT
F ARENHEIT DRY BULB
FLEXIBLE DUCT
FINISHED FLOOR ELEVATION
FINISH
FLOOR, FLASHING
FOOT, FEET
FARENHEIT WET BULB
GAGE
GALVANIZED
GYPSUM BOARD
GROUND FAULT CIRCUIT INTERRUPTOR
GALLONS PER MINUTE
GRADE
GROUND
GROUND WATER
HEIGHT
HEXAGONAL
HORSEPOWER
INSIDE DIAMETER, INSIDE DIMENSION
INCH
INCH COLD WATER
JUNCTION BOX
KV
KVA
KW
L L
IV
LBS
LED
LT
MAX
MBH
MECH
MD
MIN
MISC
MTD
N, NW
NFPA
NIC
NO
NTS
O OD
OPNG
OBD
KILOVOLT
KILOVOLT-AMPERE
KILOWATT
LENGTH, LENGTH OF CURVE
POUNDS
LIGHTING EMITING DIODE
LIGHT
MAXIMUM
MEGA BRITISH HOUR
MECHANICAL
MANUAL DAMPER
MINIMUM
MISCELLANEOUS
MOUNTED
NORTH, NEW
NATIONAL FIRE PROTECTION
ASSOCIATION
NOT IN CONTRACT
NUMBER
NOT TO SCALE
OUTSIDE DIAMETER
OPENING
OUTSIDE BLADE DAMPER
p
PL
PRELIM
PSI
PVC
PSF
R R
RR
RG
s
RE, REF
REINF
REV
RM
RLA
RTU
PLATE
PRELIMINARY
POUNDS PER SQUARE INCH
POINT OF VERTICAL CURVE,
POLYVINYL CHLORIDE
POUNDS PER SQUARE FOOT
RADIUS, RISER, RUBBER SHEATH
RETURN REGISTER
RETURN GRILLE
REFERENCE, REFER TO
REINFORCEMENT
REVISION
ROOM
RA TED LOAD AMPERE
ROOF TOP UNIT
SCH, SCHED SCHEDULE
SD SPLITTER DAMPER
SECT SECTION
SHT
SPEC
SQ
SS
STD
STL
STO
STRUCT
SW
SHEET
SPECIFICATION
SQUARE
STAINLESS STEEL
STANDARD
STEEL
STORAGE
STRUCTURE. STRUCTURAL
SWITCH
T 3/P
TS
TON
TYP
U UG
\/ v
VCP
VERT
w w W/
WP
WT
X XFMR
90'
3W
TOP, TANGENT
THREE POLE
TUBULAR STEEL
TONELATE
TYPICAL
UNDERGROUND
VENT, VOLT, VALVE
VITRIFIED CLAY PIPE
VERTICAL
WIDTH, WASTE, WATER, WATT, WEST
WITH
WATERPROOF, WEATHERPROOF
WEIGHT
TRANSFORMER
ANGULAR
AT
AND
ANGLE DEGREE
NUMBER. POUND
DIAMETER
THREE WAYS
REVISED AND ENDORSED BY:
ACTIVITY PRINT NAME I INITIAL DATE REV.NO I DATE
ENVIROMENTAL DIVISION (DPW
0 & M DIVISION (DPW
' MASTER PLANNING (DPW) PROJECT MANAGER
A. MOJICA 1
1DIRECTORATE OF EMERG. SERV. (DES DRAFTSMAN
D. LEBRON INSTALLATION SAFETY OFFICE (ISO
DPTMS- AT/FP
NETWORK ENTERPRICE CENTER (NEC
ARCH, STRUC. DESIGN
F. ZAYAS
ELECTRICAL DESIGN
A. MOJICA I ENERGY CONSERVATION I I I !MECHANICAL DESIGN
N/A
APPROVED
REVISIONS
DEPARTMENT OF THE ARMY
HEADQUARTERS UNITED STATES ARMY
DIRECTORATE OF PUBLIC WORKS
FORT BUCHANAN, PUERTO RICO
APPD.BY
MAINTAIN/REPLACE PAD MOUNTED TRANSFORMERS
TRANSCLOSURES,PRIMARY MAIN SWITCHES AND TRANSFER SWffCH
TITLE SHEET, LOCATION SITE MAP, PROJECT SfTE LOCATION ANO INDEX OF DRAWINGS
RECOMMEND APPROVAL
LUIS E. TORRES
CHIEF, ENGINEERING DIVISION
SCALE: DRAWING NO.
I NOT TO SCALE I DPW-PR-1370-18
DATE:
FEBRUARY.2018 I T-1
MARIA A. LOPEZ
PROJECT NUMBER
R02-18 89-K-1370-R-18
IJ0-53105
DRAWER NO. I 1
ACTING DIRECTOR OF PUBLIC WORKS OF
T41
T2
TX1
T5
T3
T4T7
TX2
T8 T25
T43
TX3
T32
T28T27
TC
T30
T10
T46 T13
T11
T12
T45T48
T17 T18 T19
T20
TX7
TX4
T38
T44
TX6
T26
T35
TX5T168
T15T16
T47
EQUIPMENT INVENTORY
T39
T34
T39
T9
T169
T143
TX8
T6
NEW DPW FACILITIES 1
T-1
ITEM EXISTING LABEL REQUIRED KVA OUTPUT
VOLTAGE
PHASE
VOLTAGE
BUILDING
SERVED
APPLICABLE
NOTES FACILITY
T-2 T-3 T-4 T-5 T-6 T-7 T-8 T-9 T-10 T-11 T-12 T-13 T-14 T-15 T-16 T-17 T-18 T-19 T-20 T-21 T-22 T-23 T-24 T-25 T-26 T-27 T-28
T-30 T-31 T-32 T-33 T-34 T-35 T-36 T-37 T-38 T-39 T-40 T-41 T-42 T-43 T-44 T-45 T-46 T-47 T-48
TX-1
TX-2
TX-3
TX-4
TX-5
TX-6
TX-7
120/208 120/208 120/208
277/4801-500 1-225 1-300 1-750 1-1,500 1-300 1-150 1-500
1-225 1-500 1-1000 1-112.5 1-1500 1-1500 1-500 1-225 1-500 1-300 1-750 1-750
1-112.5
1-1000
1-225 1-225
1-750
1-225 1-150 1-300 1-750
1-225 1-150
1-750 1-75 1-150 1-225 1-150 1-50 1-300 1-1000
3-75 3-75 3-75 3-75 3-75 3-50 3-100
120/208 120/208
120/208 120/208
120/208
120/208
480/277 120/208
120/208 120/208 120/208 120/208 120/208 120/208
120/208 120/208
120/208 120/208 120/208 120/208 120/208 120/240 120/208 120/208
120/208 120/208 120/208 120/208 120/208
120/208
277/480
277/480
277/480 277/480
277/480
277/480
277/480 277/480 277/480 277/480 277/480 277/480
Health Clinic Youth Center Bowling Alley
NAVY 73, 74, 75, 77, 78
AFRC
Physical Fitness Center Welcome Center AFRC Vehicle Maintenance Shop Area 600
Network Enterprise Center (NEC) Elementary School Elementary School Chiller High School Buildings USAR Vehicle Maintenance PX Main Store Commissary Middle School Middle School Middle School Middle School PXtra Community Club
Golf Course Well Pump Maxie Williams
Headquarters Building
Brown Feeder - South Gate Turbine
Brown Feeder - Old DPW Turbine
Reserve Center
TBS/Medcom Medcom, USAR
CPAC & EOC
USAR
El Caney E Caney
Directorate of Logistics
Brown Feeder - Site 4 Toro Creek Brown Feeder - Site 1 East Side
Various Activities Brown Feeder - Sites 2 & 3 East Side Former Vacant
Chiller, Bldg. 1300 Network Enterprise Center (NEC) Elementary School (Temporary Facility)
Mc Arthur Field Gas Station Child Development Center
Golf Club MWR Administration Office DES/Fire Department Pentagon Federal Credit Union National Guard
National Guard
Post Office / TBS / Chapel
1-300
277/480
120/208
T1
1-750 277/480 3
1-315 3
1-315
1-500 13,200 3
1-1000 13,200 3
1-1000 13,200 3
T1
T-23
T24
T-49
T-50
T-51
1-500
1-500
1-500
13,200
13,200
13,200
SOLAR PANELS - COMMISSARY PARKING
SOLAR PANELS - AQUA PARK
SOLAR PANELS - BLDG. 353 PARKING
52 T-52 1-75 120/208 3 MOTOR POOL USAR CAGUAS
53 T-53 1-2500 480/277 3 PRNG READINESS CENTER
54 T-54 1-1500 13,200 3 SOLAR PANELS - OLD DPW 556
55 T-55 1-2500 480/277 3 ELEMENTARY SCHOOL COMPLEX
56 T-56 1-1500 480/277 3 JFHQ - PRNG
1-500
T37
T40
T50 T51
T55
T54
T53
T36
T49
T52
T-1 T-2 T-3 T-4 T-5 T-6 T-7 T-8 T-9 T-10
T-13 T-143 T-15 T-16 T-17 T-18 T-19 T-20 T-168 T-169 T-23 T-24 T-25 T-26 T-27 T-28
20 MVA Substation Low Voltage Service
T-30 T-C T-32 T-39 T-34 T-35 T-36 T-37 T-38 T-39 T-40 T-41 T-1 T-43 T-44 T-45 T-46 T-47 T-48
TX-1
TX-2
TX-3
TX-8
T-49
T-50
T-51
T-52
T-53
T-54
T-55
T-56
LABEL
T56
T-12 T-11
73 to 78
1029 & 1030
1004 & 1062 1070 & 1072
353-357
224,225 227,228,231
192-193
679-681
79 to 82
1300-1301
Trailers
171-172
218,219,220, 34, 37, 38
13.2 KV LINE
13.2 KV LINE
13.2 KV
13.2 KV
13.2 KV
13.2 KV
UTILITY LINE
13.2 KV
UTILITY LINE
13.2 KV
UTILITY LINE
B - 545 -550
13.2 KV
UTILITY LINE
64 PMS 13,200 3 NEXT TO BLDG. 514PMS 514
65 PMS-1 13,200 3PMS-1 AREA 200
66 PMS-2 13,200 3PMS-BP AREA 200
67 PMS-3 13,200 3 NEXT TO BLDG. 231PMS-3 231
68 TRANSFER 13,200 3TS AREA 200
AREA 200
AREA 200
AREA 200
T-29 1-75 3120/208PM1
TX-5
TX-6
TX-7
1,20 2,4,6,8,9,13,14,22
1,20
1,20
1,20 1,20
1,20 1,20 1,18
7,20
7,20 1,20
1,20
NOTES:
1- CLEAN ENCLOSURE DIRT & DUST, INCLUDING INSIDE, OUTSIDE AND BETWEEN DOORS. ADD SOLVENT TO THE CONNECTORS AND BUSHINGS OF THE PRIMARY 15 KV AND SECONDARY 600 V SIDES, TO TAKE AWAY MOISTURE. VERIFY AND ADJUST CONNECTION TIGHTNESS AND CLEAN CONDUCTORS. REPLACE ALL OUTSIDE TRANSFORMER LABELS. USE SKETCH INFORMATION PROVIDED ON SHEET E-3. REMOVE CORROSION AND SEAL CAVITIES DUE TO CORROSION. SEAL SPACE BETWEEN METAL AND CONCRETE PAD. PAINT ENCLOSURE INCLUDING OUTSIDE, INSIDE AND BETWEEN DOORS. PAINT THE CONCRETE PAD WITH YELLOW TRAFFIC COLOR. ADD NITROGEN TO PAD MOUNTED
TRANSFORMER.
2. HEALTH CLINIC CTs: DISCONNECT SIX CURRENT TRANSFORMERS AS SHOWN IN SPECIFIC TASK 5.8.3.1 RETURN THREE OF THE SIX CT's, NOT OPERATIONAL, TO COR.
3. TRANSFORMER ENCLOSURE: TWO EXISTING 300 KVA TRANSFORMER WILL BE REPLACED FOR A NEW TRANSFORMER AND RETURNED TO
COR. CONTRACTOR SHALL DISPOSE THE OLD AND DAMAGED 300 KVA TRANSFORMER LOCATED IN O&M PARKING LOT AT DPW.
4- PERFORM ACCEPTANCE TESTS: INSULATION POWER FACTOR TEST, INSULATION RESISTANCE TEST (MEGGER), TURN RATIO TEST, OIL
SCREEN
(DIELECTRIC, NEUTRALIZATION, INSULATION POWER FACTOR AND WATER CONTENT) AND SUBSTATIONS GROUND TEST. VERIFY TIGHTENING OF CONNECTION. PROVIDE RESULTS AND RECOMMENDATIONS TO DPW, ENGINEERING DIVISION. IF ANY EQUIPMENT REQUIRES ADDITION OF ANY OF THE NOTES ESTIPULATE ON THIS SHEET AND IS NOT STATED AT THE TABLE APPLICABLE NOTE, CONTRACTOR SHALL APPLY IT.
5. BLDG.194 BOXES: TRANSFORMER AT THIS LOCATION WILL BE REPLACED. CONTRACTOR SHALL REPLACE TWO BOXES ATTACHED TO THE TRANSFORMER AND ITS COMPONENTS FOR NEW NEMA 4X ENCLOSURES FOR THE SAME DIMENSION. REPLACE AND INSTALL A NEW LOAD
CENTER, RAIN PROOF, 120/208V. LOAD CENTER SHALL BE SAME CAPACITY AS EXISTING. REPLACE ONE THREE EXISTING LIGHTING CONTACTORS, 150 AMPS, 120/240V. 250 AMPS, 208 V. REMOVE EXISTING CONTROL BOX AND TIMER BOX. PURCHASE AND INSTALL A
NEW, TWO POSITION SWITCH BOX, 208V ON/OFF NEMA 3R FOR LIGHTING CONTROL.
SITE MAP AND WORKING DETAILS FORT BUCHANAN, PUERTO RICO
E-1
4,6,8,9,10,12,13,14,15,21
4,6,8,9,10,13,14,15,21 4,6,8,11,14,16,15,21,22
3,4,6,8,9,10,13,14 4,6,8,9,12,13,14,15,21,22
4,6,8,9,12,13,14
4,6,8,9,10,13,14,22 4,6,8,9,10,12,13,14,15,21
4,5,6,8,9,12,13,14,22
GOLF COURSE
4,6,8,9,13,14,22
4,6,8,9,13,14,22
7,20
7,20
7,20
7,20
N/A
N/A
N/A
N/A
N/A
PMS
PMS-3
PMS-1
PMS-BP
TS
6- REPLACE TRANSFORMER FOR SAME CAPACITY STAINLESS STEEL TRANSFORMER AND PER EFFICIENCY TABLE SHOWN ON THE SCOPE OF REQUIRE CHARACTERISTIC ARE ALSO INCLUDED IN THE SCOPE OF WORK. SEE ITEM 5.10.3.1 FOR BLGD. 167.
7- CLEAN ENCLOSURE DIRT & DUST, INCLUDING INSIDE, OUTSIDE AND BETWEEN DOORS. ADD SOLVENT TO THE CONNECTORS AND BUSHINGS OF THE PRIMARY 15 KV AND SECONDARY 600 V SIDES TO TAKE AWAY MOISTURE. VERIFY AND ADJUST CONNECTION TIGHTNESS AND CLEAN CONDUCTORS. PAINT THE CONCRETE PAD WITH YELLOW TRAFFIC COLOR.
8- INSULATION RESISTANCE TEST: THE CONTRACTOR SHALL PERFORM INSULATION RESISTANCE TEST ON SECONDARY EXISTING 600v CABLES WHERE NEW TRANSFORMERS BEING INSTALLED, IN ORDER TO CONFIRM CABLE OPERATION FOR ACCEPTATION.
9- CURRENT TRANSFORMERS (CT's) : THE CONTRACTOR SHALL HOOK-UP RECORDED CT's CABLES CONNECTIONS IN ELEVEN (11) TRANSFORMERS AND TEMPORALLY DISCONNECT FROM POWER METERS. RETAIN Ct's AND RECONNECT CT's AFTER NEW TRANSFORMER BEEN PLACED AND POWER METERS BEEN INSTALLED. RE-INSTALL CURRENT TRANSFORMERS AS SAME AS BEFORE, UTILIZING RECORDED HOOK-UP CONNECTIONS, INCLUDING THE SAME PHASING.
10- ADVANCE METER (POWER METER MODBUS) : SHALL BE REMOVED AND RETAINED FOR REINSTALLATION AFTER NEW TRANSFORMER BEEN INSTALLED. CONTRACTOR SHALL HOOK-UP RECORDED ADVANCE METER CABLE AND CONDUITS, TAGGED, COIL CONDUIT AND FITTING BACK AND RETAIN FOR REINSTALLATION. ENSURE CABLES ARE NOT DAMAGED DURING THIS PROCESS. RE-INSTALL ADVANCE METER AS SAME AS BEFORE UTILIZING RECORDED HOOK-UP CONNECTIONS. THIS WORK SHALL BE PERFORMED IN STRICT
COORDINATION WITH THE NETWORK ENTERPRISE CENTER (NEC) AUTHORIZED PERSONNEL.
11- NAVY INSTRUMENTATION: DISCONNECT AND REMOVE ELECTRICAL POWER METER BOX. PROVIDE REMOVED EQUIPMENT WITH COMMUNICATION MATERIAL TO COR. DISCONNECT, REMOVE AND RETURN 6 CURRENT TRANSFORMERS, NOT OPERATIONAL TO COR.
12- MAIN BREAKERS: REPLACE FIVE (5) THREE (3) EXISTING MOLDED CASE CIRCUIT BREAKERS AT THE SECONDARY SIDE AND ON FIVE THREE NEW RANSFORMER AFTER NEW EQUIPMENT BEEN PLACED. CONDUCT REQUIRED TESTING FOR NEW CIRCUIT BREAKERS AS DEFINED BY THE UL489 TEST STANDARD. PROVIDE EXISTING AND REMOVED BREAKERS TO COR.
13- ELECTRICAL POWER METERS: ON ELEVEN (11) OF THE TWELVE (12) NEW TRANSFORMERS, CONTRACTOR SHALL HOOK-UP RECORDED METER CABLES, TAGGED, COIL CONDUIT AND FITTING BACK FROM METER. ENSURE CABLES ARE NOT DAMAGED DURING THIS PROCESS. REMOVE THE POWER METER FORM ELEVEN (11) TRANSFORMER, AND SAFELY SAVE FOR REINSTALLATION AFTER NEW TRANSFORMER ARE INSTALLED. WHERE POWER METERS ENCLOSURES EXIST CONTRACTOR SHALL PAINT/REPAIRED AS SAME AS TRANSFORMER ENCLOSURES. RE-INSTALL AND RE-CONNECT POWER METERS AS SAME AS BEFORE, UTILIZING RECORDED
HOOK-UP CONNECTIONS, INCLUDING THE SAME PHASING .
14- CONCRETE PAD: THE CONTRACTOR SHALL USE, AS REFERENCE, DPW CONCRETE GROUT DETAIL PHOTO IN SHEET E-3 FOR TERMINATION OF THE PAD, WHERE 12 TRANSFORMER ARE INSTALLED. CREATE ONE NEW CONCRETE PAD FOR BLDG.168 USING CONCRETE FLOOR PAD DETAIL ON SHEET E-3. EXISTING CONCRETE PAD: THE CONTRACTOR SHOULD REPAIR THE SLAB SURFACE
WITH NON-SHRINK GROUT AFTER REMOVE THE PM TRANSFORMER.
15- PRIMARY RAISER: FIVE (5) SIX (6) TRANSFORMER PRIMARY RAISERS SHALL BE REMOVED AND DISPOSED: BLDG. 148, T-3; BLDG. 152, T-8; BLDG. 168, T-4; BLDG. 660, T-169; BLDG. NAVY, T-5; BLDG. 167, T-7. FURNISH AND INSTALL NEW UNDERGROUND HIGH VOLTAGE CONDUCTORS (RAISERS) SHALL BE 15 KV, COOPER, CROSS LINKED POLYETHYLENE (XLP). OVER POTENTIAL TEST 15 KV FEEDER SHALL BE COMPLETED. MINIMUM CONDUCTOR GAGE SHALL BE NOT LESS THAN #2 AWG COOPER WITH INSULATION FOR 15 KV. FURNISH AND
INSTALL TERMINATIONS ON BOTH ENDS OF NEW CONDUCTORS, AT POLES AND TRANSFORMERS.
16- NAVY CURRENT TRANSFORMER CT's: DISCONNECT, REMOVE AND RETURN SIX (6) CURRENT TRANSFORMERS, NOT OPERATIONAL
TO COR.
17- NOT USED.
18- CLEAN ENCLOSURE DIRT & DUST, INCLUDING INSIDE, OUTSIDE AND BETWEEN DOORS. ADD SOLVENT TO THE CONNECTORS AND BUSHINGS OF THE PRIMARY 15 KV AND SECONDARY 600 V SIDES TO TAKE AWAY MOISTURE. VERIFY AND ADJUST CONNECTION TIGHTNESS AND CLEAN CONDUCTORS. REPLACE ALL OUTSIDE TRANSFORMER LABELS. USE SKETCH INFORMATION PROVIDED
ON SHEET E-3.
19- EVERY WEEK AFTER COMPLETION OF THE REQUIRED WORK, CONTRACTOR SHALL NOTIFY DPW PERSONNEL IN ORDER TO OPEN TRANSFORMER AND INSPECT IT. THIS INSPECTION SHALL OCCUR IN LESS THAN A WEEK AFTER COMPLETION.
20- DISSOLVED GAS ANALYSIS TEST (DGA): PERFORM DGA TEST IN ALL PAD MOUNTED TRANSFORMER WITH A CAPACITY OF 750 KVA
OR HIGHER. PROVIDE RESULTS AND RECOMMENDATIONS TO DPW, ENGINEERING DIVISION
21- OVER POTENTIAL TEST OR HIPOT: THE CONTRACTOR SHALL PERFORM OVER POTENTIAL TEST, UTILIZING 55 KV DC TO NEW 15 KV
FEEDERS.
22- THE CONTRACTOR SHALL PERFORM MEGGER TEST TO EXISTING 15 KV FEEDERS AT 10 KV DC WHERE NEW TRANSFORMERS
BEING INSTALLED, IN ORDER TO CONFIRM CABLE OPERATION FOR ACCEPTATION.
13,200
13,200
SWITCH
ABBREVIATTIONS:
PMS - PRIMARY MAIN SWITCH
T - TRANSFORMER
TX - TRANSCLOSURE
TS - TRANSFER SWITCH
NA - NOT APPLY
DPW - DIRECTORATE OF PUBLIC WORKS
O&M - OPERATION AND MAITENANCE
TRANSCLOSURES,PRIMARY MAIN SWITCHES AND TRANSFER SWITCH
MAINTAIN/REPLACE PAD MOUNTED TRANSFORMERS
PM- 1
(SHALL BE T-33)
(SHALL BE T-42)
SU
23- REPLACE ALL GROUND TERMINAL LUGS, EQUIPMENT GROUNDING AND BONDING CONDUCTORS FOR NEW COOPER TERMINAL LUGS, BARE
COOPER AWG#6 GROUNDING CONDUCTOR AND AWG #8 STRANDED THWN BONDING CONDUCTORS.
69 SWITCH 13,200 3SU PENFED CREDICT UNION1N/A
NA A
A4,6,8,9,13,14,22
A
A
A
,15,21 A
A
A
A 3, A
70 120/240 1T-57 174 MWR Basketball Court181-15
71 277/480 3T-58 70 New NAVY Bldg181-300
A
T-57
T-58
NON-SHRlr« CONCRETE OROUT
FOR CABINET PROTECTION.
(3"X3") r-------------------------1-----------------, PAD MOUNTED TRASFORMER
II" CONCRETE FLOOR SLAB,
Fe' - 3,000 PSI
6"-0"x6'--6"
·, .. ,, .•. · ·, ~- /. ·.~ .. · '.··"·1·~1 .'.'l ;· ·.• '~ •.• ~ ••. ·..,. .• _' ·_.... .• •. •.
"fr.m'.....;.~'=.:""".*"'"~"F.'l""F:""'i""~"""'l""'!."i"~~*"'~~ . ; t ~ :·: .. : ·~~ . ·. '
. ,,,• ;_~--~~-.·~~-·· ,• ..• ·•· .. · .. •· •. • .. • •·1."~f :J .. 1~-.··.-~· ., •; ·.'~··''· ;,/ ··:~........ :::~~~~~-· ::~1 s·
· · E~m~~... 1a1a1a11 m m ··:: · • • •' ~ ;·Jn!fimm;nmmrnmir--- COMPACTED 116% 1=::':111=::':111=::':11 l==l I 1=111= ~. . : ~- m~rn~u l :y .;. ~ • ·: • mill!Tiilln t-.. -i l~IIIillill' ;rn;...m~' 1-111Wrri~ EXISTING ELECmlCAL
,~III~
:mm'-·
EXISTING UNJIST\JRBED SOIL
EXCAVATION SECTlON
FOR PVC CONDUITS.
NEW CONCRETE FLOOR FOR PAD MOUNTED
TRANSFORMER FOR BLDG 168
STAINLESS STEEL UNl8TRlJT
SUPPORT FAME.
COMMUNICATION CONDUIT TO
*USE CONCRETE GROUT DETAIL. SEE SOW ITEM 5.2 F
*EXCAVATION SHALL BE COMPLETED BY HAND.
*RE-USE EXISTING GROUNDING SYSTEM.
e
0 0
0 0
0 0
0 0 o"' = = 0
0 0
•r
BLOG. COMMUJ«:ATION RACK ~' ..
CT I INPUT POWER OONDUIT ___ _ j
TO SWITCHGEAR
4" X 4" X -,t BASE PLATE
EXISTING SLAB STRUT RACK MOUNTED METER
ENCLOSURE DETAIL
GALVANIZE ANCHOR
BOLT~"X3"
i
;, .. . . . . .. .. . . . . " ·i · ..
'·.. ... • . ..,'4 . . .4· '! ' · .... ..... •' .. . . ., ... , ..• . .... _.,, GALVANIZE STEEL
PLATE 2"X2°Xt
LEFT SIDE OF TRANSFORMER: RIGHT SIDE OF TRANSFORMER:
120/208
[i-11 I !· YOLlS I 7'"
[j __ ] ;
DANGER) I
HIGH r VOLTAGE
-10"-
SECONDARY
DANGEi
HIGH
VOLTAGE
r_J
PELIGR•
ALTO
VOLTAGE
*USE TABLE FOR VOLTAGE LABEL INFORMATION & TRANSFORMER
NUMBER IDENTIFICATION •
TRANSFORMER, PMS, TS &
LABELS
[f J f" 13-75tj ;
r
L-7"'
120/208 DANGER) I VOLlS r SECONDARY HIGH r -10·- VOLTAGE
'---10" -
TRANSFORMER BANK (TRANSCLOSURE) LABELS
*USE TABLE FOR TRANSCLOSURE LABEL INFORMATION. ADD LABEL IDENTIRCATION ACCORDING TO EACH
EQUIPMENT REQUIREMENT.
NON-SHRINK CONCRETE OROLJT
FOR CABr<IET PROTECTlON.
CONCRETE GROUT PROTECTION FOR ALL NEW
TRANSFORMERS
*SEE SOW ITEM 5.2 F
*RE-USE EXISTING GROUNDING SYSTEM.
*INSTALL A SILICONE SEALING COMPOUND UNDERNEATH THE CONCRETE
GROUT & BETWEEN PAD & METAL CABINET.
POINT OF CONNECTION ITEM DESCRIPTION
©'""'* OVERHEAD COM)OOJ"OR, 4 / 0 AWCI, ACSR
©""'* PIN TOP INSULATOR
~ 8ALYANIZED STEEL DOUBLE CROISARM, T2"" LONI, I HOLES MADE BJ
\!) MMUFACTURER. ©""'* STIRRUPS (3 EACH).
~ UGHnNI ARRESRIR, (3 BlCH).
~ T!RMINATDR, 111 KY, PDLl'M!R HOUSm(3 DCll).
©""" FUSEO CUTOUT ASSEMBLY, (3 EACH).
©""'* HOT LINE CU.MP (3 EACH).
©""'* CONCREIE POLE, 114, 41 FT HIGH.
~ CONOUrr RIS!R, 4 INCH!& OIAMl!ll!R, RllMD llALYANlzm Sll!l!L
@ l MOUNTING BRACKEr, 3 EACH FOR UGHnNB ARRESTOR, 3 EACH FOR ASSEMM.Y.
~ CONDUCl'OR, 2AWCl,COPPER,XLP,1.5KY(3 EACH).
(§}* POLYElllYLENE, 2 AM CONDUCTOR.
~ OVERHEAD 6ROLlllD CONDUCl'OR.
@"""'* &ROUND CONNECllCUI CONDUCTOR, 8 AWG, SOLID COPPER.
g-+ CUYISCLAMP.
r.:ort 11-YIEALPUll FOR 2AW8 CABLE.
~ STAINLESSllm.CDNDUlrCLAMP. w UJERUU CDNDUlr 8Ll'PORT.
CONCRETE POLE DETAIL
REV.NO I DATE
PROJECT MANAGER
A. MOJICA
DRAFTSMAN
D. LEBRON
ARCH, STRUC. DESIGN
F. ZAYAS
ELECTRICAL DESIGN
N/A
APPROVED
REVISIONS
DEPARTMENT OF THE ARMY
HEADQUARTERS UNITED STATES ARMY
DIRECTORATE OF PUBLIC WORKS
FORT BUCHANAN, PUERTO RICO
APPD.BY
MAINTAIN/REPLACE PAD MOUNTED TRANSFORMERS
TRANSCLOSURES,PRIMARY MAIN SWfTCHES AND TRANSFER SWITCH
DETAJLS
RECOMMEND APPROVAL
LUIS E. TORRES
CHIEF, ENGINEERING DIVISION
SCALE: I DRAWING NO.
NOT TO SCALE DPW-PR-1370-18
E-2 DATE: FEBRUARY,2018
MARIA A. LOPEZ
ROJECT NUMBER
R02-18
DRAWER NO. I 3
ACTING DIRECTOR OF PUBLIC WORKS 89-K-1370-R-18
IJ0-53105
OF
| 201810807- REV A- Sheet 2- Maintain- Replace XRMS.pdf |
| Drawings (Final - Not Signed) IFB W912C3-18-B-0002, Pad Mounted Transformers, 28 Feb 2018.pdf |
| SH1 FINAL FEB 2018 |
| SH2 FINAL FEB 2018 |
| SH 3 FINAL FEB 2018 |
File details come from the government source that posted it.