AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of the amendment 007 is to extend the advertisement period of the solicitation, updated the Wage Determination, and correct the Document Classification NAICS from 236116 to 236115.
Proposals for Solicitation are now due on Friday, 18 June 2021 at 2 PM EST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BU21R0021
X 9B. DATED (SEE ITEM 11)
11-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-May-2021
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU21R0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 28-May-2021 02:00 PM to 18-Jun-2021 02:00 PM.
SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS
The following have been modified:
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236115
(2) The small business size standard is $39,500,000.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.
(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.
(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.
(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)
(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xxi) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $83,099, the provision with its Alternate II applies.
(D) If the acquisition value is $83,099 or more but is less than $100,000, the provision with its Alternate III applies.
(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.
(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.]
(i) 52.204-17, Ownership or Control of Offeror.
(ii) 52.204-20, Predecessor of Offeror.
(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.
(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.
(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).
(vii) 52.227-6, Royalty Information.
(A) Basic.
(B) Alternate I.
(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [ offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
(End of provision)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been added by full text:
WAGE DETERMINATION PA37
"General Decision Number: PA20210037 05/07/2021
Superseded General Decision Number: PA20200037
State: Pennsylvania
Construction Type: Residential
County: Monroe County in Pennsylvania.
EXCEPT TOBYHANNA
(INCLUDING TOBYHANNA ARMY DEPOT) RESIDENTIAL CONSTRUCTION
PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 01/08/2021 2 01/15/2021 3 05/07/2021
ASBE0038-004 07/01/2020
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems).........................$ 35.43 22.57
BOIL0013-006 03/01/2018
Rates Fringes
BOILERMAKER......................$ 45.89 33.39
BRPA0005-022 05/03/2020
TOBYHANNA ARMY DEPOT
Rates Fringes
Bricklayer, Stonemason...........$ 34.94 17.70
BRPA0005-040 05/01/2016
EXCEPT TOBYHANNA
Rates Fringes
Bricklayer, Stonemason...........$ 32.39 16.06
CARP0261-006 06/01/2018
Rates Fringes
Carpenter & Soft Floor Layer.....$ 28.02 12.59
ELEC0081-007 06/01/2020
BARRETT, COLLBAUGH, PARADISE, PRICE, AND TOBYHANNA TOWNSHIPS
Rates Fringes
ELECTRICIAN......................$ 20.49 3%+13.20
ELEC0102-009 05/28/2018
REMAINDER OF COUNTY
Rates Fringes
ELECTRICIAN......................$ 55.93 56.50%
Residential- Single family homes and apartments not to exceed 4 units...........$ 13.63 40.5%
ELEV0084-002 01/01/2021
Rates Fringes
ELEVATOR MECHANIC................$ 52.31 35.825+a+b
FOOTNOTES:
A. VACATION CREDIT: Employer contributes 8% basic hourly rate for 5 years or more of service as vacation pay credit, and 6% for 6 months to 5 years of service.
B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.
* ENGI0542-020 05/01/2021
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 39.87 27.94+A
GROUP 1a....................$ 42.12 28.60+A
GROUP 2.....................$ 39.59 27.85+A
GROUP 2a....................$ 41.84 28.52+A
GROUP 3.....................$ 36.87 27.04+A
GROUP 4.....................$ 35.72 26.72+A
GROUP 5.....................$ 35.27 26.59+A
GROUP 6.....................$ 34.40 26.32+A
FOOTNOTE:
A - PAID HOLIDAYS: Washington 's Birthday, Good Friday, Memorial Day, Labor Day, Presidential Election Day, Veterans Day; Thanksgiving Day and Christmas Day.
***TOXIC/HAZARDOUS WASTE REMOVAL***
Add 20 per cent to basic hourly rate for all classifications
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Machines doing hook work, any machine handling machinery, cable spinning machines, helicopters, lulltype forklift with boom attachment, concrete boom. truck, machines similar to the above including remote control equipment.
GROUP 1a: Machines doing hook work; Machines handling machinery; All types of cranes 15 ton and over factory rating; Cableways; Draglines 15 ton and over factory rating; High Rail/Burro Crane 15 ton and over factory rating; Rail Loader (Winch Boom Type) 15 ton and over factory rating; Concrete Pumps 145 feet of Boom length or less (150 yard pour, or less); Machines similar to avoe, including remote control equipment.
GROUP 2: All types of cranes (except cranes doing hook work) backhoes, cableways, draglines, keystones, shovels, derricks, trench shovels, trenching machines, hoist with two towers, pavers 21E and over, overhead cranes, building hoists (double drum) gradalls, mucking machines in tunnels, front end loaders, tandem scrapers, pippin type backhoes, boat captains, batch plant operators concrete drills, self-contained rotary drills, fork lifts, 20ft, lift and over, scrapers, tournapulls, spreaders, bulldozers and tractors, rollers (high grade finishing), mechanic-welder, motor patrols, concrete pumps, grease truck, directionall drill machines 8"" and up, skid steer, hydraulic pipe pusher 8"" and up, hydro ax, environmental recycling machine and grinder type machines, lull type lifts masonry tenders, shear attached to machines, grease truck, concreate placer machine, machines similar to the above including remote control equipment.
GROUP 2a: Crawler backhoes and crawler gradalls over one cubic yard factory rating; Hyraulic bachoes over one cubic yard factory rating; Equipment 15 ton and over factory rating; Machines similar to above, including remote control equipment.
GROUP 3: Conveyors, building hoist (single drum), high or low pressure boilers, well drillers, asphalt plant engineers, ditch witch type trencher, core drill operators, forklift trucks under 20ft. lift, fine grade machines, directional drill machine 7"" or less, hydraulic pipe pusher 7"" or less, skid-steer forklift, machines with concrete mixer attachment, machines similar to the above including remote control equipment, miscellaneous equipment operator.
GROUP 4: Welding machines, well points, compressors, pumps, heaters, farm tractors, form line graders, road finishing machines, concrete breaking machines, rollers, seaman pulverzing mixer, power boom, seeding spreader, tireman (for power equipment), grout pump 4"" and up, power broom, power sweeper, seeding spreader (self-propelled) machines similar to the above including remote control equipment.
GROUP 5: Fireman.
GROUP 6: Oilers and deck hands (personnel boats).
IRON0489-007 07/01/2016
TOBYHANNA ARMY DEPOT
Ironworkers:
Structural & Ornamental.....$ 31.57 28.50
IRON0489-009 07/01/2016
(REMAINDER OF COUNTY)
Rates Fringes
Ironworkers:.....................$ 31.57 28.50
LABO1174-005 05/01/2016
Rates Fringes
Laborers:
GROUP 1.....................$ 24.54 17.14
GROUP 2.....................$ 25.57 17.14
GROUP 3.....................$ 25.34 17.14
GROUP 4.....................$ 25.34 17.14
LABORERS CLASSIFICATIONS
GROUP 1: Cleaning, scrubbing, washing and polishing of floors, furniture and windows, stripping, dismantling, oiling and moving of concrete forms, loading, unloading and carrying of reinforced steel, handling and distribution of lumber of all other building materials, unloading, carrying, distributing and laying of pre- cast concrete slabs and planks in accordance with decisions of record, wrecking, moving and demolishing, underpinning and shoring of all structures, signal person and flag person, landscaping and nursery work, toolroom person, operators of salamanders, smudge pots, propane gas and kerosene burners and all other heating methods. Cleaning of precipitators, operating of jackhammers, busters, drills and all other pneumatic and electric hand tools, wagon drills, air and hydraulic, on or off tracks, power buggies, concrete mixers, pump and vibrators, walk- along compacting equipment, vibrating and tamping, gunniting machines (including the nozzle), operation of steam jennies, sandblasting (filling the pot, cleaning up of sand, use of nozzle), pumps 2: or under conveyors, vacuum cleaners, all types (ride or walk-along), concrete saws and cutting equipment, burning and welding torches, dynamite blasters and blaster tenders, swing scaffolds, slings and bosun chairs. Laying of non-metallic (clay, ironstone, terra cotta, vitrified concrete and plastic) pipe and making of joints for same, walk-along lifts and similar machines, pouring and placing of all concrete and related materials, all concrete curing applications.
GROUP 2: Asbestos removal, hazardous and toxic waste removal, all work in connection with handing, control, removal, abatement, encapsulation or disposal of asbestos and/or toxic waste will be assigned to the member of the Laborers' International Union of North America not to be limited to the erection, moving, servicing and dismantling of all tools and equipment normally used in the handling, control, removal or encapsulation of hazardous material, this Agreement covers work tasks associated with any and all safety requirements and final clean-up and disposal of such hazardous waste material.
GROUP 3: Mason tenders, mixing of mortar, plaster and mortar pumps, plaster tenders, caisson work, blast furnaces, coke ovens and all related work, erection and dismantling of all scaffolding, including tubular frame, manual and powered climbing scaffold, swing scaffolds, slings, bosum chairs, and all associated safety protection including barricades, nets and ropes, scaffold weather enclosures; shoring;
mortar buggies; concrete pumps; walk-behind forklifts;
electric welders torches, compressors, generators and the repair and maintenance of same; jackhammers, tampers;
cut-off saws & other power equipment required for demolition; rotary-hammer drills, electric & pneumatic hand-tools; transit, levels & lasers; tempering motar;
stocking scaffolds with masonry materials including brick, block, mortar, teera cotta, architectural pre-cast concrete, natural stone, insulation & mastic, flashing, anchors & ties, grount; mobile lifting platform scafforing powered by any power mode or method ; cleaning of all masonry debris.
GROUP 4: Skid-steering loader and folklift laborers.
Operation of rough terrain forklifts, skid-steering loaders.
PAIN0021-013 05/01/2020
Rates Fringes
Painters:
Brush and Roller............$ 28.63 20.28 Spray.......................$ 29.63 20.28
PLAS0592-002 06/01/2020
REMAINDER OF COUNTY
CEMENT MASON/CONCRETE FINISHER...$ 34.78 13.30
PLASTERER........................$ 35.36 12.30
PLAS0592-021 05/01/2014
TOBYHANNA ARMY DEPOT
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 31.23 10.00
PLASTERER........................$ 31.74 9.57
* PLUM0524-003 12/01/2020
Rates Fringes
Plumber and Steamfitter..........$ 44.74 21.32
ROOF0030-005 05/01/2020
Rates Fringes
Roofers:
Shingle.....................$ 29.50 20.90 Slate and Tile..............$ 32.50 20.90
* SHEE0044-005 05/01/2021
Rates Fringes
Sheet metal worker...............$ 31.60 26.65
TEAM0229-001 05/01/2018
Rates Fringes
Truck drivers:
GROUP 1.....................$ 35.32 0.00
GROUP 2.....................$ 35.39 0.00
GROUP 3.....................$ 35.88 0.00
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Flat Bed Truck (Single-Axle), Dump Trucks (Under 10 Yds Single Axle), Stake Body Trck (Single Axle), Dumpster (Single Axle)
GROUP 2: Dump Truck (Over 10 Yds), Asphalt Distributors, Transit Mix (Under 5 Yds), Transit Mix (Over 5 Yds.), Flat or Stake Body (Tandem), Fuel Truck A-Frame/Winch Trucks, Dry Batch Truck, Truck Mounted Sweeper and Vac Trucks, Buses, Dumpster (Tandem)
GROUP 3: Euclid-Type, Off Highway Equipment-Back or Double
Bottom Dump Trucks (Over 20 Tons), Straddle Trucks, Pusher, Articulate Dumped Trucks, Low Boy Trailers, Semi Trailers
Water Tank, Sprinkler Trucks, Winch Trucks and Fuel Trucks shall be governed by the appropriate classification as listed above.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
The following have been deleted:
WAGE DETEERMINATION
(End of Summary of Changes)
Amendment No. 0007
RFP W912BU21R0021
14. DESCRIPTION OF AMENDMENT (continued)
a. REQUESTS FOR INFORMATION (RFI) WITH RESPONSES: RFI’s with responses, annotated Amendment No. 0007, are attached to this amendment.
b. CONTRACT DRAWINGS:
(1) Please delete the following drawings in their entirety and substitute the revised drawings of the same numbers, with the latest revision date of 5 May 2021, attached hereto:
L-5 L-6
(2) Please delete the following drawings in their entirety and substitute the revised drawings of the same numbers, with the latest revision date of 13 May 2021, attached hereto:
C-19 C-28 C-29 C-30
C-31 ES14
c. Please indicate receipt of this amendment on Standard Form 1442
(SOLICITATION, OFFER, AND AWARD) as Amendment No. 0007. Failure to acknowledge all amendments may be cause for rejection of the bid.
This page was intentionally left blank for duplex printing.
Government Response RFI Date Received Received From Question Response to Bidder
028 20 04 2021 Nadiad Inc.
EXTERIOR ENTRANCES to each building: B1 101a, B2 101 and B3 101 do not appear to be listed within any of the hardware sets.
Follow the requirements of Spec Section 08 14 23, paragraph 2.5.
029 20 04 2021 Nadiad Inc.
Basement doors in building 1 and 2 (opening #’s B1 001 and B2 001) are listed under both hardware sets HW 001 and HW 003. I have a feeling that the three (3) EXTERIOR ENTRANCES listed under question 1 should be incorporated under hardware set HW 001. My thoughts are the basement doors #B1 001 and B2 001 should receive hardware set HW 003, please confirm?
Basement doors B1 001 and B2 001 should receive hardware set HW 003 as required by Spec Section 08 71 00 paragraph 3.5.
030 22 04 2021 S&S Mechanical Is all the 12470 volt between transformers to be incased in concrete?
Yes. See Amended drawing ES14.
031 22 04 2021 S&S Mechanical Who is responsible for pulling phone/TV wire? Refer to Notes on ES1, ES12 & ES 13.
032 22 04 2021 S&S Mechanical Is the electrical wage correct? Yes.
033 23 04 2021 Simplex Industries, Inc.
Given the current state and volatility of building materials (in particular lumber and panels) a price hold guarantee is going to be difficult being that costs are continuing to rise and it’s unknown what they are going to be at time of construction. Do you have any information on how this is being handled by others.
Bid project per the requirements stated on the SF1442 Part 13.
034 23 04 2021 Simplex Industries, Inc.
Within the spec book it mentions an Irrevocable Letter of Credit and also Payment & Performance Bonding. If we are providing bonds for the project is there still a need for an Irrevocable Letter of Credit? Would this be something that is even needed from the manufacturer as we would be bidding through a builder/GC.
Offerors must meet the requirements of the RFP. Subcontractors to offerors are not required to comply with bonding requirements.
035 23 04 2021 Simplex Industries, Inc.
There are some discrepancies between the information for materials/specs listed on the plans –vs what is listed in the spec book. Is it safe to assume that we are to follow the items listed within the plans and schedules?
Precedence of contract documents is governed by DFAR 252.236 7001 and FAR 52.236 21 Specifications and Drawings for Construction
036 23 04 2021 Simplex Industries, Inc.
Regarding the wage rates for on site, my fire protection company didn’t see any rates listed for a sprinkler fitter.
Are they able to use the plumber rate for this trade?
Yes, sprinkler fitters shall use the plumber rate.
037 23 04 2021 Intercontinental Construction Company Inc. Will cathodic protection be required for new water system Follow the requirements of Specification Section 22 00 00 paragraph 3.1.5 included in the RFP
038 23 04 2021 Intercontinental Construction Company Inc. Drawing C 19 shows 10” PVC sewer but calls it out as 8”
PVC in Note. What is the correct size pipe?
10" is the correct size. See amended drawing C 19.
039 23 04 2021 Intercontinental Construction Company Inc.
What are the sizes of the Compost Filter Sock that are required?
All Compost Filter sock shall be 12".
040 23 04 2021 Intercontinental Construction Company Inc.
Who installs the gas system piping and trenching?
Follow the requirements described in Note 9 on C 18 & C 19 and C 1.
041 23 04 2021 Intercontinental Construction Company Inc. Will the precast sanitary manholes require an interior coating?
Follow the requirements described on C 1 which refer offeror to PENNDOT standard details.
042 23 04 2021 Intercontinental Construction Company Inc.
What is the thickness of the 2A modified stone for the Tot Lot?
Follow the requirements of Specification Section 32 18 16.13 included in the RFP.
043 23 04 2021 Intercontinental Construction Company Inc.
Will amended soils be required for the permanent basins? (Basins 1 & 3)
Follow the requirements of the E&S plans.
Bidder Inquiry
Amendment No. 0007
Request For Information Page 1
044 23 04 2021 Intercontinental Construction
Company Inc.
Will air testing be required for storm sewer? Follow the requirements described in Specification
Section 33 30 00 Paragraph 3.3.1.
045 23 04 2021 Intercontinental Construction Company Inc.
What is the type of pipe required for the storm sewer? Note 4 on Drawings C 11 & C 12 says SLCPP for 12”. What about 15”, 18”, 24”, 36” and 8” perforated pipe, is that also
SLCPP?
Bid per RFP Documents. All storm pipe is SLCPP UNO.
046 23 04 2021 Intercontinental Construction Company Inc.
What size compost filter sock will be required around ponds
All Compost Filter sock shall be 12".
047 23 04 2021 Intercontinental Construction Company Inc. Please clarify Note #5 on Pond drawings C 28, C 29, & C 30.
What is this in reference to?
See Amended Drawings C 28,C 29, and C 30. This note is deleted.
048 23 04 2021
Intercontinental Construction Company Inc. Can the DOR update the landscaping plan? It seems like the quantities called out on the drawing L 5 exceed the total site area for the project?
See Amended drawings L 5 and L 6.
049 23 04 2021
Intercontinental Construction Company Inc. Can the government provide more in depth detail for the playground surface that’s required including the concrete base that it’s poured on?
Follow the requirements of Specification Section 32 18 16.13 included in the RFP.
050 23 04 2021
Intercontinental Construction Company Inc. There is detail on bollards but I don't see them referred anywhere in site drawings. Are there any bollards required for this project?
Follow the requirements of Specification Section 32 18 16.13 included in the RFP.
051 23 04 2021 Intercontinental Construction Company Inc.
Will the base bid need to include the necessary utility connections brought to the back side of the curb for (gas, sewer, water, rainwater collection) the 10 Bid Option Homes that will be constructed in the future if the options are not exercised?
Yes, follow the requirements of Specification Section 01 11 00, paragraph 1.21.
052 23 04 2021
Intercontinental Construction Company Inc. How will the landscaping be installed if none of the Bid Option homes are built? Will we just hydro seed the area for stabilization?
Yes, follow the requirements for "Grass Seed" shown on L 5 & L 6.
053 23 04 2021 Intercontinental Construction Company Inc.
Drawings C28, C29, & C30 show an impermeable liner in Basins 1, 2, & 3. If this is required, what are the specs on the liner? Is it PVC or HDPE and what type of backfill material will be required to be placed on top of it? If liners are required, why would they be installed in temporary basins?
See Amended Drawings C 28,C 29, and C 30.
054 23 04 2021 Intercontinental Construction Company Inc. What is the thickness of the riprap for riprap at both bypass culverts, for all outlet dissipator and for all influent dissipator
See Amended Drawings C 28, C 29, C 30 and C 31.
055 23 04 2021
Intercontinental Construction Company Inc. The pipe trench detail Is it the same for all type of utilities viz. Water, gas, sanitary sewer, stormwater?. If yes, let me know if no, please issue separate details.
No, Bid per RFP Documents
23 04 2021
Intercontinental Construction Company Inc. Do we have to provide a schedule with 1. Base bid + all options in one schedule OR 2. Base bid schedule + 10 schedule 1 each for the option OR 3. Base bid schedule only
Complete the Bid Schedule included in the RFP documents.
057 23 04 2021 Simplex Industries Inc Woodgrain texture entry doors –vs smooth fiberglass? Follow the requirements of Specification Section 08 14 23, paragraph 2.2
058 23 04 2021 Simplex Industries Inc
Stainless mesh child safety window screens –vs InView fiberglass by Pella? – Don’t believe SS screens are available through Pella
Follow the requirements of Specification Section 08 51 66 "Window Safety Screens".
059 22 04 2021 Panko Electric
Several vendors are having trouble quoting the light fixtures as there is no part number or manufacturer. Do you have specified part numbers that I have missed for these fixtures? I see on the scheduled it states that “Unless a sole source is specified, contractors are free to use any product which meets the governments minimum requirements
Follow the requirements of Specification Sections 26 51 00 & 26 56 00.
Bidder Inquiry
Amendment No. 0007
Request For Information Page 2
060 26 04 2021 Nadiad Inc.
Civil demolition sheets C 6 and C 7 , do not represent the extent of demolition relating to the buildings. The summary of work states the existing townhomes are to be demolished but the site demolition sheets do not represent this work. Kindly clarify extents of demolition.
Follow the requirements described in Note 1 on C 6 & C 7.
061 26 04 2021 Nadiad Inc.
Is the Backflow Preventer required on the domestic service to each building?
Follow the requirements described in Specifiation Section 22 00 00 Part 3.3.3.
062 26 04 2021 Nadiad Inc.
For the new construction should utilities to all Housing units in the Options be included in the base bid
The base bid includes utilities to the "curb line" for all
(26) homes. Follow the requirements of Specification Section 01 11 00, paragraph 1.21.
063 26 04 2021 Nadiad Inc.
And should grass be considered for the base bid in areas of the optional housing locations?
Kindly clarify as current landscape drawing L1 does not represent this information.
In the event options are not exercised install permanent erosion control by following the requirements for "Grass Seed" shown on L 5 & L 6.
26 04 2021 Ames1
Are we to include Amendment 2, Section 00 20 00 in the page count? This is the Past Performance Survey in Amendment 2
Yes, Amendment 2 is to be included in the proposal and will not count towards the page count.
26 04 2021 Ames1
If we include Section 00 20 00 which is the PPQ and submit with our proposal that will take up 15 of the 20 pages. Please advise.
Yes, the PPQ is to be included in the proposal and will not count towards the page count.
26 04 2021 Ames1
Do we include Tabs, Table of Contents and Cover sheets in the page count?
Yes, the Tabs, Table of Contents and Cover Sheets are to be included in the proposal and will not count towards the page count.
26 04 2021 Ames1 What type of font and font size is acceptable? Times Roman, 12 point font; single space.
26 04 2021 Ames1 Section 6.1.1 say to provide resumes. Will resumes be part of the page count?
Resumes are to be included in the proposal and will not count towards the page count.
26 04 2021 Ames1 Do you want alternate resumes for each position?
No.
070 26 04 2021 Ames1
Do we need to have a project that includes a Living areas, kitchen, bathrooms, bedrooms, storage, and basement including an attached garage combined (all 6 subsets) or is a project with just one of the subsets to element (a), such as a kitchen or a basement with an attached garage, acceptable as past performance for that element? Section
5.2 asks us to have each element (a) through (d) in our proposal but each element has several subsets or scopes.
Bid per the RFP documents. No exceptions to the past performance requirements will be allowed.
071 26 04 2021 Ames1
We have 540 calendar days to complete the work. Does this include the base bid only of 16 homes or does that have to include each Option as well.
Bid per RFP Documents. The duration will remain unchanged regardless of awarded options.
072 26 04 2021 Ames1 The current Version of LEED is 4.1. The project description in the FBO states LEED v4.0. Please verify we are to use v4.1
Bid per RFP Documents
073 26 04 2021 Ames1
The pandemic has caused an rapid increase in the cost of lumber and steel. Does the government want prime contractors to propose pricing based on their best guess for wood and steel material futures?
Bid project per the requirements stated on the SF1442 Part 13.
074 26 04 2021 Ames1 Would the government allow for an escalator in material pricing based on current wood and steel market prices?
Bid project per the requirements stated on the SF1442 Part 13.
075 26 04 2021 Ames1
The RFP includes unstamped drawings and references a design and Designer of Record, but doesn’t clarify if the Government or the Contractor is responsible for providing the design.
Stamped drawings, excluding delegated design, will be included in the award package to the successful offerer.
Bidder Inquiry
Amendment No. 0007
Request For Information Page 3
076 26 04 2021 Ames1 Who is responsible for the design of this project? The register notes, the government is approving all submittals.
Stamped drawings will be included in the award package to the successful offerer.
077 26 04 2021 Ames1
Can the government confirm they want softener tanks buttwelded steel construction conforming to the ASME
BPVC SEC VIII D1?
Follow the requirements found in specification section 22 00 00 Paragraph 2.11.3.1.
078 26 04 2021 Ames1 What is the background check process for working outside of the secure area?
The process will be addressed at the precon meeting with the successful offeror.
079 26 04 2021 Ames1
What are the TYAD Installation/ Facility specific access requirements for any personnel with a criminal record or child support background checks?
The process will be addressed at the precon meeting with the successful offeror.
080 26 04 2021 Ames1
Will the Government allow multifamily residential experience in lieu of single family residential? The RFP says "Note that at least one past project must be a single family residential housing project (any dollar size)"
Follow the requirements for source selection found in the solicitation.
081 26 04 2021 Ames1
In FBO it states "Measures in accordance with the Department of Defense DoD Minimum Antiterrorism for Buildings standards do not apply". Please confirm this Bid per RFP Documents
082 26 04 2021 Ames1
There are items in the specification that will not meet LEED Silver for Homes requirements. Will the Government provide a change order after award to update items to meet the LEED Silver for Homes that are in the current RFP? Bid per RFP Documents. Refer to Spec section 01 33 29 and attachments to see the plan to achieve LEED Silver in Attachments 1 & 2.
26 04 2021 Ames1
Would the Government allow key subcontractor experience from a housing manufacturer to satisfy any of the past performance requirements?
Bid per the RFP documents. No exceptions to the past performance requirements will be allowed.
29 04 2021 Harkins Builders, Inc
“b. If there is not a completed CPARS evaluation, the Offeror shall submit a Past Performance Questionnaire (PPQ) for the project (Attachment B) to this solicitation. Do not submit a PPQ when acompleted CPARS evaluation is available.” PPQ’s are mentioned in this section but are not included in the proposal outline. Where should we include them? Are they excluded from the 20 page limit?
Yes, the PPQ is to be included in the proposal and will not count towards the page count.
29 04 2021 Harkins Builders, Inc Is the schedule included in the 20 page limit? No.
29 04 2021 Harkins Builders, Inc
We assume Tabs/cover/table of contents are excluded from the page limit, is this correct?
Yes, the Tabs, Table of Contents and Cover Sheets are to be included in the proposal and will not count towards the page count.
29 04 2021 Harkins Builders, Inc Please confirm the page limit only applies to the technical proposal.
Yes.
29 04 2021 Harkins Builders, Inc
Please confirm JV agreements are not required in the technical proposal since they are asked for in the price proposal.
Confirmed.
Bidder Inquiry
Amendment No. 0007
Request For Information Page 4
| SF30 |
| AMENDMENT DESCRIPTION |
| REQUESTS FOR INFORMATION WITH RESPONSES |