Council Grove Park Roads 2011 CGROVERROADS 2011
Section 00 01 10 Page
SECTION 00 01 10
AMENDED BID SCHEDULE
KANSAVIEW PARK ROAD REPAIRS AT COUNCIL GROVE LAKE, KS
NOTE: The Bid Schedule included in Amendment 2 was incorrect. The revisions are in red in this Amendment 3. However, the Excel file Bid Schedule distributed with Amendment 2 was correct.
NO ITEM DESCRIPTION QTY UNIT UNIT
PRICE AMOUNT
0001 Base Bid – Road A 0001a Strip Topsoil 415 SY $ $ 0001b Pulvimixing 5,900 SY $ $ 0001c Undercut 200 CY $ $ 0001d Prime Coat 1,475 GAL $ $ 0001e Tack Coat 590 GAL $ $ 0001f Hot Mix Asphalt 1,020 TON $ $ 0001g Aggregate Base AB-3 220 CY $ $ 0001f Striping, 4 inch, Yellow 3,700 LF $ $
TOTAL BASE BID $
0002 Option 1 – Parking Areas A & B (Kansaview PUA) 0002a Pulvimixing 860 SY $ $ 0002b Undercut 30 CY $ $ 0002c Prime Coat 215 GAL $ $ 0002d Tack Coat 85 GAL $ $ 0002e Hot Mix Asphalt 150 TON $ $ 0002f Wheelstops 32 EA $ $
TOTAL OPTION 1 $
0003 Option 2 – Camp Loop Road Ramps (Kansaview PUA) 0003a Pulvimixing 310 SY $ $ 0003b Undercut 10 CY $ $ 0003c Prime Coat 75 GAL $ $ 0003d Tack Coat 30 GAL $ $ 0003e Hot Mix Asphalt 55 TON $ $
TOTAL OPTION 2 $
0004 Option 3 – Project Office Parking (Council Grove) 0004a Milling 1,210 SY $ $ 0004b Undercut 40 CY $ $ 0004c Prime Coat 301 GAL $ $ 0004d Tack Coat 121 GAL $ $ 0004e Hot Mix Asphalt 210 TON $ $ 0004f Gate Sensor Re-Set 1 LS $ $
TOTAL OPTION 3 $
0005 Option 4 – Road E (Neosho PUA) 0005a Milling 2,180 SY $ $ 0005b Undercut 73 CY $ $ 0005c Prime Coat 545 GAL $ $ 0005d Tack Coat 218 GAL $ $ 0005e Hot Mix Asphalt 376 TON $ $ 0005f Striping, 4 inch, Yellow 1,316 LF $ $
TOTAL OPTION 4 $
0006 Option 5 – Road E Parking (Neosho PUA) 0006a Milling 733 SY $ $ 0006a Undercut 24 CY $ $ 0006c Prime Coat 183 GAL $ $ 0006d Tack Coat 73 GAL $ $ 0006e Hot Mix Asphalt 127 TON $ $ 0006f Wheel Stops 16 EA $ $
TOTAL OPTION 5 $
0007 Option 6 – Road F (Neosho PUA) 0007a Milling 1,301 SY $ $ 0007b Undercut 43 CY $ $ 0007c Prime Coat 325 GAL $ $ 0007d Tack Coat 130 GAL $ $ 0007e Hot Mix Asphalt 224 TON $ $ 0007f Striping, 4 inch, Yellow 728 LF $ $
TOTAL OPTION 6 $
0008 Option 7 – Road G (Neosho PUA) 0008a Milling 5,387 SY $ $ 0008b Undercut 180 CY $ $ 0008c Prime Coat 1,347 GAL $ $ 0008d Tack Coat 539 GAL $ $ 0008e Hot Mix Asphalt 929 TON $ $ 0008f Striping, 4 inch, Yellow 3,566 LF $ $
TOTAL OPTION 7 $
0009 Option 8 – Road G Parking (Neosho PUA) 0009a Milling 1,827 SY $ $ 0009b Undercut 61 CY $ $ 0009c Prime Coat 457 GAL $ $ 0009d Tack Coat 183 GAL $ $ 0009e Hot Mix Asphalt 315 TON $ $ 0009f Wheel Stops 23 EA $ $
TOTAL OPTION 8 $
TOTAL BASE $
TOTAL OPTION 1 $
TOTAL OPTION 2 $
TOTAL OPTION 3 $
TOTAL OPTION 4 $
TOTAL OPTION 5 $
TOTAL OPTION 6 $
TOTAL OPTION 7 $
TOTAL OPTION 8 $
TOTAL BASE & OPTIONS $
An Electronic Excel File has been provided for the bid schedule. If it is used, please provide it as a separate Excel File with the Price Proposal.
NOTES
1. All costs for items of work not listed separately in the Proposal Schedule or specifically mentioned to be included in a particular item price shall be included in the listed item price most closely associated with the work involved.
2. This solicitation requires submission of a proposal on all items.
Failure to do so will result in the proposal being rejected without further consideration.
3. Optional items may be awarded, at the option of the government, at the time of contract award or may be exercised at any time from the date of contract award until 30 days after the date of contract award.
Section 00 73 00 Page 1 of 1
THE FOLLOWING PARAGRAPHS TO BE INCLUDED IN SECTION 00 73 00
AS PART OF THIS TASK ORDER
52.211-10 COMMENCEMENT, EXECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and
(c) complete the work:
If Base awarded WITHOUT Options: 134 calendar days
If Base awarded WITH one or more Options:
134 calendar days + 30 additional calendar days for each Option (i.e. 134 + 60 for Base & Options 1 & 2 = 194)
If Option awarded as a Modification AFTER TO award:
30 additional calendar days from date of modification
52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION(SEP 2000)
(1) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $988 for each calendar day of delay until the work is completed or accepted.
(2) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(END OF SECTION 00 73 00)