W912BV-16-R-0086.pdf
PDF 388 KB Posted
- Attached to
- Park Cleaning Services Federal contract opportunity
- Solicitation number
- W912BV-16-R-0086
About this file
RFP Hugo Lake Park Cleaning
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV-16-R-0086_0003.pdf | ||
| W912BV-16-R-0086_0002.pdf | ||
| W912BV-16-R-0086_0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912BV-16-R-0086 18-Feb-2016
b. TELEPHONE NUMBER
918.669.7275
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 18 Mar 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912BV9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
RUDOLFO J MORALES
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$18M
NAICS:
561720
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF80
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section B - Supplies or Services and Prices
INSTRUCTIONS TO OFFERORS
Instructions to Offers
1. OFFEROR’S QUESTIONS AND COMMENTS
Questions and/or comments relative to these documents should be submitted to the Contract Specialist identified below:
Contract Specialist – Primary POC U.S. Army Corps of Engineers, Tulsa District
ATTN: Rudolfo Morales Email: rudolfo.morales@USACE.ARMY.MIL
Please include the solicitation number, and project title with your questions. Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given the form of a written amendment to the solicitation.
2. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
3. SUBMISSION OF OFFERS SUBMITTALS
Submit signed and dated offers to the office and individual specified in this solicitation at or before the exact time specified in this solicitation by electronic means. Electronic/email quotes will be accepted and e-mail is the preferred method of submitting your proposal. Faxed quotes will not be accepted. Hard copy offers must be in sealed envelopes/packages, include CD copy of proposal, marked and addressed as follows:
MARK PACKAGES:
“Response to Solicitation Number: W912BV-16-R-0086, DO NOT OPEN”.
ADDRESS PACKAGES TO:
U.S. Army Corps of Engineers (USACE)
Tulsa District (SWT) Attention: Rudolfo Morales, CESWT-CT-E
1645 S. 101 E. Ave Tulsa, OK 74128-4609
Special Instruction pertaining to Hand Carried Offers: Hand-carried offers must be delivered to the USACE-SWT Contracting Division, Contracting Specialist, at the address shown above prior to the closing time stated in this solicitation. The SWT office is a secure facility. A picture ID must be presented at the gate to gain entrance to the facility. Building security personnel will not deliver proposals to Contracting.
INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS
USE OF BIDDER’S INQUIRY
Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following (no other means of questions or inquiries will be answered except through Bidder Inquiry):
a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and clicks continue.
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.
4. The Solicitation Numbers are: W912BV-16-R-0086
The Bidder Inquiry Key: P6NIJP-5GCUS7
5. Address/enter only one question/issue per entry.
c. The Bidder Inquiry System will be unavailable for new inquiries 4:00pm (Central) Tuesday, 15 March 2016 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
g. The point of contact for this solicitation is:
Contract Specialist: Rudy Morales Telephone: 918-669-7275 E-MAIL: Rudolfo.Morales@usace.army.mil
PREPROPOSAL/SITE VISIT CONFERENCE
A Pre-proposal Conference will be held on Wednesday, 25 February 2016 at 08:00 a.m. CST, at the Hugo Lake Project Office located at US Army Corps of Engineers, 3170 Highway 70 E, Sawyer, OK 74756 The purpose of the conference will be to familiarize prospective offerors with the extent and nature of the requirement and location of performance. Oral questions pertaining to the Performance Work Statement or other contractual matters will not be answered during the tour of the performance work areas.
This conference is not mandatory for prospective offerors. All prospective offerors are strongly urged to attend the pre-proposal conference and to satisfy themselves as to all general conditions that may affect the cost and schedule of performance of this contract.
Any questions pertaining to past or current contract information for any of the past or current contracts should be submitted to the Office of Counsel, Tulsa District Office in the form of a FOIA (Freedom of Information Act) request. Below is the contact information for the Office of Counsel, Tulsa District.
CESWT-OC
1645 South 101st East Ave
Tulsa, OK 74128-4609 foia-swt@usace.army.mil
Guidance on how to submit a FOIA request can be found at http://www.usace.army.mil/FOIA.aspx. Please ensure your request is submitted in a timely matter to receive feedback before the solicitation closing date.
PRICE SCHEDULE
BID SCHEDULE Base Year 1 MAR 16 - 28 FEB 17 PROJECT:
HUGO LAKE
CONTRACTOR: CONTRACT NO.:
ITEM
NO
SERVICES QUANTI
TY
UNIT UNIT PRICE AMOUNT
SCHEDULE I
APPENDIX A - CLEANING OF
PARKS
* SUMMER PERIOD
1 A Bridgeview 7 MO
2 A Frazier Point 7 MO
3 A Group Camp 7 MO
4 A Kiamichi Park 7 MO
5 A Overlook 7 MO
6 A Rattan Landing 7 MO
7 A Salt Creek Cove 7 MO
8 A Sawyer Bluff 7 MO
9 A Virgil Point 7 MO
10 A Wilson Point (Twin Coves) 7 MO
Total Summer Period
* FALL PERIOD
11 A Bridgeview 1 MO
12 A Kiamichi Park 1 MO
Overlook 1 MO
13 A Virgil Point 1 MO
Total Fall Period
* WINTER PERIOD
14 A Bridgeview 4 MO
15 A Kiamichi Park 4 MO
Overlook 4 MO
16 A Virgil Point 4 MO
Total Winter Period
* ADDITIONAL WORK
REQUIREMENTS
17 A Cleaning of Restrooms 15 EA
18 A Cleaning of Refuse Containers
10 EA
* HIGH PRESSURE POWER
WASHING
19 A Picnic Table Units 20 EA
20 A Utility Tables 20 EA
21 A Fireplaces 5 EA
22 A Pedestal Cookers 20 EA
23 A Fire Ring Grates 20 EA
24 A Restroom Floors 20 EA
Total High Pressure Washing
* SMALL LITTER PICK UP
25 A Picnic/Camping/Canopy/Pullo ut Sites
50 EA
26 A Picnic Shelters 25 EA
27 A Restrooms 25 EA
28 A Overlook 10 EA
29 A Playgrounds 5 TM
30 A Parking Areas 112 AC
31 A Beaches 20 TM
Total Small Litter Pickup
*OPTIONS FOR CLEANING OF
ADDITIONAL RESTROOMS
32 A Virgil Point CXT Vault Toilet
7 MO
33 A Virgil Point CXT Vault Toilet
12 MO
34 A Virgil Point CXT Shower Toilet
7 MO
35 A Rattan Landing CXT Vault Toilet
7 MO
36 A Rattan Landing CXT Vault Toilet
7 MO
37 A Wilson Point CXT Vault Toilet
7 MO
Total for Options
ACRONYMS: AC - Acre EA - Each MO - Month TM
- Time
TOTAL COST
Summer period may be prorated to reflect the actual award date.
BID SCHEDULE Opt Year 1 1 MAR 17 - 28 FEB 18 PROJECT:
NO
SERVICES QUANTI
TY
UNIT UNIT PRICE AMOUNT
SCHEDULE I
1001 A Bridgeview 7 MO
1002 A Frazier Point 7 MO
1003 A Group Camp 7 MO
1004 A Kiamichi Park 7 MO
1005 A Overlook 7 MO
1006 A Rattan Landing 7 MO
1007 A Salt Creek Cove 7 MO
1008 A Sawyer Bluff 7 MO
1009 A Virgil Point 7 MO
1010 A Wilson Point (Twin Coves) 7 MO
Total Summer Period
* FALL PERIOD
1011 A Bridgeview 1 MO
1012 A Kiamichi Park 1 MO
Overlook 1 MO
1013 A Virgil Point 1 MO
Total Fall Period
* WINTER PERIOD
1014 A Bridgeview 4 MO
1015 A Kiamichi Park 4 MO
Overlook 4 MO
1016 A Virgil Point 4 MO
Total Winter Period
1017 A Cleaning of Restrooms 15 EA
1018 A Cleaning of Refuse Containers
10 EA
1019 A Picnic Table Units 20 EA
1020 A Utility Tables 20 EA
1021 A Fireplaces 5 EA
1022 A Pedestal Cookers 20 EA
1023 A Fire Ring Grates 20 EA
1024 A Restroom Floors 20 EA
Total High Pressure Washing
* SMALL LITTER PICK UP
1025 A Picnic/Camping/Canopy/Pullo ut Sites
50 EA
1026 A Picnic Shelters 25 EA
1027 A Restrooms 25 EA
1028 A Overlook 10 EA
1029 A Playgrounds 5 TM
1030 A Parking Areas 112 AC
1031 A Beaches 20 TM
Total Small Litter Pickup
1032 A Virgil Point CXT Vault
7 MO
1033 A Virgil Point CXT Vault Toilet
12 MO
1034 A Virgil Point CXT Shower 7 MO
1035 A Rattan Landing CXT Vault Toilet
7 MO
1036 A Rattan Landing CXT Vault Toilet
7 MO
1037 A Wilson Point CXT Vault Toilet
7 MO
Total for Options
ACRONYMS: AC - Acre EA - Each MO - Month TM
BID SCHEDULE OPT Year 2 1 MAR 18 - 28 FEB 19 PROJECT:
NO
SERVICES QUANTI
TY
UNIT UNIT PRICE AMOUNT
SCHEDULE I
2001 A Bridgeview 7 MO
2002 A Frazier Point 7 MO
2003 A Group Camp 7 MO
2004 A Kiamichi Park 7 MO
2005 A Overlook 7 MO
2006 A Rattan Landing 7 MO
2007 A Salt Creek Cove 7 MO
2008 A Sawyer Bluff 7 MO
2009 A Virgil Point 7 MO
2010 A Wilson Point (Twin Coves) 7 MO
Total Summer Period
* FALL PERIOD
2011 A Bridgeview 1 MO
2012 A Kiamichi Park 1 MO
Overlook 1 MO
2013 A Virgil Point 1 MO
Total Fall Period
* WINTER PERIOD
2014 A Bridgeview 4 MO
2015 A Kiamichi Park 4 MO
Overlook 4 MO
2016 A Virgil Point 4 MO
Total Winter Period
2017 A Cleaning of Restrooms 15 EA
2018 A Cleaning of Refuse Containers
10 EA
2019 A Picnic Table Units 20 EA
2020 A Utility Tables 20 EA
2021 A Fireplaces 5 EA
2022 A Pedestal Cookers 20 EA
2023 A Fire Ring Grates 20 EA
2024 A Restroom Floors 20 EA
Total High Pressure Washing
* SMALL LITTER PICK UP
2025 A Picnic/Camping/Canopy/Pullo ut Sites
50 EA
2026 A Picnic Shelters 25 EA
2027 A Restrooms 25 EA
2028 A Overlook 10 EA
2029 A Playgrounds 5 TM
2030 A Parking Areas 112 AC
2031 A Beaches 20 TM
Total Small Litter Pickup
2032 A Virgil Point CXT Vault
7 MO
2033 A Virgil Point CXT Vault Toilet
12 MO
2034 A Virgil Point CXT Shower Toilet
7 MO
2035 A Rattan Landing CXT Vault Toilet
7 MO
2036 A Rattan Landing CXT Vault Toilet
7 MO
2037 A Wilson Point CXT Vault
7 MO
Total for Options
ACRONYMS: AC - Acre EA - Each MO - Month TM
BID SCHEDULE OPT Year 3 1 MAR 19 - 29 FEB 20 PROJECT:
NO
SERVICES QUANTI
TY
UNIT UNIT PRICE AMOUNT
SCHEDULE I
3001 A Bridgeview 7 MO
3002 A Frazier Point 7 MO
A Group Camp 7 MO
3004 A Kiamichi Park 7 MO
3005 A Overlook 7 MO
3006 A Rattan Landing 7 MO
3007 A Salt Creek Cove 7 MO
3008 A Sawyer Bluff 7 MO
3009 A Virgil Point 7 MO
3010 A Wilson Point (Twin Coves) 7 MO
Total Summer Period
* FALL PERIOD
3011 A Bridgeview 1 MO
3012 A Kiamichi Park 1 MO
Overlook 1 MO
3013 A Virgil Point 1 MO
Total Fall Period
* WINTER PERIOD
3014 A Bridgeview 4 MO
3015 A Kiamichi Park 4 MO
Overlook 4 MO
3016 A Virgil Point 4 MO
Total Winter Period
3017 A Cleaning of Restrooms 15 EA
3018 A Cleaning of Refuse Containers
10 EA
3019 A Picnic Table Units 20 EA
3020 A Utility Tables 20 EA
3021 A Fireplaces 5 EA
3022 A Pedestal Cookers 20 EA
3023 A Fire Ring Grates 20 EA
3024 A Restroom Floors 20 EA
Total High Pressure Washing
* SMALL LITTER PICK UP
3025 A Picnic/Camping/Canopy/Pullo ut Sites
50 EA
3026 A Picnic Shelters 25 EA
3027 A Restrooms 25 EA
3028 A Overlook 10 EA
3029 A Playgrounds 5 TM
3030 A Parking Areas 112 AC
3031 A Beaches 20 TM
Total Small Litter Pickup
3032 A Virgil Point CXT Vault
7 MO
3033 A Virgil Point CXT Vault Toilet
12 MO
3034 A Virgil Point CXT Shower Toilet
7 MO
3035 A Rattan Landing CXT Vault Toilet
7 MO
3036 A Rattan Landing CXT Vault Toilet
7 MO
3037 A Wilson Point CXT Vault Toilet
7 MO
Total for Options
ACRONYMS: AC - Acre EA - Each MO - Month TM
BID SCHEDULE OPT Year 4 1 MAR 20 - 28 FEB 21 PROJECT:
NO
SERVICES QUANTI
TY
UNIT UNIT PRICE AMOUNT
SCHEDULE I
4001 A Bridgeview 7 MO
4002 A Frazier Point 7 MO
4003 A Group Camp 7 MO
4004 A Kiamichi Park 7 MO
4005 A Overlook 7 MO
4006 A Rattan Landing 7 MO
4007 A Salt Creek Cove 7 MO
4008 A Sawyer Bluff 7 MO
4009 A Virgil Point 7 MO
4010 A Wilson Point (Twin Coves) 7 MO
Total Summer Period
* FALL PERIOD
4011 A Bridgeview 1 MO
4012 A Kiamichi Park 1 MO
Overlook 1 MO
4013 A Virgil Point 1 MO
Total Fall Period
* WINTER PERIOD
4014 A Bridgeview 4 MO
4015 A Kiamichi Park 4 MO
Overlook 4 MO
4016 A Virgil Point 4 MO
Total Winter Period
4017 A Cleaning of Restrooms 15 EA
4018 A Cleaning of Refuse Containers
10 EA
4019 A Picnic Table Units 20 EA
4020 A Utility Tables 20 EA
4021 A Fireplaces 5 EA
4022 A Pedestal Cookers 20 EA
4023 A Fire Ring Grates 20 EA
4024 A Restroom Floors 20 EA
Total High Pressure Washing
* SMALL LITTER PICK UP
4025 A Picnic/Camping/Canopy/Pullo ut Sites
50 EA
4026 A Picnic Shelters 25 EA
4027 A Restrooms 25 EA
4028 A Overlook 10 EA
4029 A Playgrounds 5 TM
4030 A Parking Areas 112 AC
4031 A Beaches 20 TM
Total Small Litter Pickup
4032 A Virgil Point CXT Vault
7 MO
4033 A Virgil Point CXT Vault Toilet
12 MO
4034 A Virgil Point CXT Shower Toilet
7 MO
4035 A Rattan Landing CXT Vault Toilet
7 MO
4036 A Rattan Landing CXT Vault Toilet
7 MO
4037 A Wilson Point CXT Vault Toilet
7 MO
Total for Options
ACRONYMS: AC - Acre EA - Each MO - Month TM
Section C - Descriptions and Specifications
SCOPE OF WORK
S P E C I F I C A T I O N S
OKLAHOMA
MAINTENANCE CONTRACT
FOR
PARK CLEANING
ORGANIZATION OF SPECIFICATIONS
This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following pages.
The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.
Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.
TABLE OF CONTENTS
Page No. Paragraph Title
1 Scope of Work
2 Definitions
3 References
4 Initiation, Execution, & Acceptance of Work
5 Personnel
6 Equipment
7 Materials and Supplies
8 Performance Requirements
9 Contractor Quality Control
10 Deductions for Deficient Work
11 Safety
12 Work Schedules
13 Reporting Defective Facilities
14 Prework Conference
15 Contractor Submittals
16 Billing
17 Changes in Amount of Facilities Serviced
EXHIBITS
No. Title
1 Additonal Work
2 Quality Assurance Report
3 Maximum Response Times
4 Specifications for Contractor-Furnished Materials and Supplies
5 Performance Requirements Table
6 Quality Control Inspection Log
7 Example of Job Hazard Analysis
8 Work Schedule for Park Cleaning
9 Invoice Format
APPENDICES
Appendix
A Cleaning of Parks
1. SCOPE OF WORK. The work required under this specification provides for the cleaning of park facilities such as toilets, picnic/camping sites, and groundskeeping.
2. DEFINITIONS.
2.1. Additional Work Requirements consists of work that is
dependent on needs that cannot be precisely determined at the time this contract is advertised because the quantity, schedule, and/or location cannot be identified. Although actual work to be ordered is unknown, the quantities shown on the bid schedule is the Government’s best estimate of the normal annual workload. As needs for this type of work are determined, work will be ordered by the Contracting Officer.
2.2. Bimonthly. Work required to be performed every other
month.
2.3. Biweekly. Work required to be performed every other week.
2.4. Contractor Quality Control (CQC). The contractor’s system of controlling the quality of services provided under the provisions of the contract.
2.5. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements given in Exhibit 5.
2.6. Government. The term “Government” as used herein means the United States of America.
2.8. Performance Requirement (PR). The Government’s requirement for each service provided under the contract. The requirements are stated as Performance Standards (PStd) and specify the minimum standard (quality) for each service provided under the contract.
2.9. Project. The term “project” as used herein means all
Government property and easements at Hugo Lake.
2.10. Public Use Area (PUA). Parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.
2.11. Quality is conformance with the contract specification.
2.12. Quality Assurance (QA). The procedure by which the
Government determines CQC is functioning effectively.
2.13. Regulations. The term “regulations” refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.
2.14. Response Times. The dates for initiating and completing the work specified are agreed to by the Contracting Officer and the contractor.
2.15. Semimonthly. Work required to be performed twice a month.
2.16. Semiweekly. Work required to be performed twice a week.
2.17. Workday. Any day work is required to be performed by this specification.
3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual, (EM 385-1-1, dated 15 September 2008) is hereby incorporated into this specification. The Contracting Officer will furnish EM 385-1-1 to the contractor upon award of a contract.
4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.
4.1. Initiation and execution of park cleaning shall be in
accordance with this specification.
4.2. Initiation and execution of options shall be in accordance with this specification issued by the Contracting Officer.
4.2.1. The Contracting Officer will initiate work by entering the scope of work, desired completion date, and the cost of the work.
4.2.2. The Contracting Officer will discuss the work with the contractor and the dates for initiating and completing work shall be negotiated.
4.2.3. If the Contracting Officer cancels work prior to the
contractor initiating work, no payment shall be made to the contractor. If the Contracting Officer cancels an work after work is initiated, the provisions and procedures of the Changes Clause shall be followed except that modification of the contract shall not be required. Work is considered initiated when mobilization of resources to the work site has begun.
4.2.4. Additional work will be ordered only if the Contracting Officer determines such work is required. Payment will only be made for work actually accomplished.
4.3. Acceptance of park cleaning work. The Government shall
accept Work unless the Contracting Officer notifies the contractor of deficient services.
4.3.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the Contracting Officer in writing within two (2) workdays. Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance (QA) Report (SWT Form 982, Exhibit 2).
4.3.2. If the Contracting Officer notifies the contractor of
deficient work the contractor shall initiate action to accomplish corrective work. Work performed on a daily schedule shall be reperformed the same day. Work performed on less than a daily schedule shall be reperformed not later than the following day.
Refer to paragraph 10 for deficient work not reperformed.
4.3.3. The contractor shall notify the Contracting Officer when corrective work is completed. Notification shall be made by completing Part IV of the QA Report provided it has been furnished the contractor. If not, notification shall be made orally. When work has been corrected, the Contracting Officer shall take necessary action to complete Part V of the QA Report and provide a copy to the contractor.
4.4. Acceptance of additional work (Option)requirements. When additional work is completed, the contractor will notify the Contracting Officer.
4.4.1. If the Contracting Officer notifies the contractor of
deficient work the contractor shall initiate action to accomplish corrective work. Reperformance of work to correct deficiencies must be completed within the original response time.
4.4.2. The contractor shall notify the Contracting Officer when corrective work is completed
5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification, within specified time limits and within reasonable time frames not to exceed the response times set forth in subparagraph 4.2.
5.1. Experience and Skills. The contractor shall provide
personnel that are experienced and demonstrate proficiency in the skills required to perform the various types of work specified.
5.2. Supervision.
5.2.1. The contractor shall provide one on-site supervisor on the project who shall have full authority to direct any work required. This on-site supervisor and alternates, who shall have full authority to execute work during his absence, shall be designated in writing.
5.2.2. The contractor shall provide the Contracting Officer a local or toll free telephone number at or through which the on-site supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular-type phone is acceptable.
5.2.3. The on-site supervisor shall contact the Contracting
Officer each workday between 8:00 a.m. and 8:30 a.m. If this contact is made by telephone, the Contracting Officer may require the on-site supervisor to meet and discuss problems. The Contracting Officer shall establish the time and location for such meetings after consultation with the on-site supervisor.
The Contracting Officer will not require such meetings within two
(2) hours after the time of requests.
6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish all work required by this specification, within specified time limits and within reasonable time frames not to exceed the response times set forth in subparagraph 4.2.
6.1. Amount and Type of Equipment. Equipment that equals or
exceeds the quantity and quality certified by the contractor as being available during the pre-award survey shall be utilized when work is initiated. If the contractor demonstrates that the requirements of the contract can be met with less equipment or a different kind of equipment, the amount and/or type of equipment may be modified upon approval of the Contracting Officer.
6.2. Equipment Inspection. The contractor shall present all
equipment to the Contracting Officer for inspection whenever it is brought to the project. After consultation with the contractor, the Contracting Officer shall establish the time and location for these inspections. No equipment shall be used on the project prior to being inspected. The Contracting Officer may inspect all equipment monthly at a time and location specified.
6.3. Equipment Requirements. All equipment used to perform work under this specification must be in good operating and mechanical condition and comply with EM 385-1-1.
6.3.1. Trucks used for hauling refuse, litter, and debris shall have a covering device to prevent the material from being blown out of the refuse bins. Bins shall be covered at all times when material is subject to blowing from the bins.
6.3.2. The working pressure of high-pressure power washers, if used to clean facilities specified in Appendix A, shall be at least 1,500 p.s.i. The working pressure of power washers shall not exceed 50 p.s.i.
6.3.3. Signs located on each side of the vehicles shall mark all sedans and trucks used by the contractor to perform work under this specification. Signs may be painted on the doors or magnetic signs may be attached to the doors. Magnetic signs shall not be removed at any time vehicles are at the project.
Lettering shall be at least 2 inches high. Each sign shall contain the following:
__________ LAKE
CLEANING SERVICES
PROVIDED BY
(Contractor’s Name)
6.4. Vehicle Operation and Parking. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the Contracting Officer approves use of other areas.
7. MATERIALS AND SUPPLIES.
7.1. Contractor Furnished.
7.1.1. Except for the items listed in subparagraph 7.2., the
contractor shall furnish all materials and supplies necessary to accomplish all work required by this specification within specified time limits.
7.1.2. All materials and supplies shall be new and adequate
quantities shall be maintained to perform the required services without interruptions. All materials and supplies are subject to review by the Contracting Officer to determine compliance with this specification.
7.1.3. Specifications for selected contractor-furnished
materials and supplies are given in Exhibit 4.
7.1.4. In addition to materials and supplies listed in Exhibit 4, the contractor shall furnish the following:
Cleaning compounds Disinfectants Mops, brooms, etc.
7.2. Government Furnished. The Government will furnish potable water and odor control chemicals for vault toilets. The contractor shall be responsible for transporting Government-furnished materials and supplies to work sites.
8. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 5. The contractor’s performance will be evaluated using these PRs as follows:
8.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient. Major or recurring minor deficiencies will result in a letter of correction being issued by the Contracting Officer’s Representative.
8.2. Deficient services are determined during initial QA
inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory reperformance.
9. CONTRACTOR QUALITY CONTROL (CQC). The contractor shall establish and execute a CQC Program to assure all work required by the specification is completed on schedule and in accordance with the PRs in Exhibit 5.
9.1. The results of all quality control inspections conducted by the contractor shall be entered on the Quality Control Inspection Log (SWT Form 990, Exhibit 6). A copy of completed inspection logs shall be furnished the Contracting Officer weekly.
9.2. The Contracting Officer may waive the requirements in
subparagraph 9.1. if he determines proper CQC can be achieved without the required submissions. This determination will normally be made on the basis of actual performance by the contractor.
10. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor’s scheduled earnings shall be made for services that do not meet the PStds in Exhibit 5. Deductions for documented defects will be made in accordance with the following procedures:
10.1. Each service found deficient and reperformed by the
contractor: No deduction.
10.2. Each service found deficient and performed by the
Government: Deduction for loss in value shall be based on the Government’s cost for performing the work.
10.3. Each service found deficient and performed by another
contractor: Deduction is the contract price paid the other contractor to perform the work.
10.4. Each service found deficient and not reperformed by
anyone, or work not performed at all: Deduction for loss in value shall be based on estimates of the contractor’s cost for performing the work. Loss in value shall be based on the contract bid price or applicable portion thereof.
11. SAFETY.
11.1. Safety Plan. The contractor shall furnish the Contracting Officer a comprehensive safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The safety plan shall include, but not be limited to the following:
11.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.
11.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.
11.1.3. Procedures for handling, reporting, and correcting
unsafe conditions, practices, and safety violations.
11.1.4. Procedures for treating and transporting injured persons to medical facilities.
11.1.5. Fire prevention plans.
11.1.6. Job hazard analyses shall include an evaluation of
hazards that might be encountered for an operation, and proposed methods and techniques for accomplishing each job in a safe manner. Contractor personnel shall be thoroughly indoctrinated with job hazard analyses, especially at the start of a major job.
Initially, the safety plan shall include, but not be limited to, job hazard analyses for the jobs listed below. However, the contractor shall prepare additional analyses as the need arises and/or the Contracting Officer directs. Job hazard analysis directed by the Contracting Officer shall be submitted for approval within one (1) week. An example of a job hazard analysis is given in Exhibit 7.
11.1.6.1. Loading and unloading of equipment (analysis for each type of equipment to be used to perform services required by this specification).
11.1.6.2. Equipment operation and maintenance (for each type of equipment).
11.1.6.3. Vehicle operation and maintenance.
11.2. Safety Meetings. The contractor shall conduct monthly
meetings to discuss safety items pertaining to ongoing work.
Employees of subcontractors shall attend safety meetings. The contractor shall provide at least one-day notice of safety meetings to the Contracting Officer so that Corps of Engineers personnel can attend. A quarterly report of the meetings shall be furnished in writing to the Contracting Officer by the 15th day following the end of each quarter. The report shall include the following information on each meeting: Date, location of meeting, names of persons attending, safety items discussed and persons who conducted the meeting.
11.3. Safety Violations. If a contractor’s employee persists in not following the safety requirements of this specification or the contractor’s safety plan, the employee shall be permanently discharged upon the request of the Contracting Officer.
11.4. Personal Clothing and Safety Apparel. Contractor
personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers. Personnel shall wear additional protective apparel when required by Section 5, EM 385-1-1.
11.5. Accident Reports.
11.5.1. The contractor shall immediately notify the Contracting Officer of all known accidents that occur at the project and result in death or serious injury.
11.5.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the Contracting Officer immediately, and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.
11.6. Exposure Reports. The contractor shall maintain an
accurate record of exposure data (man-hours worked) and submit the figure in writing monthly by the 2nd workday of the following month.
12. WORK SCHEDULES. The contractor shall submit a work schedule for each park cleaning crew in the format given in Exhibit 8.
12.1. The schedule shall be prepared for work to be accomplished during the period which work will be started. Work schedules for subsequent periods shall be furnished two (2) weeks prior to the beginning of each period.
12.2. Schedules for additional cleaning of toilets shall be
considered a part of this work schedule.
12.3. The contractor shall utilize these plans for accomplishing work and shall furnish the Contracting Officer a revised plan prior to changing his mode of operation.
13. REPORTING DEFECTIVE FACILITIES. While performing work, contractor personnel shall observe the condition of Government facilities. Damaged, defective, and/or inoperative facilities shall be reported to the Contracting Officer at least once each workday.
14. PREWORK CONFERENCE. The Contracting Officer shall conduct a Prework Conference with the contractor to discuss the provisions of this specification and the contractor’s submittals listed in paragraph 15 below. As a minimum, the officer of the company that signed the contract, the on-site supervisor shall represent the contractor, and the person that will directly supervise the administrative work associated with the contract. The Contracting Officer shall establish the location, date, and time of the Prework Conference after consultation with the contractor.
15. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the Contracting Officer two (2) weeks prior to the Prework Conference. All submittals, other than copies of licenses and contracts, shall be typed and the original and one copy shall be furnished the Contracting Officer. If the Contracting Officer determines any of the proposed plans or schedules do not comply with this specification, the contractor shall resubmit these documents within one (1) week.
15.1. Names of on-site supervisor and alternate supervisor(s) (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1.).
15.2. Safety Plan (subparagraph 11.1.).
15.3. Report of Safety meetings (submit within 15 days after the end of each quarter) (subparagraph 11.2.).
15.4. Exposure reports (submit by 2nd workday of each month)
(subparagraph 11.6.).
15.5. Supplemental Work Schedules for Cleaning Parks (submit
prior to initiation of work and prior to changing schedules) (paragraph 12.).
16. BILLING.
16.1. The contractor shall submit the original and two copies of invoices at the end of each month for all park cleaning work.
Invoices shall be prepared in the format given at Exhibit 9.
16.2. The invoice should also include any additional work
requirements that have been completed. Payment will only be made for work actually performed.
16.3. All exposure reports shall be submitted before an invoice will be accepted.
16.4. The invoices and supporting documents shall be delivered or mailed to the Lake Manager, Hugo Project Office, PO Box 99, Sawyer, OK 74756-0099.
17. CHANGES IN AMOUNT OF FACILITIES SERVICED. Adjustment in contract price will be negotiated at the request of either party only if either or both of the following conditions occur.
17.1. Park cleaning services required are deleted for a period of one (1) month or longer in an entire park.
17.2. A singular change in the amount of project facilities to be serviced is made and the change results in an annual increase or decrease in the cost of park cleaning work that exceeds $300.
The cost of increases or decreases shall be based upon estimates of the contractor’s costs for performing the work.
EXHIBIT 1
EXHIBIT 2
QUALITY ASSURANCE REPORT
EXHIBIT 3
MAXIMUM RESPONSE TIMES
MAXIMUM RESPONSE TIMES FOR ADDITONAL CLEANINGS
RESPONSE TIMES
WORK DESCRIPTION START1 FINISH2
APPENDIX A - Additional Work Requirements
Cleaning of Toilets 2 WD
Cleaning of Refuse Containers 2 WD
High Pressure Power Washing 2 WD
Small Litter Pickup 2 WD
WD - Workdays
1The maximum allowable time to begin work at the work site after the option is signed by both parties.
2The maximum allowable time to complete work after an option is signed by both parties.
EXHIBIT 4
SPECIFICATIONS FOR CONTRACTOR-FURNISHED
MATERIALS AND SUPPLIES
ITEM APPENDIX SPECIFICATION
FLOURESCENT LAMPS A
Compact Fluorescent 23-Watt)
REFUSE CONTAINER
LINER
A PLASTIC, 8 TO 32 GALLON.
TOWELS A SINGLE PLY, MULTI-FOLD, NATURAL,
40% POST CONSUMER WASTE RECYCLED
MATERIALS TO MEET EPA GUIDELINES
AS SPECIFIED IN THE FEDERAL
REGISTER, #150, FORT HOWARD CO. OR
EQUAL.
TISSUE PAPER A 2-PLY BATH TISSUE, NON-BLEACHED,
NATURAL, SEPTIC TANK SAFE, MINIMUM
OF 500 SHEETS PER ROLL, 100% POST
CONSUMER WASTE RECYCLED MATERIALS,
#100, FORT HOWARD CO. OR EQUAL.
URINAL DEODORANT
CAKE
A PERFUMED, COMMERCIAL QUALITY,
SEPTIC TANK SAFE.
EXHIBIT 5
PERFORMANCE REQUIREMENTS
SERVICE REQUIREMENT PR NO. PERFORMANCE STANDARDS
Clean interior of waterborne toilets & showers
A 1 Clean. Floors, walls, toilet fixtures, and showers sanitary. No standing water on floors. Free of graffiti. Supply of tissue in toilets is adequate until next cleaning day. Light bulbs operate properly.
Clean interior of vault toilets
A 2 Clean. Floors, walls, and toilet fixtures sanitary. No standing water on floors. Free of graffiti. Supply of tissue in toilets is adequate until next cleaning day. Light bulbs operate properly.
Clean exterior of toilets, showers & overlook(s)
A 3 Clean. Free of graffiti. Light Bulbs operate properly. Clean and sanitize drinking fountains. Walkways clean.
Monitor toilet vaults A 4 Vaults exceeding specified limit are reported.
Clean picnic shelters A 5 Clean. Free of graffiti. No refuse, debris, or partially burned wood in fireplaces or cookers. Accumulations of ashes do not exceed an average depth of 1 inch in cookers and 3 inches in fireplaces.
Clean picnic & camping sites
A 6 Clean. No refuse, debris, or partially burned wood in fireplaces or cookers.
Accumulations of ashes do not exceed and average depth of 1 inch in cookers and 3 inches in fire rings.
Clean trailer dump stations
A 7 Clean.
Clean courtesy docks A 9 Clean.
Grounds keeping PUAs & access roads
A 10 No refuse or debris visible from a distance of 25 feet. No dead animals.
Fishing areas A 11 Remove dead fish and all litter visible from a distance of 25 feet.
Embankment road A 12 No refuse or debris visible from a distance of 25 feet. No dead animals.
Refuse Collection A 13 Containers are not more than ¼ full & contents do not emit strong odors.
Liners are clean and not torn.
Refuse Disposal A 14 Refuse disposed at designated site. No deposition along roads.
SERVICE REQUIREMENT PR NO. PERFORMANCE STANDARDS
Report stinging insects & nests
A 15 All insect nests within 5 feet of facilities or on any buildings reported.
Clean refuse containers
A 16 Clean.
High pressure washing A 17 Clean. No stains or accumulations of grease. No damage to paint on adjacent surfaces.
Small litter pick up A 18 No litter visible from a distance of 10 feet.
Rip Rap Areas A 19 Remove all litter and dead fish
EXHIBIT 6
QUALITY CONTROL INSPECTION LOG
EXHIBIT 7
EXAMPLE OF JOB HAZARD ANALYSIS
ACCIDENT PREVENTION PROGRAM
JOB HAZARD ANALYSIS
1. _______________________________________________ 2. __________________________________________ 3. __________________________
PROJECT CONTRACTOR DATE
4. _______________________________________________ 5. __________________________________________ 6. __________________________
LOCATION CONTRACT NO. START DATE
7. PHASE OF WORK 8. SAFETY HAZARD 9. PRECAUTIONARY ACTION TAKEN
Park cleaning Liquids spilled on toilet floors
Spills will be mopped up as soon as possible to prevent an injury from falling.
Mopping floors When floors are being mopped, signs shall be posted or doors to toilets shall be locked, to warn the public of possible slipping hazard.
Motor vehicle operation
When operating any motor vehicle, personnel will have a current, valid state operators license in their possession. Seat belts will be worn at all times when vehicle is in operation. Vehicles will be operated at posted speeds or lesser as indicated by road and weather conditions. Vehicles will be operated in a safe manner. Personnel will have vehicles under control at all times. Exit or entrance to vehicles will not be permitted while vehicle is in motion. No vehicle will be left unattended unless the engine is shut off, key removed, parking brake set, and gear selector in park. Every passenger will have a seat and wear a seatbelt. There will be no riders permitted in the back of pickups, flatbed trucks, etc.
Traffic Practice defensive driving techniques. Properly position mirrors for turning and backing. All vehicles will stop at railroad crossings and determine if a train is approaching before proceeding. Care shall be used in entering access or primary roads.
All appropriate State Motor Vehicle Operating laws will always be observed.
Refuse disposal Trucks used for refuse disposal will be in good operating condition. Vehicles will be operated in a safe manner. Trucks will have covers to prevent trash from flying out causing a driving hazard to others.
Lifting Always use proper lifting techniques. Use adequate manpower or mechanical assistance.
Weather If lightning is present, personnel will move to a clear area away from trees and equipment and will remain there until the danger passes or if the Foreman directs them to another location.
10. ___________________________________________________________________________ CONTRACTOR (Signature/Date)
11. DISCUSSED WITH CONTRACTOR/ON-SITE SUPERVISOR ON (Date) ___________________
12. ___________________________________________________________________________ CONTRACTING OFFICER or REPRESENTATIVE (Signature/Date)
EXHIBIT 8
WORK SCHEDULE FOR PARK CLEANING
SCHEDULE OF CLEANING SERVICES, _____________________To____________________
CREW NO.________ No. OF PERSONNEL IN CREW________ SHEET ___ OF ___
PUBLIC USE AREA →
COMPLETION
TIME →
SERVICE WORKDAYS
Toilets, & Overlooks
Picnic Shelters
Picnic and Camping Sites
Trailer Dump Stations
Drinking Fountains
Courtesy Docks
Groundskeeping - PUAs & Access Roads
Groundskeeping - Small Litter Pickup
Groundskeeping - Nature & Hiking Trails
Groundskeeping - Primitive Areas
Groundskeeping - Fishing Areas
Groundskeeping - Embankment Road
See Reverse for Instructions
LIST OF ASSIGNED EQUIPMENT:
INSTRUCTIONS:
1. List all public use areas given in Table A-2 in the order they are to be cleaned.
2. In the boxes to the right of the services listed, enter M, T, W, Th, F, Sa, and/or S, for work performed at a weekly frequency or greater. For work performed at less than a weekly frequency, i.e. monthly, enter M, T, W, Th, F, Sa, or S, preceded by a number to indicate the day of the month, i.e., the second Tuesday of the month would be 2T. Precede with an asterisk (*) to indicate bimonthly frequency, i.e., *2T.
3. On the Completion Times, give the time (� 30 minutes) that work will be completed in each public use area.
EXHIBIT 9
INVOICE FORMAT
BILLING FOR MAINTENANCE CONTRACT
PROJECT: ________________________ SHEET __ OF __
CONTRACTOR: _____________________ DATE: ________
ADDRESS: ________________________ CONTRACT NO: W912BV-__-_-_____
BILLING PERIOD: _____ THRU ______ INVOICE NO: __________
PAYMENT TERMS: __________________________________
(Payment Discount or N/A)
ADDITIONAL WORK
BID ITEM BID ITEM
NO. AMOUNT TOTAL
TOTAL EARNINGS: ____________
APPENDIX A
CLEANING OF PARKS
1. FACILITIES TO BE SERVICED. All park facilities listed in Table A-1.
2. PARK CLEANING WORK.
2.1. Seasonal Work Periods. The amount of work required varies with the seasons of the year based on need. The following work periods are established to reflect changes in inventory of facilities and/or frequency of services from season to season:
Summer Period: 1 March thru 30 September
Winter Period: 1 October thru 28 February
2.2. Frequencies and Times of Services.
2.2.1. The contractor shall accomplish services in accordance with the frequencies specified in Table A-2a, A-2b, and subparagraphs 2.3.2. and 2.3.13.1. .
2.2.2. If the frequency is stated as weekly, semiweekly, biweekly, monthly, semimonthly, or bimonthly, the contractor shall perform the required services on any day, Monday through Friday.
2.2.3. The contractor shall begin work no earlier than 6 a.m.
and shall complete work by 2 p.m.
2.3. Description of Work.
2.3.1. Vault Toilets and Waterborne Restrooms. The contractor shall clean all waterborne toilets, showers and vault toilets, including windows, vent coverings, interpretive facilities, contiguous sidewalks, light fixtures (interior and exterior), plumbing fixtures, walls, ceilings, doors, eaves, screens, partitions, floors, and exterior drinking fountains.
2.3.1.1. The contractor shall empty refuse containers. Plastic liners shall be maintained in each refuse container. Refuse shall be deposited in dumpsters provided by others.
2.3.1.2. Toilet tissue shall be distributed at each toilet when it is cleaned.
2.3.1.3. The contractor shall remove all litter and debris in a five-foot area around the exterior of facilities.
2.3.1.4. All marks of vandalism and graffiti removable without damaging the paint or surface shall be removed.
2.3.1.5. Light bulbs in fixtures located on the interior of
toilets and on exterior walls shall be checked. Bulbs that are burned out or broken shall be replaced on the same day they are discovered. Light bulbs that are operated by standard switches or photoelectric over-ride switches shall be checked each time toilets are cleaned. Replacement shall be made with new bulbs of like wattage. Security lights are not subject to the provisions of this subparagraph.
2.3.1.6. Each time vault toilets are cleaned, available storage in the vaults shall be checked. When the waste in a vault reaches 12 inches from the top of the vault, the Contracting Officer shall be notified by 8:30 a.m. on the next workday.
2.3.1.7. Odor control shall be added to toilet vaults as
directed by the Contracting Officer.
2.3.1.8. Interior of light fixtures shall be cleaned biweekly and windows shall be cleaned monthly.
2.3.2. Additional cleaning of toilets at selected PUAs shall be performed in addition to those specified in the attached tables.
Additional cleanings will be required on different days that a cleaning is specified in Table A-2.
2.3.2.1. Additional cleanings may be required only during
holiday periods, or other high use times, i.e., fishing season, at the times set forth in subparagraph 2.2.3. All work required by subparagraphs 2.3.1., 2.3.1.1., 2.3.1.2., 2.3.1.3., 2.3.1.4., 2.3.1.5., and 2.3.1.6. shall be performed during additional cleanings.
2.3.2.2. The Contracting Officer shall furnish the contractor a schedule for performing these cleanings.
2.3.2.3. An additional six restrooms may be added to the
inventory of facilities requiring cleaning. An option for cleaning of each restroom facility individually may be exercised upon completion of construction. The type and location of restroom facility is outlined in the bid schedule.
2.3.3. Picnic Shelters. The contractor shall clean the floor
slab, table seats and tops, fireplaces, light fixtures, eaves, ceilings, and columns. All material removed from fireplaces shall be disposed of in dumpsters provided by others.
2.3.4. Cookers & Fire Rings. All ashes and debris shall be
removed from cookers once a year in November. All material removed from cookers and fire rings shall be disposed of in dumpsters provided by others.
2.3.5. Trailer Dump Stations. The contractor shall clean all
slabs, flush bowls, intakes, hoses, wheel stops, and other appurtenances at trailer dump stations. Each time trailer dump stations are cleaned, the available storage in the vaults shall be checked.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .