AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU22B0003

X 9B. DATED (SEE ITEM 11)

27-Oct-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment is to:

(1) Edit the INSTRUCTION TO BIDDERS, specifically, under IMPORTANT NOTES REGARDING THIS ACQUISITION: Note: Deleted"Please submit your price schedule with sufficient backup documentation to enable us to do a thorough analysis of the proposed offer (price). Ex: If the offer includes materials, the supporting documentation would include vendor quotes. Also, if travel is necessary, the travel costs should be documented in compliance with the Joint Travel Regulations",

(2) Clause 52.204-8,Annual Representations and Certif ications is added, and

(3) Responses to all RFI's are attached. ******Bid Opening remains December 7, 2021 at 11:00AM.******.

PLEASE INDICATE RECEIPT OF THIS AMENDMENT ON SF1442 (SOLICITATION, OFFER, AND AWARDS) AS AMENDMENT 0002. FAILURE TO

ACKNOWLEDGE ALL AMENDMENTS MAY BE CAUSE FOR REJECTION OF THE BID.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Nov-2021

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: FREDERICK D. CONWAY, 100 PENN SQUARE EAS

R BUILDING

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU22B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been added by full text:

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (SEP 2021)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is [insert NAICS code].

(2) The small business size standard is [insert size standard].

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees if the acquisition--

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $83,099, the provision with its Alternate II applies.

(D) If the acquisition value is $83,099 or more but is less than $100,000, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

(i) 52.204-17, Ownership or Control of Offeror.

(ii) 52.204-20, Predecessor of Offeror.

(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).

(vii) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [ offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of provision)

(End of Summary of Changes)

This page was intentionally left blank for duplex printing.

Amendment No. 0002

IFB W912BU22B0003

14. DESCRIPTION OF AMENDMENT

a. REQUESTS FOR INFORMATION (RFI) WITH RESPONSES: RFI’s with responses, annotated Amendment No. 0002, attached hereto.

b. PRE-BID SITE VISIT ATTENDANCE SHEET: Please add the Pre-Bid Site Visit Attendance Sheet to the Contract Documents, annotated Amendment No. 0002, attached hereto.

c. BIDDING SCHEDULE: Please delete the Bidding Schedule in its entirety and substitute the revised Bidding Schedule, annotated Amendment No. 0002, attached hereto.

d. TECHNICAL SPECIFICATIONS:

(1) SECTION 01 50 00 – TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS:

Please delete Section 01 50 00 in its entirety and substitute the revised Section, annotated Amendment No. 0002, attached hereto.

(2) SECTION 02 41 00 – DEMOLITION: Please delete Section 02 41 00 in its entirety and substitute the revised Section, annotated Amendment No. 0002, attached hereto.

(3) SECTION 03 30 53 – MISCELLANEOUS CAST-IN-PLACE CONCRETE: Please delete Section 03 30 53 in its entirety and substitute the revised Section, Annotated Amendment No. 0002, attached hereto.

(4) SECTION 31 00 00 – EARTHWORK: Please delete Section 31 00 00 in its entirety and substitute the revised Section, annotated Amendment No. 0002, attached hereto.

(5) SECTION 31 05 20 – GEOMEMBRANE: Please delete Section 31 05 20 in its entirety and substitute the revised Section, annotated Amendment No. 0002, attached hereto.

(6) SECTION 35 31 19 – RIPRAP: Please delete Section 35 31 19 in its entirety and substitute the revised Section, annotated Amendment No. 0002, attached hereto.

e. DRAWINGS:

(1) Please delete drawings C-002, C-003, C-101, C-102, C-103 and CE101 in their entirety and substitute the revised drawings of the same numbers, with the latest revision date of 22 November 2021, attached hereto.

f. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0002. Failure to acknowledge all amendments may be cause for rejection of the bid.

RFI# Request for Information Response

Regarding the erosion and sediment plans, can you please advise the specific detail for the erosion and control material on plan page CE503?

As specified in Note 2 on sheet CE101, the “SF” designation on the Erosion and Sediment Control Plan allows for use of sediment barriers options from sheets CE501 through CE503.

Can excess materials from the subgrade excavation remain at the stock pile site if graded off at project completion?

Yes, excess materials from the subgrade excavation and other excess materials can remain at the downstream stockpile/staging site. See Amendment No. 0002.

Due to the Thanksgiving holiday, would you be willing to provide a week extension for bid submission?

Yes. Bid Opening was extended to December 7, 2021.

See Amendment No. 0001.

The Instructions to Bidders states, "Please submit your price schedule with sufficient backup documentation to enable us to do a thorough analysis of the proposed offer (price). Ex: If the offer includes materials, the supporting documentation would include vendor quotes. Also, if travel is necessary, the travel costs should be documented in compliance with the Joint Travel Regulations" Do we need to supply vendor quotes with our proposal?

No. Vendor quotes are not required as part of the bid package. See Amendment No. 0002.

The directions state, "II. BIDDERS ARE REQUIRED TO COMPLETE

THE REPRESENTATION AND CERTIFICATIONS PORTION OF

SECTION 00 45 00 OF THIS SOLICITATION AND SUBMIT THIS

WITH THEIR BID." There are no reps and certs to fill out in section 00 45 00 to submit with this solicitation except one, 52.204-24 which is only incorporated by reference. Is this correct?

Clause 52.204-8 has been added.

See Amendment No. 0002.

There are four different details shown for the silt fence spec. Can you please clarify what detail needs to be used for the silt fence?

As specified in Note 2 on sheet CE101, the “SF” designation on the Erosion and Sediment Control Plan allows for use of sediment barriers options from sheets CE501 through CE503.

7 Are all of the necessary permits in place? Yes, all necessary permits are in place.

8 Have the local homeowners been notified of the project?

Yes. A meeting was held with Honesdale and Wayne County officials to discuss the project.

9 Can the government independent estimate be provided for reference? No. The Government estimate will not be provided.

Geomembrane specification Section 31-05-19, Item 3.10.3 states all geomembrane pipe boots to be paid in Bid Item titled “Liner system pipe boot”. This pay item is not found in the Bid Form. Please clarify. Also this paragraph states this cost does not include the liner system boot installed as part of the USGS Gauge pipe modifications. Which pay item is this sentence referring to?

A line item has been added to the Bid Schedule.

"USGS Gauge Pipe Modifications" has been changed to "USGS Gauge Shed Modifications". See Amendment No. 0002.

Per 00 21 13, A.3 Note: The Instructions mention providing vendor quotes as backup for the bid pricing. We have not seen this request in an USACE bid before, and with most bids these quotes come in fairly close to the bid time, making printing and including in the packet almost impossible. We have previously provided a breakdown of labor, equipment, materials, and overhead (including travel) for bids, would this be acceptable?

Vendor quotes are not required as part of the bid package. See Amendment No. 0002.

Geomembrane specification Section 31‐05‐19, Item 3.10.3 states all geomembrane pipe boots to be paid in Bid Item titled “Liner system pipe boot”. This pay item is not found in the Bid Form. Please clarify.

A line item has been added to the Bid Schedule. See Amendment No. 0002.

Paragraph 31‐05‐19, Item 3.10.3 states this cost does not include the liner system boot installed as part of the USGS Gauge pipe modifications.

Which pay item is this sentence referring to? Please clarify.

"USGS Gauge Pipe Modifications" has been changed to "USGS Gauge Shed Modifications". See Amendment No. 0002.

REQUESTS FOR INFORMATION with RESPONSES Solicitation No. W912BU22B0003

RFI# Request for Information Response

Would USACE consider moving the bid date back from Nov 30, say, to sometime after Dec 6 due to the Thanksgiving Holidays. Myself, and several of our larger vendors are requesting this.

Yes. Bid Opening was extended to December 7, 2021.

See Amendment No. 0001.

Can you please provide a copy of the plan holder’s list and pre‐bid sign‐in sheet for the above mentioned project.

The pre-bid site visit list will be provided. See Amendment No. 0002.

We are looking to provide materials pricing on this job to the bidders, but I cannot seem to locate the pre‐bid meeting list or a planholders list through Sam.gov site project page:

https://sam.gov/opp/fb85b1649a9c43af856ee11984324561/view. Would there happen to be one readily available to send over at this time?

The pre-bid site visit list will be provided. See Amendment No. 0002.

Can you provide traffic load ratings for culvert(s) and bridge(s) along the access routes?

Load ratings will not be provided by the Government.

The Contractor is responsible for investigating this per Section 01 30 00 Paragraph 1.5c. and Section 01 50 00, Paragraph 3.5.2.

Are the guide rail posts to be removed and reinstalled currently driven in or in a concrete footer? The latter would require new posts to be provided.

The guide post on the crest of the dam are driven in.

No concrete footers are present.

The scope for piezometer modifications references “instrumentation” but nothing specific and none shown on the drawings. Is there down hole instrumentation that the contractor will have to manage?

The Contractor will not be required to manage any instrumentation.

What size/quantity culverts are required for the stream crossing, reference Details 5, 6, and 7 on CE501.

The Contractor is responsible for designing the temporary stream crossing. The design requirements are stated in Section 31 00 00, Paragraph 1.5.1.

Is the contractor responsible for cleanout of the outlet trash rack after large storm events/flows? Or only when the debris buildup creates a backwater that impedes work?

The Contractor shall keep the trash racks clear of debris for the duration of the project, as needed, or as directed by the Contracting Officer. See Amendment No. 0002.

There are a few culverts with headwalls/endwalls along the upstream access road. Is the contractor responsible for maintaining these and confirming capacity upon completion?

Yes, if the culverts and headwalls are in the Contractor Work Limit as shown on the drawings.

23 Can the required surveying be completed by an in‐house PLS?

No. An independent surveyor is required, per specifications.

The Scope in the Demolition Specification Section 02 41 00, 3.1 notes that the paint on the USGS shed contains a small amount of lead and references the sample results in Appendix D71 which are non‐detect. Can you clarify since this seems contradictory? This has been clarified. See Amendment No. 0002.

At the onsite pre‐bid meeting it was noted that there is a significant amount of grout from the 1970 grouting operation within the riprap layer that must be excavated. Since this will be a different type of removal method can you provide an anticipated quantity for that grout excavation?

The approximate volume of grouted riprap will be added to the specifications. See Amendment No.

0002.

Can you confirm the units are correct in the table under the Rip Rap Specification Section 35 31 19, 1.3.1, specifically those for the value 117.62?

The units have been modified.

See Amendment No. 0002.

Can you please define the qualifications / duties for the following key positions: Project Engineer and Office Engineer? I do not see these listed in the Spec book(s).

Qualifications/duties for a Project Engineer and Office Engineer will not be defined.

28 Does the contractor need to supply an office trailer for the Core?

Yes. However, requirements have been modified to allow a shared office. See Amendment No. 0002.

29 Is there on‐site power that the contractor can meter into? No, there is no on-site power.

Item states the concrete collar footing will be paid for under bid Item "Modifications to USGS Gauge Pipe". I do not see that particular bid item.

We do, however, see #22: "Modifications of Existing Settlement Pipes and Horizontal Pipes". Is this where this item is to be paid for?

No. Item should be paid for under Bid Item #23 "USGS Gauge Shed Modifications". See Amendment No. 0002.

00 10 00 Page 4

BIDDING SCHEDULE

(To be attached to SF 1442)

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

1. Mobilization and Demobilization 1 JOB LS $__________

2. Removal and Reinstallation Of Guiderail 1 JOB LS $__________

3. Temporary Stream Crossing 1 JOB LS $__________

4. Demolition of USGS Gauge Shed 1 JOB LS $__________

5. Riprap Excavation 27,100 CY $______ $__________

6. Placement of Excavated Riprap 18,970 CY $______ $__________

7. Imported R-7 Riprap 9,180 TON $______ $__________

8. Subgrade Excavation 27,120 CY $______ $__________

9. Boulder and Earth Fill Transition Material Rehandling 350 CY $______ $__________

10. Highly-Textured Geomembrane 12,690 SY $______ $__________

11. Textured Geomembrane 8,830 SY $______ $__________

12. Geotextile 31,000 SY $______ $__________

13. Geogrid 9,210 SY $______ $__________

14. Concrete Anchor Trench 275 CY $______ $__________

15. AASHTO #57 Aggregate 6,525 CY $______ $__________

16. AASHTO #1 Aggregate 3,730 CY $______ $__________

17. Dense Graded Aggregate (DGA) 17a. Crest of Dam 415 CY $______ $__________ 17b. Anchor Trench 155 CY $______ $__________

18. On-Site One-Inch Minus Soil 18,715 CY $______ $__________

19. Imported One-Inch Minus Soil 190 CY $______ $__________

20. New Piezometers 4 EACH $______ $__________

21. Modification of Existing Piezometers 21a. Slope Piezometer 4 EACH $______ $__________ 21b. Upstream Crest Piezometer 4 EACH $______ $__________ 21c. Downstream Crest Piezometer 10 EACH $______ $__________

22. Modifications of Existing Settlement Pipes and Horizontal Pipes 5 EACH $______ $__________

23. USGS Gauge Shed Modifications 1 JOB LS $__________

24. Imported Topsoil 1,400 CY $______ $__________

25. Seeding 25a. Wildflower Seed Mix 25,800 SY $______ $__________ 25b. Annual Cover Mix 13,100 SY $______ $__________

26. Full Depth Replacement of Bituminous Pavement 80 TONS $______ $__________

00 10 00 Page 4

27. Partial Depth Replacement of Bituminous Pavement 50 TONS $______ $__________

28. Asphalt Pothole Repairs - Paved Areas 10 TONS $______ $__________

29. DGA Pothole Repairs – Unpaved Areas 200 CY $______ $__________

30. Regrade and Recompact Unpaved Areas 3,000 SY $______ $__________

31. Liner System Pipe Boot 17 EACH $______ $__________

TOTAL ESTIMATED BID AMOUNT $_________________

NOTE: Bidders must bid on all items.

SECTION 01 50 00

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO MUTCD (2010) Manual on Uniform Traffic Control Devices

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 10 (2018; TIA 18-1) Standard for Portable Fire Extinguishers

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14; TIA 17-15; TIA 17-16; TIA 17-17 )

National Electrical Code

NFPA 241 (2019) Standard for Safeguarding Construction, Alteration, and Demolition Operations

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION (PennDOT)

Publication 408 (April 2020) Publication 408 Specifications

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

EP 310-1-6a (2006) Sign Standards Manual, VOL 1

EP 310-1-6b (2006) Sign Standards Manual, VOL 2, Appendices

U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

MUTCD (2015) Manual on Uniform Traffic Control Devices

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

Section 01 50 00 Page 1 submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Construction Site Plan; G, COR

Traffic Control Plan; G, COR

Develop and submit for approval a traffic control plan incorporating the herein specified requirements in accordance with the Publication 408 . The plan shall include, but not be limited to, location of ingress and egress points from the site, temporary and regulatory warning signs layout, and the traffic routes used to move equipment to the site.

1.3 CONSTRUCTION SITE PLAN

Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas.

1.4 COORDINATION WITH COUNTY EMERGENCY COMMUNICATIONS OFFICE

Coordinate activities requiring closure of any roads with Berks County

EMA/911.

1.5 PUBLIC ACCESS

Provide the public with access to all private and commercial properties.

1.6 CONTRACTOR ACCESS

Access to the work areas is only permitted at the locations shown.

Provide materials required to establish or stabilize access points for vehicle use and remove upon project completion. Protect all existing structures from damage throughout the entire contract, and maintain all access points in accordance with Section 01 57 19 TEMPORARY ENVIRONMENTAL

CONTROLS.

1.7 LOCAL POLICE NOTIFICATION

Notify the local police department at least 24 hours prior to starting work to obtain approval for temporary parking and placement of any required signs.

Section 01 50 00 Page 2

PART 2 PRODUCTS

2.1 TEMPORARY SIGNAGE

2.1.1 Bulletin Board

Within 1 calendar day of mobilization on site and prior to the commencement of work activities, provide a clear weatherproof covered bulletin board not less than 36 by 48 inches in size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, Safety and Health Information as required by EM 385-1-1 Section 01 and other information approved by the Contracting Officer. Coordinate requirements herein with

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS.

2.1.2 Project Identification Signs

The construction project sign package consists of two signs: one for project identification and the other to show the on-the-job safety performance of the Contractor. The package shall conform to the requirements of EP 310-1-6a and EP 310-1-6b , specifically Section 16 (attached to this section). Submit the sign legend orders as described in Section 16 of EP 310-1-6a prior to erecting the signs. In addition, the project sign shall include the Army Star as shown on the attached sheets.

2.1.3 Warning Signs

Post temporary signs, tags, and labels to give workers and the public adequate warning and caution of construction hazards according to the EM 385-1-1 Section 04. Attach signs to the perimeter fencing every 150 feet warning the public of the presence of contruction hazards. Signs must require unauthorized persons to keep out of the construction site.

Correct the data required by safety signs daily.

2.2 TEMPORARY TRAFFIC CONTROL

2.2.1 Traffic Control Devices

Traffic control devices (signs, lights, reflectors, barricades, etc.) shall conform to the requirements of AASHTO MUTCD for the safety of the vehicular and pedestrian traffic and protection of the work area. Be responsible for maintaining all traffic control devices in a first-class operating condition.

2.2.2 Barricades

Erect and maintain temporary barricades to limit public access to hazardous areas. Whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic barricades will be required. Securely place barricades clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.

2.3 FENCING

Provide fencing along the construction site and at all open excavations and tunnels to control access by unauthorized personnel. Safety fencing must be highly visible to be seen by pedestrians and vehicular traffic.

Section 01 50 00 Page 3

Specific fencing requirements are as described herein. All fencing will meet the requirements of EM 385-1-1 .

2.3.1 Polyethylene Mesh Safety Fencing

Temporary safety fencing must be a high visibility orange colored, high density polyethylene grid, a minimum of 48 inches high and maximum mesh size of 2 inches. Fencing must extend from the grade to a minimum of 48 inches above the grade and be tightly secured to T-posts spaced as necessary to maintain a rigid and taut fence. Fencing must remain rigid and taut with a minimum of 200 pounds of force exerted on it from any direction with less than 4 inches of deflection.

2.3.2 Chain Link Panel Fencing

Temporary panel fencing must be galvanized steel chain link panels 6 feet high with 3 strands of barbed wire. Multiple fencing panels may be linked together at the bases to form long spens as needed. Each panel base must be weighted down using sand bags or other suitable materials in order for the fencing to withstand anticipated winds while remaining upright.

Fencing must remain rigid and taut with a minimum of 200 pounds of force exerted on it from any direction with less than 4 inches of deflection.

2.4 TEMPORARY WIRING

Provide temporary wiring in accordance with EM 385-1-1 Section 11, NFPA 241 and NFPA 70 . Include monthly inspection and testing of all equipment and apparatus.

2.5 GOVERNMENT FIELD OFFICE

Provide a Government project office for the length of the contract. The office shall have a minimum floor area of 550 square feet, with two separate offices, a conference room, and partitioned restroom facilities with flushing toilets and running water with prior approval by the Contracting Officer. The office shall have sufficient lighting to supply 150 foot-candles at the desk top level and shall be supplied with 110 volt and 220 volt electrical outlets as required for heating, air conditioning, lighting, water cooler, office equipment, and other accessories. Provide either a heater and air conditioner or a heat pump sufficient to maintain comfortable conditions. Provide a door with a cylinder lock and windows with locking hardware. The exterior of the office shall be equipped with flood lights to provide adequate security lighting during hours of darkness. Weekly janitorial services shall be supplied during normal working hours. Provide potable water (hot and cold), provide for treatment of sewage, and provide permanent electric service, all in accordance with applicable local municipal, county and State codes.

At the Contractor's option, one office may be provided for the Contractor and Corps personnel to share. The office shall have a separate room for Corps personnel, with a lockable door.

2.5.1 Trailer-Type Mobile Office

The Contractor may, furnish and maintain a trailer-type mobile office acceptable to the Contracting Officer and provide a minimum 10 foot wide by 60 foot long trailer, with the facilities specified above. If a trailer is provided, it shall be new or recently renovated to a like-new condition subject to the approval of the Contracting Officer. Securely

Section 01 50 00 Page 4 anchor the trailer to the ground at all four corners to guard against movement during high winds.

2.5.2 Office Equipment

Provivde the following office equipment for the Government field office:

a. Two desks having 60-inch by 30-inch tops, with lockable drawers, two swivel chairs, and two tables with 60-inch by 30-inch laminated tops;

b. One 96-inch by 48-inch conference table with ten chairs;

c. One free-standing full-size drafting table, minimum 37-1/2 inch by 60 inch top, and drafting chair;

d. Two lockable, fire-resistant, letter-size, two-drawer 36 inch-wide steel lateral filing cabinets set up for side-by-side filing with ball-bearing suspensions for full-drawer extensions;

e. A magnet-compatible white dry erase board, minimum 2 feet high by 3 feet wide in size, whose surface does not require cleaners. In addition, the contractor shall provide 4 non-toxic dry erase chisel-tip markers in black, blue, red and green and appropriate eraser;

f. One battery-powered quartz round wall clock, 8-1/2 inch minimum diameter, constructed of a plastic case and lens, having a white dial with Arabic numbers and black hour, minute and second hands shall be provided in the conference area;

g. Shelf set, two shelves high, each measuring 12-inch deep by 3-feet long, one per desk;

h. Three waste baskets;

i. Electric water cooler;

j. Vertical filing plan rack for two sets of 28-inch by 40-inch plans each rack;

k. Two portable two-way marine radios with chargers capable of operating on the Contractor's working frequencies;

l. Countertop microwave oven, with digital display, interior light, and a minimum 0.6 cubic feet capacity;

m. Compact refrigerator, with 1.58 cubic foot capacity, and ice tray;

n. Fabricate a large sign, minimum 3 feet in each dimension, made of stiff plastic or aluminum, to be attached to a free-standing post securely founded in the ground or attached directly to the Corps' trailer, as directed by the Contracting Officer. The sign shall provide the U. S. Army Corps of Engineers, Philadelphia District name and logo as shown on the attached sheets for the project signs; and

o. One plastic wall-mounted exterior mailbox with closing lid, (similar to that used by realtors at homes for sale to hold brochures)

Section 01 50 00 Page 5 and capable of holding several 8-1/2 inch by 11 inch sheets of paper vertically.

p. A fire extinguisher. Placement and size shall meet NFPA 10 .

NOTE: All office equipment shall be in new or like new condition.

PART 3 EXECUTION

3.1 EMPLOYEE PARKING

Construction contract employees will park privately owned vehicles in an area designated by the Contracting Officer. This area will be within reasonable walking distance of the construction site. Employee parking must not interfere with existing and established parking requirements of the government installation.

3.2 TEMPORARY BULLETIN BOARD

Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.

3.3 PROJECT AND SAFETY SIGNS

a. Provide and erect one project identification and one safety performance sign at the locations designated by the Contracting Officer. Install signs within 15 calendar days after receipt of the Notice to Proceed.

b. Maintain signs in good condition throughout the contract period. The information contained on the face of the safety performance sign regarding the Contractor's safety record shall be updated on a daily basis throughout the contract period.

3.4 AVAILABILITY AND USE OF UTILITY SERVICES

3.4.1 Temporary Utilities

Provide temporary utilities required for construction. Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards.

3.4.2 Sanitation

Provide and maintain within the construction area minimum field-type sanitary facilities approved by the Contracting Officer and periodically empty wastes into a municipal, district, or station sanitary sewage system, or remove waste to a commercial facility. Obtain approval from the system owner prior to discharge into any municipal, district, or commercial sanitary sewer system. Any penalties or fines associated with improper discharge will be the responsibility of the Contractor.

Coordinate with the Contracting Officer and follow station regulations and procedures when discharging into the station sanitary sewer system.

Maintain these conveniences at all times. Include provisions for pest control and elimination of odors. Government toilet facilities will not be available to Contractor's personnel.

3.4.3 Telephone

Make arrangements and pay all costs for telephone facilities desired.

Section 01 50 00 Page 6

3.4.4 Fire Protection

Provide temporary fire protection equipment for the protection of personnel and property during construction. Remove debris and flammable materials daily to minimize potential hazards.

3.5 TRAFFIC PROVISIONS

3.5.1 Maintenance of Traffic

a. Conduct operations in a manner that will not close any thoroughfare or interfere in any way with traffic on railways or highways except with written permission of the Contracting Officer at least 15 calendar days prior to the proposed modification date, and provide a Traffic Control Plan detailing the proposed controls to traffic movement for approval. The plan must be in accordance with State and local regulations and the MUTCD, Part VI. Contractor may move oversized and slow-moving vehicles to the worksite provided requirements of the highway authority have been met.

b. Conduct work so as to minimize obstruction of traffic, and maintain traffic on at least half of the roadway width at all times. Obtain approval from the Contracting Officer prior to starting any activity that will obstruct traffic.

c. Provide, erect, and maintain, at contractors expense, lights, barriers, signals, passageways, detours, and other items, that may be required by the Life Safety Signage, overhead protection authority having jurisdiction.

3.5.2 Protection of Traffic

Maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment the work, and the erection and maintenance of adequate warning, danger, and direction signs, will be as required by the State and local authorities having jurisdiction. Protect the traveling public from damage to person and property. Minimize the interference with public traffic on roads selected for hauling material to and from the site. Investigate the adequacy of existing roads and their allowable load limit. Contractor is responsible for the repair of any damage to roads caused by construction operations.

3.5.3 Dust Control

Dust control methods and procedures must be approved by the Contracting Officer. Coordinate dust control methods with 01 57 19 TEMPORARY

ENVIRONMENTAL CONTROLS.

3.6 CONTRACTOR'S TEMPORARY FACILITIES

3.6.1 Administrative Field Offices

Provide and maintain administrative field office facilities within the construction area at the designated site. The office shall be equipped and staffed to efficiently conduct the work under this contract and

Section 01 50 00 Page 7 provide essential information to the Contracting Officer or authorized representative. Keep at all times a copy of all drawings, specifications, and other pertinent information, and allow access to these documents by the Contacting Officer. The office shall be clean and equipped, at a minimum, with a conference table, twelve chairs, a desk and chair, copying machine, laser printer, and telephone facilities which shall be available for use by the Contracting Officer. Government office and warehouse facilities will not be available to the Contractor's personnel.

3.6.2 Staging and Storage Area

Do not place or store trailers, materials, or equipment outside the fenced area unless such trailers, materials, or equipment are assigned a separate and distinct storage area by the Contracting Officer away from the vicinity of the construction site but within the installation boundaries.

Trailers, equipment, or materials must not be open to public view with the exception of those items which are in support of ongoing work on any given day. Do not stockpile materials outside the fence in preparation for the next day's work. Park mobile equipment, such as tractors, wheeled lifting equipment, cranes, trucks, and like equipment within the fenced area at the end of each work day.

3.6.3 Appearance of Trailers

a. Trailers which are rusted, have peeling paint or are otherwise in need of repair will not be allowed on Installation property. Trailers must present a clean and neat exterior appearance and be in a state of good repair.

b. Maintain the temporary facilities. Failure to do so will be sufficient reason to require their removal.

3.6.4 Maintenance of Storage Area

Keep fencing in a state of good repair and proper alignment. Grassed or unpaved areas, which are not established roadways, and will be traversed with construction equipment or other vehicles, will be covered with a layer of gravel as necessary to prevent rutting and the tracking of mud onto paved or established roadways, should the Contractor elect to traverse them with construction equipment or other vehicles. Mow and maintain grass located within the boundaries of the construction site for the duration of the project. Grass and vegetation along fences, buildings, under trailers, and in areas not accessible to mowers will be edged or trimmed neatly.

3.6.5 Security Provisions

Provide adequate outside security lighting at the temporary facilities.

The Contractor will be responsible for the security of its own equipment.

3.7 GOVERNMENT FIELD OFFICE

Provide and maintain a field office for the sole use of the Contracting Officer's representatives at the location indicated on the contract drawings or as directed by the Contracting Officer. The field office shall be complete and ready for occupancy not later than 15 days after receipt of notice to proceed, or prior to the transport of any equipment on site, with the exception of the equipment required to conduct the pre-placement condition surveys. The Government field office shall be

Section 01 50 00 Page 8 available for use 24 hours per day, 7 days per week, and shall remain in place 30 days after the final demobilization. Provide the following for the life of the contract:

a. Utilities: Provide hot and cold potable water, provide for treatment of sewage, and provide electric service, all in accordance with applicable local municipal, county and state codes. All utility costs arising from the use of the office shall be borne by the Contractor.

b. The trailer shall be placed on concrete block supports, leveled and tied down to withstand wind loads. A corrugated metal curtain shall be installed around the perimeter of the trailer from floor level to the ground. The curtain shall be firmly attached to withstand appropriate wind loads. All water piping and all waste piping shall be adequately supported and insulated.

c. Janitorial Services: Provide all janitorial supplies and services for the office facilities to include as a minimum, weekly sweeping, dusting, emptying of waste baskets, trash collection, servicing of toilets, mopping of all floors, sterilization of toilet seats and monthly waxing of all tile floors and washing of windows. Provide for snow plowing of the parking area, shoveling of walkways, and major maintenance to the office and its utilities.

3.8 PLANT COMMUNICATIONS

Whenever the individual elements of the plant are located so that operation by normal voice between these elements is not satisfactory, install a satisfactory means of communication, such as telephone or other suitable devices and make available for use by Government personnel.

3.9 SECURITY FENCE

Erect a security fence to enclose the Contractor`s project office, the Government field office if a trailer is used, and the Contractor's staging and storage area(s). The Contractor's staging area(s) and shall be lighted during hours of darkness. This fence shall enclose a Government parking area for approximately 5 cars and shall include appropriate gates with locks for both vehicles and employees. Fence posts may be driven, in lieu of concrete bases, where soil conditions permit. Posts shall be installed at maximum 10-foot intervals in the ground. Installation of all security fencing materials shall be in accordance with the fence manufacturer's printed instructions.

3.10 TEMPORARY PROJECT SAFETY FENCING

As soon as practicable, but not later than 15 days after the date established for commencement of work, furnish and erect temporary project safety fencing at the work site. Maintain the safety fencing during the life of the contract and, upon completion and acceptance of the work, removefrom the work site.

3.11 CLEANUP

Remove construction debris, waste materials, packaging material and the like from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways must be cleaned away. Store any salvageable materials resulting from demolition activities within the fenced area

Section 01 50 00 Page 9 described above or at the supplemental storage area. Neatly stack stored materials not in trailers, whether new or salvaged.

3.12 RESTORATION OF STORAGE AREA

Upon completion of the project remove the bulletin board, signs, barricades, haul roads, and any other temporary products from the site.

After removal of trailers, materials, and equipment from within the fenced area, remove the fence. Restore areas used during the performance of the contract to the original or better condition. Remove gravel used to traverse grassed areas and restore the area to its original condition, including top soil and seeding as necessary.

3.13 MEASUREMENT AND PAYMENT

No separate measurement or payment will be made for the work specified in this section and all costs in connection therewith shall be included in the the cost of all the bid items.

-- End of Section --

Section 01 50 00 Page 10

SECTI…