Dredging and Rock Removal, Delaware River, Philadelphia to the Sea, PA, NJ and DE.
Solicitation number
W912BU22R0007
Issued by

About this file

This document provides information on a federal solicitation for dredging and rock removal services on the Delaware River. The U.S. Army Corps of Engineers, Philadelphia District, is seeking a firm fixed price contract to perform maintenance dredging of the Delaware channel and rock removal through December 31, 2022. The solicitation will utilize a best value tradeoff source selection process. No federal disposal areas will be provided for rock material, which must be placed at designated open water reef sites instead. A nationwide water quality permit has already been obtained for the work in Delaware waters. Liquidated damages will be assessed for project delays. The Corps will conduct acceptance surveys with three to five days allowed for review. Estimated value of the contract is between $5-10 million. Electronic proposal submissions via DoD Safe are preferred over hard copies.

View the file

Other files

File Type Posted
DOD Safe Instructions.pdf PDF
W912BU22R0007- AM2.pdf PDF
Bellevue 4_11March21_1x1min_MLLW.txt TXT text file
Marcus Hook 12_11March21_1x1min_MLLW.txt TXT text file
Marcus Hook 33_11March21_1x1min_MLLW.txt TXT text file
Marcus Hook 38_11March21_1x1min_MLLW.txt TXT text file
Past Performance Questionaire_PPQ-r.pdf PDF
W912BU22R0007-DWGS.pdf PDF
W912BU22R0007-SPECS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

462100

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

- Answers to RFI questions

- Attach Past Performance Questionaire (PPQ) - uploaded

- XYZ files uploaded

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU22R0007

X 9B. DATED (SEE ITEM 11)

11-Feb-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The reason for this amendment is as follows:

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

7 MAR 2022

***********PROPOSAL DUE DATE IS EXTENDED TO 25 MARCH 2022*************

*****PLEASE INDICATE RECEIPT OF THIS AMENDMENT ON SF1442 (SOLICITATION, OFFER, AND AWARDS) AS AMENDMENT 0001.

FAILURE TO ACKNOWLEDGE ALL AMENDMENTS MAY BE CAUSE FOR REJECTION OF THE PROPOSAL******

X

W912BU22R0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

ANSWERS to RFI Questions submitted for W912BU22R007 Dredging and Rock Removal, Delaware River, Philadelphia to the Sea, PA, NJ, and DE. River

1. Please provide all native XYZ files for bathymetry at the work locations. (XYZ files are attached)

2. Please consider expanding the Past Performance Requirement (Volume I & II) from five (5) years to ten

(10) years for a maximum of 10 projects. (Past performance requirement is increased to 10 years)

3. Please provide the format/form that you require the PPQ’s to be completed with as there are different formats that the gov’t has used in the past. (PPQ is attached)

4. Volume II of the proposal requires that a Past Performance Questionnaire (PPQ) be submitted. We are unable to locate this form in the specifications provided. Could you please provide the form or point out its location? (PPQ is attached)

5. If a past performance questionnaire isn’t provided, could past CPARS evaluations be submitted instead?

(PPQ is attached)

6. Are contractors required to submit hard copies of their proposal at the time of bid, or will an electronic submittal alone suffice? (Electronic submittal alone would suffice)

7. What is the maximum number of pages for Item 3 – Small Business Plan? (No limitation, just answer the questions accordingly)

8. Would the Government please increase the maximum pages allowed for submittal for Item 4 Cost and Price section to 75 pages? We believe the current allowance of 25 pages will largely get consumed by certifications and other forms. (You may increase to 75 pages for cost and price section)

9. Form 1442, Box 11 States to complete within 60 CD. This contradicts Page 4 of 108, #2 which states to finish by 12/31/22. Please clarify. (Project completion date is12/31/22)

10. Page 7 of 108, Section 3, B, this section is requiring us to submit the price information in Microsoft Excel. We cannot find an excel bid sheet in the documents. Please clarify or provide. (There was no excel spreadsheet provided. Please provide your excel spreadsheet to meet this requirement)

11. Page 7 of 108, Section 3, B, This section directs us to submit our proposal via DoD Safe. This contradicts Page 14 of 108 which states to submit the proposals via DoD Safe OR to the USACE office.

Please clarify what is required concerning the submission of the 4 volumes. (While a choice was provided to submit a hard copy, the preferred method of proposal submission via DoD Safe.)

(End of Summary of Changes)