W912BV-16-R-0086_0002.pdf
PDF 93 KB Posted
- Attached to
- Park Cleaning Services Federal contract opportunity
- Solicitation number
- W912BV-16-R-0086
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV-16-R-0086_0003.pdf | ||
| W912BV-16-R-0086_0001.pdf | ||
| W912BV-16-R-0086.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment incorporates a revised Price Schedule.
POC: Rudy Morales 918-669-7275
1. CONTRACT ID CODE PAGE OF PAGES
1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Mar-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-16-R-0086
X 9B. DATED (SEE ITEM 11)
18-Feb-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Mar-2016
CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV-16-R-0086
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been added by full text:
PRICE SCHEDULE (REVISED)
BID SCHEDULE Base Year 1 Apr 16 - 28
FEB 17
PROJECT: HUGO
LAKE
CONTRACTOR: CONTRACT NO.:
ITEM
NO
SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
SCHEDULE I
APPENDIX A - CLEANING OF PARKS
* SUMMER PERIOD
1 A Bridgeview 7 MO
2 A Frazier Point 7 MO
3 A Group Camp 7 MO
4 A Kiamichi Park 7 MO
5 A Overlook 7 MO
6 A Rattan Landing 7 MO
7 A Salt Creek Cove 7 MO
8 A Sawyer Bluff 7 MO
9 A Virgil Point 7 MO
10 A Wilson Point (Twin Coves) 7 MO
Total Summer Period
* FALL PERIOD
11 A Bridgeview 1 MO
12 A Kiamichi Park 1 MO
Overlook 1 MO
13 A Virgil Point 1 MO
Total Fall Period
* WINTER PERIOD
14 A Bridgeview 4 MO
15 A Kiamichi Park 4 MO
Overlook 4 MO
16 A Virgil Point 4 MO
Total Winter Period
* ADDITIONAL WORK REQUIREMENTS
17 A Cleaning of Restrooms 15 EA
18 A Cleaning of Refuse Containers 10 EA
* HIGH PRESSURE POWER WASHING
19 A Picnic Table Units 20 EA
20 A Utility Tables 20 EA
21 A Fireplaces 5 EA
22 A Pedestal Cookers 20 EA
23 A Fire Ring Grates 20 EA
24 A Restroom Floors 20 EA
Total High Pressure Washing
* SMALL LITTER PICK UP
25 A Picnic/Camping/Canopy/Pullout Sites
50 EA
26 A Picnic Shelters 25 EA
27 A Restrooms 25 EA
28 A Overlook 10 EA
29 A Playgrounds 5 TM
30 A Parking Areas 112 AC
31 A Beaches 20 TM
Total Small Litter Pickup
*OPTIONS FOR CLEANING OF
ADDITIONAL RESTROOMS
32 A Virgil Point CXT Vault Toilet 7 MO
33 A Virgil Point CXT Vault Toilet 12 MO
34 A Virgil Point CXT Shower Toilet 7 MO
35 A Rattan Landing CXT Vault Toilet
7 MO
36 A Rattan Landing CXT Vault Toilet
7 MO
37 A Wilson Point CXT Vault Toilet 7 MO
Total for Options
ACRONYMS: AC - Acre EA - Each MO - Month TM - Time TOTAL
COST
BID SCHEDULE Opt Year 1 1 MAR 17 - 28 FEB 18 PROJECT:
HUGO LAKE
CONTRACTOR: CONTRACT NO.:
ITEM
NO
SERVICES QUANTI
TY
UNIT UNIT PRICE AMOUNT
SCHEDULE I
APPENDIX A - CLEANING OF
PARKS
* SUMMER PERIOD
1001 A Bridgeview 7 MO
1002 A Frazier Point 7 MO
1003 A Group Camp 7 MO
1004 A Kiamichi Park 7 MO
1005 A Overlook 7 MO
1006 A Rattan Landing 7 MO
1007 A Salt Creek Cove 7 MO
1008 A Sawyer Bluff 7 MO
1009 A Virgil Point 7 MO
1010 A Wilson Point (Twin Coves) 7 MO
Total Summer Period
* FALL PERIOD
1011 A Bridgeview 1 MO
1012 A Kiamichi Park 1 MO
Overlook 1 MO
1013 A Virgil Point 1 MO
Total Fall Period
* WINTER PERIOD
1014 A Bridgeview 4 MO
1015 A Kiamichi Park 4 MO
Overlook 4 MO
1016 A Virgil Point 4 MO
Total Winter Period
* ADDITIONAL WORK
REQUIREMENTS
1017 A Cleaning of Restrooms 15 EA
1018 A Cleaning of Refuse Containers
10 EA
* HIGH PRESSURE POWER
WASHING
1019 A Picnic Table Units 20 EA
1020 A Utility Tables 20 EA
1021 A Fireplaces 5 EA
1022 A Pedestal Cookers 20 EA
1023 A Fire Ring Grates 20 EA
1024 A Restroom Floors 20 EA
Total High Pressure Washing
* SMALL LITTER PICK UP
1025 A Picnic/Camping/Canopy/Pullo ut Sites
50 EA
1026 A Picnic Shelters 25 EA
1027 A Restrooms 25 EA
1028 A Overlook 10 EA
1029 A Playgrounds 5 TM
1030 A Parking Areas 112 AC
1031 A Beaches 20 TM
Total Small Litter Pickup
1032 A Virgil Point CXT Vault Toilet
7 MO
1033 A Virgil Point CXT Vault Toilet
12 MO
1034 A Virgil Point CXT Shower Toilet
7 MO
1035 A Rattan Landing CXT Vault Toilet
7 MO
1036 A Rattan Landing CXT Vault Toilet
7 MO
1037 A Wilson Point CXT Vault Toilet
7 MO
Total for Options
ACRONYMS: AC - Acre EA - Each MO - Month TM
- Time
TOTAL COST
BID SCHEDULE OPT Year 2 1 MAR 18 - 28 FEB 19 PROJECT:
NO
SERVICES QUANTI
TY
UNIT UNIT PRICE AMOUNT
SCHEDULE I
2001 A Bridgeview 7 MO
2002 A Frazier Point 7 MO
2003 A Group Camp 7 MO
2004 A Kiamichi Park 7 MO
2005 A Overlook 7 MO
2006 A Rattan Landing 7 MO
2007 A Salt Creek Cove 7 MO
2008 A Sawyer Bluff 7 MO
2009 A Virgil Point 7 MO
2010 A Wilson Point (Twin Coves) 7 MO
Total Summer Period
* FALL PERIOD
2011 A Bridgeview 1 MO
2012 A Kiamichi Park 1 MO
Overlook 1 MO
2013 A Virgil Point 1 MO
Total Fall Period
* WINTER PERIOD
2014 A Bridgeview 4 MO
2015 A Kiamichi Park 4 MO
Overlook 4 MO
2016 A Virgil Point 4 MO
Total Winter Period
2017 A Cleaning of Restrooms 15 EA
2018 A Cleaning of Refuse Containers
10 EA
2019 A Picnic Table Units 20 EA
2020 A Utility Tables 20 EA
2021 A Fireplaces 5 EA
2022 A Pedestal Cookers 20 EA
2023 A Fire Ring Grates 20 EA
2024 A Restroom Floors 20 EA
Total High Pressure Washing
* SMALL LITTER PICK UP
2025 A Picnic/Camping/Canopy/Pullo ut Sites
50 EA
2026 A Picnic Shelters 25 EA
2027 A Restrooms 25 EA
2028 A Overlook 10 EA
2029 A Playgrounds 5 TM
2030 A Parking Areas 112 AC
2031 A Beaches 20 TM
Total Small Litter Pickup
2032 A Virgil Point CXT Vault
7 MO
2033 A Virgil Point CXT Vault Toilet
12 MO
2034 A Virgil Point CXT Shower Toilet
7 MO
2035 A Rattan Landing CXT Vault Toilet
7 MO
2036 A Rattan Landing CXT Vault Toilet
7 MO
2037 A Wilson Point CXT Vault Toilet
7 MO
Total for Options
ACRONYMS: AC - Acre EA - Each MO - Month TM
BID SCHEDULE OPT Year 3 1 MAR 19 - 29 FEB 20 PROJECT:
NO
SERVICES QUANTI
TY
UNIT UNIT PRICE AMOUNT
SCHEDULE I
3001 A Bridgeview 7 MO
3002 A Frazier Point 7 MO
A Group Camp 7 MO
3004 A Kiamichi Park 7 MO
3005 A Overlook 7 MO
3006 A Rattan Landing 7 MO
3007 A Salt Creek Cove 7 MO
3008 A Sawyer Bluff 7 MO
3009 A Virgil Point 7 MO
3010 A Wilson Point (Twin Coves) 7 MO
Total Summer Period
* FALL PERIOD
3011 A Bridgeview 1 MO
3012 A Kiamichi Park 1 MO
Overlook 1 MO
3013 A Virgil Point 1 MO
Total Fall Period
* WINTER PERIOD
3014 A Bridgeview 4 MO
3015 A Kiamichi Park 4 MO
Overlook 4 MO
3016 A Virgil Point 4 MO
Total Winter Period
3017 A Cleaning of Restrooms 15 EA
3018 A Cleaning of Refuse Containers
10 EA
3019 A Picnic Table Units 20 EA
3020 A Utility Tables 20 EA
3021 A Fireplaces 5 EA
3022 A Pedestal Cookers 20 EA
3023 A Fire Ring Grates 20 EA
3024 A Restroom Floors 20 EA
Total High Pressure Washing
* SMALL LITTER PICK UP
3025 A Picnic/Camping/Canopy/Pullo ut Sites
50 EA
3026 A Picnic Shelters 25 EA
3027 A Restrooms 25 EA
3028 A Overlook 10 EA
3029 A Playgrounds 5 TM
3030 A Parking Areas 112 AC
3031 A Beaches 20 TM
Total Small Litter Pickup
3032 A Virgil Point CXT Vault
7 MO
3033 A Virgil Point CXT Vault Toilet
12 MO
3034 A Virgil Point CXT Shower Toilet
7 MO
3035 A Rattan Landing CXT Vault Toilet
7 MO
3036 A Rattan Landing CXT Vault Toilet
7 MO
3037 A Wilson Point CXT Vault Toilet
7 MO
Total for Options
ACRONYMS: AC - Acre EA - Each MO - Month TM
BID SCHEDULE OPT Year 4 1 MAR 20 - 28 FEB 21 PROJECT:
NO
SERVICES QUANTI
TY
UNIT UNIT PRICE AMOUNT
SCHEDULE I
4001 A Bridgeview 7 MO
4002 A Frazier Point 7 MO
A Group Camp 7 MO
4004 A Kiamichi Park 7 MO
4005 A Overlook 7 MO
4006 A Rattan Landing 7 MO
4007 A Salt Creek Cove 7 MO
4008 A Sawyer Bluff 7 MO
4009 A Virgil Point 7 MO
4010 A Wilson Point (Twin Coves) 7 MO
Total Summer Period
* FALL PERIOD
4011 A Bridgeview 1 MO
4012 A Kiamichi Park 1 MO
Overlook 1 MO
4013 A Virgil Point 1 MO
Total Fall Period
* WINTER PERIOD
4014 A Bridgeview 4 MO
4015 A Kiamichi Park 4 MO
Overlook 4 MO
4016 A Virgil Point 4 MO
Total Winter Period
4017 A Cleaning of Restrooms 15 EA
4018 A Cleaning of Refuse Containers
10 EA
4019 A Picnic Table Units 20 EA
4020 A Utility Tables 20 EA
4021 A Fireplaces 5 EA
4022 A Pedestal Cookers 20 EA
4023 A Fire Ring Grates 20 EA
4024 A Restroom Floors 20 EA
Total High Pressure Washing
* SMALL LITTER PICK UP
4025 A Picnic/Camping/Canopy/Pullo ut Sites
50 EA
4026 A Picnic Shelters 25 EA
4027 A Restrooms 25 EA
4028 A Overlook 10 EA
4029 A Playgrounds 5 TM
4030 A Parking Areas 112 AC
4031 A Beaches 20 TM
Total Small Litter Pickup
4032 A Virgil Point CXT Vault
7 MO
4033 A Virgil Point CXT Vault Toilet
12 MO
4034 A Virgil Point CXT Shower Toilet
7 MO
4035 A Rattan Landing CXT Vault Toilet
7 MO
4036 A Rattan Landing CXT Vault Toilet
7 MO
4037 A Wilson Point CXT Vault Toilet
7 MO
Total for Options
ACRONYMS: AC - Acre EA - Each MO - Month TM
The following have been deleted:
PRICE SCHEDULE
(End of Summary of Changes)
File details come from the government source that posted it. Updated .