Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0005_SF30(Final).pdf | ||
| FUT_PH_2_site_visit_12-FEB-2018.pdf | ||
| Amendment_0004_SF30(Final).pdf | ||
| W912BV18R0002_Amendment_0003.pdf | ||
| APPENDIX_E_-_1_OF_4_Drawings.pdf | ||
| APPENDIX_E_-_2_OF_4_Drawings.pdf | ||
| SF30_W912BV18R0002_AMD_0001.pdf | ||
| AM01_TABLE_OF_CONTENTS.pdf | ||
| APPENDIX_D_Geotechnical_Report_(2).pdf | ||
| APPENDIX_E_-_3_OF_4_Drawings.pdf | ||
| APPENDIX_E_-_4_OF_4_Drawings.pdf | ||
| APPENDIX_C_Structural_Interior_Design_(SID).pdf | ||
| W912BV18R0002_Solicitation_Final.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
KC-46A FTU Fuselage Trainer Phase 2, Altus AFB, OK
Amendment 0002 provides for an additional site visit (see revision to clause 52.236-27), revises Section 00 21 00 paragraph 1.9 and replaces Section 00 73 46 Wage Determiantion Schedule. See attached continuation page for additional details (changes in Red). Proposal due date and time remain unchanged.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Feb-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV18R0002
X 9B. DATED (SEE ITEM 11)
04-Jan-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Feb-2018
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV18R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
The following have been modified:
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS TO OFFERORS
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 GOVERNMENT SECURITY REQUIREMENTS
1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.4 OFFEROR'S QUESTIONS AND COMMENTS
1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.7 PRE-PROPOSAL CONFERENCE
1.8 ACCURACY IN PROPOSALS
1.9 PROPOSAL SUBMITTALS
1.10 JOINT VENTURE PROPOSAL REQUIREMENTS
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
KC-46A FTU Fuselage Trainer Phase 2 Altus AFB, Oklahoma
Adds to and alters the existing high bay of the Fuselage Trainer (FuT) facility using economical design and construction methods to accomplish the mission of the facility. The facility will consist of a cast in place concrete footer and foundation walls, a steel structural frame with brick veneer and factory-finished sloped roof with rigid insulation board. Project will include fire suppression systems, all utilities, pavements, communications, site improvements, and associated support facilities to provide a complete and useable facility. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4- 101-01.
1.2. GOVERNMENT SECURITY REQUIREMENTS
The Offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not l imited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at 2488 E. 81st Street, Tulsa, OK 74137-4290, if it does not contain a return mailing address. There will be no exceptions.
USACE Tulsa District Point of Contact is Brian Hutchison Phone: 918-669-7426 Email: Brian.C.Hutchison@usace.army.mil
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted through the Federal Business Opportunities (FBO) website at:
http://www.fbo.gov
Solicitation number: W912BV18R0002
It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
1.4. OFFEROR'S QUESTIONS AND COMMENTS
Questions and/or comments relative to the document should be submitted via Bidders Inquiry at:
https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic.
Instructions for registering in the ProjNet Bidder Inquiry system are available on the above web site.
The Bidder Inquiry Key for this project is: YC26YJ-QG2Y93 http://www.fbo.gov/ https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic
Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
Note: All questions and/or comments should be entered in Bidder’s Inquiry no later than 7 calendar days prior to the proposal deadline, so they may be given consideration or action taken prior to receipt of offers.
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE
The small business size standard for NAICS Code 236220.
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.7. PRE-PROPOSAL CONFERENCE
The Government intends to hold the pre-proposal conference. The date, location, and time will be announced by Amendment. The offeror must submit, via e-mail, the firm’s name, address, point of contact, telephone number, and number of personnel planning to attend to the following no later than ten (10) working days prior to the conference:
U.S. Army Corps of Engineers, Tulsa District ATTN: Bruce Hayes, CESWT-CT 2488 E. 81st Street Tulsa, OK 74137-4290 Phone: 918-669-7277 Fax: 918-669-7436 Email: Bruce.E.Hayes@usace.army.mil
During this conference, the requirements set forth in the solicitation will be reviewed and discussed, with part of the conference to include a question and answer period.
1.8. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).
The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.9. PROPOSAL SUBMITTALS
The submittal method for proposals is electronic ONLY via AMRDEC SAFE web site below, or email, in accordance with section 00 22 11:
https://safe.amrdec.army.mil/safe/.
The following email addresses must be entered for notification of proposal receipt and download availability:
brian.c.hutchison@usace.army.mil bruce.e.hayes@usace.army.mil daniel.a.foyil@usace.army.mil
Proposals will be received until the time and date shown on Standard Form SF 1442 or as amended on SF30.
https://safe.amrdec.army.mil/safe/ mailto:brian.c.hutchison@usace.army.mil mailto:bruce.e.hayes@usace.army.mil
1.10. JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) All interested Vendors are encouraged to attend the Site Visit. An organized Site Visit is scheduled to take place on February 12, 2018 at 8:00 a.m. CST. POCs for the Site Visit are Mr.
Jeffrey Hirschfeld and MS. Denise Ladd. You may contact them via phone or email at:
Mr. Jeffrey Hirschfeld, Jeffrey.S.Hirschfeld@usace.army.mil, (580) 581-4155 MS. Denise Ladd, Denise.L.Ladd@usace.army.mil, (580) 482-9398
Participants will meet at USACE Altus Resident Office, Building 358, Room A1029, Altus Air Force Base, Oklahoma. All contractors must enter the installation through the south gate.
Prospective contractors should email a list of all potential attendees to include name and contractor they are represneting to the POCs lsited above by Noon 9 February 2018.
(End of provision)
SECTION 00 73 46 - WAGE DETERMINATION SCHEDULE
The following have been modified:
WAGE RATE DETERMINATION
General Decision Number: OK180039 01/05/2018 OK39 mailto:Jeffrey.S.Hirschfeld@usace.army.mil mailto:Denise.L.Ladd@usace.army.mil
Superseded General Decision Number: OK20170039
State: Oklahoma
Construction Type: Building Building Construction -does not include residential construction consisting of single family homes and apartments up to and including 4 stories. (Including building projects on treatment plants)
County: Jackson County in Oklahoma.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018
BOIL0592-001 01/01/2017
Rates Fringes
BOILERMAKER......................$ 28.47 21.88
BROK0005-004 06/01/2016
Rates Fringes
BRICKLAYER.......................$ 23.34 9.01
ELEC1141-010 05/29/2017
Rates Fringes
ELECTRICIAN (Excludes Low Voltage Wiring and Installation of Alarms)..........$ 31.80 17.25%+5.40
* ENGI0627-012 06/01/2017
Rates Fringes
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 28.65 12.98 Group 2.....................$ 26.95 12.98 Group 3.....................$ 26.40 12.98 Group 4.....................$ 25.65 12.98 Group 5.....................$ 25.15 12.98 Group 8.....................$ 22.70 12.98 Group10.....................$ 21.70 12.98
POWER EQUIPMENT OPERATOR
GROUP 1: All Crane Type Equipment 200 ton and larger and including 400 ton capacity cranes. All Tower Cranes.
GROUP 2: All Crane Type Equipment 100 ton capacity and larger cranes, and less than 200 ton capacity.
GROUP 3: All Crane Type Equipment 50 ton capacity and larger cranes, and less than 100 ton capacity. Crane Equipment (as rated by mfg.) 3 cu. yd. and over Guy derrick Whirley Power Driven Hole Digger (with 30' and longer mast).
GROUP 4: CRANES with Boom Incl. Jib less than 100 ft and less than 3 cu. Yd.; Overhead Monorail Crane
GROUP 5: BULLDOZER
GROUP 8: FORK-LIFT
GROUP 10:OILER
IRON0048-009 06/01/2017
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 24.00 14.81
PLUM0344-006 07/01/2017
Rates Fringes
PLUMBER (Excludes HVAC Pipe Installation)....................$ 31.73 14.90
PLUM0344-022 07/01/2017
Rates Fringes
PIPEFITTER (Including HVAC Pipe and Unit Installation)......$ 31.73 14.90
SHEE0124-010 07/01/2017
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 31.00 15.32
SUOK2012-019 06/18/2012
Rates Fringes
CARPENTER........................$ 15.71 5.50
CEMENT MASON/CONCRETE FINISHER...$ 16.10 0.00
ELECTRICIAN (Alarm Installation)....................$ 17.50 2.27
ELECTRICIAN (Low Voltage Wiring)..........................$ 19.73 4.55
LABORER: Common or General......$ 11.60 0.84
LABORER: Mason Tender - Brick...$ 11.88 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 13.04 0.00
LABORER: Pipelayer..............$ 13.03 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 19.34 0.74
PAINTER: Brush, Roller and Spray............................$ 12.15 0.00
ROOFER...........................$ 15.00 0.29
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 27.32 11.11
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
| 1.1. GENERAL DESCRIPTION OF WORK |
| KC-46A FTU Fuselage Trainer Phase 2 Altus AFB, Oklahoma |
| Adds to and alters the existing high bay of the Fuselage Trainer (FuT) facility using economical design and construction methods to accomplish the mission of the facility. The facility will consist of a cast in place concrete footer and foundation wal... |
| 1.2. GOVERNMENT SECURITY REQUIREMENTS |
| 1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS |
| 1.4. OFFEROR'S QUESTIONS AND COMMENTS |
| 1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE |
| 1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS |
| 1.7. PRE-PROPOSAL CONFERENCE |
| 1.8. ACCURACY IN PROPOSALS |
| 1.9. PROPOSAL SUBMITTALS |
| 1.10. JOINT VENTURE PROPOSAL REQUIREMENTS |