Amendment0001 Specs-W912BU23B0022.pdf
PDF 39 KB Posted
- Attached to
- Inland Waterway C&D Maintenance Dredging Federal contract opportunity
- Solicitation number
- W912BU23B0022
About this file
This amendment modifies the specifications and bidding schedule for a federal dredging solicitation. The solicitation seeks dredging services for fourteen acceptance sections totaling approximately 514,296 cubic yards along an inland waterway. The amendment revises the bidding schedule, technical specifications section on dredging, and adds clarification on estimated quantities, limits of dredging and acceptance criteria. Bidders must acknowledge this amendment on their offer and failure to do so may result in rejection. The solicitation is identified as W912BU23B0022 and is issued by the Department of the Army Corps of Engineers Philadelphia District for maintenance dredging of the C&D Canal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04 Bid Abstract-W912BU23B0022- C&D Maintenance Dredging.pdf | ||
| Amendment-0002-W912BU23B0022.pdf | ||
| Amendment0001-W912BU23B0022.pdf | ||
| W912BU23B0022 XYZ Files - Zipped.zip | ZIP file | |
| W912BU23B0022-Dwgs-10 AUG 2023-Part-2.pdf | ||
| W912BU23B0022-Dwgs-10 AUG 2023-Part-1.pdf | ||
| W912BU23B0022-Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment No. 0001
IFB W912BU23B0022
14. DESCRIPTION OF AMENDMENT (continued)
a. BIDDING SCHEDULE: Please delete the Bidding Schedule in its entirety, and substitute the revised Bidding Schedule, annotated Amendment No. 0001, attached hereto.
b. TECHNICAL SPECIFICATIONS:
(1) SECTION 35 20 23 – DREDGING: Please delete page 35 20 23 - 16 in its entirety and substitute the revised page 35 2-0 23 - 16, annotated Amendment No. 0001, attached hereto.
c. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0001. Failure to acknowledge all amendments may be cause for rejection of the Bidder.
This page was intentionally left blank for duplex printing.
Section 00 10 00 Page 3
BIDDING SCHEDULE
(To be attached to SF 1442)
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount
BASE BID
1. Mobilization &
Demobilization 1 JOB L.S. $___________
2. AS-5 through AS-14:
Removal & Satisfactory
Disposal of Material 423,548 CY $______ $___________
TOTAL ESTIMATED BASE BID AMOUNT $___________
OPTION 1
3. Mobilization and Demobilization
Between Base Bid and Option 1 Areas 1 JOB L.S. $___________
4. AS-1 through 4, AS-15 and AS-16:
Removal & Satisfactory Disposal of Material 90,748 CY $______ $___________
TOTAL ESTIMATED OPTION 1 AMOUNT $___________
TOTAL ESTIMATED BASE BID AND OPTION 1 AMOUNT $___________
NOTE: Bidders must bid on all items.
This page was intentionally left blank for duplex printing.
3.5.3 Records
Submit records of disposal area effluent measurements and corrective action taken, daily to the Contracting Officer.
3.5.4 Timber Flashboards
Prior to commencement of pumping, provide a sufficient number of flashboards for the sluice as required for the retention of dredged material under this contract and ensure that the entire sluice length is effective. Brush applied preservative treatment shall be available at the site and all cut surfaces shall be heavily brushed as specified in AWPA M4.
3.5.5 Continuing Effluent Control
Upon completion and acceptance of a work area, provide continuing, intermittent labor to ensure that effluent control is continued beyond the completion of dredged discharge into the disposal area. Continue the control, including the removal of flashboards, until water impoundment is reduced to that which existed prior to the commencement of disposal into this area. The time required for effluent control beyond completion and acceptance of the work assignment will not be considered part of the completion time for the contract.
3.6 OVERDEPTH, SIDE AND END SLOPES, AND EXCESSIVE DREDGING
3.6.1 Overdepth
a. Material removed to a depth of not more than 1 foot below the required depth, limited by a vertical plane through the required depth contour, will be estimated and paid for at the contract unit price for removal and disposal of material.
3.6.2 Side and End Slopes
No side or end slopes are specified for this contract. A box cut shall be made from Station 0+000 to Station 99+000, and at the upstream and downstream limits of the project. Dredging from Station 99+000 to Station 250+440 shall be performed to a point extending 25 feet outside the channel edges where shoaling occurs along the channel edge within the authorized contract limits (as determined by before-dredging surveys), unless otherwise determined or directed by the Contracting Officer. (See table in paragraph titled ESTIMATED QUANTITIES.) See drawings for typical sections.
3.6.2.1 Excessive Dredging
Material taken from beyond the limits specified in the Paragraphs titled:
"Overdepth Dredging" and "Side and End Slopes", will be deducted from the total amount dredged as excessive dredging for which payment will not be made. Nothing herein shall be construed to prevent payment for the removal of shoals performed in accordance with the applicable requirements of the Paragraph titled: "FINAL EXAMINATION AND ACCEPTANCE" of this section.
3.7 ESTIMATED QUANTITIES
The total estimated quantity of material necessary to be removed within the specified limits as shown on the drawings, including allowable overdepth is as follows for each of the dredging areas:
Section 35 20 23 Page 15
Required Allowable Total Acceptance Dredging to Overdepth Available Section Station to Station 36 feet (CY) 36-37 feet (CY) (CY)
BASE BID
AS-5 111+000 - 113+000 12,822 6,376 19,198
AS-6 162+000 - 164+000 10,212 6,498 16,710
AS-7 171+000 - 173+500 9,934 8,371 18,305
AS-8 193+000 - 195+500 8,175 13,408 21,583
AS-9 195+500 - 197+500 10,747 23,651 34,398
AS-10 208+000 - 212+500 28,203 50,847 79,050
AS-11 213+000 - 216+000 39,729 49,745 89,474
AS-12 216+000 - 219+000 42,764 28,990 71,754
AS-13 219+000 - 222+000 25,725 12,951 38,676
AS-14 247+000 - 250+000 21,506 12,894 34,400
Total Base Bid 209,817 213,731 423,548
OPTION NO 1
AS-1 60+000 - 61+000 696 463 1,159
AS-2 65+000 - 66+000 4,257 1,603 5,860
AS-3 71+000 - 74+000 7,136 4,061 11,197
AS-4 90+000 - 92+500 5,171 3,822 8,993
AS-15 C&D Basin 24,714 7,056 31,770 AS-16 C&D Basin 24,713 7,056 31,769
Total Option NO. 1 66,687 24,061 90,748
Total Base Bid and Option 1 276,504 237,792 514,296
NOTE: All sorted XYZ files used for computations will be provided to the Contractor upon request. The estimated quantities shown above and as listed on the Bidding Schedule are based on surveys conducted on the dates shown on the drawings. All depths specified for dredging are referenced to mean lower low water (MLLW). The Contracting Officer reserves the right to direct cessation of work in a particular area of work at any time during the contract period.
3.8 LIMIT OF DREDGING
3.8.1 General
The area to be dredged is the channel within the limits indicated on the Contract Drawings and specified in the Paragraph titled: "FINAL EXAMINATION AND ACCEPTANCE", and as defined by the dredging prism indicated in the Paragraphs titled "OVERDEPTH, SIDE AND END SLOPES, AND EXCESSIVE DREDGING" and "MEASUREMENT AND PAYMENT", of this Section.
3.8.2 Completion of Acceptance Sections
Complete dredging in each acceptance section in its entirety to the required depth, prior to acceptance of the work by the Government. If after-dredging surveys of a portion of an Acceptance Section indicate dredging is required, and it was indicated by the before-dredging surveys, remove required material found to be remaining above the required depth, unless such dredging is waived by the Contracting Officer. Material removed as a result of redredging, within the dredging contour, will be paid for at the contract unit price and quantity as determined by the
Section 35 20 23 Page 16
| SF30 AND CONTRACT CLAUSES |
| AMENDMENT DESCRIPTION |
| BIDDING SCHEDULE |
| 35 20 23-16 DREDGING |
File details come from the government source that posted it. Updated .