This document is a solicitation (W912BU24B0008) for beach nourishment services along Absecon Island in Atlantic County, New Jersey. The Department of the Army Corps of Engineers, Philadelphia District is the contracting agency. The solicitation invites bids for the periodic replenishment of sand along the beaches in this area. Key details include:

The procurement is for beach nourishment work, with no government-conducted site visit planned. All questions must be received by July 19, 2024. Bidders are required to complete the representation and certifications portion of the solicitation. The contract will result from this competitive solicitation, which has an affirmative action requirement. No additional information is provided about pricing terms, set-asides, incumbents, or other salient details.

View the file

Other files

File Type Posted
w912bu24b0008 Amend 0003.pdf PDF
W912BU24B0008-AM0003-Dwgs.pdf PDF
AM0002_Absecon IFB FY24.pdf PDF
W912BU24B0008-AM0002-Specs.pdf PDF
W912BU24B0008-AM0001-Specs.pdf PDF
W912BU24B0008-AM0001-Dwgs.pdf PDF
AbseconInlet_BorrowH_2023_9column.txt TXT text file
W912BU24B0008-Dwgs.pdf PDF
AbseconInlet_Grid_2023_9column.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB W912BU24B0008

US Army Corps of Engineers

Philadelphia District

Beach Nourishment

Brigantine Inlet to Great Egg Harbor Inlet

Absecon Island

Atlantic County, New Jersey

Construction Solicitation and Specifications

20 MAY 2024

This page was intentionally left blank for duplex printing.

20 May 2024

INVITATION NO. W912BU24BOO08

PHILADELPHIA DISTRICT

CORPS OF ENGINEERS

INVITATION FOR BIDS

FOR

BEACH NOURISHMENT

BRIGANTINE INLET TO GREAT EGG HARBOR INLET

ABSECON ISLAND

ATLANTIC COUNTY, NEW JERSEY

I. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL OPPORTUNITY CLAUSE

WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.

II. BIDDERS ARE REQUIRED TO COMPLETE THE REPRESENTATION AND CERTIFICATIONS

PORTION OF SECTION 00 45 00 OF THIS SOLICITATION AND SUBMIT THIS WITH THEIR

BID.

III. ALL QUESTIONS PERTAINING TO THIS PROCUREMENT MUST BE RECEIVED NO LATER

THAN 19 JUL 2024. RESPONSES MAY NOT BE PROVIDED TO REQUEST FOR INFORMATION

(RFI'S) RECEIVED AFTER THIS CUTOFF DATE.

IV. THERE WILL NOT BE A GOVERNMENT CONDUCTED SITE VISIT FOR THIS PROJECT.

THE PROSPECTIVE BIDDERS ARE ENCOURAGED TO VISIT THE SITE OF THE WORK AT THEIR

CONVENIENCE IN ORDER TO ACQUAINT THEMSELVES WITH THE SITE CONDITIONS AND ANY

PROBLEMS INCIDENT TO THE PROSECUTION OF THE WORK.

Specif ications: W912BU24B0008 dated 20 May 2024 Draw ings: W912BU24B0008 dated 20 May 2024

INVITATION FOR BIDS W912BU24B0008

PROJECT TITLE: Periodic Beach Nourishment – Absecon Island, Atlantic County, New Jersey

TYPE OF CONTRACT: The proposed project w ill be a competitive, f irm-f ixed-price contract in accordance w ith FAR part 14, Sealed Bidding via an Invitation for Bids (IFB).

NAICS CODE: 237990, SIZE STANDARD: $37 Million

MAGNITUDE OF CONSTRUCTION: Betw een $25,000,000 and $100,000,000

A PROJECT LABOR AGREEMENT MUST BE SUBMITTED BY THE APPARENT SUCCESSFUL OFFEROR AFTER BID OPENING AND PRIOR TO CONTRACT AWARD! This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for def initions and requirements pertaining to the use of a PLA for this contract.

THIS IS A FULL AND OPEN COMPETITION.

X

FREDERICK CONWAY 215.656.6833

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

03-Jul-2024

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________08 Aug 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY CORPS AND ENGINEERS - PHILA

1650 ARCH STREET

PHILADELPHIA PA 19103

W912BU

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: (215) 656-6469 TEL: FAX:

W912BU24B0008 100

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912BU24B0008

Section 00 10 00 - Solicitation

INFORMATIONAL TEXT

IMPORTANT NOTES REGARDING THIS ACQUISITION

Potential Bidders are reminded of the documents required for bid submission:

1. Signed 1442.

2. Signed and acknowledged solicitation amendments, or amendment acknowledgement provided on SF 1442.

3. Filled out bid schedule and totals.

4. Bid Guarantee.

5. Complete and submit applicable Representations and Certifications.

REQUEST FOR INFORMATION (RFI)

Request for Information (RFI): Prospective Bidders may submit RFI inquiries relating to the solicitation by email to the following: Frederick Conway, Contract Specialists: email: Deah.L.Gerard-May@usace.army.mil and Frederick.conway@usace.army.mil and Esther Edinborough,Contracting Officer, Esther.A.Edinborough@usace.army.mil. RFIs shall be submitted by 4:00 PM EDT, 19 July 2024. The government reserves the right not to respond to RFIs received after this date. Interested bidders should submit any technical questions concerning this IFB at the earliest time possible to enable the Contracting Officer to respond. When submitting your RFI, please provide the project name, location, and solicitation number.

MAGNITUDE OF CONSTRUCTION PROJECT

The magnitude of construction of the proposed work (base and all options) is between $25,000,000 and $100,000,000.

EVIDENCE OF AUTHORITY TO SIGN BIDS

Evidence of the authority of individuals signing bids to submit firm bids/proposals on behalf of the bidder is required except where the bid is signed, and shows that it is so signed by: The President, Vice-President, or Secretary of Incorporated bidders; a partner in case of partnership; the owner in the case of sole proprietorships.

Failure to submit with the bid satisfactory evidence of authority of all other persons may be cause for rejection of bid as an invalid or non-responsive bid.

ARITHMETIC DISCREPANCIES

a. For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by bidder:

1) Obviously misplaced decimal points will be corrected.

2) If there is a discrepancy between unit price and extended price, the unit price will govern.

3) Apparent errors in extension of unit prices will be corrected.

4) Apparent errors in addition of lump-sum and extended prices will be corrected.

b. For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends its bid to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above, and the bid will be so reflected on the abstract of bids.

c. These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

DELIVERY OF BIDS

Bids shall be delivered in person or by mail to the:

Mailroom:

US Army Corps of Engineers Philadelphia District Attn: Frederick Conway/Deah Gerard-May/ CENAP-CT 1650 Arch Street, 4th Floor - Mailroom Philadelphia, PA 19103-2004

Bid Room:

The bid room is located at:

US Army Corps of Engineers Philadelphia District

1650 Arch Street, 4th Floor – Room 434 Philadelphia, PA 19103-2004 Please e-mail Frederick.Conway@usace.army.mil , Deah.L.Gerard-May@usace.army.mil and Esther.A.Edinborough@usace.army.mil if you intend to attend and the name of your representative. Bids can be delivered in person or by mail. All bids need to be received before or by the due date stated in Block 13 of the SF1442. We will also have a conference line available for the bid opening. If you would like to attend by conference line only, a call in number will be provided ONLY upon request.

IMPORTANT: A PROJECT LABOR AGREEMENT MUST BE SUBMITTED BY THE

APPARENT SUCCESSFUL OFFEROR AFTER BID OPENING AND PRIOR TO

CONTRACT AWARD! This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract.

CONTRACTING OFFICER STATEMENT

Only a warranted Contracting Officer, acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

Mobilization and Demobilization

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

Structures Monitoring

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 922,000 Cubic

Yard Beachfill

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004 8,013 Square

Foot I-5 Crossover Base Material 9-inch Thick

FFP

I-5 crossover Base material 9-Inch thickness

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005 10,966 Square

Foot I-5 Crossover Base Material 12 Inch thic

FFP

I-5 Crossover Base Material 12-Inch Thickness FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0006 3,394 Linear

Foot Sand Fence

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0007 3,787 Linear

Foot Sand Fence Removal and Replacement

FFP

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0008 2,265 Linear

Foot Split Rail Fence

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0009 286 Linear

Foot Post and Rail Fence

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0010 3,173 Square

Yard Dune Planting for wind blown area

FFP

Dune planting for wind blown area

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0011 14,778 Square

Yard Dune Grass Planting (18")

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0012 4,101 Square

Yard Dune Grass Planting (24")

FFP

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0013 1 Job

Additional Insured

FFP

Name the State of New Jersey and the City of Atlantic City as "Additional Insured" under General Liability Insurance FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0014 1 Job

Structure Monitoring

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0015 858 Cubic

Yard Reconstruct Dune

FFP

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0016 382 Linear

Foot

Sand Fence

FFP

0017 1,826 Square

Yard

Dune Grass Planting (18")

0018 1,596 Square

Dune Grass Planting (24")

0019 1 Job Additional Insured

FFP

Name the State of New Jersey and the City of Ventnor as "Additional Insured" under Genral Liability Insurance

0020 1 Job Structures Monitoring

0021 353,000 Cubic

Beachfill

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0022 1 Job

Additional Insured

FFP

Name the State of New Jersey and City of Ventnor as "Additional Insured" under General Liability Insurance FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0023 1 Job

Structures Monitoring

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0024 1,767 Cubic

Yard Reconstruct Dune

FFP

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0025 785 Linear

Foot Sand Fence

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0026 1,135 Square

Yard Dune Planting for Wind Blown area

FFP

Dune Planting for wind blown areas

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0027 3,439 Square

Yard Dune Grass Plantings (18")

FFP

Dune Grass Plantings (18") FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0028 2,344 Square

Yard Dune Grass Plantings (24")

FFP

Dune Grass Plantings (24") FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0029 1 Job

Additional Insured

FFP

Name the State of New Jersey and the City of Margate as "Additional Insured" under General Liability Insurance

0030 1 Job Structures Monitoring

0031 663 Cubic

Reconstruct Dune

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0032 12,892 Square

Foot I-5 Crossover Base Material 12"

FFP

I-5 Crossover Base Material (12") FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0033 834 Linear

Foot Split Rail Fence

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0034 354 Square

Yard Dune Grass Plantings (24")

FFP

Dune Grass Plantings (24")

0035 1 Job Additional Insured

FFP

Name the State of New Jersey and City of Longport as "Additional Insured" under General Liability Insurance

0036 200,000 Cubic

OPTION Option 1 - Beachfill

0037 100,000 Cubic

OPTION Option 2-Beachfill

0038 50,000 Cubic

OPTION Option 3-Beachfill

0039 1 Job OPTION Option 4-Stormwater Outfall

FFP

Stormwater outfall landward Pipe Repair: Station 28+44 (New Jersey Ave.)

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0040 1 Job OPTION Option 5-Sormwater Outfall

FFP

Stormwater Outfall Removal and Disposal: Station 28+44 (New Jersey Ave.)

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0041 1 Job OPTION Option 6-Stormwater Outfall

FFP

Stormwater Outfall Pipe Extension: Station 28+44 (New Jersey Ave.)

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0042 1 Job OPTION Option 7-Stormwater Outfall

FFP

Stormwater Outfall Pipe Repair: Station 40+16 (Virginia Ave.)

0043 75,000 Cubic

OPTION Option 8-Beachfill

0044 50,000 Cubic

OPTION Option 9-Beachfill

0045 25,000 Cubic

OPTION Option 10-Beachfill

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0046 1,070 Cubic

Yard OPTION Option 11-Reconstruct Dune

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0047 17,890 Square

Foot OPTION Option 12-I-5 Crossover Base Material 12

FFP

I-5 Crossover Base Material (12") FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0048 2,873 Linear

Foot OPTION Option 13- Sand Fence Removal and Replac

FFP

Sand Fence Removal and Replacement

0049 873 Linear

OPTION Option 14-Split Rail Fence

0050 17,499 Square

OPTION Option 15- Dune Grass Plantings

Dune Grass Plantings (18")

0051 17,298 Square

OPTION Option 16-Dune Grass Plantings

Dune Grass Plantings (24")

0052 75,000 Cubic

OPTION Option 17-Beachfill

0053 50,000 Cubic

OPTION Option 18-Beachfill

0054 25,000 Cubic

OPTION Option 19-Beachfill

0055 592 Linear

OPTION Option 20-Sand Fence Removal and Replace

Sand Fence Removal and Replacement

0056 3,549 Square

OPTION Option 21-Dune Grass Plantings 18"

0057 3,378 Square

OPTION Option 22-Dune Grass Plantings 24"

Dune Grass Palntings (24")

0058 100,000 Cubic

OPTION Option 23-Beachfill

0059 50,000 Cubic

OPTION Option 24-Beachfill

0060 25,000 Cubic

OPTION Option 25-Beachfill

0061 75,000 Cubic

OPTION Option 26-Beachfill

0062 50,000 Cubic

OPTION Option 27-Beachfill

0063 25,000 Cubic

OPTION Option 28-Beachfill

0064 1,729 Linear

OPTION Option 29-Sand Fence Removal and Replace

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0065 1,642 Square

Yard OPTION Option 30-Dune Planting for Wind Blown

FFP

Dune Plantings for wind blown areas FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0066 7,659 Square

Yard OPTION Option 31-Dune Grass Plantings 18"

FFP

Dune gRass Plantings (18")

0067 6,216 Square

OPTION Option 32-Dune Grass Plantings 24"

0068 75,000 Cubic

OPTION Option 33-Beachfill

0069 50,000 Cubic

OPTION Option 34-Beachfill

0070 25,000 Cubic

OPTION Option 35-Beachfill

0071 550 Linear

OPTION Option 36-Sand Fence Removal and Replace

0072 2,383 Square

OPTION Option 37-Dune Grass Plantings 18"

0073 2,487 Square

OPTION Option 38-Dune Grass Plantings 24"

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

0003 N/A N/A N/A N/A

0004 N/A N/A N/A N/A

0005 N/A N/A N/A N/A

0006 N/A N/A N/A N/A

0007 N/A N/A N/A N/A

0008 N/A N/A N/A N/A

0009 N/A N/A N/A N/A

0010 N/A N/A N/A N/A

0011 N/A N/A N/A N/A

0012 N/A N/A N/A N/A

0013 N/A N/A N/A N/A

0014 N/A N/A N/A N/A

0015 N/A N/A N/A N/A

0016 N/A N/A N/A N/A

0017 N/A N/A N/A N/A

0018 N/A N/A N/A N/A

0019 N/A N/A N/A N/A

0020 N/A N/A N/A N/A

0021 N/A N/A N/A N/A

0022 N/A N/A N/A N/A

0023 N/A N/A N/A N/A

0024 N/A N/A N/A N/A

0025 N/A N/A N/A N/A

0026 N/A N/A N/A N/A

0027 N/A N/A N/A N/A

0028 N/A N/A N/A N/A

0029 N/A N/A N/A N/A

0030 N/A N/A N/A N/A

0031 N/A N/A N/A N/A

0032 N/A N/A N/A N/A

0033 N/A N/A N/A N/A

0034 N/A N/A N/A N/A

0035 N/A N/A N/A N/A

0036 N/A N/A N/A N/A

0037 N/A N/A N/A N/A

0038 N/A N/A N/A N/A

0039 N/A N/A N/A N/A

0040 N/A N/A N/A N/A

0041 N/A N/A N/A N/A

0042 N/A N/A N/A N/A

0043 N/A N/A N/A N/A

0044 N/A N/A N/A N/A

0045 N/A N/A N/A N/A

0046 N/A N/A N/A N/A

0047 N/A N/A N/A N/A

0048 N/A N/A N/A N/A

0049 N/A N/A N/A N/A

0050 N/A N/A N/A N/A

0051 N/A N/A N/A N/A

0052 N/A N/A N/A N/A

0053 N/A N/A N/A N/A

0054 N/A N/A N/A N/A

0055 N/A N/A N/A N/A

0056 N/A N/A N/A N/A

0057 N/A N/A N/A N/A

0058 N/A N/A N/A N/A

0059 N/A N/A N/A N/A

0060 N/A N/A N/A N/A

0061 N/A N/A N/A N/A

0062 N/A N/A N/A N/A

0063 N/A N/A N/A N/A

0064 N/A N/A N/A N/A

0065 N/A N/A N/A N/A

0066 N/A N/A N/A N/A

0067 N/A N/A N/A N/A

0068 N/A N/A N/A N/A

0069 N/A N/A N/A N/A

0070 N/A N/A N/A N/A

0071 N/A N/A N/A N/A

0072 N/A N/A N/A N/A

0073 N/A N/A N/A N/A

SUMMARY SCOPE OF WORK

PERIODIC BEACH NOURISHMENT

ABSECON ISLAND, ATLANTIC COUNTY, NEW JERSEY

The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed contract to provide Periodic Beach Nourishment between Absecon Inlet and Great Egg Harbor Inlet, located in Atlantic County, New Jersey.

The contract work consists of a Base Bid to place approximately 1,500,000 cubic yards of beachfill material along the Atlantic Ocean coastline of Absecon Island, Atlantic County, New Jersey. The project area encompasses the municipalities of Atlantic City, Ventnor City, Margate City, and Longport Borough. The Contract work will also consist of various separate Options to place additional amounts of beachfill per option, if awarded, in locations within and outside of the Base Bid areas.

The Base Bid also includes the construction or repair of pedestrian, vehicle, and ADA accessible dune crossovers; planting dune grass; removal of damaged sand fence and posts; providing new sand fence, split rail fence, and post and rail fence; and the relocation of various existing structures to accommodate the new beachfill and dunes.

The Contract work may include separate options to repair or extend existing stormwater outfalls and drainage structures, including pipe support systems, if awarded, in locations within and outside of the Base Bid areas. All beachfill work shall also include the requirements for structures monitoring.

The beachfill material for this contract must come from the authorized borrow areas, which are shown on the contract drawings, located within and adjacent to the Absecon Inlet in the Atlantic Ocean, and a separate designated area located approximately 2 – 3 miles offshore of Absecon Island in the Atlantic Ocean.

IMPORTANT: A PROJECT LABOR AGREEMENT MUST BE SUBMITTED BY THE

APPARENT SUCCESSFUL OFFEROR AFTER BID OPENING AND PRIOR TO

CONTRACT AWARD! This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract.

00 10 00-3

BIDDING SCHEDULE

(To be attached to SF 1442)

Item Estimated Unit Estimated

No. Description Quantity Unit Price Amount

BASE BID:

1. Mobilization and

Demobilization 1 JOB LS $____________

ATLANTIC CITY (Sta. 0+00 to Sta. 90+00):

2. Structures Monitoring 1 JOB LS $____________

3. Beachfill 922,000 CY $______ $____________

4. I-5 Crossover Base Material

9-inch Thickness 8,013 SF $______ $____________

5. I-5 Crossover Base Material

12-inch Thickness 10,966 SF $______ $____________

6. Sand Fence 3,394 LF $______ $____________

7. Sand Fence Removal and

Replacement 3,787 LF $______ $____________

8. Split Rail Fence 2,265 LF $______ $____________

9. Post and Rail Fence 286 LF $______ $____________

10. Dune Planting for

Wind Blown Area 3,173 SY $______ $____________

11. Dune Grass Planting (18") 14,778 SY $______ $____________

12. Dune Grass Planting (24") 4,101 SY $______ $____________

13. Name the State of New Jersey and the City of Atlantic City as “Additional Insured” under

General Liability Insurance 1 JOB LS $____________

VENTNOR CITY (Sta. 180+00 to Sta. 225+27):

14. Structures Monitoring 1 JOB LS $____________

15. Reconstruct Dune 858 CY $______ $____________

16. Sand Fence 382 LF $______ $____________

17. Dune Grass Planting (18”) 1,826 SY $______ $____________

18. Dune Grass Planting (24”) 1,596 SY $______ $____________

19. Name the State of New Jersey and City of Ventnor as

“Additional Insured” under

General Liability Insurance 1 JOB LS $____________

00 10 00-4

VENTNOR CITY (Sta. 225+27 to Sta. 270+00):

20. Structures Monitoring 1 JOB LS $__________

21. Beachfill 353,000 CY $______ $__________

22. Name the State of New Jersey and City of Ventnor as

“Additional Insured” under

General Liability Insurance 1 JOB LS $__________

MARGATE CITY (Sta. 270+00 to Sta. 354+50):

23. Structures Monitoring 1 JOB LS $__________

24. Reconstruct Dune 1,767 CY $______ $__________

25. Sand Fence 785 LF $______ $__________

26. Dune Planting for Wind Blown Areas 1,135 SY $______ $__________

27. Dune Grass Plantings (18”) 3,439 SY $______ $__________

28. Dune Grass Plantings (24”) 2,344 SY $______ $__________

29. Name the State of New Jersey and City of Margate as

General Liability Insurance 1 JOB LS $__________

LONGPORT BOROUGH (Sta. 354+50 to Sta. 429+33):

30. Structures Monitoring 1 Job LS $____________

31. Reconstruct Dune 663 CY $_______ $____________

32. I-5 Crossover Base

Material (12”) 12,892 SF $_______ $____________

33. Split Rail Fence 834 LF $_______ $____________

34. Dune Grass Plantings (24”) 354 SY $_______ $____________

35. Name the State of New Jersey and City of Longport as

General Liability Insurance 1 JOB LS $____________

TOTAL ESTIMATED BASE BID AMOUNT $__________________

00 10 00-5

OPTIONS

ATLANTIC CITY (Sta. 0+00 to Sta. 90+00):

36. Option 1 - Beachfill 200,000 CY $________ $____________

37. Option 2 - Beachfill 100,000 CY $________ $____________

38. Option 3 - Beachfill 50,000 CY $________ $____________

39. Option 4 – Stormwater Outfall Landward Pipe Repair: Station 28+44

(New Jersey Ave.) 1 JOB LS $____________

40. Option 5 – Stormwater Outfall Removal and Disposal: Station 28+44

(New Jersey Ave.) 1 JOB LS $____________

41. Option 6 – Stormwater Outfall Pipe Extension: Station 28+44

(New Jersey Ave.) 1 JOB LS $____________

42. Option 7 – Stormwater Outfall Pipe Repair: Station 40+16

(Virginia Ave.) 1 JOB LS $____________

ATLANTIC CITY (Sta. 90+00 to Sta. 180+00):

43. Option 8 - Beachfill 75,000 CY $________ $____________

44. Option 9 - Beachfill 50,000 CY $________ $____________

45. Option 10 - Beachfill 25,000 CY $________ $____________

46. Option 11 - Reconstruct Dune 1,070 CY $________ $____________

47. Option 12 – I-5 Crossover Base Material (12”) 17,890 SF $________ $____________

48. Option 13 – Sand Fence Removal and replacement 2,873 LF $________ $____________

49. Option 14 – Split Rail Fence 873 LF $________ $____________

50. Option 15 – Dune Grass Plantings (18”) 17,499 SY $________ $____________

51. Option 16 – Dune Grass Plantings (24”) 17,298 SY $________ $____________

00 10 00-6

VENTNOR CITY (Sta. 180+000 to Sta. 225+27)

52. Option 17 - Beachfill 75,000 CY $________ $____________

53. Option 18 - Beachfill 50,000 CY $________ $____________

54. Option 19 - Beachfill 25,000 CY $________ $____________

55. Option 20 – Sand Fence Removal and Replacement 592 LF $________ $____________

56. Option 21 – Dune Grass

Plantings (18”) 3,549 SY $________ $____________

57. Option 22 – Dune Grass

Plantings (24”) 3,378 SY $________ $____________

VENTNOR CITY (Sta. 225+27 to Sta. 270+00)

58. Option 23 - Beachfill 100,000 CY $________ $____________

59. Option 24 - Beachfill 50,000 CY $________ $____________

60. Option 25 - Beachfill 25,000 CY $________ $____________

MARGATE CITY (Sta. 270+00 to Sta. 354+50):

61. Option 26 – Beachfill 75,000 CY $________ $____________

62. Option 27 - Beachfill 50,000 CY $________ $____________

63. Option 28 - Beachfill 25,000 CY $________ $____________

64. Option 29 – Sand Fence Removal and Replacement 1,729 LF $________ $____________

65. Option 30 – Dune Planting for

Wind Blown Areas 1,642 SY $________ $____________

66. Option 31 – Dune Grass

Plantings (18”) 7,659 SY $________ $____________

67. Option 32 – Dune Grass

Plantings (24”) 6,216 SY $________ $____________

LONGPORT BOROUGH (Sta. 354+50 to Sta. 429+33)

68. Option 33 - Beachfill 75,000 CY $________ $____________

69. Option 34 - Beachfill 50,000 CY $________ $____________

70. Option 35 - Beachfill 25,000 CY $________ $____________

00 10 00-7

71. Option 36 – Sand Fence Removal and Replacement 550 LF $________ $____________

72. Option 37 – Dune Grass

Plantings (18”) 2,383 SY $________ $____________

73. Option 38 – Dune Grass

Plantings (24”) 2,487 SY $________ $____________

TOTAL ESTIMATED BASE BID AND ALL OPTIONS AMOUNT $_________________

NOTES:

1. Bidders must bid on all items.

2. Bidders shall list the cost of additional premium, if any, to name the

State of New Jersey and the Cities of Atlantic City, Margate City, Ventnor

City, and Longport Borough as “Additional Insured” under General Liability

Insurance as noted in Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph entitled “INSURANCE REQUIREMENTS”.

Section 00 21 00 - Instructions

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-10 Contract Award--Sealed Bidding JUL 1990 52.214-12 Preparation Of Bids APR 1984 52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.215-7008 Only One Offer DEC 2022 252.215-7016 Notification to Offerors--Postaward Debriefings DEC 2022

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Esther Edinborough, Contracting Officer Esther.edinborough@usace.army.mil U.S. Army Corps of Engineers - Philadelphia District Attn: Contracting Office, 4th Floor 1650 Arch Street Philadelphia, PA 19103

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. There will be no formal site visit conducted for this project.

(b) Site visits may be arranged during normal duty hours by contacting: N/A

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012) -

ALTERNATE I (SEP 1996)

(a) The Government may terminate performance of work under this contract in whole or, from time to time, in part if the Contracting Officer determines that a termination is in the Government's interest. The Contracting Officer shall terminate by delivering to the Contractor a Notice of Termination specifying the extent of termination and the effective date.

(b) After receipt of a Notice of Termination, and except as directed by the Contracting Officer, the Contractor shall immediately proceed with the following obligations, regardless of any delay in determining or adjusting any amounts due under this clause:

(1) Stop work as specified in the notice.

(2) Place no further subcontracts or orders (referred to as subcontracts in this clause) for materials, services, or facilities, except as necessary to complete the continued portion of the contract.

(3) Terminate all subcontracts to the extent they relate to the work terminated.

(4) Assign to the Government, as directed by the Contracting Officer, all right, title, and interest of the Contractor under the subcontracts terminated, in which case the Government shall have the right to settle or to pay any termination settlement proposal arising out of those terminations.

(5) With approval or ratification to the extent required by the Contracting Officer, settle all outstanding liabilities and termination settlement proposals arising from the termination of subcontracts; the approval or ratification will be final for purposes of this clause.

(6) As directed by the Contracting Officer, transfer title and deliver to the Government (i) the fabricated or unfabricated parts, work in process, completed work, supplies, and other material produced or acquired for the work terminated, and (ii) the completed or partially completed plans, drawings, information, and other property that, if the contract had been completed, would be required to be furnished to the Government.

(7) Complete performance of the work not terminated.

(8) Take any action that may be necessary, or that the Contracting Officer may direct, for the protection and preservation of the property related to this contract that is in the possession of the Contractor and in which the Government has or may acquire an interest.

(9) Use its best efforts to sell, as directed or authorized by the Contracting Officer, any property of the types referred to in subparagraph (b)(6) of this clause; provided, however, that the Contractor (i) is not required to extend credit to any purchaser and (ii) may acquire the property under the conditions prescribed by, and at prices approved by, the Contracting Officer. The proceeds of any transfer or disposition will be applied to reduce any payments to be made by the Government under this contract, credited to the price or cost of the work, or paid in any other manner directed by the Contracting Officer.

(c) The Contractor shall submit complete termination inventory schedules no later than 120 days from the effective date of termination, unless extended in writing by the Contracting Officer upon written request of the Contractor within this 120-day period.

(d) After expiration of the plant clearance period as defined in Subpart 49.001 of the Federal Acquisition Regulation, the Contractor may submit to the Contracting Officer a list, certified as to quantity and quality, of termination inventory not previously disposed of, excluding items authorized for disposition by the Contracting Officer. The Contractor may request the Government to remove those items or enter into an agreement for their storage. Within 15 days, the Government will accept title to those items and remove them or enter into a storage agreement. The Contracting Officer may verify the list upon removal of the items, or if stored, within 45 days from submission of the list, and shall correct the list, as necessary, before final settlement.

(e) After termination, the Contractor shall submit a final termination settlement proposal to the Contracting Officer in the form and with the certification prescribed by the Contracting Officer. The Contractor shall submit the proposal promptly, but no later than 1 year from the effective date of termination, unless extended in writing by the Contracting Officer upon written request of the Contractor within this 1-year period. However, if the Contracting Officer determines that the facts justify it, a termination settlement proposal may be received and acted on after 1 year or any extension. If the Contractor fails to submit the proposal within the time allowed, the Contracting Officer may determine, on the basis of information available, the amount, if any, due the Contractor because of the termination and shall pay the amount determined.

(f) Subject to paragraph (e) of this clause, the Contractor and the Contracting Officer may agree upon the whole or any part of the amount to be paid or remaining to be paid because of the termination. The amount may include a reasonable allowance for profit on work done. However, the agreed amount, whether under this paragraph (g) or paragraph (g) of this clause, exclusive of costs shown in subparagraph (g)(3) of this clause, may not exceed the total contract price as reduced by (1) the amount of payments previously made and (2) the contract price of work not terminated. The contract shall be modified, and the Contractor paid the agreed amount. Paragraph (g) of this clause shall not limit, restrict, or affect the amount that may be agreed upon to be paid under this paragraph.

(g) If the Contractor and Contracting Officer fail to agree on the whole amount to be paid the Contractor because of the termination of work, the Contracting Officer shall pay the Contractor the amounts determined as follows, but without duplication of any amounts agreed upon under paragraph (f) of this clause:

(1) For contract work performed before the effective date of termination, the total (without duplication of any items) of--

(i) The cost of this work;

(ii) The cost of settling and paying termination settlement proposals under terminated subcontracts that are properly chargeable to the terminated portion of the contract if not included in subdivision (g)(1)(i) of this clause; and

(iii) A sum, as profit on subdivision (g)(1)(i) of this clause, determined by the Contracting Officer under 49.202 of the Federal Acquisition Regulation, in effect on the date of this contract, to be fair and reasonable; however, if it appears that the Contractor would have sustained a loss on the entire contract had it been completed, the Contracting Officer shall allow no profit under this subdivision (iii) and shall reduce the settlement to reflect the indicated rate of loss.

(2) The reasonable costs of settlement of the work terminated, including--

(i) Accounting, legal, clerical, and other expenses reasonably necessary for the preparation of termination settlement proposals and supporting data;

(ii) The termination and settlement of subcontracts (excluding the amounts of such settlements); and

(iii) Storage, transportation, and other costs incurred, reasonably necessary for the preservation, protection, or disposition of the termination inventory.

(h) Except for normal spoilage, and except to the extent that the Government expressly assumed the risk of loss, the Contracting Officer shall exclude from the amounts payable to the Contractor under paragraph (g) of this clause, the fair value as determined by the Contracting Officer, for the loss of the Government property.

(i) The cost principles and procedures of Part 31 of the Federal Acquisition Regulation, in effect on the date of this contract, shall govern all costs claimed, agreed to, or determined under this clause.

(j) The Contractor shall have the right of appeal, under the Disputes clause, from any determination made by the Contracting Officer under paragraph (e), (g), or (l) of this clause, except that if the Contractor failed to submit the termination settlement proposal or request for equitable adjustment within the time provided in paragraph (e) or (l), respectively, and failed to request a time extension, there is no right of appeal.

(k) In arriving at the amount due the Contractor under this clause, there shall be deducted--

(1) All unliquidated advance or other payments to the Contractor under the terminated portion of this contract;

(2) Any claim which the Government has against the Contractor under this contract; and

(3) The agreed price for, or the proceeds of sale of, materials, supplies, or other things acquired by the Contractor or sold under the provisions of this clause and not recovered by or credited to the Government.

(l) If the termination is partial, the Contractor may file a proposal with the Contracting Officer for an equitable adjustment of the price(s) of the continued portion of the contract. The Contracting Officer shall make any equitable adjustment agreed upon. Any proposal by the Contractor for an equitable adjustment under this clause shall be requested within 90 days from the effective date of termination unless extended in writing by the Contracting Officer.

(m)(1) The Government may, under the terms and conditions it prescribes, make partial payments and payments against costs incurred by the Contractor for the terminated portion of the contract, if the Contracting Officer believes the total of these payments will not exceed the amount to which the Contractor will be entitled.

(2) If the total payments exceed the amount finally determined to be due, the Contractor shall repay the excess to the Government upon demand, together with interest computed at the rate established by the Secretary of the Treasury under 50 U.S.C. App. 1215(b)(2). Interest shall be computed for the period from the date the excess payment is received by the Contractor to the date the excess is repaid. Interest shall not be charged on any excess payment due to a reduction in the Contractor's termination settlement proposal because of retention or other disposition of termination inventory until 10 days after the date of the retention or disposition, or a later date determined by the Contracting Officer because of the circumstances.

(n) Unless otherwise provided in this contract or by statute, the Contractor shall maintain all records and documents relating to the terminated portion of this contract for 3 years after final settlement. This includes all books and other evidence bearing on the Contractor's costs and expenses under this contract. The Contractor shall make these records and documents available to the Government, at the Contractor's office, at all reasonable times, without any direct charge. If approved by the Contracting Officer, photographs, microphotographs, or other authentic reproductions may be maintained instead of original records and documents.

(End of clause)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/dfars

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

Section 00 22 00 - Supplementary Instructions

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

Section 00 45 00 - Representations and Certifications

52.204-26 Covered Telecommunications Equipment or Services--

Representation.

OCT 2020

52.209-7 Information Regarding Responsibility Matters OCT 2018 52.209-13 Violation of Arms Control Treaties or Agreements --

Certification

NOV 2021

52.219-1 Small Business Program Representations FEB 2024 52.219-2 Equal Low Bids OCT 1995 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

JUN 2020

52.229-12 Tax on Certain Foreign Procurements FEB 2021 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

SEP 2022

252.204-7008 Compliance With Safeguarding Covered Defense Information Controls

OCT 2016

252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation

DEC 2019

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation

MAY 2021

252.225-7046 Exports by Approved Community Members in Response to the Solicitation

JUN 2013

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990 – Subset Dredging and Surface Cleanup Activities.

(2) The small business size standard is $37,000,000.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition--

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .