This solicitation notice is for a design-bid-build construction project for a Commercial Vehicle Inspection Facility at Tinker Air Force Base in Oklahoma. The U.S. Army Corps of Engineers - Tulsa has been tasked to solicit for and award the project. The facility will provide new construction for traffic control and inspection of large commercial vehicles, including a security control center, enclosed inspection station, and Overwatch facility. Site work will include grading, utility work, roads, fencing, lighting, and security systems. The project is estimated to last 476 calendar days. As the North American Industry Classification System code is 236220 with a small business size standard of $39.5M, small businesses are reminded of limitations on subcontracting more than 85% of the amount paid by the government to non-similarly situated entities. Interested parties should contact Brian Welch at the email provided to request drawings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV21R0020-0006.pdf | ||
| W912BV21R0020-0004.pdf | ||
| Site Visit Attendance List.xlsx | XLSX spreadsheet | |
| W912BV-21-R-0020-0003.pdf | ||
| W912BV-21-R-0020-0002.pdf | ||
| W912BV-21-R-0020-0002.pdf | ||
| Commercial Gate Site Visit.pptx | PPTX presentation | |
| Pre-Bid Conference Attendance List.xlsx | XLSX spreadsheet | |
| CVIF Pre-Bid Agenda.doc | DOC document | |
| W912BV-21-R-0020-0001.pdf | ||
| Tinker CVIF Specifications.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 342
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
21-May-2021
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY CODE W912BV 7. ADMINISTERED BY (If other than item 6) CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
See Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X
9A. AMENDMENT OF SOLICITATION NO.
W912BV21R0020
X 9B. DATED (SEE ITEM 11)
31-Mar-2021
10A. MOD. OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT S/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Commercial Vehicle Inspection Facility, Tinker AFB
(1) Amendment 0005 changes/replaces sections 00 00 00, 00 11 00, 00 21 00, 00 73 46, 01 33 00.15, 07 42 63, 08 60 45, 08 71 00, 10 51
13, 21 13 13.00 10, 25 05 11.00 08, 25 05 11 .00 10, 28 10 05, 28 31 76 and 34 71 13.19 (see below ).
(2) Amendment 0005 adds sections 13 34 19 and 13 34 19.01 (see below ).
(3) Amendment 0005 deletes section 10 51 13.
(4) Amendment 0005 changes draw ings A-010, C-001, C-141, C-231, C-240, C-519, C-522, E-504, E-506, EG120, ES104, FA110, G-002, S-110, TY010, TY012, TY013 and TY601 (see below ).
(5) Proposal due date is changed from 27 May 2021 at 2:00pm to 1 June 2021 at 10:00am.
(6) All other terms and conditions remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
21-May-2021
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 27-May-2021 02:00 PM to 01-Jun-2021 10:00 AM.
TOC-1
AMENDMENT 0005
W912BV21R0020
COMMERCIAL VEHICLE INSPECTION FACILITY
APPENDICES: SEE NEXT PAGE
00 00 00 00 11 00 00 21 00 00 73 46 01 33 00.15 07 42 63 08 60 45 08 71 00 10 51 13 21 13 13.00 10 25 05 11.00 08
25 05 11 .00 10
28 10 05 28 31 76 34 71 13.19
TABLE OF CONTENTS
PRICING (CLIN) SCHEDULE
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
WAGE DETERMINATION (replaced entire document) ATTACHMENT (submittal register for legibility)
FABRICATED WALL PANEL ASSEMBLIES
TRANSLUCENT PANELS
DOOR HARDWARE
METAL LOCKERS (deleted in it's entirety)
WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - ACTIVE
VEHICLE BARRIER
CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - INTRUSION
DETECTION
ELECTRONIC SECURITY SYSTEMS (ESS)
INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
ACTIVE VEHICLE BARRIERS
TINKER AFB, OKLAHOMA
The revised/new sections/appendices/pages listed below are hereby added to or revised and made a part of the solicitation. Revised or added/deleted information can be located in the specifications by searching for an asterisk and amendment number (i.e., *AM5 and second asterisk (*) signifies end of change).
SPECIFICATIONS:
THE FOLLOWING SPECIFICATIONS HAVE BEEN CHANGED/REPLACED
THE FOLLOWING SPECIFICATIONS HAVE BEEN ADDED
THE FOLLOWING SPECIFICATIONS HAVE BEEN DELETED
13 34 19 METAL BUILDING SYSTEMS
13 34 19.01 PREFABRICATED GUARD HOUSE
10 51 13 METAL LOCKERS
DRAWINGS:
-- END CONTINUATION SHEET --
THE FOLLOWING DRAWINGS ARE CHANGED AS SHOWN HERIN
A-010 C-001 C-141 C-231 C-240 C-519 C-522 E-504 E-506
EG120
ES104
FA110
G-002 S-110
TY010
TY012
TY013
TY601
AIR BARRIER PLAN
GENERAL NOTES AND SHEET LIST
GRADING AND DRAINAGE PLAN 1
WATER LINE PLAN AND PROFILE 1
STORM DRAINAGE PLAN AND PROFILES 1
SITE DETAILS
SITE DETAILS
ELECTRICAL DETAILS
PANEL SCHEDULES
LIGHTNING PROTECTION PLAN
ELECTRICAL SITE PLAN
FIRE ALARM PLAN
DRAWING INDEX
FOUNDATION SLAB PLAN
OVERALL SECURITY SITE PLAN
SECURITY SITE PLAN
SECURITY SITE PLAN
SECURITY ONE-LINES
NOTE: PLANS NOT PRESENTED IN THE ORDER LISTED BELOW
COMMERCIAL VEHICLE INSPECTION FACILITY
TINKER AFB, OKLAHOMA CITY, OK
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00 PRICING (CLIN) SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA,
AND BASIS OF AWARD
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 04 00 COORDINATION, FIELD ENGINEERING, AND MEETINGS (CORO)
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 30 01 ADDITIONAL ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE FULL DBB COAO
01 33 00.15 DIGITAL SUBMITTAL PROCEDURES AND CORRESPONDENCE
01 33 29 SUSTAINABILITY REPORTING
01 35 26.00 10 GOVERNMENTAL SAFETY REQUIREMENTS (COAO)
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 15 QUALITY CONTROL (DBB)
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS 3.0 CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS (TINKER)
01 57 20.00 02 ENVIRONMENTAL PROTECTION (TAFB)
01 58 00 BULLETIN BOARD, PROJECT SIGN, AND SAFETY SIGN
01 60 00.00 50 MATERIAL AND EQUIPMENT
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00.00 15 CLOSEOUT SUBMITTALS
01 78 23.10 10 OPERATION AND MAINTENANCE DATA - COAO
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
PROJECT TABLE OF CONTENTS Page 1
*Amended Section: Replace Section in it's entirety*
*AM (replaced in it's entirety) *
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 02 BULLET-RESISTANT COMPONENTS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 60 45 TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
09 96 00 HIGH-PERFORMANCE COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
13 34 19.01 PREFABRICATED GUARD HOUSE (added new section) *
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
PROJECT TABLE OF CONTENTS Page 2
*AM (deleted in it's entirety)
(added new section)
Aaron Fox Strikethrough
10 51 13 METAL LOCKERS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.00 01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS-FIRE
ALARM
25 05 11.00 02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - HVAC
DDC CONTROLLERS
25 05 11.00 08 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -
ACTIVE VEHICLE BARRIER
25 05 11.00 09 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -
CLOSED CIRCUIT TELEVISION (CCTV)
25 05 11.00 10 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -
INTRUSION DETECTION SYSTEM (IDS)
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 28 21.00 40 MANUAL TRANSFER SWITCHES
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS)
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
PROJECT TABLE OF CONTENTS Page 3
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
31 63 26 DRILLED CAISSONS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
32 11 29 LIME-STABILIZED SUBGRADE
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 51 15 NATURAL-GAS DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 - TRANSPORTATION
34 41 26.00 10 ACCESS CONTROL POINT CONTROL SYSTEM
34 71 13.19 ACTIVE VEHICLE BARRIERS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
Appendices
APPEAPPENDIX ANDIX A DRAWINGS (PROVIDED UNDER SEPAR
-- End of Project Table of Contents --
SECTION 00 11 00
PRICING (CLIN) SCHEDULE
CLIN Description Estimated Unit Unit Amount
No. Quantity Price
BASE PROPOSAL
0001 1 JOB XXXX $
0002 1 JOB XXXX $
Option 1: Access Road Construction STA. 1+66.33C to 15+00C - Concrete Pavement
Option 2:
Contaminated Soil Removal
Option 3:
Temporary Contaminated Soil Storage
CY
JOB
XXXX $
XXXX $
1 JOB XXXX 0003
0004 1 JOB XXXX
Site Work
Construction
O&M Manuals
As-Built Drawings
$20,000.00
$100,000.00
TOTAL BASE PROPOSAL
(CLINS 0001 – 0004 Inclusive) $
--------------------------------- OPTION PROPOSAL ---------------------------------
0005 1 JOB XXXX $
TOTAL OPTION PROPOSAL
(CLINS 0005 – 0008 Inclusive) $
GRAND TOTAL PROPOSAL
(CLINS 0001 – 0008 Inclusive) $
Contract Duration in Calendar Days (See Note 6)
COMMERCIAL VEHICLE INSPECTION FACILITY
Tinker AFB, OK
00 11 00 - 1
0008 Option 4: Closed Circuit TV (CCTV)
1 JOB XXXX $
PRICING (CLIN) SCHEDULE NOTES
1. The Offeror shall submit pricing data on the latest PRICING SCHEDULE as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
2. Offerors must insert a price on all numbered items of the PRICING SCHEDULE.
Failure to do so will disqualify the Offer.
3. All quantities are estimated except where the unit is given as LUMP SUM (LS) or
JOB.
4. If a modification to a proposal is submitted and provides for a LUMP SUM or JOB adjustment to the total estimated cost, the application of the LUMP SUM or JOB adjustment to each unit price and/or LUMP SUM or JOB price, in the PRICING
SCHEDULE must be stated or, if it is not stated, the Offeror agrees that the LUMP
SUM or JOB adjustment shall be applied on a prorated basis to every item in the
Pricing Schedule.
5. All the extensions of the unit prices shown (if applicable) will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
6. The Offeror shall propose a total contract duration in number of calendar days after the Notice to Proceed (NTP) is received by the Contractor, whether via electronic means or hard copy, whichever is the earliest method of delivery. The total number of proposed calendar days for construction through completion, ready for turnover shall not exceed the days shown at, SCR: 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or
Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP.
7. AWARD
Only one contract will be awarded under this solicitation.
8. AWARD OF OPTION CLIN's: Award of any or all options will be at the discretion of the Government and may be from contract award until 180 days from Notice to Proceed (NTP).
AWARD OF CLIN 0005 - Option 1: Costs for CLIN 0005 shall include Option 1: Remove requirement for construction of the asphalt roadway identified from STA. 1+66.33C to STA.
15+00C as well as construction of the asphalt POV parking lot. Instead, replace with CLIN 0005 at the same location to include construction of a concrete roadway from STA. 1 +66.33C to STA. 15+00C as well as construction of a concrete POV parking lot. If this option is exercised, all alignment and surface elevations of the roadway shall be as shown on the contract drawings, but shall utilize the roadway cross section for concrete pavement as well as the joint layout shown on drawing C-423.
AWARD OF CLIN 0006 - Option 2: Contaminated soil will be removed if visible staining is seen during excavations. Prior to removal and stockpiling, the Contracting Officer will need to obtain visual verification and approve soil stockpiling.
AWARD OF CLIN 0007 - Option 3: The area for stockpiling contaminated soil shall be identified by the Contracting Officer. Soil will require an impermeable layer on which to place the soil. Testing and disposal of contaminated soil will be done by others.
COMMERCIAL VEHICLE INSPECTION FACILITY
Tinker AFB, OK
00 11 00 - 2
Tinker AFB, OK
00 11 00 - 3
AWARD OF CLIN 0008 - Option 4: Close Circuit TV (CCTV) *AM Provide all construction for cameras, cables, and control cabinets for an entire system. Cameras shall include four (4) total Pan-tilt-zoom (PTZ) Cameras, and, one (1) lockable cabinets, Cat 6 cable, not to exceed 250 feet in length, from control cabinet to cameras, fiber from cabinet to communications cabinet.
Provide programming to add camera to Maintenance Operations Center in Building 3001. Install cameras at 25’ AFF at exterior northeast and southwest corner of the inspection bay, and at 20’ AFF at two diametrically opposite corners of the interior inspection bay.
Provide, procure, install and program as necessary a complete and functional CCTV system. The system consists of a minimum six (6) pan-tilt-zoom (PTZ) cameras and twenty-five (25) fixed cameras, category 6 cabling not to exceed 250 feet in length or fiber from cameras or camera enclosures to the communications provided cabinet located in ID Check Room 103. Provide all necessary programming and equipment to add CVIF cameras to Maintenance Operations Building 3001.*
-- END OF SECTION --
http://www.ecmra.mil/
M5ECFADB
Cross-Out
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.1. GENERAL DESCRIPTION OF WORK
This is a competitive best value solicitation for a construction contract for the Commercial Vehicle Inspection
Facility project located at Tinker Air Force Base, Oklahoma. The Government will evaluate proposals in accordance with the criteria described herein and award a firm fixed-price contract to the responsible firm whose proposal conforms to all the terms and conditions of the solicitation and is determined the overall best value to the
Government.
1.2. GOVERNMENT SECURITY REQUIREMENTS
The offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.
ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the U.S. Army Corps of
Engineers mail room facility located at 2488 E. 81st Street, Tulsa, OK 74137-4290, if it does not contain a return mailing address. There will be no exceptions.
USACE Tulsa District Point of Contact is Mr Brian Welch:
Phone: 405-869-2617
Email: Brian.Welch@usace.army.mil
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and any amendments will be provided electronically to the contractor. If the files are too big to transmit via an email, DoD SAFE https://safe.apps.mil will be used to send the information.
1.4. OFFEROR'S QUESTIONS AND COMMENTS
All contractual matters, questions and or comments relative to these documents should be submitted via Bidder
Inquiry in ProjNet at http://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic no later than 7 calendar days prior to the proposal due date, in order that they may be given consideration or actions taken prior to receipt of offers.
The bidder inquiry key for this project is TTSIT2-7EZSZF.
Instructions for registering in the ProjNet Bidder Inquiry system are available on the above website.
mailto:Brian.Welch@usace.army.mil http://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE
The NAICS Code selected for this project is 236220, Commercial and Institutional Building Construction, and the size standard is $39,500,000.00. Also see FAR 52.204-8.
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This request for proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal
1.7. PRE-BID CONFERENCE/SITE VISIT
Pre-Bid Conference Information:
Commercial Vehicle Inspection Facility, Tinker AFB, OK Sol. No. W912BV21R0020
Hosted by Ruben Del Rio https://usace1.webex.com/usace1/j.php?MTID=m45d39605b2ea5616c6cb38a7a0eeb1ef
Monday, Apr 19, 2021 10:30 am | 1 hour 30 minutes | (UTC-05:00) Central Time (US & Canada)
Meeting number: 199 836 4824
Password: vYxaBM7Q@56
Agenda: Pre-Bid Meeting agenda for Organized Site Visit for Commercial Vehicle Inspection Facility.
Join by video system
Dial 1998364824@usace1.webex.com
You can also dial 207.182.190.20 and enter your meeting number.
Join by phone
+1-844-800-2712 US Toll Free
+1-669-234-1177 US Toll
Access code: 199 836 4824
Site Visit Information:
See Clause 52.236-27 in solicitation for site visit information.
1.8. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.9. PROPOSAL SUBMITTAL
1.9.1. The submittal method for proposals is electronic via DoD SAFE or email ONLY (no mailed proposals).
DoD SAFE web site: https://safe.apps.mil/
The following email addresses must be entered for notification of proposal receipt and download availability:
Brian.Welch@usace.army.mil
Rudolfo.Morales@usace.army.mil
1.9.2. Proposals will be received until the date and time and specified in this Request for Proposal. Mail all bonds to:
U.S. Army Corps of Engineers, Tulsa District
ATTN: CESWT-CT-E (Mr. Welch) mailto:1998364824@usace1.webex.com mailto:Brian.Welch@usace.army.mil mailto:Rudolfo.Morales@usace.army.mil
2488 E. 81st Street
Tulsa, OK 74137-4290
1.9.3. The packaging shall be marked Solicitation Number: W912BV-21-R-0020.
1.10. PROPOSALS
Offer Closing Date: 01 June 2021
Offer Closing Time: 10:00 am Central Standard Time (CST)
1.11. JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.
1.12. DEVIATIONS AND EXCEPTIONS
Deviations and exceptions to the terms and conditions of the solicitation are neither encouraged nor desired.
Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for the award. Should the offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer.
Notwithstanding the above, if deviations and exceptions are included with the offer, the offeror shall list and describe in detail the deviations and/or exceptions. All deviations and exceptions shall be fully supported with the
Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the
RFP.
W912BV21R0020
Commercial Vehicle Inspection Facility
Tinker AFB, OK
APPLICABILITY OF WAGE RATES
*AM
Wage Decision No.OK20210049, Building, and dated 01-01-2021 04-30-2021, is applicable to building construction at Tinker AFB, OK for the construction of the Commercial Vehicle Inspection Facility and associated parking lotand any construction work that is considered outside.
Wage Decision No. OK20210015, Highway Construction, dated 01-01-2021 is applicable to Tinker
AFB, OK Commercial Vehicle Inspection Facility associated roads with the exception of the parking lot and any other construction requirements.
PLEASE NOTE: The applicable wage decision must be referenced on each payroll.
Section 01 00 00 - General Requirements
"General Decision Number: OK20210049 04/30/2021
Superseded General Decision Number: OK20200049
State: Oklahoma
Construction Type: Building
Building Construction -does not include residential construction consisting of single family homes and apartments up to and including 4 stories. (Including building projects on industrial sites and treatment plants)
County: Oklahoma County in Oklahoma.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/01/2021
1 04/09/2021
2 04/30/2021
BROK0005-004 06/01/2020
Rates Fringes
BRICKLAYER.......................$ 25.37 11.34
CARP0216-002 01/01/2017
MILLWRIGHT.......................$ 27.65 8.48
CARP0329-003 06/01/2017
Rates Fringes
CARPENTER (Form Work Only).......$ 22.75 7.95
ELEC1141-010 12/28/2020
Rates Fringes
ELECTRICIAN (Excludes Low
Voltage Wiring and
Installation of Alarms)..........$ 34.15 17.25%+6.00
* ELEC1141-030 06/01/2019
Rates Fringes
ELECTRICIAN (Low Voltage
Wiring Only).....................$ 21.60 3%+12%+1/2%+8.60
ELEV0063-004 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 41.90 34.765+a+b
PAID HOLIDAYS:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after
Thanksgiving, and Christmas Day.
b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.
ENGI0627-023 06/01/2019
Rates Fringes
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 31.05 13.75
Group 2.....................$ 29.35 13.75
Group 3.....................$ 28.80 13.75
Group 4.....................$ 28.00 13.75
Group10.....................$ 22.20 13.75
POWER EQUIPMENT OPERATOR
GROUP 1: All Crane Type Equipment 200 ton and larger and including 400 ton capacity cranes. All Tower Cranes.
GROUP 2: All Crane Type Equipment 100 ton capacity and larger cranes, and less than 200 ton capacity.
GROUP 3: All Crane Type Equipment 50 ton capacity and larger cranes, and less than 100 ton capacity. Crane Equipment (as rated by mfg.) 3 cu.yd. and over Guy derrick Whirley Power
Driven Hole Digger (with 30' and longer mast).
GROUP 4: CRANES with Boom Incl. Jib less than 100 ft and less than 3 cu. Yd.; Overhead Monorail Crane
GROUP 10:OILER; SEMI-TRAILER TRUCK DRIVER
IRON0048-014 06/01/2019
Rates Fringes
IRONWORKER (Ornamental and
Structural)......................$ 26.00 15.35
PLUM0344-006 07/01/2019
Rates Fringes
PLUMBER (Excludes HVAC Pipe
Installation)....................$ 33.00 15.19
PLUM0344-019 07/01/2020
Rates Fringes
HVAC MECHANIC (Installation of HVAC Unit Only, Excludes
Installation of HVAC Pipe and
Duct)............................$ 34.00 14.59
PLUM0344-024 07/01/2020
Rates Fringes
PIPEFITTER (Including HVAC
Pipe Installation)...............$ 34.00 14.59
ROOF0143-001 06/01/2020
Rates Fringes
ROOFER...........................$ 22.30 8.35
SFOK0669-002 04/01/2021
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers)......................$ 34.89 23.99
SHEE0124-010 07/01/2020
SHEET METAL WORKER (HVAC Duct
Installation Only)...............$ 32.98 15.66
SUOK2012-029 07/30/2012
CARPENTER (Acoustical Ceiling
Installation Only)...............$ 14.98 0.00
CARPENTER, Excludes
Acoustical Ceiling
Installation, Drywall
Hanging, Form Work, and Metal
Stud Installation................$ 16.61 3.00
CEMENT MASON/CONCRETE FINISHER...$ 16.75 0.00
DRYWALL FINISHER/TAPER...........$ 13.74 0.00
DRYWALL HANGER, Includes
Metal Stud Installation..........$ 14.38 0.00
ELECTRICIAN (Alarm
Installation)....................$ 20.97 5.22
FENCE ERECTOR....................$ 14.00 0.00
GLAZIER..........................$ 12.02 2.42
IRONWORKER, REINFORCING..........$ 17.11 0.00
LABORER: Common or General......$ 11.70 0.00
LABORER: Landscape..............$ 13.75 0.00
LABORER: Mason Tender - Brick...$ 12.00 0.00
LABORER: Mason Tender -
Cement/Concrete..................$ 13.00 1.91
LABORER: Pipelayer..............$ 12.39 0.00
LABORER: Plaster Tender.........$ 11.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 21.25 4.35
OPERATOR: Bulldozer.............$ 20.64 2.35
OPERATOR: Forklift..............$ 20.55 0.00
OPERATOR: Grader/Blade..........$ 14.28 1.70
OPERATOR: Loader (Front End)....$ 16.18 0.00
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 13.38 1.54
PAINTER: Brush, Roller and
Spray, Excludes Drywall
Finishing/Taping.................$ 12.42 0.00
PLASTERER........................$ 16.10 0.00
SHEET METAL WORKER, Excludes
HVAC Duct Installation...........$ 17.57 4.64
TRUCK DRIVER: Dump and
Flatbed Truck....................$ 11.60 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 93 PAGES
W912BV-15-D-0006
COMMERCIAL VEHICLE INSPECTION FACILITY
01 04 00 SD-09 Manufacturer’s Field
Reports
GSurvey Field Notes
01 14 00 SD-01 Preconstruction Submittals
1.2.1.1 GList of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals
1.3 GView Location Map
1.4 GProgress and Completion
Pictures
01 32 01.00 10 SD-01 Preconstruction Submittals
Preliminary Project Schedule; G
Initial Project Schedule; G
Recovery Schedule; G
Construction Completion
Schedule; G
Periodic Schedule Update; G
Preliminary Project Schedule
Cost Loading; G
Initial Project Schedule Cost
Loading; G
Recovery Project Schedule Cost
Loading; G
Construction Completion
Schedule Cost Loading; G
Preliminary Project Schedule
FOW; G
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
*Amended Section: Replace Attachment to Section 01 33 00.15 in it's entirety. Revised for readability*
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 93 PAGES
COMMERCIAL VEHICLE INSPECTION FACILITY
01 32 01.00 10 Initial Project Schedule FOW; G
Recovery Project Schedule FOW;
G
Construction Completion
Schedule FOW; G
SD-07 Certificates
GDesignated Authorized
Representative (DAR) Project
Scheduler Qualifications;
01 33 00.15 SD-01 Preconstruction Submittals
GSubmittal Register
SD-09 Manufacturer’s Field
Reports
1.2.1Factory Test Reports
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 SPreliminary High Performance
and Sustainable Building Checklist
1.4.1 SSustainability Action Plan
1.5.3.1 SPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.3.1 SFinal High Performance and
Sustainable Building Checklist
1.5.3.1 SFinal Sustainability eNotebook
1.5.3.1 SAmended Final Sustainability
eNotebook
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 93 PAGES
COMMERCIAL VEHICLE INSPECTION FACILITY
01 33 29 1.5.3.1 SAmended Final High
Performance and Sustainable
Building Checklist
01 35 26.00 10 SD-01 Preconstruction Submittals
1.6 G AAccident Prevention Plan (APP)
1.7 G AActivity Hazard Analysis (AHA)
1.6.1 G ACrane Critical Lift Plan
1.5.1.2 G ACrane Operators
SD-06 Test Reports
1.11Reports
1.11.1Accident Reports
1.11.3Crane Reports
SD-07 Certificates
1.8Confined Space Entry Permit
1.8Hot work permit
1.11.4Certificate of Compliance
01 45 00.00 15 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.10.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
3.1.1 GProject Manual
3.1.1Written Practices
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 93 PAGES
COMMERCIAL VEHICLE INSPECTION FACILITY
01 45 35 3.1.3Written Practices
3.1.1NDT Procedures and Equipment
Calibration Records
3.1.3NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.1Daily Reports
3.1.3Daily Reports
3.1.3Daily Reports
3.1.1Biweekly Reports
3.1.2Biweekly Reports
SD-07 Certificates
GSpecial Inspector of Record
1.5 GSpecial Inspector
3.1.1Qualification Records
3.1.3Qualification Records
SD-11 Closeout Submittals
3.1.1Interim Final Report
3.1.3Interim Final Report
3.1.1 GComprehensive Final Report
3.1.3 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 93 PAGES
COMMERCIAL VEHICLE INSPECTION FACILITY
01 50 00 Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 20.00 02 SD-01 Preconstruction Submittals
GEnvironmental Protection Plan
G REStorm Water Pollution Prevention
Plan (SWP3)
GWaste Management Plan
GSpray Painting Plan
GRestoration Plan
GNotice of Intent (DEQ Form
640-571)
GNotice of Termination (ODEQ
Form 640-572)
SD-07 Certificates
Maintenance of Pollution Control
Training Certification; G
01 74 19 SD-01 Preconstruction Submittals
1.5 GWaste Management Plan
SD-11 Closeout Submittals
1.6Records
01 78 00.00 15 SD-03 Product Data
1.7.1Warranty Management Plan
1.7.5Warranty Tags
1.5Spare Parts Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 93 PAGES
COMMERCIAL VEHICLE INSPECTION FACILITY
01 78 00.00 15 SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.6As-Built Record of Equipment and Materials
3.5Construction Contract
Specifications
2.3 GCertification of EPA Designated
Items
1.2.2 3.10.3DD FORM 1354
1.2.2 3.10.3DD FORM 1354
1.2.2 3.10.3DD FORM 1354
1.2.2 3.10.3DD FORM 1354
1.8.1.2 3.11DD FORM 1354
1.8.1.2 3.11DD FORM 1354
1.8.1.2 3.11.3DD FORM 1354
1.8.1.2 3.11.3DD FORM 1354
3.10.1 3.11.3DD FORM 1354
3.10.1 3.11.3DD FORM 1354
3.10.1 3.11.3DD FORM 1354
3.10.1 3.11.3DD FORM 1354
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 93 PAGES
COMMERCIAL VEHICLE INSPECTION FACILITY
01 78 00.00 15 3.10.1 GDD FORM 1354
3.10.1 GDD FORM 1354
3.10.2 GDD FORM 1354
3.10.2 GDD FORM 1354
3.10.2 GDD FORM 1354
3.10.2 GDD FORM 1354
3.10.2 GDD FORM 1354
3.10.2 GDD FORM 1354
3.10.3 GDD FORM 1354
3.10.3 GDD FORM 1354
3.10.3 GDD FORM 1354
3.10.3 GDD FORM 1354
3.11 GDD FORM 1354
3.11 GDD FORM 1354
3.11.3 GDD FORM 1354
3.11.3 GDD FORM 1354
3.11.3 GDD FORM 1354
3.11.3 GDD FORM 1354
3.11.3 GDD FORM 1354
3.11.3 GDD FORM 1354
01 78 23.10 10 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 93 PAGES
COMMERCIAL VEHICLE INSPECTION FACILITY
01 78 23.10 10 SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 91 00.15 10 SD-01 Preconstruction Submittals
1.8 GCommissioning Firm
1.8.1 GLead Commissioning Specialist
1.8.2 GTechnical Commissioning
Specialists
1.8 GCommissioning Firm's Contract
SD-06 Test Reports
3.1.2.1 GInterim Construction Phase
Commissioning Plan
3.1.2.2 GFinal Construction Phase
Commissioning Plan
3.1.2.1.2 GTemplate Building Envelope
Inspection Checklists
3.1.4.2 GBuilding Envelope Inspection
Checklists
3.1.4.3 GPre-Functional Checklists
1.9Issues Log
3.2 GCommissioning Report
3.3.1 GPost-Construction Trend Log
Report
SD-07 Certificates
1.10 GCertificate of Readiness
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 93 PAGES
COMMERCIAL VEHICLE INSPECTION FACILITY
01 91 00.15 10 SD-10 Operation and Maintenance
Data
3.1.5 G ROTraining Plan
3.1.5 G ROTraining Attendance Rosters
3.1.6 GMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.2 SFinal Commissioning Report
3.1.2.2 SFinal Construction Phase
Commissioning Plan
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.6 GQuality Control Personnel
Certifications
1.6.6 GQuality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
3.3.8Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.5 GJoint Sealants
2.4.4 GJoint Filler
2.1 GFormwork Materials
2.3.1 GCementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 93 PAGES
COMMERCIAL VEHICLE INSPECTION FACILITY
03 30 00 2.4.6 GVapor Retarder
2.4.1 GConcrete Curing Materials
2.6 GReinforcement
2.4.3.1 GLiquid Chemical Floor Hardeners
and Sealers
2.3.5 GAdmixtures
2.6.2Mechanical Reinforcing Bar
Connectors
1.6.3.2 GPumping Concrete
1.6.3.3 GFinishing Plan
2.4.2 GNonshrink Grout
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1 GFly Ash
1.6.4.2Aggregates
3.9.2.1Tolerance Report
3.12.2.3 GCompressive Strength Tests
3.12.2.5Unit Weight of Structural
Concrete
3.12.2.4Air Content
3.12.2.1Slump Tests
2.3.2Water
3.12.2.6Chloride Ion Concentration
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 93 PAGES
COMMERCIAL VEHICLE INSPECTION FACILITY
03 30 00 2.6.1Reinforcing Bars
1.8Welder Qualifications
1.6.3.4Safety Data Sheets
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1 GLiquid Chemical Floor Hardeners
and Sealers
2.4.5 GJoint Sealants
2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.3.4.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay or Shale Brick
2.2.3.2.1 GCement
2.4.1.1 GCementitious Materials
2.6.8 GInsulation
SD-04 Samples
2.2.2 GClay or Shale Brick
2.2.3.2 GConcrete Masonry Units (CMU)
2.2.3.3 GConcrete Brick
2.4.1.4…