W912BU22B0003-Dwgs.pdf
PDF 13 MB Posted
- Attached to
- W912BU22B0003 - The General Edgar Dam Modification Poject formerly W912BU21B0012 Dam Modification
- Solicitation number
- W912BU21B0012
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
OF WORK
LOCATION
N
SUBMITTED:
APPROVED:
CHIEF, ENGINEERING AND CONSTRUCTION DIVISION
PETER M. TRANCHIK, P.E.
CHIEF, ENGINEERING BRANCH
ANDREW J. SCHWAIGER, P.E.
THIS PROJECT WAS DESIGNED BY THE
PHILADELPHIA DISTRICT OF THE U.S.
ARMY CORPS OF ENGINEERS. THE
INITIALS OR SIGNATURES AND
REGISTRATION DESIGNATIONS OF
INDIVIDUALS APPEAR ON THESE
PROJECT DOCUMENTS WITHIN THE
SCOPE OF THEIR EMPLOYMENT AS
REQUIRED BY ER 1110-1-8152.
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I L
E
N
A M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
C T
N
U M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
P S
O
F
E
N G
I N
E E
R S
D I S
T R
I C
T
SOLICITATION NO:
CONTRACT NO:
ISSUE/SUBMITTAL DATE:
G-001
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
D Y
B E
R R
Y
C
R E
E K
G E
N E
R A
L
E
D G
A R
J
D W
I
D
M
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
C O
V E
R
S
H E
E T
F N
W
B U
B
P H
I L A
D E
L P
H I A
PHILADELPHIA
DAM SAFETY MODIFICATION
GENERAL EDGAR JADWIN DAM
DYBERRY CREEK
HONESDALE, PENNSYLVANIA
27 OCT 2021
W912BU22B0003
VICINITY MAP
N
LOCATION
OF PROJECT
DRAWING INDEX
SHEET NUMBER SHEET TITLE
GENERAL
G-001
COVER SHEET
CIVIL
C-001
GENERAL INFORMATION SHEET
C-002
SURVEY AND CONSTRUCTION CONTROL
C-003
CONSTRUCTION CONTROL TABLES
C-101
GENERAL PLAN
C-102
EXISTING CONDITIONS
C-103
MODIFICATION PLAN
C-104
CREST - PIEZOMETER PLAN
C-301
TYPICAL SECTIONS
C-302
TYPICAL SECTIONS
C-501
DETAILS
C-502
DETAILS
C-503
DETAILS
C-504
DETAILS
C-505
DETAILS
C-506
DETAILS
CE001
EROSION AND SEDIMENT CONTROL NOTES
CE101
EROSION AND SEDIMENT CONTROL PLAN
CE102
EROSION AND SEDIMENT CONTROL PLAN
CE501 EROSION AND SEDIMENT CONTROL DETAILS
CE502 EROSION AND SEDIMENT CONTROL DETAILS
CE503 EROSION AND SEDIMENT CONTROL DETAILS
PLAN SYMBOLS LEGEND
LIGHT POLE
SIGN POST
LIMIT OF DISTURBANCE
MARSH
TREE
CONTRACTOR ACCESS AREA
CONTRACTOR STAGING AREA
METAL POST FENCE
CHAIN LINK FENCE
WOOD POST FENCE
PROPERTY LINE
WETLANDS LIMIT
20'
CONTOUR LINE
CIVIL SITE WORK LINE TYPE LEGEND
CONTRACTOR WORK LIMIT
(ALTERNATE LINE TYPE)
W
G
W
C
CB
COMMUNICATION PULL BOX
COMMUNICATION VAULT
POST INDICATOR VALVE
WELL
WATER METER
WATER VALVE
MONITORING WELL
FIRE HYDRANT
CATCH BASIN
PHOTO CENTER
GAS MARKER
GAS METER
GAS VALVE
CLEAN OUT
STORM DRAIN INLET
T
G
AFS
UNDERGROUND STORAGE TANK
TRANSFORMER
GENERATOR
ABOVE GROUND FUEL STORAGE
TREE PROTECTION FENCE
GENERAL NOTES:
1. ELEVATIONS ARE EXPRESSED IN FEET AND TENTHS OF A FOOT AND REFER TO THE NORTH AMERICAN VERTICAL
DATUM (NAVD) 1988.
2. HORIZONTAL CONTROL IS REFERENCED TO THE PENNSYLVANIA NORTH STATE PLANE COORDINATE SYSTEM
(NAD 1983).
3. THE CONTRACTOR WORK LIMIT AND LIMIT OF DISTURBANCE LINES SHALL BE AS SHOWN ON SHEET C-002 AND
C-003.
4. THE CONTRACTOR SHALL STAGE AND ACCESS THE SITE FROM THE LOCATIONS SHOWN ON SHEET C-101, CE101
AND CE102.
5. THE SITE CONDITION SURVEYS ARE A RESULT OF SURVEYS CONDUCTED ON JULY 2019 AND SUPPLEMENTED
WITH A SURVEY CONDUCTED MARCH 2021, AND CAN ONLY BE CONSIDERED REPRESENTATIVE OF THE
CONDITIONS OCCURRING AT THAT TIME.
SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
WM
GRASS PLANTINGS
X-1011
VIEW NAME
MATCHLINE MATCHLINE
RE: X-XXX RE: X-XXX
X-101
CLOUD
REVISION & AMENDMENT
CLOUD AND SYMBOL
REVISION SYMBOL
(NUMERIC)
AMENDMENT SYMBOL
(ALPHA)
1 a
VIEW TITLE SYMBOL
SECTION CUT SYMBOL
VIEW IDENTIFICATION NUMBER
VIEW NAME
DIRECTION OF VIEW
CALLOUT SYMBOL
CALLOUT AREA VIEW
MATCHLINE SYMBOL
CALLOUT IDENTIFICATION
NUMBER
DETAIL SHEET
REF NUMBER
DRAWING SHEET
MATCHING REFERNECE
NUMBER
DRAWING SHEET SYMBOLS
GRAPHIC BAR SCALE SYMBOLS
SECTION IDENTIFICATION NUMBER
DETAIL SHEET
REF NUMBER
PRIMARY
SCALE
EXTENSION
SCALE
V: X X X X X
X X X X
H: X
SCALE IN FEET/METERS
(TYPICAL BAR SCALE)
SCALE IN FEET/METERS
(HORIZONTAL/VERTICAL BAR SCALE)
U
CONTRACTOR STAGING
AND STORAGE AREA
MANHOLE
W
EXIST PIEZOMETER
EXIST
SETTLEMENT PIPE
GEOTECHNICAL SYMBOLS
SDI
G
G
CO
PRIMARY
SCALE
EXTENSION
SCALE
X X X XX
HATCH LEGEND
DIRECTION OF
MAGNETIC NORTH
NNORTH
PLAN
MAGNETIC
NORTH
PLAN
NORTH
NORTH SYMBOLS
ABBREVIATIONS
ABBRV DESCRIPTION ABBRV DESCRIPTION ABBRV DESCRIPTION
AD AREA DRAIN FIG FIGURE SINGLE PNL PANEL
ADDL ADDITIONAL FDN FOUNDATION PSF POUNDS PER SQUARE FOOT
AFF ABOVE FINISHED FLOOR FF FINISHED FLOOR PSI POUNDS PER SQUARE INCH
AGG AGGREGATE FIN FINISH PVI POINT OF VERTICAL INFLECTION
BD BOARD FL FLOOR RAD RADIUS
BIT BITUMINOUS FM FORCE MAIN REINF REINFORCEMENT
BL or BASE LINE FT
FOOT, FEET
REM REMOVABLE
BLDG BUILDING FTG FOOTING ROW RIGHT OF WAY
BM BEAM G GROUND S SOUTH
BMP BEST MANAGEMENT PRACTICE GG GEOGRID SCH SCHEDULE
BOT BOTTOM GM GEOMEMBRANE SECT SECTION
BVCE BEGINNING OF VERTICAL CURVE ELEVATION GOVT GOVERNMENT SPEC SPECIFICATION
BVCS BEGINNING OF VERTICAL CURVE STATION GR GRADE SPRT SUPPORT
CL or CENTERLINE GT GEOTEXTILE SQ SQUARE
CMU CONCRETE MASONRY UNIT HORIZ HORIZONTAL SS STAINLESS STEEL
CO CLEAN OUT HS HIGH STRENGTH STA STATION
COL COLUMN HT HEIGHT STD STANDARD
CONC CONCRETE HVY HEAVY STRUCT STRUCTURAL
CONSTR CONSTRUCTION IN INCH SUSP SUSPENDED
CONT CONTINUOUS INSUL
INSULATION, INSULATED
SYS SYSTEM
CTRL CONTROL IINT INTERIOR TD TRENCH DRAIN
CWL CONTRACTOR WORK LIMITS INV INVERT TDO TRENCH DRAIN OUTLET PIPE
C.A. COARSE AGGREGATE LL LIVE LOAD TEMP TEMPORARY
DET DETAIL LP LOW POINT TELE TELEPHONE
DGA DENSE GRADED AGGREGATE LT LIGHT THK THICK
DIA DIAMETER LOD LIMIT OF DISTURBANCE TOPO TOPOGRAPHY
DIM DIMENSION JCT JUNCTION TYP TYPICAL
DL DEAD LOAD MATL MATERIAL UD UNDERDRAIN
DWG DRAWING MAX MAXIMUM UDO UNDERDRAIN OUTLET PIPE
E EAST MIN MINIMUM UE UNDERGROUND ELECTRIC
EA EACH MISC MISCELLANEOUS UGND UNDERGROUND
ECM EROSION CONTROL MAT N NORTH UNO UNLESS NOTED OTHERWISE
EJ EXPANSION JOINT NLT NOT LESS THAN UOP UNDERDRAIN OUTLET PIPE
EL ELEVATION NTS NOT TO SCALE UXO UNEXPLODED ORDINANCE
ELEC ELECTRIC OC ORIGINAL CONSTRUCTION VB VINYL BASE
EOP EDGE OF PAVEMENT OD OUTSIDE DIAMETER VC VERTICAL CURVE
EOS EDGE OF SHOULDER OH OVERHEAD VCT VINYL COMPOSITION TILE
EQ EQUAL OPG OPENING VOL VOLUME
EQUIP EQUIPMENT OPP OPPOSITE VERT VERTICAL
EXH EXHAUST PC POINT OF CURVE VTR VENT THROUGH ROOF
EXIST or (E)
EXISTING PD PAVEMENT DRAIN W/ WITH
EXP
EXPANSION, EXPOSED
PI POINT OF INFLECTION W WEST
EXP JT EXPANSION JOINT PIV POST INDICATOR VALVE WL WATER LEVEL
EXT EXTERIOR POT POINT OF TANGENT WS WATER SURFACE
EXCAV EXCAVATION PMP PROBABLE MAXIMUM PRECIPITATION W/O WITHOUT
C
L
B
L
PIEZOMETER
BENCH MARK
SF SF
SEDIMENT BARRIER
DYL-31
DYL-31P
DYS-3
ROCK CONSTRUCTION ENTRANCE
USGS STAFF GAGE
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I L E
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
IS
TR
IC
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
PHILADELPHIA
C-001
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
D Y
B E
R R
Y
C
R E
E K
G E
N E
R A
L
E
D G
D W
M
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
I N
F O
R M
A T
I O
N
S
H E
E T
F N
W
B U
B
P H
IL
A
D E
LP
H
IA
A D
D A
D D
G M
G D
A
LIMITS OF 1970'S GROUTING
(SEE DETAIL 1/C-301)
UPSTREAM BERM
WETLAND
LIMIT (TYP)
WETLAND
LIMIT
DOWNSTREAM
BERM
EXISTING DAM RIPRAP
LIMIT OF TOP
OF DAM (TYP)
EXISTING DAM RIPRAP
USGS GAGE SHED
(TO BE REMOVED)
E
X
I S
T
I
G
N
C
R
E
W
I R
EXIST. GROUT
WASHOUT
EXIST. BOOM
ANCHOR PAD
(TO REMAIN)
℄ CREST OF DAM
D
Y
B
E
R
Y
E
E
K
S
P
I L
L
W
A
Y
EXISTING CONCRETE
CONDUIT THROUGH DAM
C
O
N
T
R
A
C
T
C
E
X
I
S
T
I
A
V
A
D
C
O
N
T
R
A
C
T
C
E
X
I S
T
I
A
V
A
D
EXISTING USGS
PIPE OUTLET
(TO REMAIN)
EXISTING USGS
PIPE OUTLET
(TO REMAIN)
EXIST. USGS
PIPE OUTLET
(TO REMAIN)
118119
126127
D
M
CONTRACTOR
WORK LIMIT
(TYP)
STAGING AREA
LIMIT (TYP)
LIMIT OF
DISTURBANCE
(TYP)
EDGE OF LINER
SYSTEM (TYP)
EDGE OF LINER
SYSTEM (TYP)
C
O
N
T
R
A
C
T
C
E
X
I S
T
I
A
V
A
D
APPROX. LIMITS OF
TEMPORARY STREAM
CROSSING
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D I S
T R
I C
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
P H
I L A
D E
L P
H I A
-W
B U
B
C
R
V E
Y
A
N
S T
R U
C T
I O
N
C
O N
T R
O L d w g
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
S U
R V
N
S T
R U
C T
I O
N
C
O N
T R
O L
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
E
D G
D W
M
D Y
B E
R R
Y
C
R E
E K
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
C-002
PHILADELPHIA
NOTES:
1. CWL POINTS 130-163 AND 177-211 ARE NOT SHOWN ON PLAN. POINTS FOLLOW EXISTING ACCESS ROADS.
2. CWL, LOD, STAGING AREA AND LINER LIMITS POINT TABLES ARE SHOWN ON SHEET C-003.
3. SEE SPECIFICATIONS FOR BENCHMARK DESCRIPTION SHEETS.
4. SEE SHEET C-104 FOR PIEZOMETER PLAN AND TABLE OF WORK.
NORTH
PLAN
SURVEY AND CONSTRUCTION CONTROL PLAN
SURVEY AND CONSTRUCTION CONTROL PLAN
NORTH
PLAN
LINER
COORDINATES
POINT #
NORTHING
536362.76
536377.72
536438.56
536544.29
536569.22
536594.16
536629.06
536818.57
536847.51
536658.01
536623.10
536598.16
536573.23
536467.51
536406.67
536391.71
EASTING
2647457.30
2647456.22
2647451.80
2647444.13
2647442.33
2647440.52
2647437.98
2647424.24
2647823.19
2647836.94
2647839.47
2647841.28
2647843.09
2647850.76
2647855.17
2647856.25
LIMIT OF DISTURBANCE
(LOD) COORDINATES
POINT #
NORTHING
536574.89
536624.18
536864.78
536832.05
536593.07
536542.62
536377.06
536362.98
536353.03
536338.89
536371.09
536393.51
536403.42
536409.33
EASTING
2647866.03
2647854.43
2647836.97
2647408.22
2647425.56
2647421.19
2647433.21
2647377.08
2647378.43
2647436.17
2647881.01
2647936.36
2647935.61
2647878.04
CONTRACTOR STAGING
AREA COORDINATES
POINT #
NORTHING
536575.50
536591.96
536836.43
536870.38
536618.30
536626.36
536658.57
536837.11
536905.94
536911.96
536866.56
536445.92
536478.33
536509.89
536501.36
536443.85
536435.32
536440.08
536422.89
536445.32
536602.61
536873.92
536877.42
536777.77
536717.33
536484.29
536456.27
536048.08
535919.05
535940.07
536055.43
536116.84
536221.80
536198.06
536181.71
536154.11
EASTING
2647209.17
2647416.03
2647399.87
2647844.59
2647862.88
2647967.51
2648055.40
2648147.59
2648083.24
2647929.50
2647334.79
2648513.58
2648511.30
2648483.99
2648438.18
2648353.80
2648388.37
2648499.59
2648677.74
2648685.79
2648658.33
2648582.72
2648554.71
2648511.92
2648477.51
2648576.31
2648575.08
2647401.23
2647459.70
2647485.55
2647480.14
2648139.32
2648097.75
2647804.20
2647649.75
2647353.18
CONTRACTOR WORK LIMIT
(CWL) COORDINATES
POINT #
NORTHING
536619.23
536621.66
536655.64
536801.81
536872.83
536817.57
536812.79
536937.58
536960.07
536896.92
536805.56
536685.69
536642.52
536514.83
536491.10
536469.09
536512.07
536503.24
536445.84
536445.84
536416.90
536398.05
536419.70
536389.56
536367.15
536334.85
536349.00
536332.54
536294.91
536042.98
535831.39
535681.74
535482.05
535402.97
535294.03
535151.87
535028.21
534878.79
534772.63
534688.40
534593.56
534573.71
534542.87
534449.95
534286.03
EASTING
2647940.01
2647969.23
2648060.65
2648136.12
2648222.61
2648301.89
2648336.53
2648264.42
2648282.52
2648480.73
2648499.58
2648439.90
2648441.97
2648523.28
2648528.31
2648521.83
2648484.75
2648437.38
2648353.56
2648353.56
2647954.69
2648444.34
2648352.61
2647937.28
2647881.92
2647435.83
2647378.09
2647151.27
2647125.47
2647196.79
2647206.86
2647194.83
2647211.62
2647207.96
2647152.48
2647067.29
2646998.01
2646928.71
2646866.65
2646758.67
2646448.99
2646420.20
2646391.15
2646343.20
2646641.54
CONTRACTOR WORK LIMIT
(CWL) COORDINATES
POINT #
NORTHING
534213.35
534139.66
534057.24
533901.08
533649.96
533623.42
533652.00
533892.93
534133.71
534219.08
534396.53
534443.96
534523.14
534736.28
534928.51
535110.04
535298.86
535543.54
535667.82
535891.55
536158.06
536228.72
536136.03
536098.72
535946.16
535919.90
535876.09
535901.90
536008.40
535941.56
535944.31
535876.72
535578.56
535297.37
535090.80
534937.30
534731.28
534518.49
534438.75
534391.75
534238.29
534129.55
533888.19
533611.90
533540.82
EASTING
2646714.23
2646892.70
2646969.07
2646995.10
2647084.69
2647102.65
2647126.17
2647191.84
2647250.27
2647267.90
2647288.59
2647301.78
2647324.94
2647370.17
2647434.40
2647476.19
2647492.05
2647510.02
2647500.43
2647465.02
2647347.01
2648101.20
2648137.55
2648226.17
2648255.19
2648274.60
2648249.12
2648199.60
2648067.31
2647712.29
2647548.64
2647494.29
2647531.65
2647510.99
2647493.70
2647457.50
2647388.53
2647343.38
2647320.05
2647306.98
2647291.26
2647268.81
2647210.24
2647136.25
2647138.74
CONTRACTOR WORK LIMIT
(CWL) COORDINATES
POINT #
NORTHING
533532.03
533640.82
533895.10
534025.63
534083.75
534132.90
534188.21
534266.55
534441.98
534441.98
534556.86
534592.03
534615.42
534720.62
534804.95
535039.14
535163.91
535391.03
535481.53
535681.33
535740.21
535832.02
536020.97
536303.30
536355.31
536373.48
536581.13
536569.53
536782.74
536875.51
536920.97
536915.47
537007.28
537195.92
537195.19
536875.74
536603.08
536445.15
536420.38
536454.84
536483.93
536633.87
536625.15
536500.14
536426.68
EASTING
2647121.90
2647063.54
2646971.79
2646950.25
2646913.34
2646847.59
2646705.71
2646627.25
2646312.16
2646312.16
2646371.36
2646404.48
2646438.42
2646760.95
2646857.75
2646976.62
2647046.53
2647174.95
2647187.57
2647170.79
2647173.41
2647182.80
2647173.79
2647097.97
2647105.74
2647356.26
2647341.20
2647196.80
2647276.82
2647333.78
2647929.24
2648069.68
2648181.50
2648371.00
2648454.57
2648584.30
2648660.28
2648687.85
2648678.97
2648573.01
2648574.29
2648510.72
2648485.98
2648552.69
2648549.37
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D I S
T R
I C
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
-D A
N G
M G
A D
D A
D D
P H
I L A
D E
L P
H I A
-W
B U
B
C O
N S
T R
U C
T I O
N
C
O N
T R
B
L E
S d w g
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
C O
N S
T R
U C
T I O
N
C
O N
T R
B
L E
S
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
E
D G
D W
M
D Y
B E
R R
Y
C
R E
E K
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
C-003
PHILADELPHIA
14+69.39
0+00
1+00
2+00
3+00
4+00
9+00
10+00
11+00
12+00
13+00
14+00
LIMITS OF 1970'S
GROUTING
(SEE DETAIL 1/C-301)
UPSTREAM
BERM
WETLAND
LIMITS
(TYP)
WETLAND
LIMIT (TYP)
WETLAND
LIMIT
DOWNSTREAM
BERM
EXISTING
DAM
RIPRAP
LIMIT OF TOP
OF DAM (TYP)
EXISTING
DAM
RIPRAP
USGS GAGE SHED
(TO BE REMOVED)
EXISTING
CONCRETE
WEIR
EXIST.
GROUT
WASHOUT
EXIST. BOOM
ANCHOR PAD
(TO REMAIN)
℄ CREST OF DAM
D
H A
N C
O C
K H
W Y
. 1
D
Y B
E R
R
Y
C
R
E E
K
D
Y
B
E
R
E
E
K
S
P
I L
L
W
A
Y
D
C
E
A
D
EXISTING CONCRETE
CONDUIT THROUGH DAM
C
O
N
T
R
A
C
T
C
E
S
S
E
X
I S
T
I
A
V
A
D
CONTRACTOR ACCESS
(EXISTING GRAVEL ROAD)
CONTRACTOR ACCESS (EXISTING PAVED ROAD, POOR CONDITION)
M
I
L
L
S H
E E
T
C
118119
D
ES102
CONTRACTOR ACCESS
(EXISTING GRAVEL ROAD)
CONTRACTOR ACCESS (EXISTING
PAVED ROAD, FAIR CONDITION)
CONTRACTOR
WORK LIMIT (TYP)
GATE
GATE
C O
N T
R A
C T
C
E S
S
E
X I S
T I N
G
G
R A
V E
L
R
O A
D
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D I S
T R
I C
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
D A
N G
M G
A D
D A
D D
P H
I L A
D E
L P
H I A
-W
B U
B
G E
N E
R A
L
P
L A
N d w g
G E
N E
R A
L
P
L A
N
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
E
D G
D W
M
D Y
B E
R R
Y
C
R E
E K
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
C-101
PHILADELPHIA
GENERAL PLAN
GENERAL PLAN
NORTH
PLAN
NOTES:
1. FOR GENERAL INFORMATION SEE SHEET C-001.
2. FOR SURVEY AND CONSTRUCTIONS POINT LOCATIONS SEE SHEET C-002 AND C-003.
3. ACCESS TO THE SITE IS OFF OF MILLER DRIVE, A PAVED STATE ROUTE. THE UPPER AND LOWER
ACCESS ROADS ARE GATED. THE UPPER ACCESS ROAD IS GRAVEL. THE LOWER ACCESS ROAD IS
ASPHALT-PAVED. THE SECTION OF THE LOWER ACCESS ROAD THAT IS INDICATED AS POOR
CONDITION SHALL BE MAINTAINED PER SPEC SECTION 31 00 00 AS IF IT IS UNPAVED (I.E. GRAVEL), WHILE THE SECTION THAT IS INDICATED AS FAIR CONDITION SHALL BE MAINTAINED AS SPECIFIED
FOR PAVED AREAS.
ORIGINAL DIVERSION CHANNEL
(BURIED) SEE NOTE 1
LIMITS OF 1970'S GROUTING
(SEE DETAIL 1/C-301)
UPSTREAM BERM
WETLAND
LIMIT (TYP)
WETLAND
LIMIT
DOWNSTREAM
BERM
EXISTING DAM RIPRAP
LIMIT OF TOP
OF DAM (TYP)
EXISTING DAM RIPRAP
USGS GAGE SHED
(TO BE REMOVED)
E
X
I S
T
I
N
C
R
E
I R
EXIST. GROUT
WASHOUT
EXIST. BOOM
ANCHOR PAD
(TO REMAIN)
ORIGINAL DIVERSION
CHANNEL ROCK BERM
(BURIED) SEE NOTE 1
℄ CREST OF DAM
D
Y
B
E
R
E
E
K
S
P
I L
L
W
A
Y
EXISTING CONCRETE
CONDUIT THROUGH DAM
C
O
N
T
R
A
C
T
C
E
X
I
S
T
I
A
V
A
D
C
O
N
T
R
A
C
T
C
E
X
I S
T
I
A
V
A
D
EXISTING USGS
PIPE OUTLET
(TO REMAIN)
EXISTING USGS
PIPE OUTLET
(TO REMAIN)
EXIST. USGS
PIPE OUTLET
(TO REMAIN)
118119
126127
D
CONTRACTOR
WORK LIMIT
(TYP)
LIMIT OF
DISTURBANCE
(TYP)
C
O
N
T
R
A
C
T
C
E
X
I S
T
I
A
V
A
D
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D I S
T R
I C
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
D A
N G
M G
A D
D A
D D
P H
I L A
D E
L P
H I A
-W
B U
B
E X
I S
T I N
G
C
O N
D I T
I O
N S d w g
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
E X
I S
T I N
G
C
O N
D I T
I O
N S
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
E
D G
D W
M
D Y
B E
R R
Y
C
R E
E K
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
C-102
PHILADELPHIA
EXISTING CONDITIONS PLAN
EXISTING CONDITIONS PLAN
NORTH
PLAN
C-301
NORTH
PLAN
NOTES:
1. EXTENT AND LOCATION OF ORIGINAL DIVERSION CHANNEL AND ROCK BERM IS APPROXIMATE. IT IS UNKNOWN IF THE ORIGINAL
DIVERSION CHANNEL AND ROCK BERM WAS COMPLETELY REMOVED OR BURIED IN PLACE. FOR BIDDING PUPOSES, ASSUME
THAT THE ROCK BERM WILL NOT BE ENCOUNTERED ON THE UPSTREAM BERM. THE ORIGINAL CHANNEL MAY BE ENCOUNTERED
AT THE NORTHERN EDGE OF THE BERM. EXCAVATION AT THIS LOCATION IS TO BE CATEGORIZED AS "COMMON EXCAVATION"
AS DEFINED IN THE SPECIFICATIONS.
M
E
A
R
A
N
C
E
M
E
A
R
A
N
C
E
23'
23'
100'
LIMITS OF 1970'S GROUTING
(SEE DETAIL 1/C-301)
UPSTREAM BERM
WETLAND
LIMIT (TYP)
WETLAND
LIMIT
DOWNSTREAM
BERM
EXISTING DAM RIPRAP
LIMIT OF TOP
OF DAM (TYP)
EXISTING DAM RIPRAP
USGS GAGE SHED
(TO BE REMOVED)
E
X
I S
T
I
N
C
R
E
I R
EXIST. GROUT
WASHOUT
EXIST. BOOM
ANCHOR PAD
(TO REMAIN)
℄ CREST OF DAM
D
Y
B
E
R
E
E
K
S
P
I L
L
W
A
Y
EXISTING CONCRETE
CONDUIT THROUGH DAM
LIMIT OF RIPRAP
REPLACEMENT
C
O
N
T
R
A
C
T
C
E
X
I
S
T
I
A
V
A
D
UP STREAM STAGING/
STOCKPILING AREA
STAGING AREA
MOVABLE
EQUIPMENT
ONLY
C
O
N
T
R
A
C
T
C
E
X
I S
T
I
A
V
A
D
T E
M P
O R
A R
Y H
A U
L R
O A
D
UPSTREAM EDGE
OF LINER SYSTEM
APPROX. LIMITS OF
TEMPORARY STREAM
CROSSING
STAGING AREA
FOR FACILITIES
DOWN STREAM STAGING/ STOCKPILING AREA/ EXCESS MATERIAL DISPOSAL AREA
SIDE ANCHOR
TRENCH (TYP)
UPSTREAM
BERM ANCHOR
TRENCH (TYP)
TRANSITION HIGHLY
TEXTURED GM TO
TEXTURED GM
LIMIT OF LINER
EXIT DRAIN
15'
LIMIT OF
GEOGRID
CONC. ANCHOR TRENCH
SUBGRADE
SLOPE
BREAK
EXISTING USGS
PIPE OUTLET
(TO REMAIN)
EXISTING USGS
PIPE OUTLET
(TO REMAIN)
EXIST. USGS
PIPE OUTLET
(TO REMAIN)
118119
126127
D
CONTRACTOR
WORK LIMIT
(TYP)
STAGING AREA
LIMIT (TYP)
LIMIT OF
DISTURBANCE
(TYP)
EDGE OF LINER
SYSTEM (TYP)
EDGE OF LINER
SYSTEM (TYP)
C
O
N
T
R
A
C
T
C
E
X
I S
T
I
A
V
A
D
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D I S
T R
I C
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
D A
N G
M G
A D
D A
D D
P H
I L A
D E
L P
H I A
-W
B U
B
C
D
I F
I C
A T
I O
N
P
L A
N d w g
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
M O
D I F
I C
A T
I O
N
P
L A
N
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
E
D G
D W
M
D Y
B E
R R
Y
C
R E
E K
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
C-103
PHILADELPHIA
UPSTREAM DAM MODIFICATION PLAN
UPSTREAM DAM MODIFICATION PLAN
NORTH
PLAN
NOTES:
1. SEE SPECIFICATIONS FOR TEMPORARY STREAM CROSSING REQUIREMENTS.
2. SEE SPECIFICATIONS FOR USGS GAGE SHED AND PIPE, SEE DETAIL 3/C-502
3. SEE SHEET C-003 AND SECTION 2/C-301 FOR LINER LOCATION COORDINATES AND ELEVATIONS.
NORTH
PLAN
C-301
C-302
C-302
C-302
C-302
C-302
LIMITS OF 1970'S GROUTING
(SEE DETAIL 1/C-301)
EXISTING
DAM RIPRAP
EXISTING DAM RIPRAP
USGS GAGE SHED
(TO BE REMOVED)
EXIST.
GROUT
WASHOUT
LIMIT OF RIPRAP REPLACEMENT
T E
M P
O R
A R
Y H
A U
L R
O A
D
SIDE ANCHOR TRENCH (TYP)
LIMIT OF GEOGRID
CONC.
ANCHOR
TRENCH
SUBGRADE SLOPE BREAK
EDGE OF LINER SYSTEM (TYP)
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D I S
T R
I C
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
D A
N G
M G
A D
D A
D D
P H
I L A
D E
L P
H I A
-W
B U
B
P I E
Z O
M E
T E
R
P
L A
N d w g
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
C R
E S
T
P
I E
Z O
M E
T E
R
P
L A
N
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
E
D G
D W
M
D Y
B E
R R
Y
C
R E
E K
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
C-104
PHILADELPHIA
NORTH
PLAN
CREST - PIEZOMETER PLAN
CREST - PIEZOMETER PLAN
C-302
COMPACTED EARTH FILL IS EXCAVATED AND COMPACTED FOR CONCRETE PLACEMENT
2%
EXIST GUIDERAIL
(TYP)
20'
EXIST BOT OF RIPRAP
ELEV. 1011.9
321±
EXIST. BOULDER &
EARTH FILL TRANSITION
ZONE
ARMOR STONE
EXIST. DAM
EMBANKMENT
APPROX 1970
GROUTED
ZONE
EXISTING DOWNSTREAM
ARMOR STONE
DAM
2.5
1.75
70' (APPROX)
EXIST. BOT
OF RIPRAP
EXIST. EARTH FILL
UPSTREAM BERM
EXISTING
EARTH FILL
EMBANKMENT
EXISTING BOULDER &
EARTH FILL TRANSITION
APPROX ORIGINAL GROUND
UPSTREAM
BERM / EXIST
GROUND
EXIST.
RIPRAP
SURFACE
EL. 1047.3
(APPROX)
PMF PEAK POOL EL 1082.2
EXIST. DAM
EMBANKMENT LINE
CREST EL 1081.4
2.5
EXIST. AGG ROAD
SURFACE
TO EXIST.
SUBGRADE
SLOPE BREAK
EXIST. DUMPED
ROCK FILL
STABILITY BERM
APPROX
ORIGINAL
(PRE-DAM)
GROUND
SPILLWAY DESIGN FLOOD EL 1075.9
RESERVOIR DESIGN FLOOD EL 1052.4
EL 990.0
APPROX
WETLAND
LIMIT
EXIST BOT OF RIPRAP
EXIST RIPRAP TOE OF SLOPE
ELEV. 1013.4
(APPROX)
30'
RIPRAP SURFACE
SLOPE BREAK
EL. 1047.7
RIPRAP SURFACE
SLOPE BREAK
EL. 1052.6
EXISTING
EARTH FILL
EMBANKMENT
EXIST RIPRAP TOE OF SLOPE
ELEV. 1004.4
(APPROX)
EXIST HORIZ PIPE
(SEE NOTE 2)
EXIST HORIZ PIPE
(SEE NOTE 2)
EXIST HORIZ PIPE
(SEE NOTE 2)
COMPACTED EARTH FILL IS EXCAVATED AND COMPACTED FOR CONCRETE PLACEMENT
RIPRAP
SURFACE
(PROPOSED)
APPROX 1970
GROUTED
ZONE
2' THICK AASHTO #57
COARSE AGG WITH
GEOGRID IN MIDDLE
SURFACE OF 1' THK
AASHTO #1
COARSE AGG
ANCHOR
TRENCH
TAPERED RIPRAP THICKNESS
(8' THICK AT RIPRAP SURFACE SLOPE BREAK
TO 4.5' THICK AT CREST)
EXISTING DOWNSTREAM
ARMOR STONE
DAM
2.5
70' (APPROX)
EXIST. RIPRAP
SUBGRADE
(1V:1.75H)
EXIST. EARTH FILL
UPSTREAM BERM
EXISTING
EARTH FILL
EMBANKMENT
RIPRAP
SURFACE
SLOPE BREAK
EL. 1047.7
EXISTING BOULDER &
EARTH FILL TRANSITION
APPROX
ORIGINAL
GROUND
UPSTREAM
BERM / EXIST
GROUND
EL. 1052.6
EXIST.
RIPRAP
SURFACE
EL. 1045.5
PMF PEAK POOL EL 1082.2
LINER SYSTEM
EXIST.
EMBANKMENT
LINE
AASHTO #1
COARSE AGG
LINER EXIT DRAIN
TEMPORARY
HAUL ROAD
CREST EL 1081.4
2.5
LINER
SYSTEM
EXIST. AGG ROAD
SURFACE
TO EXIST.
SUBGRADE
SLOPE BREAK
250'
UPSTREAM EDGE GM
FROM EXIST. TOE OF RIPRAP SLOPE
EXIST. DUMPED
ROCK FILL
STABILITY BERM
ANCHOR
TRENCH
APPROX
ORIGINAL
(PRE-DAM)
GROUND
UPSTREAM
EDGE OF LINER
SYSTEM
EXCAV
SUBGRADE
EXIST HORIZ PIPE
(SEE NOTE 2)
EXIST HORIZ PIPE
(SEE NOTE 2)
EXIST HORIZ PIPE
(SEE NOTE 2)
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D I S
T R
I C
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
H O
W N
D A
N G
M G
R A
D R
A D
P H
I L A
D E
L P
H I A
-W
B U
B
T Y
P I C
C
T I O
N S d w g
T Y
P I C
C
T I O
N S
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
E
D G
D W
M
D Y
B E
R R
Y
C
R E
E K
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
C-301
PHILADELPHIA
NOTES:
1. GEOSYNTHETICS OFFSET FOR CLARITY.
2. THREE (3) EXISTING HORIZONTAL PIPES, WHICH DAYLIGHT
FROM THE EXISTING EMBANKMENT AND UPSTREAM BERM
SLOPES IN THE VICINITY OF STA. 4+59, ARE NOT ACTUALLY
LOCATED ALONG TYPICAL SECTIONS 1 & 2, BUT WERE
PROJECTED ONTO THEM TO SHOW THEIR APPROXIMATE
LOCATION ALONG THE EMBANKMENT SLOPE. EACH
HORIZONTAL PIPE HAS NOMINAL DIAMETER OF 4 INCHES
AND IS GALVANIZED STEEL. SEE SHEET C-104, TABLE
ENTITLED "HORIZONTAL PIPES WORK TABLE" FOR MORE
INFORMATION.
C-501
C-501
C-504
C-501
C-501
TYPICAL SECTION - EXISTING CONDITIONS JADWIN DAM
TYPICAL SECTION - EXISTING CONDITIONS JADWIN DAM
TYPICAL SECTION - JADWIN DAM
3'
1.5
400'
EXISTING
RIPRAP
SURFACE
EXIST
RIPRAP
SUBGRADE
RIPRAP
SURFACE
GG
1' THK DGA
FILTER (TYP)
HIGHLY-TEXTURED
GEOMEMBRANE
1' THK, 1-INCH MINUS
SOIL
1' THK, AASHTO #1
COARSE AGG. (TYP)
1' THK, AASHTO #57
COARSE AGG. (TYP)
RIPRAP
(TYP)
GG (TYP)
GT (TYP)
RIPRAP
SUBGRADE (TYP)
EXCAV
SLOPE
1' THK, AASHTO #57
COARSE AGG. (TYP)
2' THK, 1-INCH
MINUS SOIL
EXCAV
SUBGRADE
3'
1.5
EXIST
RIPRAP
SUBGRADE
GG
1' THK DGA
FILTER (TYP)
EXCAV
SLOPE
EXCAV
SUBGRADE
L
O W
O
P E
L
O W
O
P E
L
O W
O
P E
L
O W
O
P E
1V:1H 1V:1H
HIGHLY-TEXTURED
GEOMEMBRANE
2' THK, 1-INCH
MINUS SOIL
1' THK, 1-INCH MINUS
SOIL
L
O W
O
P E
L
O W
O
P E
RIPRAP
(TYP)
EXISTING
RIPRAP
SURFACE
RIPRAP
SURFACE
3'
1.5
400'
TEXTURED
GEOMEMBRANE
1' THK, 1-INCH
MINUS SOIL
4" TOPSOIL
GEOTEXTILE
EXCAV
SLOPE
2.5' THK, 1-INCH
MINUS SOIL
EXCAV
SUBGRADE
1V:1H
EXIST GROUND
(UPSTREAM BERM
SURFACE)
4" TOPSOIL
3'
1.5
EXCAV
SLOPE
1V:1H
EXIST GROUND
(UPSTREAM BERM
SURFACE)
4" TOPSOIL
1' THK, 1-INCH
MINUS SOIL
4" TOPSOIL
GEOTEXTILE
2.5' THK, 1-INCH
MINUS SOIL
TEXTURED
GEOMEMBRANE
EXCAV
SUBGRADE
3'
1.5
400'
HIGHLY-TEXTURED
GEOMEMBRANE
1' THK, 1-INCH
MINUS SOIL
GEOTEXTILE
GEOGRID
1-INCH MINUS SOIL
EXCAV
SUBGRADE
1V:1H
EXIST GROUND
(CREST ACCESS
ROAD SURFACE)
1'-THK DGA
ROAD
SURFACE
AASHTO #57 COARSE
AGG. (TYP)
GEOTEXTILE
EXCAV
SLOPE
1' THK DGA
1-INCH MINUS SOIL
3'
1.5
HIGHLY-TEXTURED
GEOMEMBRANE
1' THK, 1-INCH
MINUS SOIL
GEOTEXTILE
GEOGRID
1-INCH MINUS SOIL
EXCAV
SUBGRADE
1V:1H
EXIST GROUND
(CREST ACCESS
ROAD SURFACE)
1'-THK DGA
ROAD
SURFACE
AASHTO #57 COARSE
AGG. (TYP)
GEOTEXTILE
EXCAV
SLOPE
1' THK DGA
1-INCH MINUS SOIL
EXCAV
SUBGRADE
GEOTEXTILE
6" DIA. NPS, SCH. 80 GALV. METAL PIPE
1-INCH MINUS SOIL
1' THK DGA
400'
10 MAX
EXCAV SLOPE FOR
TEMPORARY HAUL ROAD
CONCRETE ANCHOR TRENCH
EL. 1072.6
EL. 1081.5
1.5
EXIST GROUND
(CREST ACCESS
ROAD SURFACE)
1'-THK DGA
ROAD
SURFACE
GEOTEXTILE
GEOGRID
10 MAX
EXCAV SLOPE FOR
TEMPORARY HAUL ROAD
EL. 1072.6
EL. 1081.5
1.5
EXIST GROUND
(CREST ACCESS
ROAD SURFACE)
1'-THK DGA
ROAD
SURFACE
GEOTEXTILE
GEOMEMBRANE
GEOTEXTILE
EXCAV
SUBGRADE
GEOGRID
PIPE
C/L
EXISTING
4" DIA
HORIZONTAL
STEEL PIPE
(SEE NOTE 13)
8" DIA NPS
HORIZONTAL STEEL
PIPE SLEEVE
EXCAVATION
SUBGRADE AT
TOP OF EXIST
PIPE ALONG C/L
EXCAVATION
SUBGRADE ON
UPSTREAM BERM
10'
5.3'
2%
4" TOPSOIL
GT
GM
1- INCH
MINUS SOIL
3'
EXTRUSION
WELD (TYP)
GM/GT PIPE
BOOT
32'
1' THK
ONE-INCH
MINUS SOIL
PIPE MOUND ZONE
EXIST
GROUND
4" TOPSOIL
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D I S
T R
I C
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
D A
N G
M G
R A
D R
A D
P H
I L A
D E
L P
H I A
-W
B U
B
C
P
I C
C
T I O
N S d w g
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
T Y
P I C
C
T I O
N S
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
E
D G
D W
M
D Y
B E
R R
Y
C
R E
E K
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
C-302
PHILADELPHIA
NOTES:
1. GEOSYNTHETICS ARE OFFSET FOR CLARITY IN ALL SECTIONS.
2. SECTION 1 - METAL PIPE IN ANCHOR TRENCH IS OFFSET FOR CLARITY.
3. SECTIONS 3 & 4 - SECTIONS ARE CUT PERPENDICULAR TO SLOPE SURFACE.
4. SECTION 5 - SECTION IS SYMMETRICAL ABOUT THE EXIST. HORIZONTAL PIPE C/L.
5. SECTION 5 - SEE SHEET C-502/DETAIL 6 FOR DETAIL DRAWN PERPENDICULAR TO SECTION 5.
6. SECTION 5 - VERTICAL DIMENSIONS SHOWN APPLY ONLY TO THE CROSS SECTION'S CUT
LOCATION, BUT VARY LINEARLY ALONG THE 20'-LONG EXPOSED EXISTING PIPE LENGTH AS
SHOWN ON SHEET C-502/DETAIL 6.
7. SECTION 5 - FIELD ADJUST VERTICAL DIMENSIONS SHOWN AS NECESSARY AND APPROVED TO
ADJUST TO ACTUAL DEPTH AND LOCATION OF EXISTING HORIZONTAL PIPE ON THE UPSTREAM
BERM.
TYPICAL SECTION - UPSTREAM SLOPE SIDE ANCHOR TRENCHES
TYPICAL SECTION - UPSTREAM SLOPE SIDE ANCHOR TRENCHES
TYPICAL SECTION - UPSTREAM BERM SIDE ANCHOR TRENCHES
TYPICAL SECTION - CREST SIDE ANCHOR TRENCHES
TYPICAL SECTION - CREST HAUL ROAD OVER CONCRETE ANCHOR TRENCH
TYPICAL SECTION - CREST HAUL ROAD OVER CONCRETE ANCHOR TRENCH
TYPICAL SECTION - UPSTREAM BERM HORIZONTAL PIPE
EXIST. BOT
OF RIPRAP
(SAME AS
GG LEVEL;
SEE NOTE 6)
GEOTEXTILE
HIGHLY-TEXTURED
GEOMEMBRANE
1' THICK 1-INCH MINUS SOIL
SURFACE OF 2' THK
AASHTO #57 COARSE
AGG WITH GEOGRID IN
MIDDLE
EXCAVATION
SUBGRADE
(~ 2' BELOW EXIST BOT RIPRAP)
SURFACE OF 1' THK
AASHTO #1
COARSE AGG
P
R
O
P
RIPRAP
SURFACE
SLOPE BREAK
~ EL. 1047.7
E
X
I S
T
RIPRAP
SURFACE
EXIST. RIPRAP
SURFACE
GEOGRID
EXCAVATION
SUBGRADE SLOPE
BREAK @ EL. 1045.5
(APPROX 70' FROM DAM
CREST C/L)
P
R
O
P
P
R
O
P
10'
1' THK DGA
ROAD SURFACE
1' THK AASHTO #1
COARSE AGG (PLACE
UPPER POLYGON AFTER
RIPRAP; CHOKE AT ROAD
SURFACE WITH DGA)
1' THK #57 AGG
EXCAVATION SUBGRADE
HIGHLY-TEXTURED GM
DAM
C/L
2%
EXIST
BOULDER &
EARTH FILL
TRANSITION
(SEE NOTE 4)
1-INCH MINUS
SOIL
GEOGRID
GEOTEXTILE
1' THK 1-INCH MINUS SOIL
#57 AGG
EXISTING GUIDERAIL (TYP)
(SEE NOTE 2)
2%
RIPRAP CREST
EL. 1081.4
0%
2%
EXIST. BOT
OF RIPRAP
(SEE NOTE 6)
10'
0%
20'
TEMPORARY HAUL ROAD
(SEE NOTE 3)
2%
CREST
EL 1081.4
EXIST ARMOR STONE
(SEE NOTE 4)
1'
EXCAV
SUBGRADE
(6' BELOW
EXIST ROAD)
2.5'
DAM
C/L
2'
1"
MINUS
SOIL
1"
MINUS
SOIL
EXCAV SUBGRADE
(6' BELOW EXIST ROAD)
GEOTEXTILE
CONCRETE
ANCHOR TRENCH
(SEE SHT. C-503, DTL. 2)
SEE
NOTE 5
GT
N
O
R
I
P
R
A
P
AASHTO #57 AGG SURFACE
COMPACTED EARTH FILL IS EXCAVATED AND COMPACTED FOR CONCRETE PLACEMENT
HIGHLY-TEXTURED
GEOMEMBRANE
SURFACE OF 1'-THK
AASHTO #1 COARSE AGG
SURFACE OF 1'-THK
AASHTO #57 COARSE
AGG W/ GEOGRID IN
MIDDLE
EXIST BOT
OF RIPRAP
(SEE NOTE 6)
EXCAV
SUBGRADE
(2' BELOW
EXIST BOT OF
RIPRAP )
GEOGRID
1'-THK 1-INCH
MINUS SOIL
RIPRAP
SURFACE
EXIST
RIPRAP TOE
OF SLOPE
ELEV. 1013.4
(APPROX)
SUBGRADE SLOPE BREAK
EL. 1009.4
(~ 4' BELOW EXIST GROUND
SURFACE @ EXIST RIPRAP
TOE OF SLOPE)
EXIST.
RIPRAP
SURFACE
4" TOPSOIL
1'-THK AASHTO #1
COARSE AGG
LINER EXIT DRAIN
1'-THK AASHTO #57
COARSE AGG
1' THICK
1-INCH
MINUS SOIL
2%
FROM SLOPE
BREAK
1' THICK
1-INCH
MINUS SOIL
HIGHLY-TEXTURED
GEOMEMBRANE
EXIST EMBANKMENT LINE
EXIST GROUND
(TOP OF
UPSTREAM BERM)
EXCAV
SUBGRADE
(4' BELOW
EXIST GROUND)
EXIST
GROUND
SURFACE
GT
1-INCH
MINUS SOIL
2%
10%
SURFACE OF 1-INCH
MINUS SOIL ABOVE
GEOMEMBRANE
10%
25'
H
IG
H L Y
-T E
X T
U R
E D
G M
250' FROM EXIST RIPRAP TOE TO NORTH LINER EXTENT
ORIGINAL
GROUND BEFORE
DAM (APPROX)
EXIST. BASE
OF DAM
EMBANKMENT
GT
T E
X T
U R
E D
G M
H
IG
H L Y
-T E
X T
U R
E D
G M
F
R O
M E
X
IS
T R
IP
R
A P
T O
E O
F S
L O
P E
(M E
A S
U R
E D
A L O
N G
S L O
P E
G T
U N
D E
R G
M
SUBGRADE SLOPE BREAK
EL. 1009.9
(~ 2' BELOW EXIST BOTTOM
OF RIPRAP)
UPSTREAM BERM UPSTREAM SLOPE
EXIST USGS HORIZ
PIPE INVERT
EL. 1018.8
(SEE SHEET
C-502/DETAIL 2)
GT
EXIST USGS
HORIZ PIPE
ELEV. 979.4
UPSTREAM
ANCHOR
TRENCH
1.5
1-INCH
MINUS SOIL
4" TOPSOIL
TEXTURED
GM
EXIST GROUND
(TOP OF
UPSTREAM BERM)
EXIST/PROP
GROUND
1-INCH MINUS
SOIL
10%
10%
ORIGINAL
GROUND BEFORE
DAM (APPROX)
250' TO EXIST RIPRAP TOE
3'
GT
EXCAV
SUBGRADE
EL. 980.4
EL. 987.1
EL. 984.8
EL. 985.8
1' THICK
1-INCH
MINUS SOIL
EXIST USGS
HORIZ PIPE
EXIST USGS PIPE
(SEE NOTE 8 & SHEET
C-502/DETAIL 6)
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D I S
T R
I C
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
O
W N
D A
N G
M G
R A
D R
A D
P H
I L A
D E
L P
H I A
-W
B U
B
D E
T A
I L
S d w g
D E
T A
I L
S
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
E
D G
D W
M
D Y
B E
R R
Y
C
R E
E K
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
C-501
PHILADELPHIA
NOTES:
1. GEOTEXTILE IS OFFSET FOR CLARITY. GEOMBRANE IS OFFSET IN ANCHOR TRENCHES FOR CLARITY.
2. REMOVE AND REINSTALL THE EXISTING GUIDERAIL AND POSTS, AS REQUIRED. SEE SPECIFICATIONS.
3. ONCE THE TEMPORARY HAUL ROAD IS EXCAVATED TO GRADE, THE CONTRACTOR MAY ADD SUPPLEMENTAL
AGGREGATES AND GEOTEXTILE AND/OR GEOGRID TO THE EXCAVATION SUBGRADE TO MAKE IT MORE DRIVABLE AND
TO REDUCE ROAD MAINTENANCE DURING CONSTRUCTION. SUCH SUPPLEMENTAL MATERIALS WILL BE AT NO
ADDITIONAL COST TO THE GOVERNMENT. PRIOR TO RESTORING THE EMBANKMENT BACK TO ITS ORIGINAL
GEOMETRY, ANY SUPPLEMENTAL MATERIALS INSTALLED FOR THE TEMPORARY HAUL ROAD MUST BE REMOVED.
4. ONCE THE TEMPORARY HAUL ROAD IS NO LONGER NEEDED TO PERFORM THE CONTRACT WORK, EXISTING BOULDER
AND EARTH FILL TRANSITION MATERIAL AND EXISTING ARMOR STONE ON THE DOWN STREAM FACE SHALL BE
REPLACED IN KIND TO THEIR ORIGINAL CONFIGURATION AS SHOWN.
5. SEE SHEET C-503, DETAIL 2 FOR DETAILS OF TEMPORARY, ONE-INCH MINUS SOIL LEVEL, WHICH NEEDS TO BE IN
PLACE BEFORE PLACING AASHTO #57 STONE OVER THE GEOTEXTILE ON THE UPSTREAM EMBANKMENT SLOPE.
6. A FINER ROCK FILTER MAY EXIST BETWEEN THE EXISTING BOTTOM OF RIPRAP AND THE UNDERLYING SOIL
SUBGRADE. IF A FINER ROCK FILTER DOES EXIST, IT WILL LIKELY BE ABOUT 1' TO 3'-THICK AND WILL OVERLIE THE
EXISTING BOTTOM OF RIPRAP LINE SHOWN. SINCE THE EXISTENCE OF THIS FINER ROCK FILTER IS UNKNOWN, IT IS
NOT SHOWN. EXISTING RIPRAP AND ROCK FILTER MATERIAL (IF IT EXISTS) SHALL BE SEGREGATED DURING
EXCAVATION AND STOCKPILED SEPARATELY. IF THE ROCK FILTER DOES EXIST, DO NOT REINSTALL THE ROCK FILTER
MATERIAL INTO THE PROPOSED LINER SYSTEM; RATHER, DISPOSE OF IT ONSITE.
7. RIPRAP THICKNESS SHALL BE 4.5'-THICK AT CREST (DETAIL 4, THIS SHEET), LINEARLY INCREASE TO 9.7'-THICK AT
MIDSLOPE ABOVE THE SUBGRADE SLOPE BREAK (DETAIL 3, THIS SHEET), AND THEN TAPER TO A CONSTANT 8'
THICKNESS ON THE LOWER 1V:3H SLOPE (DETAIL 2 & 3, THIS SHEET). FOR FULL EMBANKMENT SLOPE VIEW, SEE
SHEET C-301, SECTION 2.
8. ON DETAIL 1, THE EXISTING USGS HORIZONTAL PIPE HAS BEEN PROJECTED ONTO THIS DETAIL TO PROVIDE A
GENERAL IDEA OF WHERE THIS PIPE DAYLIGHTS ON THE UPSTREAM BERM IN THE VICINITY OF THE UPSTREAM BERM
ANCHOR TRENCH. HOWEVER, THE LINER DETAIL SHOWN ON DETAIL 1 DOES NOT REPRESENT THE REQUIRED PIPE
PENETRATION DETAIL AT THIS LOCATION. FOR THE REQUIRED PIPE PENETRATION DETAIL AT THIS LOCATION, REFER
TO SHEET C-502/DETAIL 6.
DETAIL - MIDSLOPE
DETAIL - MIDSLOPE
DETAIL - TOE OF DAM
DETAIL - TOE OF DAM
DETAIL - CREST OF DAM
DETAIL - CREST OF DAM
C-503
C-503
DETAIL - UPSTREAM BERM ANCHOR TRENCH
DETAIL - UPSTREAM BERM ANCHOR TRENCH
PIPE RISER (PIEZOMETER
OR SETTLEMENT PIPE)
M
I N
B
O
T
H
E I G
H T
HIGHLY-TEXTURED
GEOMEMBRANE (TYP)
EXTRUSION WELD (TYP)
NON-TEXTURED
GEOMEMBRANE
BOOT (TYP)
STAINLESS STEEL BANDING, 0.75-IN. WIDE,
WITH 1/4-IN. EPDM RUBBER GASKETS ON
BOTH SIDES OF GEOMEMBRANE BOOT
(TYP)
COMPACTED
1-INCH MINUS SOIL
6"
MIN.
1' THK, AASHTO
#57 COARSE
AGG. (TYP)6"
MIN.
GEOTEXTILE
BOOT (TYP)
M
I N
PLASTIC ZIP TIE OR SS BANDING
GEOGRID
(TYP)
GEOTEXTILE
(TYP)
M
I N
E P
D M
G T
1' THK, AASHTO
#57 COARSE
AGG. (TYP)
4"
MIN.
REINFORCED
CONCRETE COLLAR
FOOTING
6.5'
53-INCH DIA. #5 DEFORMED REBAR
HOOP, EPOXY-COATED
EXIST. 42-INCH DIA.
GALV. CMP
#5 DEFORMED REBAR,
EPOXY-COATED,
6" O.C. GRID
6.5' X 6.5' REINFORCED
CONCRETE COLLAR
FOOTING
54-INCH O.D. EPOXY-COATED
PROTECTIVE STEEL PIPE CASING,
3/4-INCH THK WALL (TYP)
(SEE NOTE 2 & NOTE 3)
NON-SHRINK
GROUT (TYP)
(SEE NOTE 8)
EXIST. 42-INCH DIA.
GALV. CMP (TYP)
(SEE NOTE 2)
#5 DEFORMED REBAR,
EPOXY-COATED (TYP),
ON 6 X 6 GRID (2 LAYERS)
C
L R
3/4" THK STEEL STIFFENER FIN
(TYP - FACTORY-WELDED ON 4 PIPE
QUADRANTS AND TO BASE PLATE)
3/4" X 8.5" GALV. ANCHOR BOLT
(TYP), 6" EMBEDMENT
(SEE NOTE 14)
C
L R
3" CLR
R
SECTION A
T
Y P
53-INCH DIA. #5 DEFORMED REBAR
HOOP, EPOXY-COATED
5.5' X 5.5' STEEL BASE
PLATE W/ 52.5" DIA. HOLE
IN MIDDLE, 3/4"-THK,
FACTORY-WELDED TO
PIPE TOP AND BOTTOM
9/16"
BASE PLATE AND PIPE PLAN
54-INCH O.D. EPOXY-COATED
PROTECTIVE STEEL PIPE
CASING, 3/4-INCH THK WALL
(TYP)
EXIST. 42-INCH DIA.
GALV. CMP (TYP)
3/4" THK STEEL STIFFENER FIN,
FACTORY-WELDED ON 4 PIPE
QUADRANTS AND TO TOP &
BOTTOM BASE PLATES (TYP)
5.5' X 5.5' STEEL BASE
PLATE W/ 52.5" DIA. HOLE
IN MIDDLE, 3/4"-THK,
FACTORY-WELDED TO
PIPE TOP AND BOTTOM
6.5' X 6.5' REINFORCED
CONCRETE COLLAR
FOOTING
A
REBAR PLAN
6.5'
1" DIA. HOLE
IN TOP & BOT BASE PLATES
(TYP)
3"
1' THK
DGA ROAD
SURFACE
1' THK AASHTO #1 AGG
1' THK
#57 AGG
LINER
EXCAV.
SUBGRADE
GG
GT
1' THK
1-INCH
MINUS SOIL
#57 AGG
EXIST. BOT
OF RIPRAP
1" MINUS
SOIL
1' THK
1-INCH
MINUS
SOIL
GT
PIPE
C/L
PIPE C/L
EXIST. 8" THK. REINF.
CONC. SLAB TO REMOVE
(SEE DTL. 4
THIS SHEET)
EXIST. 42-INCH I.D.
GALV. CMP (43.25" O.D.)
EXCAVATION SUBGRADE TO INSTALL
COLLAR FTG. (SEE NOTE 7)
54-INCH O.D.
EPOXY-COATED PROT.
STEEL PIPE CASING,
3/4" THK WALL, 17 LF
1.5
1V:1.5H
EXIST. GUIDE
RAIL
1-INCH
MINUS SOIL
BACKFILL
1' THK REINF. CONC.
COLLAR FOOTING
(SEE DETAIL 5
THIS SHEET)
EXIST.
RIPRAP
SURFACE
FTG. SUBGRADE
EL. 1062.2
7' X 7' REMOVABLE PRECAST
REINF. CONC. SLAB, 6" THK,
AASHTO H-10 RATING
(SEE SHEET C-505, DETAIL 2)
EXIST. USGS GAUGE SHED
TO REMOVE (SEE NOTES 3 TO 6)
(SEE NOTE 11)
GEOGRID
SPREADER PIPE
(SEE NOTE 12)
GM
1-INCH
MINUS SOIL
BACKFILL
GT
1V:1H (FOR FIRST 3' IN HEIGHT)
1.5'
RIPRAP
23.6' +/- 0.2'
(SEE NOTE 12)
2.5
DAM C/L
WELL CASING
BY OTHERS
RESET WALKWAY
& STEPS
0.75-INCH WIDE
STAINLESS STEEL
BAND CLAMPS WITH
EPDM GASKET ON
BOTH SIDES OF GM
PIPE BOOT
1/4-INCH THK
EPDM GASKET
HIGHLY- TEXTURED
GEOMEMBRANE
EXTRUSION
WELD
N
NON-TEXTURED
GEOMEMBRANE
BOOT, 16" MIN HT.
N
GEOTEXTILE
BOOT
(SEE NOTE 9)
EXISTING
42-IN. I.D. CMP
(SEE NOTE 2)
54-IN. O.D. EPOXY-COATED
PROTECTIVE STEEL PIPE
CASING, 3/4-INCH THK WALL
(SEE NOTES 2 & 3)
MAIN
GEOTEXTILE
GEOGRID
NON-SHRINK GROUT
(SEE NOTE 8)
K
S
H
C
O
A
R
G
1' THK, AASHTO
#57 COARSE
AGG. (TYP)
S
K
I
N
C
H
M
I
N
I
L
4.5"
(APPROX)
EXCAV
SUBGRADE
0.75-INCH WIDE
SS BAND CLAMP
N
STAINLESS STEEL BANDING
WITH EPDM GASKETS
(SEE SHEET C-502/DETAIL 1)
EXTRUSION
WELD (TYP)
CONNECTS TO EXIST.
USGS 42" VERTICAL CMP
EXISTING 4" DIA
HORIZONTAL
STEEL PIPE
(SEE NOTE 13)
GALV. STEEL PIPE
SLEEVE, 8" DIA. NPS,
SCHED. 80; ANNULUS
FILLED WITH
NON-SHRINK GROUT
20'8.4'
8.4'
2'
3'
1'
2'
GM/GT
PIPE BOOT
1V:10H
EXCAV
SUBGRADE
1V:10H
EXCAV
SUBGRADE
1V:10H
EXIST/PROPOSED
GROUND
4" TOPSOIL
I N
M
IN
U
S
S O
IL
GT
EXCAVATION
SUBGRADE AT
TOP OF PIPE
GM
EXIST
DEBRIS
SCREEN
1 IN. MINUS
SOIL
1' THK
ONE-INCH
MINUS SOIL
I N
M
IN
U
S
S O
IL
GRADE PARALLELS EXIST. PIPE
GM/GT
PIPE BOOT
STAINLESS STEEL BANDING
WITH EPDM GASKETS
(SEE SHEET C-502/DETAIL 1)
EXTRUSION
WELD (TYP)
CONNECTS TO EXIST.
USGS 42" DIA.
VERTICAL CMP
I N
EXISTING 4" DIA
HORIZONTAL
STEEL PIPE
(SEE NOTE 13)
GT
GM
A
A
S
H
C
O
A
R
N
U
S
S
O
I L
EXCAVATION
SUBGRADE
GG
A
A
S
H
C
O
A
R
G
RIPRAP
SURFACE 2
GALV. STEEL PIPE
SLEEVE, 8" DIAM.
NPS, SCHED. 80;
ANNULUS FILLED
WITH NON-SHRINK
GROUT
3' MIN.
GG
EXIST
DEBRIS
SCREEN
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D I S
T R
I C
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
O
W N
D A
N G
M G
R A
D R
A D
P H
I L A
D E
L P
H I A
-W
B U
B
C
T
A I L
S d w g
D E
T A
I L
S
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
E
D G
D W
M
D Y
B E
R R
Y
C
R E
E K
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
C-502
PHILADELPHIA
NTS
DETAIL - TYPICAL PIPE PENETRATION
DETAIL - TYPICAL PIPE PENETRATION
4. ALL EXISTING INSTRUMENTATION & UTILITIES IN AND ON USGS GAUGE SHED WILL BE REMOVED BY OTHERS PRIOR TO SHED DEMO.
5. REMOVE EXISTING HANDRAILS, PLATFORM (A.K.A., WALKWAY), STEPS, AND ANCILLARY FEATURES RELATED TO THE USGS SHED
PRIOR TO COMMENCING USGS SHED DEMOLITION ACTIVITIES. THESE FEATURES SHALL BE REINSTALLED AFTER RIPRAP PLACEMENT
AROUND THE USGS SHED, UNLESS OTHERWISE APPROVED OR DIRECTED. ANY REQUIRED MODIFICATIONS TO EXISTING HANDRAILS, PLATFORM, STEPS, AND ANCILLARY FEATURES SHALL BE PERFORMED AS NECESSARY AND APPROVED TO PROPERLY REINSTALL TO
THE USGS SHED'S NEW PRECAST CONCRETE SLAB AS SHOWN.
6. REMOVE THE EXISTING, USGS SHED DOWN TO THE TOP EDGE OF THE EXISTING, 42-INCH DIAMETER CORRUGATED METAL PIPE (CMP)
AS SHOWN AND SPECIFIED IN SECTION 02 41 00 DEMOLITION. USGS SHED REMOVAL SHALL OCCUR PRIOR TO REMOVAL OF EXISTING
RIPRAP AROUND THE SHED (I.E., RIPRAP WITHIN A 30-FOOT RADIUS OF THE SHED'S CENTER). CAREFULLY REMOVE USGS SHED IN A
WAY THAT DOES NOT DAMAGE THE EXISTING, 42-INCH DIAMETER CMP IN ANY WAY. REMOVAL WORK SHALL ALSO INCLUDE CAREFUL
REMOVAL OF EXISTING METAL PIPE FLANGES & BRACKETS ATTACHED TO THE EXISTING, 42-INCH DIAMETER CMP, AND CAREFUL
REMOVAL OF THE EXISTING, 8-INCH THICK REINFORCED CONCRETE SLAB THAT SUPPORTS THE USGS SHED'S CONCRETE MASONRY
UNIT (CMU) WALLS.
7. EXCAVATE TO STABLE SLOPE TO INSTALL PROTECTIVE STEEL PIPE CASING AND PIPE FOOTING, OR USE APPROVED SHORING FOR
VERTICAL CUT. BACKFILL AND COMPACT EXCAVATED AREA FOR PIPE INSTALL USING 1-INCH MINUS SOIL.
NOTES:
1. GEOTEXTILE IS OFFSET FOR CLARITY. GEOMEMBRANE IS OFFSET FOR CLARITY IN ANCHOR TRENCHES AND ON GEOMEMBRANE
BOOT DETAILS.
2. ANY DAMAGE TO THE FACTORY-APPLIED EPOXY COATING OF THE 54" O.D. PROTECTIVE STEEL PIPE CASING SHALL BE REPAIRED BY
RECOATING WITH EPOXY PAINT AS SPECIFIED AND TO THE APPROVAL OF THE COR.
3. CONTRACTOR SHALL TEMPORARILY CAP/COVER THE EXISTING 42" CMP BEFORE COMMENCING DEMOLITION ACTIVITIES TO ENSURE
THAT NO DEBRIS FALLS DOWN THE PIPE. CAP/COVER SHALL BE RIGID AND OF SUFFICIENT STRENGTH TO WITHSTAND ANY FALLING
DEMOLITION DEBRIS.
8. ANNULAR SPACE SHALL BE GROUTED USING NON-SHRINK GROUT AS SHOWN AND SPECIFIED IN SPEC. SECTION 03 30 53
MISCELLANEOUS CAST-IN-PLACE CONCRETE.
9. ON DETAIL 4, THE VERTICAL EXTENT OF GEOTEXTILE BOOT SHALL EXTEND 6" ABOVE TOP EDGE OF GEOMEMBRANE BOOT.
GEOTEXTILE BOOT ON SLOPE SHALL OVERLAP MAIN GEOTEXTILE BOOT BY A MINIMUM OF 12 INCHES AS SHOWN.
10. ON DETAIL 4, BASE OF THE FIELD-FABRICATED GEOMEMBRANE BOOT FOR ATTACHING TO PROTECTIVE STEEL PIPE CASING SHALL
EXTEND A MINIMUM OF 12-INCHES BEYOND THE PIPE CASING AS SHOWN. CONSIDERING THAT THE PIPE BOOT WILL BE ON A 1V:2H
SLOPE, THE BOOT'S BASE WILL NEED TO HAVE AN ELLIPTICAL OPENING HAVING THE FOLLOWING DIMENSIONS: IN THE NORTH-SOUTH
DIRECTION, THE INSIDE EDGE OF THE ELLIPSE SHALL BE 60.5 TO 61.5 INCHES AND THE OUTSIDE EDGE SHALL BE AT LEAST 84.5
INCHES, UNLESS OTHERWISE APPROVED. IN THE EAST-WEST DIRECTION, THE INSIDE EDGE OF THE ELLIPSE SHALL BE 54.5 TO 55.5
INCHES AND THE OUTSIDE EDGE SHALL BE AT LEAST 78.5 INCHES, UNLESS OTHERWISE APPROVED.
11. ON DETAIL 4, THE LINER CONNECTION DETAIL SHOWN IS ALONG THE SOUTH SIDE OF THE USGS GAUGE STATION. THE CONNECTION
DETAIL ON THE NORTH SIDE OF THE USGS STATION IS THE SAME, EXCEPT THAT THE GEOMEMBRANE BOOT HEIGHT SHALL BE ABOUT
43 INCHES AND THE GEOTEXTILE BOOT HEIGHT SHALL BE ABOUT 49 INCHES. IN BETWEEN THE NORTH AND SOUTH SIDES, THE BOOT
HEIGHTS SHALL VARY BETWEEN THESE NORTH AND SOUTH SIDE BOOT HEIGHTS. THE UPPER EDGE OF THE GEOMEMBRANE AND
GEOTEXTILE BOOTS SHALL BE HORIZONTAL, WHILE THE LOWER EDGE SHALL BE FLUSH WITH THE 1V:2H SLOPE.
12. GEOGRID SPREADER PIPE SHALL BE GALVANIZED STEEL PIPE, 6" DIA. NPS, 3/4" WALL THICKNESS, 14 LF EACH. GEOGRID SPREADER
PIPES SHALL BE INSTALLED AND CONNECTED TO EACH OTHER USING STAINLESS STEEL CABLES OR GALV. THREADED ROD AS
SHOWN ON SHEET C-505, DETAILS 1 & 3 AND SPECIFIED IN SPEC. SECTION 05 12 10 USGS GAUGE SHED MODIFICATIONS. INSTALL
GEOGRID SPREADER PIPES AND CONNECTING CABLES OR THREADED ROD PRIOR TO PLACING ANY AASHTO #57 COARSE AGGREGATE
OVER GEOGRID DOWN-GRADIENT OR UPGRADIENT OF THE USGS GAUGE SHED.
13. EXISTING 4" DIA. HORIZONTAL STEEL PIPES SHALL BE ADEQUATELY SUPPORTED DURING THE CONTRACT WORK TO PREVENT FROM
DAMAGE. PIPE MAY BE TEMPORARILY CUT OFF AND CAPPED TO FACILITATE CONSTRUCTION, BUT MUST BE REINSTALLED BACK TO
ORIGINAL CONDITON. 8" DIA. GALVANIZED STEEL PIPE SLEEVES SHALL BE INSTALLED OVER THE EXISTING HORIZONTAL STEEL PIPES
PRIOR TO BACKFILLING AS SHOWN. USE CENTRALIZERS TO CENTER THE 8" PIPE SLEEVES. CEMENT-BENTONITE GROUT SHALL BE
INJECTED OR TREMIE-GROUTED IN THE PIPE ANNULUS BETWEEN THE 2 PIPES. ANY DAMAGED TO THE EXISTING PIPES SHALL BE
REPAIRED OR REPLACED AS DIRECTED. DAMAGE CAUSED DURING THE CONTRACT WORK SHALL BE REPAIRED OR REPLACED AT NO
ADDITIONAL COST TO THE GOVERNMENT.
14. ON DETAIL 5/SECTION A, THE 3/4" X 8.5" GALV. ANCHOR BOLTS HAVE BEEN PROJECTED ONTO SECTION A TO HIGHLIGHT THE BOLTS, BUT ACTUALLY SHALL BE OFFSET FROM SECTION A BY 2 FEET AS SHOWN ON DETAIL 5/BASE PLATE AND PIPE PLAN. THIS
PROJECTION WAS DONE TO HIGHLIGHT THAT THE 54" O.D. STEEL CASING SHALL BE BOLTED TO THE CONCRETE COLLAR FOOTING.
DETAIL - USGS SHED PIPE FOOTING
DETAIL - USGS GAUGE SHED AND PIPE
NTS
DETAIL - LINER CONNECTION TO USGS SHED PIPE
C-505
DETAIL - UPSTREAM BERM HORIZONTAL PIPE PENETRATIONS
C-302
NTS
DETAIL - UPSTREAM SLOPE HORIZONTAL PIPE
HIGHLY-TEXTURED
GEOMEMBRANE
2%
1 FT THK
1" MINUS SOIL
GT
EXIST BOT
OF RIPRAP
BOTTOM
OF RIPRAP
EXIST
RIPRAP
SURFACE
RIPRAP SURFACE
EXIST
RIPRAP TOE
OF SLOPE
ELEV. 1013.4
(APPROX)
RIPRAP BENCH
SURFACE OF 1-INCH
MINUS SOIL ABOVE
GEOMEMBRANE
GT
AASHTO #1
COARSE AGG
LINER EXIT DRAIN
2%
10%
10%
2%
EXCAVATION SUBGRADE
(~ 4' BELOW EXIST GROUND)
1 FT THK
1" MINUS SOIL
EXCAVATION SUBGRADE SLOPE BREAK AT EL. 1009.4
(LINES UP WITH THE EXIST RIPRAP TOE OF SLOPE;
SEE PLAN VIEW FOR LOCATION)
GM
1 FT THK
AASHTO #1
COARSE AGG
25'
4" TOPSOIL
EXIST
GROUND
SURFACE
10%
10%
2%
1" MINUS SOIL
(THICKNESS VARIES)
EXIST DAM
EMBANKMENT LINE
2%
EL. 1012.3
EL. 1015.5
EL. 1015.5
EL. 1010.8
EL. 1009.9
EL. 1011.1
EL. 1012.1
EL. 1010.1
NOTE: GT OFFSET FOR CLARITY
EL. 1010.4
H
IG
H L Y
-T E
X T
U R
E D
G E
O M
E M
B R
A N
E E
X T
E N
D S
N
O R
T H
F R
O M
H E
R E
2' OVERLAP
GT
EL. 1010.4
1.5
1 FT THK
AASHTO #1
COARSE AGG
1 FT THK
AASHTO #57
COARSE AGG
5'
1 FT THK
AASHTO #57
COARSE AGG
4.8'
GG
GT
K
A
A
S
H
C
O
U
R
G
HIGHLY-TEXT.
GM
A
A
S
H
T
O
G
GT
2%
EXIST
GUIDERAIL
(TYP; REMOVE
& REINSTALL)
1'
1' THK DGA
ROAD SURFACE
1-INCH
MINUS SOIL
(SEE NOTE 7)
HIGHLY-TEXTURED
GEOMEMBRANE
1 FT THK
1" MINUS SOIL
2%
2%
2%
0%
2'
EXIST BOT
OF RIPRAP
BOTTOM
OF RIPRAP
RIPRAP CREST
EL. 1081.4
EXIST
RIPRAP
SURFACE
K
N
I
L
EXCAV
SUBGRADE
(6' BELOW
EXIST ROAD)
2.5
1.75
1' THK AASHTO #1
COARSE AGG (PLACE
AFTER RIPRAP; CHOKE AT
ROAD SURFACE WITH DGA)
EXCAV
SUBGRADE
D G
A
GEOTEXTILE
(SEE NOTE 1)
HIGHLY-TEXT.
GM (SEE NOTE 2)
EXCAV
SUBGRADE
CONCRETE
ANCHOR TRENCH
(SEE NOTES 3 & 4)
GEOTEXTILE
(SEE NOTE 1)
DAM C/L
1.5
1.5
TEMP
HAUL
ROAD
2%
2%
2%
1.5" - WIDE
BODKIN
BAR
1-INCH
MINUS SOIL
EXCAV
SUBGRADE
EXIST. BOULDER &
EARTH FILL TRANSITION
ZONE
BOULDER & EARTH FILL
TRANSITION ZONE
ARMOR STONE
EXIST. DAM
EMBANKMENT
6" DIA. NPS,
SCH. 80 GALV.
METAL PIPE
K
A
A
S
H
C
O
U
R
G
S
K
A
A
S
H
U
R
S
E
A
2.5'
1.25'
9'
1.7'
GG
GEOTEXTILE
(SEE NOTE 1)
GT
EL. 1075.4
EL. 1072.6
EL. 1075.4
DGA CREST
EL. 1081.6
1" MINUS SOIL
@ CREST
EL. 1080.6
DGA
EL. 1081.4
DGA
EL. 1081.4
1'
0%
EL. 1081.4
2%
TEMP. ONE-INCH MINUS
SOIL LEVEL REQD. TO
BACKFILL SLOPE GT WITH
#57 C. AGG. (SEE NOTE 6)
TEMPORARY SLOPE
(SEE NOTE 5)
10'
GEOGRID
(SEE NOTE 8)
EL. 1076.6
EL. 1076.4
EL. 1076.4
EL. 1080.4
EL. 1081.4
EL. 1076.5
EL. 1075.5
EL. 1072.6
EL. 1080.4
GT
GT
GT
GT
EL. 1075.3
EL. 1075.5
(SEE NOTE 9)
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D I S
T R
I C
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
O
W N
D A
N G
M G
R A
D R
A D
P H
I L A
D E
L P
H I A
-W
B U
B
C
T
A I L
S d w g
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
D E
T A
I L
S
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
E
D G
D W
M
D Y
B E
R R
Y
C
R E
E K
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
C-503
PHILADELPHIA
DETAIL - TOE OF DAM CALL OUT
DETAIL - TOE OF DAM CALL OUT
DETAIL - CREST OF DAM CALL OUT
DETAIL - CREST OF DAM CALL OUT
5. THE 1V:1.5H SLOPE IS SHOWN AS "TEMPORARY" BECAUSE THIS SLOPE WILL ONLY EXIST WHILE THE TEMP HAUL ROAD IS IN USE.
HOWEVER, ONCE THE TEMP HAUL ROAD IS NO LONGER NEEDED FOR CONSTRUCTION, THE TEMPORARY SLOPE SHALL BE FILLED
AGAINST TO RESTORE THE CREST ACCESS ROAD TO ITS ORIGINAL GRADE AS SHOWN.
6. NO AASHTO #57 COARSE AGGREGATE SHALL BE PLACED OVER THE EMBANKMENT SLOPE GEOTEXTILE UNTIL THE ONE-INCH
MINUS SOIL IS PLACED AND COMPACTED OVER THE CONCRETE ANCHOR TRENCH TO THE "TEMP. ONE-INCH MINUS SOIL LEVEL"
(I.E., THE DIAGONAL-HATCH LIMITS). PLACE THE 1-FOOT THICK LAYER OF ONE-INCH MINUS SOIL LAYER IN ONE LIFT.
7. NO AASHTO #57 COARSE AGG. SHALL BE PLACED OVER THE EMBANKMENT SLOPE GEOGRID UNTIL THE ONE-INCH MINUS SOIL IS
PLACED OVER THE CREST GEOGRID AND CONCRETE ANCHOR TRENCH TO THE DOTTED-HATCH LIMITS SHOWN.
8. ON THE DAM CREST, ONE GEOGRID SPLICE WILL BE PERMITTED IF NECESSARY AND APPROVED BY THE COR TO FACILITATE
CONSTRUCTION. IF SUCH GEOGRID SPLICE IS REQUESTED AND APPROVED, 2 BODKIN BARS PER PANEL CONNECTION
NOTES:
1. GEOTEXTILE IS OFFSET FOR CLARITY (I.E., ITS TRUE LOCATION IS DIRECTLY ON THE UNDERLYING LAYER, BUT WAS
OFFSET A SMALL DISTANCE TO DISTINGUISH IT FROM THE UNDERLYING LAYER).
2. GEOMBRANE IS OFFSET IN THE ANCHOR TRENCH FOR CLARITY, BUT IS AT ITS TRUE LOCATION OUTSIDE THE
ANCHOR TRENCH.
3. CONCRETE ANCHOR TRENCH SHALL BE BACKFILLED WITH 800 P.S.I (MIN.) FLOWABLE CONCRETE FILL.
4. ONCE THE CONCRETE ANCHOR TRENCH IS CONSTRUCTED AND THE CONCRETE ATTAINS A COMPRESSIVE
STRENGTH OF AT LEAST 600 P.S.I., ONE-INCH MINUS SOIL SHALL BE PLACED AND COMPACTED IN LIFTS AS
SPECIFIED AND TO THE GEOMETRY SHOWN ON TOP OF THE CONCRETE ANCHOR TRENCH.
(... CONTINUED) ARE REQUIRED, WITH THE BARS BEING
SPACED AT LEAST 2' APART AND LOCATED AS CLOSE
TO THE ANCHOR TRENCH AS POSSIBLE.
9. THE VERTICAL SIDE OF CONCRETE ANCHOR TRENCH
SHALL BE 12" +/- 1" IN HEIGHT. DUE TO THE
OFFSETTING OF GEOSYNTHETICS FOR CLARITY IN THE
DETAIL, THE HEIGHT APPEARS LESS THAN REQUIRED.
C-302
M I N
RIPRAP
SURFACE
6" STEEL LOCKABLE HINGED
CAP (SEE NOTE 7)
RISER
PIPE
PROTECTIVE
STEEL SURFACE
CASING
END CAP
GALV. STEEL OUTER
PIPE SLEEVE,
10-INCH NPS, SCHED. 80
11 LF (APPROX),
(SEE NOTE 4)
CEM-BENT
GROUT
M I N
EXIST.
RIPRAP
SURFACE
CEMENT-BENTONITE
GROUT
GT
PIPE
BOOT
GM
PIPE
BOOT
GG
GT
HIGHLY-TEXTURED
GEOMEMBRANE
C
A
C
A
C
A
EXCAV.
SUBGRADE
I N
C
H
M
I N
U
S
S
O
I L
GALV. STEEL OUTER
PIPE SLEEVE,
10" DIA. NPS, SCHED. 80
4' X 4' GALV.
STEEL BASE
PLATE, 1/2-IN
THICK
RISER
PIPE
PIPE BOOT:
SEE DETAIL
ON 1/C-502
TEMP PIPE
CUT-OFF & CAP
(OPTIONAL - SEE
NOTE 5)
CEM-BENT
GROUT
(SEE NOTE 6)
6-IN (MIN) DRILL HOLE
DIAMETER (SEE NOTE 6)
GALV. STEEL INNER
PIPE SLEEVE, 8"
DIA. NPS, SCHED.
80, 9 LF (MIN)
3/8"
CEM-BENT
GROUT
CEM-BENT
GROUT
INNER PIPE
STICKUP
3/8"
2' X 2' GALV.
STEEL BASE
PLATE, 1/2-IN THK
HIGHLY-TEXTURED
GEOMEMBRANE
TEMP PIEZOMETER CUT-OFF & CAP
(OPTIONAL - SEE NOTE 5)
GALV. STEEL OUTER
PIPE SLEEVE,
10" DIA. NPS, SCHED. 80
11 LF (APPROX),
(SEE NOTE 4)
4' X 4' GALV.
STEEL BASE
PLATE, 1/2-IN
THICK
6-IN (MIN) DRILL HOLE
DIAMETER (SEE NOTE 6)
PIPE
BOOT
#1 C.A.
#57 C.A.
GG
GT
R
I P
R
A
P
EXCAV.
SUBGRADE
1' THK
1-INCH
MINUS
SOIL
2.5
SUBGRADE SLOPE BREAK
PIPE
RISER
C-504
C-504
PROTECTIVE
STEEL SURFACE
CASING
GALV. STEEL INNER PIPE SLEEVE,
8" DIA. NPS, SCHED. 80, 9 LF
CEM-BENT
GROUT
(SEE NOTE 6)
CENTRALIZER
CEM-BENT
GROUT
M
I N
2' MIN. DEPTH
2'
6" STEEL LOCKABLE, HINGED CAP
PVC. VENTED END CAP
(NOT THREADED)
WITH 1/4" DIA. VENT HOLE
SLOPE GROUT AWAY FROM CASING
BENTONITE SEAL
(TREMIE COURSE GRANULAR
OR COMPRESSED PELLETS)
2' LONG POROUS
PIEZOMETER FILTER TIP
FILTER PACK
BOTTOM ELEVATION VARIES
PVC SCHEDULE 80 RISER PIPE
2" DIAMETER
CENTRALIZERS
AS NECESSARY
CENTRALIZERS
AS NECESSARY
L E
N G
V
R
I E
S
PROTECTIVE
STEEL SURFACE
CASING
GROUND
SURFACE
AUGERED HOLE,
6-INCH MIN.
CEMENT-BENTONITE GROUT
TELESCOPING GALV.
STEEL PIPE SLEEVES
(TYP; SEE NOTE 8)
EXISTING
GUIDERAIL (TYP)
GT/GM
PIPE
BOOT
TEMP PIEZO
CUT-OFF & CAP
(TYP)
TEMP STEEL
PLATE
EXIST PIEZOMETER & STEEL
CASING (TYP; SEE NOTE 9)
TEMP EXCAV FOR
PIEZO CUT-OFF;
1-INCH MINUS SOIL
BACKFILL (TYP)
20'
TEMPORARY HAUL ROAD
EXCAV
SUBGRADE
EXCAV
SG
GM
GG
GT
1' THK DGA
ROAD SURFACE
VARIES
9'
DAM
C/L
GT
#1 C.A.
#57 C.A.
CEM-BENT GROUT
PIPE INFILL (TYP)
9'
GG
EXIST. 6-IN DIA.
DRILL HOLE
(TYP)
EXIST ARMOR
STONE
EXIST BOULDER & EARTH
FILL TRANSITION ZONE
9.1'
1'
CONCRETE
ANCHOR
TRENCH
DAM
C/L
RIPRAP
GALV. STEEL PIPE SLEEVE,
8" DIA. NPS, SCHED. 80, 10 LF
W/ 2' X 2' GALV. STEEL
BASE PLATE
#57 C.A.
#1 C.A.
GALV. STEEL PIPE SLEEVE,
8" DIA. NPS, SCHED. 80, 9 LF
W/ 2' X 2' GALV. STEEL
BASE PLATE
GG
K
A
A
S
H
C
O
U
R
G
HIGHLY-TEXT.
A
A
S
H
T
O
G
GT
2%
EXIST
GUIDERAIL
(TYP; REMOVE
& REINSTALL)
1' THK DGA
ROAD SURFACE
HIGHLY-TEXTURED
GEOMEMBRANE
1 FT THK
1" MINUS SOIL
2%
2%
2%
2'
EXIST BOT
OF RIPRAP
BOTTOM
OF RIPRAP
RIPRAP CREST
EL. 1081.4
EXIST
RIPRAP
SURFACE
K
N
I
L
EXCAV
SUBGRADE
(6' BELOW
EXIST ROAD)
2.5
1.75
1' THK AASHTO #1
COARSE AGG (PLACE
AFTER RIPRAP; CHOKE AT
ROAD SURFACE WITH DGA)
EXCAV
SUBGRADE
GM/GT PIPE BOOT
(SEE SHEET
C-502/DETAIL 1)
BOTTOM OF TEMP EXCAV
FOR TEMP PIEZO
CUT-OFF & CAP (TYP)
EL. 1071.8
TEMP PIEZO
CUT-OFF
& CAP (TYP)
6-IN (MIN)
DRILL HOLE
DIA. (TYP)
D G
A
EXISTING PROTECTIVE
STEEL CASING
(TYP; REMOVE &
REINSTALL)
EXIST PIEZOMETER
RISER PIPE
(TYP; PARTIALLY
REMOVE & REINSTALL)
CEM-BENTONITE
GROUT
EXISTING
CEM-BENTONITE
GROUT (TYP)
1-INCH MINUS SOIL
BACKFILL (TYP)
GEOTEXTILE
(SEE NOTE 1)
GALV. STEEL PIPE SLEEVE,
8" DIA. NPS, SCHED. 80, 10 LF
W/ 2' X 2' GALV. STEEL
BASE PLATE
3/8"
K
A
A
S
H
C
O
U
R
G
GT
EL. 1076.5
EL. 1075.5
GT
K
A
A
S
H
U
R
G
1-INCH
MINUS SOIL
GT
EXISTING 6-IN. DIA.
DRILL HOLE
EXISTING
PIEZOMETER
RISER PIPE
D
2 3
C
4 5
A
B
1 2 3 4 5
US Army Corps of Engineers
DISTRICT
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
F I
M
E
M A
R K
D W
G
S
I Z
E
C O
N T
R A
M
B E
R
SHEET NUMBER
B Y
D E
S C
R I P
T I O
N A
C T
I O
N
X
I S
S U
E S
U B
M I T
T A
L
D
A T
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D I S
T R
I C
T
D W
N
B
Y
R E
V I E
W E
D
B
Y
D E
S
B
Y
P L O
T
S
C A
L E
C K
D
B
Y
O
W N
D A
N G
M G
R A
D R
A D
P H
I L A
D E
L P
H I A
-W
B U
B
C
T
A I L
S d w g
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
D E
T A
I L
S
D A
M
S
A F
E T
Y
M
O D
I F
I C
A T
I O
N
G E
N E
R A
L
E
D G
D W
M
D Y
B E
R R
Y
C
R E
E K
H O
N E
S D
A L
E
P
E N
N S
Y L
V A
N I A
C-504
PHILADELPHIA
NOTES:
1. DETAILS ON THIS SHEET APPLY TO NEW AND EXISTING PIEZOMETERS. MODIFICATIONS TO EXISTING
SETTLEMENT PIPES ARE SHOWN ON SHEET C-506. RISER PIPES FOR OLDER, EXISTING PIEZOMETERS
ARE GALVANIZED STEEL AND SHALL BE REPLACED IN KIND ABOVE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .