This document is Amendment 0003 to Solicitation W912BU24R0031 for the shipyard services to execute the repower of the Dredge Hurley. The amendment addresses the following key details:

Answers to RFI #009 and #010, clarifying that all flexible connections attached directly to the engines will be provided as government-furnished equipment (GFE), while the contractor must furnish all other flexible connections needed to modify the fuel oil and cooling water systems. The amendment also updates the specifications, notably changing the vessel delivery timeline from on or about November 1, 2025 to between September 15 and November 1, 2025. Additionally, the amendment corrects Section J and adds an attachment with additional reference drawings. All other terms and conditions remain unchanged.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Answ er RFI #9-10

2. Update specif ications. Attachment "SOW Combined Final Hurley Rev 2"

3. Update section "J" and add attachment "3127 Reference Draw ings Part 2"

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Jul-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BU24R0031

X 9B. DATED (SEE ITEM 11)

31-May-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jul-2024

CODE

U.S. ARMY CORPS AND ENGINEERS - PHILA

1650 ARCH STREET

PHILADELPHIA PA 19103

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU24R0031

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

Amendment 0003 – Cpec change, RFIs, and Drawing Package 2

ANSWERS TO RFI 009-010 AS OF JULY 8th, 2024

RFI 009:

Section C630 Fuel Oil System Paragraph D. General, states “flexible connections associated with new engines shall be new and furnished by Contractor.” Then states “ Flexible connections to the engines will be provided as part of GFE package.” Please clarify. Does this apply to the flex connections for the cooling system also.

ANSWER: All flexible connections attached directly to the engine will be provided as GFE. All other flexible connections needed to modify the fuel oil system and the cooling water system in accordance with Contract Drawings 368-F630-01 and 368-F640-01 shall be new and furnished by the Contractor.

RFI 010:

Drawing no. 368-F640-01 Dredge Hurley Engine Cooling Piping Mod Drawing the following note and reference give guidance for piping insulation, please provide the expected operating temperature in order to select the appropriate insulation.

ANSWER: The maximum working temperatures for the system are found in the Material Schedule on Sheet 15 of Drawing 368-F640-01. Please see highlights on the table below.

Changes to Specifications:

F01 – Previous: For bid purposes, the Government shall deliver the vessel to the entrance channel sea buoy closest to the Contractor's shipyard on or about 1 Nov 2025.

Updated: For bid purposes, the Government shall deliver the vessel to the entrance channel sea buoy closest to the Contractor's shipyard between 15 Sep 2025 1 Nov 2025.

H1.b. - Previous: If exercised, this phase is expected to commence on/about 01NOV2025 when the vessel is no longer in service for the season. This option is aligned with the availability of PRIP funding and decision to exercise will be no later than 31 AUG 2025.

Updated: If exercised, this phase is expected to commence between 15 SEP 2025 and 01 NOV 2025. This option is aligned with the availability of PRIP funding and decision to exercise will be no later than 31 AUG 2025.

H1.table – Previous: 01-NOV-25 Updated: 15-SEP-25 to 01-NOV-25

H1. Last sentence – Previous: The vessel will not be made available to the Contractor prior to 1 Nov 2025 to perform active shipyard work Updated: The vessel will not be made available to the Contractor prior to satisfactory completion of Phase I submittals identified in Section H3.

H16 Previous: All GFE will be delivered to the Contractor’s facility during Phase I for storage. (See H05 for storage details).

Updated: … (See H06 for storage details).

H6.C Previous: Upon receiving the government furnished parts, the contractor must store them inside the warehouse, protected from the weather.

Updated: … The contractor can expect to store the GFE for approximately half of the Phase I duration. For bidding purposes, the Contractor shall assume the storage of all GFE and submit the cost of storage per day.

1. Section J correction Revised and added attachment “3127 Reference Drawings Part 2”