A T L A N T I c 0 c E A N
PUNTA BORINQUEN
(FORME..R__fl.AMEY U S AIR FORCE BASE) r ~~-~--'-._~-~--~-;~
FORT BUCHANAN
MAINTAIN /REPLACE PAD MOUNTED TRANSFORMERS,
\ p u E R T 0 R I c 0 ROOSEVELT ROADS f' fl SALINAS / ::,) __,, _ v TRAING AREA ('
(r'----..J'--.,,,_'\ ""~~_./~} ~~~~ _,......,_ ~-~
TRANSCLOSURES, PRIMARY MAIN SWITCHES &
~ ~c;- v '"/~/~ ©-
• TRANSFER SWITCH c A R I B B E A N s E A -·-
N
SHEET NO.
D E x 0 F D R A w N G s
DRAWING NO. TITLE
T-1
E-1 E-2
TITLE SHEET, LOCATION SITE MAPS, AND INDEX OF DRAWINGS
SITE MAP AND WORKING DETAILS FORT BUCHANAN, PUERTO RICO
DETAILS
LOCATION MAP
Project Site
BUCHANAN SITE MAP
400 0 100 !lO
~ 1N FEET
LIST OF ABBREVIATIONS NOTE: SOME ABBREVIATIONS LISTED ARE NOT CONTAINED IN THESE DRAWINGS
A A.B.I.
A/C
AFF
AL, ALUM
ALT
AMP,A
AP
APPROX
ARCH
ARR
AWG
G B, BOT
BD
BLDG, B
BW
C Cl cc.ere
CFM
CKT
CLG
CMU
CND,C
COL
CONC
COND
CONN
CONST
D D
DET, DTL
D, DIAM.
DIM
DWG
ACOUSTICAL BATT INSULATION
AIR CONDITIONING
ABOVE FINISH FLOOR
ALUMINUM
ALTERNATE
AMPERE
ACCESS PANEL
APPROXIMATE
ARCHITECTURAL
ARRESTOR
AMERICAN WIRE GAGE
BOTIOM
BOARD
BUILDING
BOTH WAY
CIRCUIT NUMBER
CENTER TO CENTER
CUBIC FEET PER MINUTE
CIRCUIT
CENTERLINE
CEILING
CONCRETE MASONRY UNITS
CONDUIT
COLUMN
CONCRETE
CONDUCTOR
CONNECTION
CONSTRUCTION
DEPTH, DEEP, DEGREE OF CURVATURE
DETAIL
DIAMETER
DIMENSION
DRAWING
E EA
EF
EL, ELEV
ELEC
EMB
EMT
ETC
EW
EXIST, EX, E
F F
G
FDB
FD
FFE
FIN
FL
FT
FWB
GA, G
GALV
GB
GFCI
GPM
GR
GRD
GW
H H, HGT, HT
HEX
HP
ID
IN
IN C.W.
,J JB
EACH
EACH FACE
ELEVATION
ELECTRIC, ELECTRICAL
EMBBEDED
ELECTRICAL METALLIC TUBING
ETCETERA
EACH WAY
EXISTING
FARENHEIT
F ARENHEIT DRY BULB
FLEXIBLE DUCT
FINISHED FLOOR ELEVATION
FINISH
FLOOR, FLASHING
FOOT, FEET
FARENHEIT WET BULB
GAGE
GALVANIZED
GYPSUM BOARD
GROUND FAULT CIRCUIT INTERRUPTOR
GALLONS PER MINUTE
GRADE
GROUND
GROUND WATER
HEIGHT
HEXAGONAL
HORSEPOWER
INSIDE DIAMETER, INSIDE DIMENSION
INCH
INCH COLD WATER
JUNCTION BOX
KV
KVA
KW
L L
IV
LBS
LED
LT
MAX
MBH
MECH
MD
MIN
MISC
MTD
N, NW
NFPA
NIC
NO
NTS
O OD
OPNG
OBD
KILOVOLT
KILOVOLT-AMPERE
KILOWATT
LENGTH, LENGTH OF CURVE
POUNDS
LIGHTING EMITING DIODE
LIGHT
MAXIMUM
MEGA BRITISH HOUR
MECHANICAL
MANUAL DAMPER
MINIMUM
MISCELLANEOUS
MOUNTED
NORTH, NEW
NATIONAL FIRE PROTECTION
ASSOCIATION
NOT IN CONTRACT
NUMBER
NOT TO SCALE
OUTSIDE DIAMETER
OPENING
OUTSIDE BLADE DAMPER
p
PL
PRELIM
PSI
PVC
PSF
R R
RR
RG
s
RE, REF
REINF
REV
RM
RLA
RTU
PLATE
PRELIMINARY
POUNDS PER SQUARE INCH
POINT OF VERTICAL CURVE,
POLYVINYL CHLORIDE
POUNDS PER SQUARE FOOT
RADIUS, RISER, RUBBER SHEATH
RETURN REGISTER
RETURN GRILLE
REFERENCE, REFER TO
REINFORCEMENT
REVISION
ROOM
RA TED LOAD AMPERE
ROOF TOP UNIT
SCH, SCHED SCHEDULE
SD SPLITTER DAMPER
SECT SECTION
SHT
SPEC
SQ
SS
STD
STL
STO
STRUCT
SW
SHEET
SPECIFICATION
SQUARE
STAINLESS STEEL
STANDARD
STEEL
STORAGE
STRUCTURE. STRUCTURAL
SWITCH
T 3/P
TS
TON
TYP
U UG
\/ v
VCP
VERT
w w W/
WP
WT
X XFMR
90'
3W
TOP, TANGENT
THREE POLE
TUBULAR STEEL
TONELATE
TYPICAL
UNDERGROUND
VENT, VOLT, VALVE
VITRIFIED CLAY PIPE
VERTICAL
WIDTH, WASTE, WATER, WATT, WEST
WITH
WATERPROOF, WEATHERPROOF
WEIGHT
TRANSFORMER
ANGULAR
AT
AND
ANGLE DEGREE
NUMBER. POUND
DIAMETER
THREE WAYS
REVISED AND ENDORSED BY:
ACTIVITY PRINT NAME I INITIAL DATE REV.NO I DATE
ENVIROMENTAL DIVISION (DPW
0 & M DIVISION (DPW
' MASTER PLANNING (DPW) PROJECT MANAGER
A. MOJICA 1
1DIRECTORATE OF EMERG. SERV. (DES DRAFTSMAN
D. LEBRON INSTALLATION SAFETY OFFICE (ISO
DPTMS- AT/FP
NETWORK ENTERPRICE CENTER (NEC
ARCH, STRUC. DESIGN
F. ZAYAS
ELECTRICAL DESIGN
A. MOJICA I ENERGY CONSERVATION I I I !MECHANICAL DESIGN
N/A
APPROVED
REVISIONS
DEPARTMENT OF THE ARMY
HEADQUARTERS UNITED STATES ARMY
DIRECTORATE OF PUBLIC WORKS
FORT BUCHANAN, PUERTO RICO
APPD.BY
MAINTAIN/REPLACE PAD MOUNTED TRANSFORMERS
TRANSCLOSURES,PRIMARY MAIN SWITCHES AND TRANSFER SWffCH
TITLE SHEET, LOCATION SITE MAP, PROJECT SfTE LOCATION ANO INDEX OF DRAWINGS
RECOMMEND APPROVAL
LUIS E. TORRES
CHIEF, ENGINEERING DIVISION
SCALE: DRAWING NO.
I NOT TO SCALE I DPW-PR-1370-18
DATE:
FEBRUARY.2018 I T-1
MARIA A. LOPEZ
PROJECT NUMBER
R02-18 89-K-1370-R-18
IJ0-53105
DRAWER NO. I 1
ACTING DIRECTOR OF PUBLIC WORKS OF
NOTES:
1- CLEAN ENCLOSURE DIRT Be DUST, INCLUDING INSIDE, OUTSIDE AND BETWEEN DOORS. ADD SOLVENT TO THE CONNECTORS AND BUSHINGS OF THE PRIMARY 15 KV AND SECONDARY 600 V SIDES, TO TAKE AWAY MOISTURE. VERIFY AND ADJUST CONNECTION TIGHTNESS AND CLEAN CONDUCTORS. REPLACE ALL OUTSIDE TRANSFORMER LABELS. USE SKETCH INFORMATION PROVIDED ON SHEET E-3. REMOVE CORROSION AND SEAL CAVITIES DUE TO CORROSION. SEAL SPACE BETWEEN METAL AND CONCRETE PAD. PAINT ENCLOSURE INCLUDING OUTSIDE, INSIDE AND BETWEEN DOORS. PAINT THE CONCRETE PAD WITH YELLOW TRAFFIC COLOR. ADD NITROGEN TO PAD MOUNTED
TRANSFORMER.
2. HEALTH CLINIC CTs: DISCONNECT SIX CURRENT TRANSFORMERS AS SHOWN IN SPECIFIC TASK 5.8.3.1 RETURN THREE OF THE SIX Cl's, NOT OPERATIONAL, TO COR.
3. TRANSFORMER ENCLOSURE: EXISTING 300 KVA TRANSFORMER WILL BE REPLACED FOR A NEW TRANSFORMER AND RETURNED TO COR.
CONTRACTOR SHALL DISPOSE THE OLD AND DAMAGED 300 KVA TRANSFORMER LOCATED IN OS.M PARKING LOT AT DPW.
4- PERFORM ACCEPTANCE TESTS: INSULATION POWER FACTOR TEST, INSULATION RESISTANCE TEST (MEGGER), TURN RATIO TEST, OIL
SCREEN
(DIELECTRIC, NEUTRALIZATION, INSULATION POWER FACTOR AND WATER CONTENT) AND SUBSTATIONS GROUND TEST. VERIFY TIGHTENING OF CONNECTION. PROVIDE RESULTS AND RECOMMENDATIONS TO DPW, ENGINEERING DIVISION. IF ANY EQUIPMENT REQUIRES ADDITION OF ANY OF THE NOTES ESTIPULATE ON THIS SHEET AND IS NOT STATED AT THE TABLE APPLICABLE NOTE, CONTRACTOR SHALL APPLY IT.
5. BLDG.194 BOXES: TRANSFORMER AT THIS LOCATION WILL BE REPLACED. CONTRACTOR SHALL REPLACE TWO BOXES ATTACHED TO THE TRANSFORMER FOR NEW NEMA 4X ENCLOSURES FOR THE SAME DIMENSION. REPLACE AND INSTALL A NEW LOAD CENTER, RAIN PROOF, 120/208V. LOAD CENTER SHALL BE SAME CAPACITY AS EXISTING. REPLACE ONE EXISTING LIGHTING CONTACTOR, 150 AMPS, 120/240V.
DE DIEGO EXPRESSWAY ( ROAD NO PR-28 )
IT1, T1 T3 T3
6- REPLACE TRANSFORMER FOR SAME CAPACITY STAINLESS STEEL TRANSFORMER AND PER EFFICIENCY TABLE SHOWN ON THE SCOPE OF REQUIRE CHARACTERISTIC ARE ALSO INCLUDED IN THE SCOPE OF WORK. SEE ITEM 5.10.3.1 FOR BLGD.167.
7- CLEAN ENCLOSURE DIRT Be DUST, INCLUDING INSIDE, OUTSIDE AND BETWEEN DOORS. ADD SOLVENT TO THE CONNECTORS AND BUSHINGS OF THE PRIMARY 15 KV AND SECONDARY 600 V SIDES TO TAKE AWAY MOISTURE. VERIFY AND ADJUST CONNECTION TIGHTNESS AND CLEAN CONDUCTORS. PAINT THE CONCRETE PAD WITH YELLOW TRAFFIC COLOR.
8- INSULATION RESISTANCE TEST: THE CONTRACTOR SHALL PERFORM INSULATION RESISTANCE TEST ON SECONDARY EXISTING 600V CABLES WHERE NEW TRANSFORMERS BEING INSTALLED, IN ORDER TO CONFIRM CABLE OPERATION FOR ACCEPTATION.
9- CURRENT TRANSFORMERS (CT'S) : THE CONTRACTOR SHALL HOOK-UP RECORDED Cl's CABLES CONNECTIONS IN ELEVEN (11) TRANSFORMERS AND TEMPORALLY DISCONNECT FROM POWER METERS. RETAIN Ct's AND RECONNECT Cl's AFTER NEW TRANSFORMER BEEN PLACED AND POWER METERS BEEN INSTALLED. RE-INSTALL CURRENT TRANSFORMERS AS SAME AS BEFORE, UTILIZING RECORDED HOOK-UP CONNECTIONS, INCLUDING THE SAME PHASING.
10-ADVANCE METER (POWER METER MODBUS): SHALL BE REMOVED AND RETAINED FOR REINSTALLATION AFTER NEW TRANSFORMER BEEN INSTALLED. CONTRACTOR SHALL HOOK-UP RECORDED ADVANCE METER CABLE AND CONDUITS, TAGGED, COIL CONDUIT AND FITTING BACK AND RETAIN FOR REINSTALLATION. ENSURE CABLES ARE NOT DAMAGED DURING THIS PROCESS. RE-INSTALL ADVANCE METER AS SAME AS BEFORE UTILIZING RECORDED HOOK-UP CONNECTIONS. THIS WORK SHALL BE PERFORMED IN STRICT
COORDINATION WITH THE NETWORK ENTERPRISE CENTER (NEC) AUTHORIZED PERSONNEL.
11- NAVY INSTRUMENTATION: DISCONNECT AND REMOVE ELECTRICAL POWER METER BOX. PROVIDE REMOVED EQUIPMENT WITH COMMUNICATION MATERIAL TO COR. DISCONNECT, REMOVE AND RETURN 6 CURRENT TRANSFORMERS, NOT OPERATIONAL TO COR.
I SU I IT168 I ITXSI I T9
,\ ~ r~ - - =--;;=±-------J~-/-(__-1 ..------.1\ ~ ... ~v ~- .;:_ ~~"fi\
-.r~
PMS
TX1
2Q-.._\
T
TS
TS - """"'H"" ITS
12- MAIN BREAKERS: REPLACE FIVE (5) EXISTING MOLDED CASE CIRCUIT BREAKERS AT TllE SECONDARY SIDE AND ON FIVE NEW TRANSFORMER AFTER NEW EQUIPMENT BEEN PLACED. CONDUCT REQUIRED TESTING FOR NEW CIRCUIT BREAKERS AS DEFINED BY
THE UL489 TEST STANDARD. PROVIDE EXISTING AND REMOVED BREAKERS TO COR.
13- ELECTRICAL POWER METERS: ON ELEVEN (11) OF THE TWELVE (12) NEW TRANSFORMERS, CONTRACTOR SHALL HOOK-UP RECORDED METER CABLES, TAGGED, COIL CONDUIT AND FITTING BACK FROM METER. ENSURE CABLES ARE NOT DAMAGED DURING THIS PROCESS. REMOVE THE POWER METER FORM ELEVEN (11) TRANSFORMER, AND SAFELY SAVE FOR REINSTALLATION AFTER NEW TRANSFORMER ARE INSTALLED. WHERE POWER METERS ENCLOSURES EXIST CONTRACTOR SHALL PAINT/REPAIRED AS SAME AS TRANSFORMER ENCLOSURES. RE-INSTALL AND RE-CONNECT POWER METERS AS SAME AS BEFORE, UTILIZING RECORDED
HOOK-UP CONNECTIONS, INCLUDING THE SAME PHASING •
14- CONCRETE PAD: THE CONTRACTOR SHALL USE, AS REFERENCE, DPW CONCRETE GROUT DETAIL PHOTO IN SHEET E-3 FOR TERMINATION OF THE PAD, WHERE 12 TRANSFORMER ARE INSTALLED. CREATE ONE NEW CONCRETE PAD FOR BLDG.168 USING CONCRETE FLOOR PAD DETAIL ON SHEET E-3. EXISTING CONCRETE PAD: THE CONTRACTOR SHOULD REPAIR THE SLAB SURFACE
WITH NON-SHRINK GROUT AFTER REMOVE THE PM TRANSFORMER.
15- PRIMARY RAISER: FIVE (&)TRANSFORMER PRIMARY RAISERS SHALL BE REMOVED AND DISPOSED: BLDG. 148, T-3; BLDG.152, T-8;
BLDG.168, T-4; BLDG. 660, T-169; BLDG. NAVY, T-5. FURNISH AND INSTALL NEW UNDERGROUND HIGH VOLTAGE CONDUCTORS (RAISERS) SHALL BE 15 KV, COOPER, CROSS LINKED POLYETHYLENE (XLP). OVER POTENTIAL TEST 15 KV FEEDER SHALL BE COMPLETED. MINIMUM CONDUCTOR GAGE SHALL BE NOT LESS THAN #2 AWG COOPER WITH INSULATION FOR 15 KV. FURNISH AND
INSTALL TERMINATIONS ON BOTH ENDS OF NEW CONDUCTORS, AT POLES AND TRANSFORMERS.
T2
'<s<Rv~ l~81 T2
.5 "°" 'j +\...( :Z:::::::: l -~
MAXIE 'MLUA~S
JR FlELD , ..
'it cl
'Z-
\_(SHALL BE \-42)
ROAD No PR-165
T3
~,_v~ SPc "" ~~R'!.."!!DN G4 ,ftc4
- ~ ~/>/[)11_R'r JI ~ :::: Go• ... ' •. . \,>
~ :::J
C::J '112
. "" ~"-""€<' I TS I~
T1
IT271 IT2 PMS-3 IT391
(SHALL BE T-33)
T-23
16- NAVY CURRENT TRANSFORMER CT's: DISCONNECT, REMOVE AND RETURN SIX (6) CURRENT TRANSFORMERS, NOT OPERATIONAL
TOCOR.
17- NOT USED.
18- CLEAN ENCLOSURE DIRT Be DUST, INCLUDING INSIDE, OUTSIDE AND BETWEEN DOORS. ADD SOLVENT TO THE CONNECTORS AND
BUSHINGS OF THE PRIMARY 15 KV AND SECONDARY 600 V SIDES TO TAKE AWAY MOISTURE. VERIFY AND ADJUST CONNECTION TIGHTNESS AND CLEAN CONDUCTORS. REPLACE ALL OUTSIDE TRANSFORMER LABELS. USE SKETCH INFORMATION PROVIDED
ON SHEET E-3.
19- EVERY WEEK AFTER COMPLETION OF THE REQUIRED WORK, CONTRACTOR SHALL NOTIFY DPW PERSONNEL IN ORDER TO OPEN TRANSFORMER AND INSPECT IT. THIS INSPECTION SHALL OCCUR IN LESS THAN A WEEK AFTER COMPLETION.
20- DISSOLVED GAS ANALYSIS TEST (DGA): PERFORM DGA TEST IN ALL PAD MOUNTED TRANSFORMER WITH A CAPACITY OF 750 KVA
OR HIGHER. PROVIDE RESULTS AND RECOMMENDATIONS TO DPW, ENGINEERING DIVISION
21- OVER POTENTIAL TEST OR HIPOT: THE CONTRACTOR SHALL PERFORM OVER POTENTIAL TEST, UTILIZING 55 KV DC TO NEW 15 KV
FEEDERS.
22- THE CONTRACTOR SHALL PERFORM MEGGER TEST TO EXISTING 15 KV FEEDERS AT 10 KV DC WHERE NEW TRANSFORMERS
BEING INSTALLED, IN ORDER TO CONFIRM CABLE OPERATION FOR ACCEPTATION.
23- REPLACE ALL GROUND TERMINAL LUGS, EQUIPMENT GROUNDING AND BONDING CONDUCTORS FOR NEW COOPER TERMINAL LUGS, BARE
COOPER AWG#6 GROUNDING CONDUCTOR AND AWG #8 STRANDED THWN BONDING CONDUCTORS.
EQUIPMENT INVENTORY
ITEM EXISTING LABEL REQUIRED
LABEL KVA OUTPUT
VOLTAGE
PHASE
VOLTAGE
BUILDING
SERVED
APPLICABLE
NOTES FACILITY
T-1
T-2
T-3
T-4
T-5
T-6
T-7 T-8
T-9
T-10 T-11
T-12
T-13 T-143
T-15
T-16 T-17
T-18
T-19
T-20
T-168
T-169
T-23
T-24
T-25
T-26
T-27
T-28
PM1
T-30 T-C
T-32
T-39 T-34
T-35
T-36 T-37
T-38
T-39 T-40
T-41
T-1 T-43
T-44
T-45
T-46
T-47
T-48
T-49
T-50
T-5.1
T-52
T-53
T-54
T-55
T-56
T-1
T-2
T-3
T-4
T-5
T-6
T-7
T-8
T-9
T-10 T-11
T-12
T-13 T-14
T-15
T-16 T-17
T-18
T-19
T-20
T-21
T-22
T-23
T-24
T-25
T-26
T-27
T-28 T-29
T-30 T-31
T-32
T-33 T-34
T-35
T-36 T-37
T-38
T-39 T-40
T-41
T-42 T-43
T-44
T-45 T-46
T-47
T-48
T-49
T-50
T-51
T-52
T-53
T-54
T-55
T-56
1-750 277/480
1-500 277/480
1-225 I 120/208
1-300 I 120/208 1-750 I 120/208
1-1,500 I 277/480
1-300 I 120/208
1-150 I 120/208 1-soo I 277/480
120/208
1-225 I 120/208
1-soo I 277/480
1-1000 I 277/480 1-112.s I 120/208
1-1500 I 277/480
1-1500 I 277/480 1-soo I 277/480
1-225 I 277/480
1-soo I 277/480 1-aoo I 277/480
1-750 I 277/480
1-750 I 120/208 1-315 I 13,200
1-soo I 480/277
1-112.s I 120/208
1-315 13,200
1-750 120/208
1-1000 277/480 1-75 120/208
1-225 120/208
1-225 120/208
1-225 120/208
1-150 120/208
1-300 120/208
1-750 120/208
1-500 13,200
1-1000 13,200 1-225 120/208
1-150 120/208
1-1000 13,200
1-750 120/208
1-75 120/208
1-150 120/208
1-225 120/208
1-150 120/208
1-80 120/240
1-300 120/208
1-1000 120/208
1-800 13,200
1-500 13,200
1-500 13,200
1-75 120/208
1-2500 480/277
1-1500 13,200
1-2500 480/277
1-1500 480/277
3 34. 37. 38 .20 NEW DPW FACILITIES
3 21 2.4.6.8.9.13.14.22 Health Clinic
3 148 4.6.8.9.10.12.13.14.15.21 I Youth Center 3 168 4.6.8.9.10.13,14,15,21 I Bowling Alley 3 73to78 4,6,B,1.1,1.4,1.11,15,21,22, I NAVY 73, 74, 75, 77, 78
3 315 20 I AFRC
3 167 3.4.6.8.9.10.13.14. I Physical Fitness Center 3 152 ,6,8,9,12,13,14,15,21,221 Welcome Center 3 615 1 I AFRC Vehicle Maintenance Shop Ania 600
3 376 1 I Network Enterprise Center (NEC)
3 1029&1030 1 Elementary School
3 4,6,8,9,12,13,14 Elementary School Chlller 3 1,20 High School Bulldlngs
3 528 18 USAR Vehicle Maintenance 3 689 1,20 PX Main Store 3 689 20 CommiBSary 3 1071 1 Mlddle School 3 1079 1 Mlddle School 3 1083 7 Mlddle School
3 1087 1 Mlddle School 3 606 4,6,8,9,10,13,14,22 PXtra
3 660 4,6,8,9,:L0,12,13,14,1&,21. Community Club 3 13.2 KV LI NE I 7 I Brown Feeder - South Gate Turbine 3 GOLF COURSE I 1 I Golf Course Well Pump 3 194 I 4.5.6.8.9.12.13.14.22 I Maxie Wllllams 3 113.2 KV LINEI 7 Brown Feeder - Old DPW Turbine
3 I 390 I 1,20 Headquarters Bulldlng
3 I 353-357 I 1,20 Reserve Center
3 I 142 I 1.18 20 MYA Substation Low Voltal!B Service 3 I 224,225 I 1 TBS/Medcom
3 1227,228,2311 1 Medcom, USAR
3 I 192-193 I 1 CPACBtEOC
3 1223 I 1 USAR
3 I 679-681 I 1 El caney
3 1678 I 1 ECaney
3 I 13.2 KV I 7 Brown Feeder - Site 4 Toro Creek
3 I 13.2 KV I 7,20 Brown Feeder - Site 1 East Side 3 1512 I 7 Directorate of Loe:lstlcs 3 I 514 I 4.6.8.9.13.14.22 Various Activities 3 I 13.2 KV I 7,20 Brown Feeder - Sites 2 Bt 3 East Side 3 I 79to82 I 1,20 Former Vacant
3 1138 I 1 3 I 1300-1301 I 1 I Chlller, Bldg. 1300 3 I 527 I 1 I Network Enterprise Center (NEC)
3 I Trailers I 1 I Elementary School (Temporary Faclllty)
1 I 375 I 1 I Mc Arthur Fleld
3 I 677 I 4.6.8,9.13.14.22 I Gas Station 3 I 1000 I 1,20 I Chlld Development Center
3 I. _:i,;:11,2 ~~--- I 7 I SOLAR PANELS -COMMISSARY PARKING
3 l._~,2~~--- I 7 I SOLAR PANELS-AQUAPARK
3 I 13.2 KV I 7 I SOLAR PANELS - BLDG. 363 PARKING
UTILITY LINE
3 I 615 I 7 I MOTOR POOL USAR CAGUAS
3 I B- 545-550 I 7,20 I PRNG READINESS CENTER
3 I 13.2 KV I 7 20 I SOLAR PANELS - OLD DPW 556
UTILITY LINE '
3 I 541 I 7,20 I ELEMENTARY SCHOOL COMPLEX
3 542 7 ,20 JFHQ - PRNG
·' •"'· I 57 I TX-1 I TX-1 I 3-75 I 120/208 I 3 171-172 1 Golf Club , 60 TX-5
61 TX-6
62 TX-7
63 TX-8
64 PMS
65 PMS-1
66 PMS.SP
67 PMS-3
68 TS
69 SU
ABBREVIA TTIONS:
PMS - PRIMARY MAIN SWITCH
T - TRANSFORMER
TX-TRANSCLOSURE
TS - TRANSFER SWITCH
NA - NOT APPLY
TX-2 I 3-75 I 120/208 I 3 I 136 I 1 I MWR Administration Office
3-75 I 120/208 I 3 I 399 I 18 I DES/Fire Deoartment TX-4 I 3-75 I 120/208 I 3 I 673 I 1 I Pentagon Federal Credit Union TX-5 I 3-75 I 120/208 I 3 I 540 I 1 I National Guard
TX-6 I 3-50 I 277/480 I 3 I 541 I 1 I National Guard
TX-7 I 3-100 I 120/208 I 3 1218·~~220·1 1 I Post Office/ TBS I Chapel
PMS I N/A I 13,200 I 3 I 514 I 1 I NEXT TO BLDG. 514
PMS-1 I N/A I 13,200 I 3 I AREA 200 I 1 I AREA 200
PMS-2 I N/A I 13,200 I 3 I AREA 200 I 1 I AREA 200
PMS-3 I N/A I 13,200 I 3 I 231 I 1 I NEXT TO BLDG. 231
TRANSFER I N/ A SWITCH
SWITCH I N/A
13,200 3 I AREA 200 I 1 I AREA 200
13,200 3
REV.NO I DATE
PROJECT MANAGER
A. MOJICA
PENFED I 1 I CREDICT UNION
REVISIONS
DEPARTMENT OF THE ARMY
HEADQUARTERS UNITED STATES ARMY
DIRECTORATE OF PUBLIC WORKS
FORT BUCHANAN, PUERTO RICO
APPD.BY
DPW - DIRECTORATE OF PUBLIC WORKS
O&M - OPERATION AND MAITENANCE
DRAFTSMAN
D. LEBRON
ARCH, STRUC. DESIGN
F. ZAYl'S
MAINTAIN/REPLACE PAD MOUNTED TRANSFORMERS
TRANSCLOSURES,PRIMARY MAIN SWITCHES AND TRANSFER SWITCH
SITE MAP AND WORKING DETAILS FORT BUCHANAN, PUEFf/O RICO
N I
ELECTRICAL DESIGN
A. MOJICA
MECHANICAL DESIGN
N/A
APPROVED
RECOMMEND APPROVAL
MARIA A. LOPEZ
ACTING DIRECTOR OF PUBLIC WORKS
LUIS E. TORRES
CHIEF, ENGINEERING DIVISION
SCALE: NOT TO SCALE
DATE: FEBRUARY,201 B
R02-18
89-K-1370-R-18
IJ0-53105
DRAWING NO.
DPW-PR-1370-18
E-1
DRAWER NO. I 2
OF
NON-SHRlr« CONCRETE OROUT
FOR CABINET PROTECTION.
(3"X3") r-------------------------1-----------------, PAD MOUNTED TRASFORMER
II" CONCRETE FLOOR SLAB,
Fe' - 3,000 PSI
6"-0"x6'--6"
·, .. ,, .•. · ·, ~- /. ·.~ .. · '.··"·1·~1 .'.'l ;· ·.• '~ •.• ~ ••. ·..,. .• _' ·_.... .• •. •.
"fr.m'.....;.~'=.:""".*"'"~"F.'l""F:""'i""~"""'l""'!."i"~~*"'~~ . ; t ~ :·: .. : ·~~ . ·. '
. ,,,• ;_~--~~-.·~~-·· ,• ..• ·•· .. · .. •· •. • .. • •·1."~f :J .. 1~-.··.-~· ., •; ·.'~··''· ;,/ ··:~........ :::~~~~~-· ::~1 s·
· · E~m~~... 1a1a1a11 m m ··:: · • • •' ~ ;·Jn!fimm;nmmrnmir--- COMPACTED 116% 1=::':111=::':111=::':11 l==l I 1=111= ~. . : ~- m~rn~u l :y .;. ~ • ·: • mill!Tiilln t-.. -i l~IIIillill' ;rn;...m~' 1-111Wrri~ EXISTING ELECmlCAL
,~III~
:mm'-·
EXISTING UNJIST\JRBED SOIL
EXCAVATION SECTlON
FOR PVC CONDUITS.
NEW CONCRETE FLOOR FOR PAD MOUNTED
TRANSFORMER FOR BLDG 168
STAINLESS STEEL UNl8TRlJT
SUPPORT FAME.
COMMUNICATION CONDUIT TO
*USE CONCRETE GROUT DETAIL. SEE SOW ITEM 5.2 F
*EXCAVATION SHALL BE COMPLETED BY HAND.
*RE-USE EXISTING GROUNDING SYSTEM.
e
0 0
0 0
0 0
0 0 o"' = = 0
0 0
•r
BLOG. COMMUJ«:ATION RACK ~' ..
CT I INPUT POWER OONDUIT ___ _ j
TO SWITCHGEAR
4" X 4" X -,t BASE PLATE
EXISTING SLAB STRUT RACK MOUNTED METER
ENCLOSURE DETAIL
GALVANIZE ANCHOR
BOLT~"X3"
i
;, .. . . . . .. .. . . . . " ·i · ..
'·.. ... • . ..,'4 . . .4· '! ' · .... ..... •' .. . . ., ... , ..• . .... _.,, GALVANIZE STEEL
PLATE 2"X2°Xt
LEFT SIDE OF TRANSFORMER: RIGHT SIDE OF TRANSFORMER:
120/208
[i-11 I !· YOLlS I 7'"
[j __ ] ;
DANGER) I
HIGH r VOLTAGE
-10"-
SECONDARY
DANGEi
HIGH
VOLTAGE
r_J
PELIGR•
ALTO
VOLTAGE
*USE TABLE FOR VOLTAGE LABEL INFORMATION & TRANSFORMER
NUMBER IDENTIFICATION •
TRANSFORMER, PMS, TS &
LABELS
[f J f" 13-75tj ;
r
L-7"'
120/208 DANGER) I VOLlS r SECONDARY HIGH r -10·- VOLTAGE
'---10" -
TRANSFORMER BANK (TRANSCLOSURE) LABELS
*USE TABLE FOR TRANSCLOSURE LABEL INFORMATION. ADD LABEL IDENTIRCATION ACCORDING TO EACH
EQUIPMENT REQUIREMENT.
NON-SHRINK CONCRETE OROLJT
FOR CABr<IET PROTECTlON.
CONCRETE GROUT PROTECTION FOR ALL NEW
TRANSFORMERS
*SEE SOW ITEM 5.2 F
*RE-USE EXISTING GROUNDING SYSTEM.
*INSTALL A SILICONE SEALING COMPOUND UNDERNEATH THE CONCRETE
GROUT & BETWEEN PAD & METAL CABINET.
POINT OF CONNECTION ITEM DESCRIPTION
©'""'* OVERHEAD COM)OOJ"OR, 4 / 0 AWCI, ACSR
©""'* PIN TOP INSULATOR
~ 8ALYANIZED STEEL DOUBLE CROISARM, T2"" LONI, I HOLES MADE BJ
\!) MMUFACTURER. ©""'* STIRRUPS (3 EACH).
~ UGHnNI ARRESRIR, (3 BlCH).
~ T!RMINATDR, 111 KY, PDLl'M!R HOUSm(3 DCll).
©""" FUSEO CUTOUT ASSEMBLY, (3 EACH).
©""'* HOT LINE CU.MP (3 EACH).
©""'* CONCREIE POLE, 114, 41 FT HIGH.
~ CONOUrr RIS!R, 4 INCH!& OIAMl!ll!R, RllMD llALYANlzm Sll!l!L
@ l MOUNTING BRACKEr, 3 EACH FOR UGHnNB ARRESTOR, 3 EACH FOR ASSEMM.Y.
~ CONDUCl'OR, 2AWCl,COPPER,XLP,1.5KY(3 EACH).
(§}* POLYElllYLENE, 2 AM CONDUCTOR.
~ OVERHEAD 6ROLlllD CONDUCl'OR.
@"""'* &ROUND CONNECllCUI CONDUCTOR, 8 AWG, SOLID COPPER.
g-+ CUYISCLAMP.
r.:ort 11-YIEALPUll FOR 2AW8 CABLE.
~ STAINLESSllm.CDNDUlrCLAMP. w UJERUU CDNDUlr 8Ll'PORT.
CONCRETE POLE DETAIL
REV.NO I DATE
PROJECT MANAGER
A. MOJICA
DRAFTSMAN
D. LEBRON
ARCH, STRUC. DESIGN
F. ZAYAS
ELECTRICAL DESIGN
N/A
APPROVED
REVISIONS
DEPARTMENT OF THE ARMY
HEADQUARTERS UNITED STATES ARMY
DIRECTORATE OF PUBLIC WORKS
FORT BUCHANAN, PUERTO RICO
APPD.BY
MAINTAIN/REPLACE PAD MOUNTED TRANSFORMERS
TRANSCLOSURES,PRIMARY MAIN SWfTCHES AND TRANSFER SWITCH
DETAJLS
RECOMMEND APPROVAL
LUIS E. TORRES
CHIEF, ENGINEERING DIVISION
SCALE: I DRAWING NO.
NOT TO SCALE DPW-PR-1370-18
E-2 DATE: FEBRUARY,2018
MARIA A. LOPEZ
ROJECT NUMBER
R02-18
DRAWER NO. I 3
ACTING DIRECTOR OF PUBLIC WORKS 89-K-1370-R-18
IJ0-53105
OF
| SH1 FINAL FEB 2018 |
| SH2 FINAL FEB 2018 |
| SH 3 FINAL FEB 2018 |