12-R-0024 Seed TO Wage Rates.pdf
PDF 46 KB Posted
- Solicitation number
- W912BV-12-R-0024
About this file
Seed TO Wage Rates
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised MATOC Specs 9 Jun 2012.pdf | ||
| Revised Seed TO Specs SOW 9 Jun 2012.pdf | ||
| RFIs Set 2.pdf | ||
| 12-R-0024 Amend 4.pdf | ||
| 12-R-0024 Amend 3.Skiatook Generator Site Visit.pdf | ||
| Revised MATOC Specs.pdf | ||
| 12-R-0024 Bid Schedule for Seed TO.xlsx | XLSX spreadsheet | |
| Pre-Proposal Site Visit Minutes.pdf | ||
| Experience Info.docx | DOCX document | |
| 12-R-0024 Amendment 2.pdf | ||
| RFIs Set 1.pdf | ||
| Sign in Sheet for 26 Jun 2012.pdf | ||
| Sign in Sheet for 27 Jun 2012.pdf | ||
| RS Kerr map.pdf | ||
| 12-R-0024 Amendment 1.pdf | ||
| skiatook map.pdf | ||
| 12-R-0024 Seed TO SOW Specs.pdf | ||
| 12-R-0024 MATOC Specs.pdf | ||
| 12-R-0024.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPLICABILITY OF WAGE RATES
General Decision Number: OK120021 01/06/2012 (OK21)
Item No 0002 (Base) – RS Kerr Lake, Marine Terminal Slope Protection Item No 0003 (Base) – RS Kerr Lake, Copeland Cemetery Slope Protection Item No 0005 (Option 2) – RS Kerr Lock & Dam 15, Jetty Slope Protection Item No 0006 (Option 3) – WD Mayo Lock & Dam 14, Slope Protection
General Decision Number: OK (OK24)
Item No 0004 (Option 1) – Skiatook Lake, Repair of Slide Near Stilling Basin Item No 0007 (Option 4) – Skiatook Lake, North from Port of Dunkin, RM 413 Slope Protection
General Decision Number: OK (OK30)
Item No 0001 (Base) – Skiatook Lake, Generator Replacement
NOTE: The applicable wage decision must be referenced on each payroll.
http://www.gpo.gov/davisbacon/ok.html
General Decision Number: OK120021 01/06/2012 OK21
Superseded General Decision Number: OK20100021
State: Oklahoma
Construction Type: Heavy
Counties: Adair, Alfalfa, Atoka, Beaver, Beckham, Blaine, Bryan, Caddo, Carter, Cherokee, Choctaw, Cimarron, Coal, Comanche, Cotton, Craig, Custer, Delaware, Dewey, Ellis, Garfield, Garvin, Grady, Grant, Greer, Harmon, Harper, Haskell, Hughes, Jackson, Jefferson, Johnston, Kay, Kingfisher, Kiowa, Latimer, Le Flore, Lincoln, Love, Major, Marshall, Mayes, McCurtain, McIntosh, Murray, Muskogee, Noble, Nowata, Okfuskee, Okmulgee, Ottawa, Pawnee, Payne, Pittsburg, Pontotoc, Pushmataha, Roger Mills, Seminole, Sequoyah, Stephens, Texas, Tillman, Washington, Washita, Woods and Woodward Counties in Oklahoma.
HEAVY CONSTRUCTION PROJECTS (does not include Sewer and Water Line Construction Projects);
EXCLUDING THE CITY OF MUSKOGEE.
Modification Number Publication Date 0 01/06/2012
SUOK1992-003 05/11/1992
Rates Fringes
CARPENTER........................$ 8.85
Concrete Finisher................$ 8.35 Form Builder.....................$ 7.25 Form Setter......................$ 7.60 Laborers:
Air tool man................$ 7.25 Asphalt raker...............$ 7.25 Asphalt shoveler............$ 7.25 Common laborers.............$ 7.25 Pipelayers..................$ 7.25
MECHANIC.........................$ 9.90
PAINTER..........................$ 7.50
Power equipment operators:
Asphalt distributor.........$ 7.25 Asphalt paving machine......$ 8.30 Asphalt Plant operator......$ 8.60 Bulldozer operator..........$ 9.10 Concrete paving machine.....$ 9.85 Concrete saw operator.......$ 8.75 Crane, Clamshell, Backhoe...$ 8.40 Crusher and screening plant op....................$ 8.25
FLAGPERSON..................$ 7.25
Front End Loaders...........$ 8.50 Mixer.......................$ 8.20 Motor grader operator.......$ 9.05 Oiler.......................$ 8.75 Power broom operator........$ 7.25 Pug mill operator...........$ 7.25 Roller Pneumatic............$ 7.25 Roller steel wheel..........$ 7.25 Scrapers....................$ 8.60 Screed operator.............$ 8.70 Traveling plant operator....$ 8.35 Reinforcing Steel Setter.........$ 7.90 Tractor operator Crawler.....................$ 7.25 Pneumatic...................$ 7.25
TRAFFIC SIGNALIZATION:
Traffic Signal Installation......$ 10.25
TRUCK DRIVER.....................$ 7.25
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example:
SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: OK120024 06/01/2012 OK24
Superseded General Decision Number: OK20100024
State: Oklahoma
Construction Type: Heavy
Counties: Creek, Osage, Rogers and Wagoner Counties in Oklahoma.
HEAVY CONSTRUCTION PROJECTS (excluding sewer and water line construction, sewer & water treatment plant construction projects or construction, alteration and repair of any facility engaged in manufacturing)
Modification Number Publication Date 0 01/06/2012 1 02/17/2012 2 02/24/2012 3 06/01/2012
ENGI9627-004 06/01/2007
Rates Fringes Power Equipment Operator End Dump....................$ 18.20 9.00 Grader......................$ 20.95 9.00 Oiler.......................$ 17.20 9.00 Scraper.....................$ 20.45 9.00
* IRON0584-012 06/01/2012
Rates Fringes Ironworkers:
Structural & Reinforcing....$ 22.70 12.28
The following Holidays are observed: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. When the Holiday falls on Sunday, the following Monday is observed as the Holiday.
SUOK1996-002 02/29/1996
Rates Fringes Carpenters:
Form setting work only......$ 9.28 All other work including form building work..........$ 10.51 Concrete Finisher................$ 10.67
ELECTRICIAN......................$ 15.63 2.40
Laborers:
Common......................$ 7.75 Landscaping.................$ 7.64 Pipelayer...................$ 8.55 Power Equipment Operator Backhoe.....................$ 11.43 Bulldozer...................$ 10.01 Crane.......................$ 11.82 Front end loader............$ 9.07 Roller......................$ 10.15 2.74 Trackhoe....................$ 9.72 Tractor.....................$ 13.50 1.26 Truck drivers:
Semi........................$ 8.46 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011.
The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example:
SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
General Decision Number: OK120030 06/01/2012 OK30
Superseded General Decision Number: OK20100032
State: Oklahoma
Construction Type: Building
Counties: Creek and Osage Counties in Oklahoma.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories, Sewage & Water treatment plants or the construction, alteration and repair of any facility engaged in manufacturing)
Modification Number Publication Date 0 01/06/2012 1 01/20/2012 2 01/27/2012 3 06/01/2012
BROK0005-003 06/01/2010
CREEK, OSAGE, ROGERS AND TULSA COS.
Rates Fringes
BRICKLAYER.......................$ 24.28 8.63
ELEV0083-002 01/01/2012
Rates Fringes Elevator Constructor Mechanic....................$ 35.85 23.535
PAID HOLIDAYS:
A- New Year's Day; B- Memorial Day; C- Independence Day; D- Labor Day; E- Thanksgiving Day; F- Friday after Thanksgiving Day; G- Christmas Day
FOOTNOTES:
a. 6 months to 5 years 6%, over 5 years 8% of basic hourly rate plus seven paid holidays - A through G.
* ENGI0627-007 06/01/2012
Rates Fringes
Power equipment operators: All Crane Type Equipment with at least 100 ft. and less than 200 ft. of boom (including jib); All Tower Cranes; Crane Equipment (as rated by mfg.) 3 cu. yd. and over; Guy Derrick;
Whirley.....................$ 24.35 10.87 All Crane Type Equipment with at least 200 ft. and less than 300 ft. of boom (including jib)..$ 24.35 10.87 All Crane Type Equipment with at least 300 ft. of boom and over (including jib).................$ 25.25 10.87 Bobcat......................$ 22.70 10.87 Bulldozer, Scraper..........$ 22.70 10.87 Cherry Picker, Mechanic.....$ 23.20 10.87 Cranes with less than 100 ft. of boom with jib and Cranes (as rated by mfg.) less than 3 cu. yd.....$ 23.20 10.87 Forklift....................$ 20.45 10.87 Oiler: Truck Crane, Crane...$ 19.45 10.87
SUOK1994-002 02/28/1994
Rates Fringes Carpenters:
Acoustical ceiling installation & drywall hanging.....................$ 12.50 All other work..............$ 13.00 $1.72 Cement Masons:...................$ 11.94 .76
DRYWALL FINISHER/TAPER...........$ 12.04
Electricians:
Excluding communication, signalling & alarm installation................$ 14.02 2.38 FLOOR LAYER: Carpet.............$ 14.07 2.97 HVAC MECHANIC (Set unit only)....$ 12.30 2.01 Laborers:
Brick tenders...............$ 9.32 Concrete saw................$ 12.00 .78 General.....................$ 8.07 Pipelayers..................$ 8.38 Plaster tenders.............$ 9.78
METAL BUILDING ERECTOR...........$ 9.25
Painters: (Excluding drywall finishers) Brush.......................$ 13.41 Roller......................$ 11.84
PIPEFITTER
HVAC work...................$ 13.84 2.59 All other work..............$ 15.28 3.75
PLASTERER........................$ 14.52
PLUMBER
Excluding HVAC work.........$ 12.69 1.79 Power Equipment Operator Backhoes....................$ 13.05 2.88 Front end loaders...........$ 10.19 Graders.....................$ 9.00 .35
Rollers.....................$ 9.14 .35 Tractors....................$ 8.00 Roofers:.........................$ 10.40 Sheet Metal Worker HVAC duct work..............$ 13.09 2.20 All other work..............$ 9.58 Sound, Communication, Signaling & Alarm Installation.....................$ 13.22 2.14
SPRINKLER FITTER.................$ 13.75 3.06
TILE SETTER......................$ 13.99 2.96
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011.
The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example:
SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.