This amendment to solicitation W912BU23B0022 provides responses to requests for information and updates the bid schedule. The Philadelphia District of the U.S. Army Corps of Engineers anticipates awarding the inland waterway maintenance dredging contract by the end of September 2023, with a notice to proceed in mid-October. The amendment adds acceptance section 16 to the bid schedule and states that XYZ files used for quantity estimates will be made available on SAM.gov. Bids are due as originally scheduled, and payment for dredging will be determined by the final acceptance survey. Dragging may be used for leveling after approval of an interim survey to verify template achievement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04 Bid Abstract-W912BU23B0022- C&D Maintenance Dredging.pdf | ||
| Amendment-0002-W912BU23B0022.pdf | ||
| Amendment0001 Specs-W912BU23B0022.pdf | ||
| W912BU23B0022 XYZ Files - Zipped.zip | ZIP file | |
| W912BU23B0022-Dwgs-10 AUG 2023-Part-1.pdf | ||
| W912BU23B0022-Dwgs-10 AUG 2023-Part-2.pdf | ||
| W912BU23B0022-Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0001 is hereby issued to provide answ ers to RFIs and provide an updated bid schedule to reflect the draw ings section.
Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER AND AWARD) as Amendment No. 0001. Failure to acknow ledge all amendments may be cause for rejection of the bid.
**********************************THIS AMENDMENT DOES NOT EXTEND THE BID OPENING DATE*****************************
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Sep-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU23B0022
X 9B. DATED (SEE ITEM 11)
22-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Sep-2023
CODE
U.S. ARMY CORPS AND ENGINEERS - PHILA
1650 ARCH STREET
PHILADELPHIA PA 19103
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU23B0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
REQUEST FOR INFORMATION
1. Question: When does the Corps anticipate award of the contract? When does the Corps anticipate issuing the Notice to Proceed?
Answer: The Philadelphia District (NAP) anticipates awarding the contract at the end of September 2023 and Notice to Proceed given in Mid-October.
2. Question: Specification Section 3.11.2.4 para B states "For mechanical dredging, request an interim survey to be performed by the Government prior to any drag bar use for leveling. Implement dragging effort after approval of survey results." Please clarify what acceptance criteria will be used to all dragging to occur and whether the additional material removed from the payment template will be paid for at the contracted unit rate?
Answer: Interim surveys will be used prior to dragging to verify that it is possible to achieve the template with dragging. Payment will be determined by final ad survey after requested by the contractor.
3. Question: Drawings C-201 and C-304 depict two acceptance sections, A.S. #15 and A.S. #16. The bid schedule does not include A.S. #16. Please clarify the discrepancy between the drawings and bid schedule.
Answer: AS #16 has been added to the bid schedule.
4. Question: 35 20 23 3.7 Estimated Quantities. Can you please provide all sorted XYZ files used for the computations?
Answer: XYZ files will be made available on the System for Award Management (www.sam.gov).
(End of Summary of Changes)