W912BU23B0002-AM0002-Specs.pdf

PDF 804 KB Posted

Attached to
Beach Nourishment: Brigantine Inlet to Great Egg Harbor Inlet, Brigantine Island, Atlantic County, NJ
Solicitation number
W912BU23B0002
Issued by

About this file

This solicitation is for beach nourishment services along the Atlantic Ocean coastline in Brigantine Island, New Jersey. The U.S. Army Corps of Engineers, Philadelphia District intends to award a firm fixed price contract for placement of approximately 200,000 cubic yards of beachfill material, with options to add additional quantities up to 300,000 cubic yards. Additional work includes construction and repair of pedestrian and vehicle crossovers, planting of dune grass, and installation of sand fencing. The base period of performance is 90 calendar days, and the estimated value of the contract is between $10 million and $25 million. Interested offerors must access the solicitation on the System for Award Management website. Questions may be directed to the specified Contract Specialist.

View the file

Other files

File Type Posted
W912BU23B0002_FY23 Periodic Nourishment Brigantine_Abstract-SAM.gov.pdf PDF
W912BU23B0002-AM0003-Dwgs.pdf PDF
W912BU23B0002-AM0003-Specs.pdf PDF
W912BU23B0002-AM0002-Dwgs.pdf PDF
W912BU23B0002-AM0001-Dwgs.pdf PDF
W912BU23B0002-AM0001-Specs.pdf PDF
Brigantine_Inlet_BA_2022_9column.txt TXT text file
GDN-NJ202300046-01062023.txt TXT text file
GDS-NJ20230003-01062023.txt TXT text file
W912BU23B0002-Specs.pdf PDF
W912BU23B0002-DWGS.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follows:

- Bid schedule is revised removing options 4 and options 5 only.

- Clause 52.217-7 changes made to options (see summary of changes)

- Bid opening location and mailing address updated in "Informational Text" and clause 52.233-2 (see summary of changes)

- RFI questions and answers attached.

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BU23B0002

X 9B. DATED (SEE ITEM 11)

31-Mar-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Apr-2023

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: ZAQUETTE EVERETT /

1650 ARCH STREET

PHILADELPHIA PA 19103-2004

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X

*****BID OPENING HAS NOT BEEN EXTENDED******

W912BU23B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

The following have been modified:

INFORMATIONAL TEXT

INFORMATIONAL TEXT

IMPORTANT NOTES REGARDING THIS ACQUISITION:

Request for Information (RFI): The Prospective Bidders may submit RFI inquiries relating to the solicitation by email to the following: Zaquette Everett, Contract Specialist: email:

zaquette.everett@usace.army.mil . RFIs initially were submitted by 11:00 AM EST, 20 April 2023, but we do not plan to extend. The interested offeror may submit any technical questions concerning this IFB at the earliest time possible to enable the Contracting Officer to respond.

When submitting your RFI, please provide the project name, location, and solicitation number.

ALL INQUIRIES MUST BE IN WRITING

We will also have a conference line available for the bid opening. If you would like to attend by conference line only, a call-in number will be provided ONLY upon request.

MAGNITUDE OF CONSTRUCTION PROJECT

The estimated value of the proposed work is $10M to $25M.

EVIDENCE OF AUTHORITY TO SIGN BIDS/PROPOSALS

Evidence of the authority of individuals signing bids/proposals to submit firm bids/proposals on behalf of the bidder/offeror is required except where the bid/offer is signed, and shows that it is so signed, by: The President, Vice-President, or Secretary of Incorporated bidders; a partner in case of partnership; the owner in the case of sole proprietorships. Failure to submit with the bid satisfactory evidence of authority of all other persons may be cause for rejection of bid as an invalid or non-responsive bid.

ARITHMETIC DISCREPANCIES

a. For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by bidder:

1)Obviously misplaced decimal points will be corrected.

2)Discrepancy between unit price and extended price, the unit price will govern.

3)Apparent errors in extension of unit prices will be corrected.

4)Apparent errors in addition of lump-sum and extended prices will be corrected.

b. For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends his bid to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

e5ctcze9 Highlight

c. These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

DELIVERY OF BIDS/PROPOSALS

Bids/Proposals shall be delivered in person to the:

US Army Corps of Engineers Philadelphia District Attn: Zaquette Everett /CENAP-CT 1650 Arch Street Philadelphia, PA 19106-3400

Please e-mail zaquette.everett@usace.army.mil if you intend to attend and the name of your representative. We will also have a conference line available for the bid opening. If you would like to attend by conference line only, a call in number will be provided ONLY upon request.

SUBMISSION OF INVOICES

(a) Original invoices for services performed under the contract shall be submitted and payment will be made by the following process:

• Contractor's invoice on ENG Form 93, which shall show, in summary form, the basis for arriving at the amount of the invoice. All invoices shall have the contract number listed.

• Contractor's monthly estimate for voucher with an update of the work completed under the contract measured as percent or as specified quantities, with subcontractor and supplier payment certification.

• Prompt payment certification.

• Updated submittal register.

PROCUREMENT CONTRACTING OFFICER

Only a warranted Contracting Officer, acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S. Army Corps of Engineers Philadelphia District Attn: Contracting Office 1650 Arch Street Philadelphia, PA 19106-3400

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS

The following have been modified:

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 21 days after the approval by the government of Pre-placement condition surveys.

Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

Options 1 through 3, if exercised will provide additional calendar days as follows:

Option 1 (25,000 cy): 4 calendar days Option 2 (50,000 cy): 5 calendar days Option 3 (75,000 cy): 6 calendar days

(End of clause)

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer has the right to exercise any or all options within 21 calendar days after the approval by the Government of the Pre-Placement Condition Surveys. The time slated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)

This page was intentionally left blank for duplex printing.

Amendment No. 0002

IFB W912BU23B0002

14. DESCRIPTION OF AMENDMENT (continued)

a. REQUESTS FOR INFORMATION (RFI) WITH RESPONSES: RFI’s with responses, annotated Amendment No. 0002, attached hereto.

b. TECHNICAL SPECIFICATIONS:

(1) BIDDING SCHEDULE: Please delete the Bid Schedule in its entirety and substitute the revised Bid Schedule, annotated as Amendment No. 0002, attached hereto.

(2) SECTION 01 11 00 – SUMMARY OF WORK: Please delete this section in its entirety and substitute the revised Section 01 11 00, annotated as Amendment No. 0002, attached hereto.

c. CONTRACT DRAWINGS: Please delete drawing C-102 in its entirety and substitute the revised drawing C-102, with the latest revision date of 24 April 2023, attached hereto:

d. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0002. Failure to acknowledge all amendments may be cause for rejection of the bid.

Requests for Information and Responses

12. Please clarify that the Base and All Option quantity will be pumped between stations STA 2+00 to STA 50+00 and nowhere else along the beach. The dashed Limit of Work line from STA 2+00 to STA 86+00 is very ambiguous. Can you please specify what type of work will be done between the “Limit of Work” line.

Answer: See Amendment No. 0002, work is not anticipated beyond station 50+00.

13. On C-001, Note 4 states The CWL will be established by the contracting officer when the area of work is known. Location and template of beachfill may be revised by the contracting officer after pre-placement condition surveys are received. Please clarify that the location and template of beachfill material will only be revised between the Base Bid and Option Limit

STA 2+00 to STA 50+00 which is specified on the contract drawings.

Answer: Revisions following precondition surveys will be between station

2+00 and 50+00.

14. The borrow area survey does not show a sufficient amount of material to complete the base and option work quantity for this contract. Please provide a maximum allowable depth that results in full contract quantity plus the sufficient amount of loses >20 percent. This must be known prior to bid to allow sufficient information to calculate coverage and production rates.

Currently there is a shortage of >25 percent.

Answer: See Amendment No. 0002.

15. Is the intent to have the Temporary Orange Construction Fence from STA

2+00 to 10+00 on Sheet C-102, be installed after beachfill is complete in that area?

Answer: See Amendment No. 0002 – Polyethylene Mesh Safety Fencing is to be installed prior to construction.

16. Please confirm that the new bid opening address is on Arch Street?

17. Amendment 0001 increased the Base Bid volume from 200,000 CY to 700,000

CY. Based on our calculations there is not enough material in the borrow area to cover the Base Bid and all the Options. If necessary, will the dredge depth be increased to get the required volume from the borrow area? What happens if there is an insufficient volume of material within the borrow area to complete the project?

00 10 00-3

BIDDING SCHEDULE

(To be attached to SF 1442)

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

BASE BID:

1. Mobilization and Demobilization 1 JOB LS $____________

2. Structures Monitoring 1 JOB LS $____________

3. Beachfill 700,000 CY $______ $____________

4. Reconstruct Pedestrian Dune Crossover 2,580 SF $______ $____________

5. Split Rail Fence 495 LF $______ $____________

6. Sand Fence 1,505 LF $______ $____________

7. Dune Grass 5,395 SY $______ $____________

8. MEC Modifications and Monitoring 1 JOB LS $____________

9. Name the State of New Jersey and the City of Brigantine as “Additional Insured” under General Liability Insurance 1 JOB LS $____________

TOTAL ESTIMATED BASE BID AMOUNT $_________________

OPTIONS:

10. Option 1 – Beachfill 25,000 CY $______ $____________

11. Option 2 – Beachfill 50,000 CY $______ $____________

12. Option 3 – Beachfill 75,000 CY $______ $____________

13. Deleted

14. Deleted

TOTAL ESTIMATED BASE BID AND OPTIONS AMOUNT $_________________

00 10 00-4

NOTES:

1. Bidders must bid on all items.

2. Bidders shall list the cost of additional premium, if any, to name the State of New Jersey and the City of Brigantine as “Additional Insured” under General Liability Insurance as noted in Section 01 30 00, Paragraph titled “INSURANCE REQUIREMENTS”.

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 SCOPE OF SECTION

This section presents a general description of the work to be accomplished under this contract on Brigantine Island, between Absecon Inlet and Brigantine Inlet located in Atlantic County, New Jersey.

1.2 DESCRIPTION OF WORK

a. The contract work consists of a Base Bid to place approximately 700,000 cubic yards of beachfill material along the Atlantic Ocean coastline in the northern portion of Brigantine Island. The beachfill work shall commence in the north end of the project and proceed south.

b. The Base Bid work includes, in addition to beachfill: structures monitoring, the reconstruction of pedestrian crossovers; planting of dune grass on exposed and reconstructed dune sections within the project area;

and providing sand fence, split rail fence, and signs, as indicated.

c. The contract work also consists of option work to place additional quantities of beachfill material; 3 separate options, if awarded, to place additional beachfill material.

d. Pre-placement condition surveys, as specified in Section 01 71 23 SURVEY REQUIREMENTS, will determine the exact location and quantity of beachfill material required within the limits indicated, and will be a determining factor in the award of Options for additional quantities of beachfill.

Where Options for additional beachfill are awarded, the additional beachfill material shall be placed immediately after the initial Base Bid quantity has been placed in the area(s) to be covered by the awarded Option. The intent is to complete the beachfill template in a given Base-plus-Option area, before proceeding with work further along the construction baseline.

e. The borrow area that will be available for the beachfill material is located northeast of the project location, adjacent to the northern tip of Brigantine Island in the Brigantine Inlet. See the Contract drawings for the exact location. All material for beachfill work performed under this contract shall be obtained from this borrow area. Beachfill material from any other source, including trucking from upland sources, will not be considered under this contract.

1.3 CONTRACTOR ACCESS

a. Access to the work site is available by land and water. Access to the beach for land based equipment is as shown on the contract drawings. Any materials required to establish or stabilize access points for vehicle use shall be approved by the COR and provided and removed by the Contractor.

Any additional parking that the Contractor requires, outside the work limits, shall be coordinated directly with the appropriate local officials. Access to the approved borrow area is by water only.

Section 01 11 00 Page 1

b. Document the original conditions of the access area and route by taking detailed photographs of those areas prior to starting work. See Section 01 32 33 CONSTRUCTION PHOTOGRAPHY for additional requirements.

c. Access areas shall be restored to the original or better condition upon completion of work. Any damage to the roads due to truck traffic or other Contractor operations shall be repaired, subject to the Contracting Officer's approval, at no additional cost to the Government.

1.4 CONTRACTOR'S WORK LIMIT

The Contractor's work limit is as shown on the contract drawings. The Contractor is prohibited from operating landward of the Contractor's work limit. The Contractor shall not enter upon, affect, or damage, in any way, areas and structures outside that limit of work.

1.5 WORK HOURS

The Contractor may work 24 hours per day, 7 days per week, to complete the contract work. However, the Contractor shall be required to comply with local codes regarding noise at all times during the contract period. The Contractor shall be required to equip his land-based equipment with noise suppression equipment if so directed by the COR.

1.6 DREDGING RESTRICTIONS

Dredging of material will only be allowed from 1 July through 28 February.

1.7 ENVIRONMENTAL RESTRICTIONS

See Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS for Piping Plover and Colonial Nesting Birds restrictions for beachfill operations.

1.8 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer.

1.9 EXISTING UTILITIES

The existing utility locations shown on the drawings are approximate and not complete. The Contractor is responsible for field verifying all existing utility locations, including those not shown on the drawings. For marking underground utility lines, call for free markouts a minimum of 3 work days before you dig at 800-272-1000.

Section 01 11 00 Page 2

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

Section 01 11 00 Page 3

SF30 AND CONTRACT CLAUSES
AMENDMENT DESCRIPTION
REQUESTS FOR INFORMATION AND RESPONSES
BID SCHEDULE
01 11 00 SUMMARY OF WORK