Solicitation Amendment W912BU25QA017-0001 SF30.pdf

PDF 3 MB Posted

Attached to
W912BU25QA017 - Beltzville Dam Facility Electrical Upgrades
Solicitation number
W912BU25QA017
Issued by

About this file

This is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a construction-related solicitation. Amendment 0001 to Solicitation W912BU25QA0017 adds FAR Clause 52.236-27 Site Visit (Construction), Alternate I, which establishes an organized site visit scheduled for 2 September 2025 at 9:00 AM EDT. The site visit location is 2145 Pohopoco Drive, Lehighton, PA 18235. The amendment was issued by the W92 ENDIST Philadelphia office located in Philadelphia, PA, with an effective date of 26 August 2025. The modification does not extend the current solicitation's receipt of offers deadline and requires contractors to acknowledge the amendment prior to the specified hour and date.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Addendum to Solicitation Provisions

Additional Information/Notes

The following clauses were added:

FAR Clauses Incorporated by Full Text

52.236-27 Site Visit (Construction). (Alternate I) (Feb 1995)Alternate I(Feb 1995)

Alternate I . If an organized site visit will be conducted, substitute a paragraph substantially (Feb 1995) the same as the following for paragraph (b) of the basic provision:

(b) An organized site visit has been scheduled for-

2 September 2025 at 9:00 AM EDT

(c) Participants will meet at-

2145 Pohopoco Drive Lehighton, PA 18235

W912BU25QA0170001

IDCode: J
Page: 1
Pages: 2
AmendNo: 0001
EffDate: 26 AUG 2025
ReqNo:
ProjNo:
IssCode: W912BU
AdmCode:
IssuedBy: W2SD ENDIST PHILADELPHIA

1650 ARCH STREET, 7TH FLOOR

PHILADELPHIA, PA 19103-0000

UNITED STATES

MOLLY GALLAGHER, EMAIL: MOLLY.GALLAGHER@USACE.ARMY.MIL TELEPHONE: 2156566929

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912BU25QA017
SolDate: 21 AUG 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: THE PURPOSE OF AMENDMENT 0001 TO SOLICITATION W912BU25QA017 IS TO INCORPORATE THE FOLLOWING CHANGES:

A.) ADD FAR CLAUSE 52.236-27, SITE VISIT (CONSTRUCTION) ALT I TO INCLUDE DETAILED SITE VISIT INFORMAITON

ContNameTitle:
CoNameTitle: CONNOR STRUCKMEYER
ContDate:
CODate: 26 AUG 2025