W912BV21R0003-00004.pdf
PDF 33 MB Posted
- Attached to
- Advanced Individual Training Barracks, Fort Sill Oklahoma Amendment 0004 Federal contract opportunity
- Solicitation number
- W912BV21R0003
About this file
This document provides details on a federal contract solicitation for construction services. The U.S. Army Corps of Engineers - Tulsa District is seeking proposals for the construction of a 180,000 square foot barracks facility at Fort Sill, Oklahoma to house 600 soldiers. The project scope includes building construction and associated site work, utilities, information systems, security systems, energy and sustainability measures, and interior design services. A geothermal HVAC system will be incorporated. Proposals are due under solicitation number W912BV21R0003, which was amended under modification 0004. The contract will be awarded on a firm-fixed price basis under the Federal Acquisition Regulation Part 15 negotiated procurement process utilizing a trade-off evaluation methodology.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV21R0003-0003.pdf | ||
| W912BV21R0003-0002.pdf | ||
| Site Visit Sign-In Sheet 29 JUL 2021.pdf | ||
| AIT Barracks Pre-Bid Site Visit.pdf | ||
| W912BV21R0003-0001.pdf | ||
| JA Brand Name or Equal AIT Barracks.pdf | ||
| AIT BARRACKS BRAND NAME OR EQUAL NOI.xlsx | XLSX spreadsheet | |
| FtSill_AIT_RTA - COMPILED_VOLUME 3 OF 4.pdf | ||
| FtSill_AIT_RTA - COMPILED_VOLUME 4 OF 4.pdf | ||
| FtSill_AIT_RTA - COMPILED_VOLUME 1 OF 4.pdf | ||
| AIT_Barracks Solicitation RFP_20210719.pdf | ||
| FtSill_AIT_RTA - COMPILED_VOLUME 2 OF 4.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
AIT BARRACKS COMPLEX, FORT SILL, OKLAHOMA
(1) Amendment 0004 revises/adds sections as listed below .
(2) All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 276
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV21R0003
X 9B. DATED (SEE ITEM 11)
19-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2021
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
i
AMENDMENT 0004
W912BV-21-R-0003
Advanced Individual Training Barracks (AIT) Complex, Phase 2 Fort Sill, Oklahoma
1. The revised/new sections/appendices/pages listed below are hereby added to or revised and made a part of the solicitation. Revised or added/deleted information can be located in the specifications by searching for an asterisk and amendment number (i.e., *AM and *). The beginning of the amendment will begin with *AM and end with an * for each amended section. Changes are shown with green text for additions and red text for deletion.
REVISED SPECIFICATION SECTIONS
Replace the following specifications sections in their entirety with the revised specification sections hereto.
00 11 00 00 73 46 03 30 00 05 40 00 22 00 00 23 64 26
PRICING (CLIN) SCHEDULE
WAGE DETERMINATION (Replaced) CAST-IN-PLACE CONCRETE (changes as marked) COLD-FORMED METAL FRAMING (changes as marked) PLUMBING, GENERAL PURPOSE (changes as marked) CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS (changes as marked)
ADDED NEW SPECIFICATION SECTIONS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE (added as new section in it’s entirety)
ADDED NEW DRAWING SHEETS
Add drawing sheets S-310A, M-402A, M-404A, M-604A, M-605A, M-606A, M-701A, M-702A, M-703A, M- 802A, M-804A, M-805A, M-806A, M-807A, M-808A, E-601A, E-602A, E-603A, E-604A, E-605A, E-606A, EP117A, ES101A, ES104A, ES503A
REVISED DRAWINGS
Remove previously issued drawing CU513, S-002, S-121, S-122, S-131, S-132, S-141, S-515, S518, A-101, A- 105, A-106, A-112, A-116, A-123, A-127, A-132, A-136, A-141, A-144, P-001, P-103, M-001, M-100, M-101, M-102, M-110, M-111, M-112, M-120, M-121, M-122, M-407, M-603, M-604, M-907, E-501, E-606, E-617, ES-105, and ES-106 in their entirety and replace with sheets CU513, S-002, S-121, S-122, S-131, S-132, S- 141, S-515, S518, A-101, A-105, A-106, A-112, A-116, A-123, A-127, A-132, A-136, A-141, A-144, P-001, P- 103, M-001, M-100, M-101, M-102, M-110, M-111, M-112, M-120, M-121, M-122, M-407, M-603, M-604, M-907, E-501, E-606, E-617, ES-105, and ES-106 hereto.
A summary of the changes made to these drawings includes, but is not limited to:
• S-002: Spacing of powder actuated fasteners at exterior walls bottom track changed to 8 inches.
• S-121: Section cut showing 3/S-514 updated to show correct moment connection on 1/S-515.
• S-122: Deleted section cut showing 4/S-304. Section cut showing 3/S-514 updated to show correct moment connection on 1/S-515.
• S-131: Section cut showing 3/S-514 updated to show correct moment connection on 1/S-515.
• S-132: Section cut showing 3/S-514 updated to show correct moment connection on 1/S-515.
• S-141: Section cut showing 3/S-514 updated to show correct moment connection on 1/S-515.
• S-515: Removed weld leader on internal connection detail and re-entrant corner detail
• S-518: Revised anchor pattern to 8-inch o.c. along exterior walls, clarified exterior and interior anchor patterns. Changed gap at head of stud to 1-inch, changed powder actuated fastener spacing to 12 inches, deleted interior track and stud detail.
ii
• Architectural Drawings: Revised column grid and dimensions
• P-001: Revised above and below grade water pipe notes and pipe materials not for condensate.
Added non-potable water abbreviation.
• P-103: Revised plumbing fixture callout.
• M-001: Revised hydronic piping material note and added DALT schedule.
• M-100: Added OSA ductwork and diffuser to room A113 and B113.
• M-101: Added OSA ductwork and diffuser for room A113. Revised diffuser tag to outside of room B113.
• M-102: Added OSA ductwork and diffuser for room A113. Revised diffuser tag to outside of room B113.
• M-110: Added OSA ductwork and diffuser to room A113 and B113.
• M-111: Added OSA ductwork and diffuser for room A113. Revised diffuser tag to outside of room B113.
• M-112: Added OSA ductwork and diffuser for room A113. Revised diffuser tag to outside of room B113.
• M-120: Added OSA ductwork and diffuser to room A113 and B113.
• M-121: Added OSA ductwork and diffuser for room A113. Revised diffuser tag to outside of room B113.
• M-122: Added OSA ductwork and diffuser for room A113. Revised diffuser tag to outside of room B113.
• E-501: Updated exterior lighting control system detail
• E-606: Updated site lighting load and panel “SL-1”
• E-617: Updated fixture “Y” and added fixtures “Z1” and “Z2”. Updated mounting column.
• ES105: Updated site lighting layout and key notes
• ES106: Updated site lighting layout
End of Continuation Sheet
AIT Barracks Construction
Fort Sill, OK
00 11 00 - Page 1
SECTION 00 11 00
PRICING (CLIN) SCHEDULE
CLIN Description of Item Quantity Unit Unit Price
Amount
BASE BID ITEMS
0001 General Conditions 1 JOB - $
0002 Demolition 1 JOB - $
0003 AIT B/COF Building C 1 JOB - $
0004 AIT B/COF Building D 1 JOB - $ 0005 Supporting Facilities 1 JOB - $
0006 Building Commissioning - Building C 1 JOB - $
0007 Building Commissioning - Building D 1 JOB - $
0008 Geothermal System – Building C 1 JOB - $
0009 Geothermal System – Building D 1 JOB - $
000800
As-Built Drawings 1 JOB - $ 300,000
000900
O&M Manuals 1 JOB - $ 200,000
00120 Mechanical Integrator 1 JOB - $
TOTAL AMOUNT BASE BID (CLINS 0001 – 00100012,
inclusive)
OPTION BID ITEMS
00110
OPTION 1 - Geothermal System Removal – Building C
1 JOB - $
0014 OPTION 2 – Geothermal System Removal – Building D
00120
OPTION 2 3 - Troop Canopies and Training 1 JOB - $
00130
OPTION 3 4 - Landscaping 1 JOB - $
TOTAL AMOUNT OPTION BID (CLINS 0011 0013 – 00130016,
inclusive)
TOTAL BID (BASE + OPTIONS) (CLINS 0001 – 00130016, inclusive) $
Contract Duration (See Note 6 & 8):
Notes:
*AM4
Replace this section in it's entirety with changes shown below
4 .
5 .
6 .
7 .
1 . The offeror a grees to perform the work required a t the prices specifie d a bove in strict a ccorda nce with the terms of this scope of work, if this offer is a ccepted by the Governm ent in writ in g within 60 ca lenda r da ys after the date offers are due.
2 . The Offeror sha ll submit pricin g da ta on the la test Pricin g Schedule a s publish ed in the solic ita t ion or th e la test a mendment thereto. In lieu of indica t in g a dditions/ded uc t io ns to line items, a ll Offerors should sta t e their revised prices for each item.
3 . Offerors must insert a price on a ll numbered items of the Pric in g Schedule . Fa ilure to do so will disqua lif y the Offer.
All qua ntities a re estima ted except where the unit is given a s JOB. If a modifica t ion to a proposa l is submitted a nd provides for a lump-sum a djustment to the tota l estima ted cost, the a pplica tion of the lump- sum a djustment to ea ch unit price a nd/or lump-sum price, in the Pricin g Schedule must be sta ted or, if it is not sta ted, the Offeror a grees tha t the lump -su m a djustment sha ll be a pplied on the prora ted ba sis to every litem in the Bidding Schedule.
All the extensions of the unit prices shown (if a pplica ble ) will be subject to verifica t ion by the Governm ent . In ca se of va ria tion between the unit price a nd the extension , the unit price will be considere d to be the offer.
The Offero r sha ll propose tota l contra ct dura tion in number of ca lenda r da ys a fter the notice to Proceed (NTP ) is issued by the Governmen t , whether via electron ic mea ns or ha rd copy, whicheve r is the ea rlie st method of delive ry . The tota l number of proposed ca lenda r da ys for construct io n through completio n , rea dy for turnover sha ll not exceed the da ys shown a t, SCR: 5.211 -10 COM M EN C EM E N T , PROS E C U TI O N AND COMP L E TI O N OF WORK . The proposed dura tion sha ll become the required contra ct dura tion. The Governm ent ma y issue the NTP via e-ma il or by other mea ns. Da y number 1 is the da y a fter the da te of issuance of the NTP.
CLIN DES C RI P TI O N AND INCLU SI O N S
CLIN 0001 – Genera l Condition s: include s, Prime contra ctor’s field ma na gement la bor (project ma na ger, superintend ent , QC a nd sa fety personnel) , ma teria ls testing, field office, telephone service s, copying servic es, photogra ph development a nd binding, vehicles a nd tra vel, per diem a nd a llowa b le expenses for field personnel.
CLIN 0002 – Demolit ion: includ in g a ll exca va tion, ea rthwork a nd ma nhole demolit ion .
CLIN 0003 – AIT Build in g C: include s a ll construct ion for a rchitectu re , structu ra l, fire protectio n , roofing, communica t ion , electrica l, mecha nica l a nd plumbin g, coolin g tower.
CLIN 0004 – AIT Build in g D: includes a ll construct ion for a rchitectu re , structura l, fire protec tion , roofing, communica t ion , electrica l, mecha nica l a nd plumbin g, coolin g tower.
CLIN 0005 – Supportin g Fa cilit ie s: include s coolin g tower founda tion a nd screen wa lls , wa lkwa y s , ra mps, curbs, stripp in g, bolla rds a nd gutters. All site improveme nts, storm dra ina ge, electrica l site work, communica t ion s site work, wa ter, sewer, ga s a nd sodding will be priced under this CLI N.
CLIN 0006 & CLIN 0007– Build in g Commiss io n in g: price build in g C a nd D sepa ra tely.
CLIN 0008 & 0009: Provide a t ea ch Build in g C a nd Build in g D respect iv e ground-loo p hea t pump systems complete a nd rea dy for opera tion . Systems include hea t pumps, system equipment , piping, pumps, electrica l equipment , controls, wells , a nd condenser. Includes demolit io n , remova l, a nd proper ca pping of existin gelectrica l utilities found to be in conflict with the geothermal system construction, to the minimal extent possible.
00 11 00 - Page 2
00 11 00 - Page 3
CLIN 0008 00010 – As-bu ilt Dra win gs: include s ma inta inin g redline s for ea ch buildin g a nd prepa ring a sepa ra te set of a s-built s for ea ch buildin g. The Governme nt will provide Microsta t io n files to contra ctor for a s-built prepa ration.
CLIN 0009 00011 – O&M Ma nua ls: includes da ta a nd instruct ion s for ma jor systems insta lled . A sepa ra te ma nua l is required for each building.
CLIN 0010 0012 – Mecha nica l Integra tor: includes performin g build in g systems integra t io n for ea ch buildin g .
Remainder of this page intentionally left Blank http://www.sam.gov/SAM/
M5ECFADB
Cross-Out
M5ECFADB
Cross-Out
M5ECFADB
Cross-Out
00 11 00 - Page 4
OPTION CLINS:
CLIN 0011 0013 - OPTI O N 1 Geotherma l System Remova l – Build in g C: Provide new ground-loo p hea t pump systems complete a nd rea dy for opera tion . Systems include hea t pumps, system equipment , piping, pumps, electrica l equipment , controls, wells, a nd condenser. Includes demolit ion , remova l, a nd proper ca pping of existin g electrica l utilities found to be in conflict with the geothermal system construction, to the minimal extent possible.
This CLIN include s the remova l of the geotherma l system from the design a nd work included under CLIN
0008. Repla ce with work shown on dra wing sheets shown with a letter “A” designa t ion a t the end of the dra win g number (i.e. S-310A, M-402A, M-404A, M-604A, M-605A, M-606A, M-701A, M-702A, M-703A, M-802A, M-804A, M-805A, M-806A, M-807A, M-808A.
CLIN 0014 - OPTI O N 2 Geotherma l System Remova l – Build in g D:
This CLIN include s the remova l of the geotherma l system from the design a nd work included under CLIN
0009 . Repla ce with work shown on dra wing sheets shown with a letter “A” designa t ion a t the end of the dra win g number (i.e. S-310A, M-402A, M-404A, M-604A, M-605A, M-606A, M-701A, M-702A, M-703A, M-802A, M-804A, M-805A, M-806A, M-807A, M-808A).
CLIN 0012 0015 - OPTI O N 23, Troop Ca nopies a nd Tra inin g: Provide ca nopies for troop a ssembly a s shown on drawings and specifications.
8 . CLIN 0013 0016 - OPTI ON 34, La ndsca pin g: Pla ntin g a nd esta blishm en t of pla ntings a s presented in dra win gs and specifications.
OPTI O N S: The Governmen t reserve s the right to exercise a ny or a ll options a t a ny time from contra ct a wa rd a nd up to 240 days after Notice to Proceed. No additional time will be given for exercised options.
9 . AWARD
Only one contra ct will be a wa rded under this solic ita t io n .
--END SECTI O N 00 11 00--
End of Amendment *
SECTION 00 73 46 - WAGE DETERMINATION SCHEDULE
The following have been modified:
"General Decision Number: OK20210043 07/16/2021
Superseded General Decision Number: OK20200043
State: Oklahoma
Construction Type: Building Building Construction -does not include residential construction consisting of single family homes and apartments up to and including 4 stories.
County: Comanche County in Oklahoma.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 04/09/2021 2 07/16/2021
BROK0005-004 06/01/2020
Rates Fringes
BRICKLAYER.......................$ 25.37 11.34
ELEC1141-011 12/28/2020
Rates Fringes
ELECTRICIAN (Excludes Low Voltage Wiring)..................$ 34.15 17.25%+6.00
ENGI0627-020 06/01/2019
Rates Fringes
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 31.05 13.75 Group 2.....................$ 29.35 13.75 Group 3.....................$ 28.80 13.75 Group 4.....................$ 28.00 13.75 Group 8.....................$ 23.65 13.75 Group10.....................$ 22.20 13.75
POWER EQUIPMENT OPERATOR
GROUP 1: All Crane Type Equipment 200 ton and larger and including 400 ton capacity cranes. All Tower Cranes.
GROUP 2: All Crane Type Equipment 100 ton capacity and larger cranes, and less than 200 ton capacity.
GROUP 3: All Crane Type Equipment 50 ton capacity and larger cranes, and less than 100 ton capacity. Crane Equipment (as rated by mfg.) 3 cu. yd. and over Guy derrick Whirley Power Driven Hole Digger (with 30' and longer mast).
GROUP 4: CRANES with Boom Incl. Jib less than 100 ft and less than 3 cu. Yd.; Overhead Monorail Crane
GROUP 8: FORK-LIFT
GROUP 10:OILER; SEMI-TRAILER TRUCK DRIVER
IRON0048-014 06/01/2019
Rates Fringes
IRONWORKER (Ornamental and Structural)......................$ 26.00 15.35
* PLUM0344-006 07/01/2021
Rates Fringes
PLUMBER (Excludes HVAC Pipe
Installation)....................$ 34.00 14.59
PLUM0344-024 07/01/2020
Rates Fringes
PIPEFITTER (Including HVAC Pipe Installation)...............$ 34.00 14.59
ROOF0143-001 06/01/2020
Rates Fringes
ROOFER...........................$ 22.30 8.35
* SHEE0124-010 07/01/2021
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 33.38 16.36
SUOK2012-023 07/30/2012
Rates Fringes
CARPENTER (Drywall Hanging Only)............................$ 15.50 2.80
CARPENTER, Excludes Drywall Hanging..........................$ 15.50 2.80
CEMENT MASON/CONCRETE FINISHER...$ 16.72 0.00
DRYWALL FINISHER/TAPER...........$ 13.80 0.00
ELECTRICIAN (Low Voltage Wiring)..........................$ 20.08 5.43
IRONWORKER, REINFORCING..........$ 17.11 0.00
LABORER: Common or General......$ 9.31 0.00
LABORER: Mason Tender - Brick...$ 12.00 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 13.00 1.91
LABORER: Pipelayer..............$ 12.39 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 21.25 4.35
OPERATOR: Bulldozer.............$ 20.64 2.35
OPERATOR: Grader/Blade..........$ 14.28 1.70
OPERATOR: Loader (Front End)....$ 16.18 0.00
PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping.................$ 12.91 0.00
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 21.82 0.00
TRUCK DRIVER: Dump and Flatbed Truck....................$ 11.60 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)
AIT Barracks Complex AM0004
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
02/19, CHG 2: 05/21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 121R (2008) Guide for Concrete Construction Quality Systems in Conformance with ISO
ACI 301 (2016) Specifications for Structural Concrete
ACI 302.1R (2015) Guide for Concrete Floor and Slab Construction
ACI 304.2R (2017) Guide to Placing Concrete by Pumping Methods
ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete
ACI 305.1 (2014) Specification for Hot Weather Concreting
ACI 305R (2010) Guide to Hot Weather Concreting
ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting
ACI 306R (2016) Guide to Cold Weather Concreting
ACI 308.1 (2011) Specification for Curing Concrete
ACI 310.1 (2020) Specification for Polished Concrete Slab Finishes
ACI SP-2 (2007; Abstract: 10th Edition) ACI Manual of Concrete Inspection
ACI SP-15 (2011) Field Reference Manual: Standard Specifications for Structural Concrete ACI 301-05 with Selected ACI References
SECTION 03 30 00 Page 1
This Section was fully Replaced in AM3. *AM4 now makes further changes to this specification.
AMERICAN HARDBOARD ASSOCIATION (AHA)
AHA A135.4 (1995; R 2004) Basic Hardboard
AMERICAN WELDING SOCIETY (AWS)
AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel
ASTM A53/A53M (2020) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A184/A184M (2019) Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement
ASTM A615/A615M (2020) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM A706/A706M (2016) Standard Specification for Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement
ASTM A934/A934M (2016) Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars
ASTM A970/A970M (2018) Standard Specification for Headed Steel Bars for Concrete Reinforcement
ASTM A996/A996M (2016) Standard Specification for Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement
ASTM A1044/A1044M (2016a) Standard Specification for Steel Stud Assemblies for Shear Reinforcement of Concrete
ASTM A1064/A1064M (2017) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete
ASTM C31/C31M (2019a) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C39/C39M (2020) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
SECTION 03 30 00 Page 2
ASTM C42/C42M (2020) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C78/C78M (2018) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)
ASTM C94/C94M (2020) Standard Specification for Ready-Mixed Concrete
ASTM C136/C136M (2019) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM C138/C138M (2017a) Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
ASTM C143/C143M (2020) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C150/C150M (2020) Standard Specification for Portland Cement
ASTM C172/C172M (2017) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C173/C173M (2016) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method
ASTM C231/C231M (2017a) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C309 (2011) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete
ASTM C311/C311M (2018) Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use in Portland-Cement Concrete
ASTM C494/C494M (2019) Standard Specification for Chemical Admixtures for Concrete
ASTM C567/C567M (2019) Determining Density of Structural Lightweight Concrete
ASTM C595/C595M (2020) Standard Specification for Blended Hydraulic Cements
ASTM C618 (2019) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
SECTION 03 30 00 Page 3
ASTM C845/C845M (2018) Standard Specification for Expansive Hydraulic Cement
ASTM C873/C873M (2015) Standard Test Method for Compressive Strength of Concrete Cylinders Cast in Place in Cylindrical Molds
ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants
ASTM C989/C989M (2018a) Standard Specification for Slag Cement for Use in Concrete and Mortars
ASTM C1017/C1017M (2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete
ASTM C1074 (2019) Standard Practice for Estimating Concrete Strength by the Maturity Method
ASTM C1077 (2017) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation
ASTM C1107/C1107M (2020) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C1157/C1157M (2020a) Standard Performance Specification for Hydraulic Cement
ASTM C1218/C1218M (2020c) Standard Test Method for Water-Soluble Chloride in Mortar and Concrete
ASTM C1260 (2014) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)
ASTM C1293 (2008; R 2015) Standard Test Method for Determination of Length Change of Concrete Due to Alkali-Silica Reaction
ASTM C1315 (2011) Standard Specification for Liquid Membrane-Forming Compounds Having Special Properties for Curing and Sealing Concrete
ASTM C1567 (2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2018) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM C1778 (2016) Standard Guide for Reducing the Risk of Deleterious Alkali-Aggregate
SECTION 03 30 00 Page 4
Reaction in Concrete
ASTM D471 (2016a) Standard Test Method for Rubber Property - Effect of Liquids
ASTM D523 (2014; R 2018) Standard Test Method for Specular Gloss
ASTM D638 (2014) Standard Test Method for Tensile Properties of Plastics
ASTM D1752 (2018) Standard Specification for Preformed Sponge Rubber, Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction
ASTM D2240 (2015; E 2017) Standard Test Method for Rubber Property - Durometer Hardness
ASTM D2628 (1991; R 2016) Standard Specification for Preformed Polychloroprene Elastomeric Joint Seals for Concrete Pavements
ASTM D2835 (1989; R 2017) Standard Specification for Lubricant for Installation of Preformed Compression Seals in Concrete Pavements
ASTM D3042 (2017) Standard Test Method for Insoluble Residue in Carbonate Aggregates
ASTM D4039 (2015) Standard Test Method for Reflection Haze of thigh-Gloss Surfaces
ASTM D5759 (2012; R 2020) Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses
ASTM D5767 (2017) Standard Test Method for Instrumental Measurement of Distinctness-of-Image (DOI) Gloss of Coated Surfaces
ASTM D6690 (2015) Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
ASTM E329 (2020) Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection
ASTM E1155 (2020) Standard Test Method for Determining Floor Flatness and Floor Levelness Numbers
ASTM E1643 (2018a) Standard Practice for Selection, Design, Installation, and Inspection of
SECTION 03 30 00 Page 5
Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs
ASTM E1745 (2017) Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
CRSI 10MSP (2018) Manual of Standard Practice
CRSI RB4.1 (2016) Supports for Reinforcement Used in Concrete
FOREST STEWARDSHIP COUNCIL (FSC)
FSC STD 01 001 (2015) Principles and Criteria for Forest Stewardship
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST PS 1 (2009) DOC Voluntary Product Standard PS 1-07, Structural Plywood
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 104 (1980) Method of Calculation of the Fineness Modulus of Aggregate
COE CRD-C 513 (1974) Corps of Engineers Specifications for Rubber Waterstops
COE CRD-C 572 (1974) Corps of Engineers Specifications for Polyvinylchloride Waterstops
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED NC (2009) Leadership in Energy and Environmental Design(tm) New Construction Rating System
1.2 DEFINITIONS
a. "Cementitious material" as used herein must include all portland cement, pozzolan, fly ash, and slag cement.
b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the building. A public location is accessible to persons not responsible for operation or maintenance of the building.
c. "Chemical admixtures" are materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.
d. "Supplementary cementing materials" (SCM) include coal fly ash, slag cement, natural or calcined pozzolans, and ultra-fine coal ash when used in such proportions to replace the portland cement that result in improvement to sustainability and durability and reduced cost.
SECTION 03 30 00 Page 6
e. "Design strength" (f'c) is the specified compressive strength of concrete at time(s) specified in this section to meet structural design criteria.
f. "Mass Concrete" is any concrete system that approaches a maximum temperature of 158 degrees F within the first 72 hours of placement.
In addition, it includes all concrete elements with a section thickness of 3 feet or more regardless of temperature.
g. "Mixture proportioning" is the process of designing concrete mixture proportions to enable it to meet the strength, service life and constructability requirements of the project while minimizing the initial and life-cycle cost.
h. "Mixture proportions" are the masses or volumes of individual ingredients used to make a unit measure (cubic meter or cubic yard) of concrete.
i. "Pozzolan" is a siliceous or siliceous and aluminous material, which in itself possesses little or no cementitious value but will, in finely divided form and in the presence of moisture, chemically react with calcium hydroxide at ordinary temperatures to form compounds possessing cementitious properties.
j. "Workability (or consistence)" is the ability of a fresh (plastic) concrete mix to fill the form/mould properly with the desired work (vibration) and without reducing the concrete's quality. Workability depends on water content, chemical admixtures, aggregate (shape and size distribution), cementitious content and age (level of hydration).
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Concrete Curing Plan
Quality Control Plan ; G, DO
Quality Control Personnel Certifications ; G
Quality Control Organizational Chart
Laboratory Accreditation ; G
Maturity Method Data
SD-02 Shop Drawings
Reinforcing Steel ; G, DO
SD-03 Product Data
SECTION 03 30 00 Page 7
Joint Sealants ; ( LEED NC)
Joint Filler ; ( LEED NC)
Formwork Materials
Recycled Aggregate Materials ; ( LEED NC)
Cementitious Materials ; ( LEED NC)
Vapor Retarder and Vapor Barrier
Concrete Curing Materials
Reinforcement ; ( LEED NC)
Liquid Chemical Floor Hardeners and Sealers
Admixtures
Mechanical Reinforcing Bar Connectors
Waterstops
Local/Regional Materials ; ( LEED NC)
Biodegradable Form Release Agent
Pumping Concrete
Finishing Plan
Nonshrink Grout
SD-04 Samples
Slab Finish Sample
Surface Finish Samples
SD-05 Design Data
Concrete Mix Design ; G, DO
SD-06 Test Reports
Concrete Mix Design ; G, DO
Fly Ash
Pozzolan
Slag Cement
Aggregates
Tolerance Report ; G, DO
SECTION 03 30 00 Page 8
Compressive Strength Tests ; G, DO
Unit Weight of Structural Concrete
Distinctness-of-Image Measurement Test ; G, DO
Chloride Ion Concentration
Air Content
Slump Tests
Water
SD-07 Certificates
Reinforcing Bars
Welder Qualifications
VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers
Safety Data Sheets
Polished Concrete Surface Installer's Qualifications
Forest Stewardship Council (FSC) Certification
Field Testing Technician and Testing Agency
SD-08 Manufacturer's Instructions
Liquid Chemical Floor Hardeners and Sealers
Joint Sealants ; ( LEED NC)
Curing Compound
1.4 MODIFICATION OF REFERENCES
Accomplish work in accordance with ACI publications except as modified herein. Consider the advisory or recommended provisions to be mandatory.
Interpret reference to the "Building Official," the "Structural Engineer," and the "Architect/Engineer" to mean the Contracting Officer.
1.5 DELIVERY, STORAGE, AND HANDLING
Follow ACI 301 , ACI 304R and ASTM A934/A934M requirements and recommendations. Do not deliver concrete until vapor retarder, vapor barrier, forms, reinforcement, embedded items, and chamfer strips are in place and ready for concrete placement. Do not store concrete curing compounds or sealers with materials that have a high capacity to adsorb volatile organic compound (VOC) emissions. Do not store concrete curing compounds or sealers in occupied spaces.
1.5.1 Reinforcement
Store reinforcement of different sizes and shapes in separate piles or
SECTION 03 30 00 Page 9 racks raised above the ground to avoid excessive rusting. Protect from contaminants such as grease, oil, and dirt. Ensure bar sizes can be accurately identified after bundles are broken and tags removed.
1.6 PRE-INSTALLATION MEETINGS
Conduct a pre-installation meeting to verify project requirements, manufacturer's installation instructions and manufacturer's warranty requirements. Review the following:
a. Environmental Requirements
b. Scheduling and phasing of work.
c. Coordinating with other work and personnel. Remind all trades that they are working on a surface that is to become a finished surface.
d. Protection of adjacent surfaces.
e. Surface preparation.
f. Repair of defects and defective work prior to installation
g. Cleaning.
h. Installation of polished floor finishes.
i. Application of liquid hardener, densifier.
j. Protection of finished surfaces after installation.
k. Placing of materials on the concrete surface that may cause staining, etching or scratching
1.7 QUALITY ASSURANCE
1.7.1 Design Data
1.7.1.1 Concrete Mix Design
Sixty days minimum prior to concrete placement, submit a mix design for each strength and type of concrete. Submit a complete list of materials including type; brand; source and amount of cement, supplementary cementitious materials, and admixtures; and applicable reference specifications. Submit mill test and all other test for cement, supplementary cementitious materials, aggregates, and admixtures. Provide documentation of maximum nominal aggregate size, gradation analysis, percentage retained and passing sieve, and a graph of percentage retained verses sieve size. Provide mix proportion data using at least three different water-cementitious material ratios for each type of mixture, which produce a range of strength encompassing those required for each type of concrete required. If source material changes, resubmit mix proportion data using revised source material. Provide only materials that have been proven by trial mix studies to meet the requirements of this specification, unless otherwise approved in writing by the Contracting Officer. Indicate clearly in the submittal where each mix design is used when more than one mix design is submitted. Resubmit data on concrete components if the qualities or source of components changes.
For previously approved concrete mix designs used within the past twelve
SECTION 03 30 00 Page 10 months, the previous mix design may be re-submitted without further trial batch testing if accompanied by material test data conducted within the last six months. Obtain mix design approval from the contracting officer prior to concrete placement.
1.7.2 Installer Qualifications
Submit data for company, personnel, experience, and training to conform to
1.5.5.1 1.7.2.1 through 1.5.5.3 1.7.2.3 :
1.7.2.1 List of Projects
List office projects performed over the last 3 years of similar type, size, and complexity.
1.7.2.2 Certifications
Certifications of installer's training from manufacturer's of each product.
1.7.2.3 Competent Supervisor
Unless otherwise specified. submit verification that a competent supervisor who 1s at the Project during the specified Work 1s certified as a Concrete Polishing Council (CPC) Craftsman, or equivalent.
Specify if more or fewer certified concrete polishers are required or permitted. Concrete polishers should be certified on the basis of work experience or successful completion of a certification program that includes written and performance examinations as described in ASCC CPC Certification Policies, February 19.
1.7.3 Finishing Components
Concrete finishing components and materials shall be from single manufacturer.
1.7.4 Manufacturer Qualifications
a. Manufacturer capable of providing field service representation during construction and approving application method.
b. Manufacturer shall have a minimum 5 years of experience in manufacturing components similar to or exceeding requirements of project.
1.7.5 Shop Drawings
1.7.5.1 Reinforcing Steel
Indicate bending diagrams, assembly diagrams, splicing and laps of bars, shapes, dimensions, and details of bar reinforcing, accessories, and concrete cover. Do not scale dimensions from structural drawings to determine lengths of reinforcing bars. Reproductions of contract drawings are unacceptable.
SECTION 03 30 00 Page 11
*AM4 *
1.7.6 Control Submittals
1.7.6.1 Concrete Curing Plan
Submit proposed materials, methods and duration for curing concrete elements in accordance with ACI 308.1 and ACI 310.1 .
1.7.6.2 Pumping Concrete
Submit proposed materials and methods for pumping concrete. Submittal must include mix designs, pumping equipment including type of pump and size and material for pipe, and maximum length and height concrete is to be pumped.
1.7.6.3 Finishing Plan
Submit proposed material and procedures to be used in obtaining the polished concrete finish for the first, second, and third floors. Include qualification of person to be used for obtaining floor tolerance measurement, description of measuring equipment to be used, and a sketch showing lines and locations the measuring equipment will follow.
1.7.6.3.1 Polishing Schedule
Submit plan showing polished concrete slab finishes and schedule of polishing operations for each area of polished concrete before start of polishing operations. Include locations of all joints, including construction joints. Schedule to include details of sequencing Work with respect to coordination of other trades interior construction. final weather protection, and when protection is necessary, if other construction activities could damage the in-place polished Work.
1.7.6.3.2 Repair Data
Submit manufacturer's technical literature for each repair product specified or proposed. Include manufacturer's technical data, application instructions, and recommendations.
1.7.6.3.3 Surface Defect Repairs
Submit plan locating and identifying surface defects. Reference surface defect locations to building column lines.
1.7.6.3.4 Crack Repairs
Unless otherwise specified, submit plan locating and identifying concrete cracks. Reference crack locations to building column lines.
Consider eliminating this provision if there are no cracks, if the cracks are not detrimental to polishing, or if the cracks will not be repaired.
1.7.6.4 VOC Content for form release agents, curing compounds, and concrete penetrating sealers
Submit certification for the form release agent, curing compounds, and concrete penetrating sealers that indicate the VOC content of each product.
SECTION 03 30 00 Page 12
1.7.6.5 Safety Data Sheets
Submit Safety Data Sheets (SDS) for all materials that are regulated for hazardous health effects. SDS must be readily accessible during each work shift to employees when they are at the construction site.
1.7.7 Test Reports
1.7.7.1 Fly Ash and Pozzolan
Submit test results in accordance with ASTM C618 for fly ash and pozzolan. Submit test results performed within 6 months of submittal date.
1.7.7.2 Slag Cement
Submit test results in accordance with ASTM C989/C989M for slag cement.
Submit test results performed within 6 months of submittal date.
1.7.7.3 Aggregates
Submit test results in accordance with ASTM C33/C33M, and ASTM C1293 or ASTM C1567 as required in the paragraph titled ALKALI-AGGREGATE REACTION.
1.7.8 Field Samples
1.7.8.1 Slab Finish Sample (Mock-Up)
Install minimum of 10 foot by 10 foot slab. Slab finish sample must not be part of the final project. Finish as required by specification.
Field mock-up-Before performing Work of this Section, provide field mock-up to verify selections made under submittals and to demonstrate aesthetic effects of polishing in accordance with 1.7.8.1.1 through
1.7.8.1.7. Approval does not constitute approval of deviations from Contract Documents unless Architect/Engineer specifically approves deviations in writing.
1.7.8.1.1 Procedures and Material
Unless otherwise specified, construct field mock-ups using same procedures, equipment, and materials that will be used for production of polished concrete. Accepted field mock-up will serve as a reference to which polished concrete will be compared for periodic and final acceptance. Construct field mock-up at an acceptable location on site.
Provide a simulated repair to demonstrate acceptable procedures. Repair procedures will provide and acceptable color and texture match. Protect from physical damage and retain mock-ups until final acceptance of polished concrete.
1.7.8.1.2 Minimum Cure Time of mock-up
Concrete in mock-up area to have a minimum cure of 28 days
1.7.8.1.3 Mock-up Hardness Testing
Prior to starting mock-up installation, verify surface hardness with a Mohs Hardness testing kit.
SECTION 03 30 00 Page 13
1.7.8.1.4 Slab Edge and Joints
Mock-up shall include slab edge polishing work. Mock-up area shall also include complete joint filling and shall demonstrate the polishing processing over one or more floor joints.
1.7.8.1.5 Abrasives
Provide preconditioned (previously used) bonded abrasives, having a complete range of tooling available for a variety of concrete surface hardnesses.
1.7.8.1.6 Mock-up Approval
The mock-up shall be reviewed and approved by the Contracting Officer, and shall become the minimum standard for acceptance of the polish work.
1.7.8.1.7 Start Concrete Polishing Work
Concrete polishing work shall not begin until mock-up has been accepted by Contracting Officer; in writing.
1.7.8.1.8 Mock-up Acceptance as a Standard
When accepted, mock-up will demonstrate minimum standard of quality required for this work.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .