W912BU21R0021-Specs-VOL2.pdf
PDF 860 KB Posted
- Attached to
- TOBYHANNA ARMY DEPOT FAMILY HOUSING
- Solicitation number
- W912BU21R0021
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP W912BU21R0021
US Army Corps of Engineers Philadelphia District
FY20 Army Family Housing
Tobyhanna Army Depot Tobyhanna, PA
Volume 2 of 3
Project Specifications and Drawings
11 March 2021
This page was intentionally left blank for duplex printing.
PROJECT TABLE OF CONTENTS
VOLUME 1 OF 3 - DIVISIONS 00 - 06
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01 PROJECT SCHEDULE
01 32 33 CONSTRUCTION PHOTOGRAPHY
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 53 ANTITERRORISM/OPERATIONS SECURITY (AT/OPSEC)
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 05 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 58 00 PROJECT AND SAFETY SIGNS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 04 - MASONRY
04 26 13 MASONRY VENEER
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 23 INTERIOR FINISH CARPENTRY
06 60 00 FIBERGLASS COLUMN COVERS
06 61 16 SOLID SURFACING FABRICATIONS
06 65 00 SIMULATED WOOD TRIM
VOLUME 2 OF 3 - DIVISIONS 07 - 23
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 26 SELF-ADHERING SHEET WATERPROOFING
07 21 00 THERMAL INSULATION
PROJECT TABLE OF CONTENTS Page 1
07 25 00 WEATHER BARRIERS
07 26 00 VAPOR RETARDERS
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 31 13 ASPHALT SHINGLES
07 46 16 ALUMINUM SOFFIT AND TRIM
07 46 33 PLASTIC SIDING
07 62 00 SHEET METAL FLASHING AND TRIM
07 71 00 ROOF SPECIALTIES
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 14 23 ENTRY DOORS
08 14 33 STILE AND RAIL WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 36 13 SECTIONAL OVERHEAD DOORS
08 51 66 WINDOW SAFETY SCREENS
08 54 13 FIBERGLASS WINDOWS
08 71 00 DOOR HARDWARE
DIVISION 09 - FINISHES
09 24 23 CEMENT STUCCO
09 29 00 GYPSUM BOARD
09 30 13 PORCELAIN TILING
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 28 00 TOILET, BATH AND LAUNDRY ACCESSORIES
DIVISION 11 - EQUIPMENT
11 31 13 ELECTRIC KITCHEN EQUIPMENT
11 68 13 PLAYGROUND EQUIPMENT
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 32 00 MANUFACTURED WOOD CASEWORK
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 00 MODULAR HOME CONSTRUCTION
DIVISION 21 - FIRE SUPPRESSION
21 21 00 FIRE EXTINGUISHING SPRINKLER SYSTEMS (RESIDENTIAL)
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
PROJECT TABLE OF CONTENTS Page 2
VOLUME 3 OF 3 - DIVISIONS 26 - 33
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 21 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 21 10.00 40 FIBER OPTIC DATA TRANSMISSION SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 31 49 PHOTOELECTRIC SMOKE AND CARBON MONOXIDE ALARMS
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 20 SUBBASE FOR FLEXIBLE PAVING
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 19 CONCRETE CURBS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 18 16.13 PLAYGROUND PROTECTIVE SURFACING
32 31 26 POLYVINYL (PVC) PRIVACY FENCE AND GATES
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 23 NATURAL GAS PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SECTION 07 13 26
SELF-ADHERING SHEET WATERPROOFING
03/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D570 (1998; E 2010; R 2010) Standard Test Method for Water Absorption of Plastics
ASTM D1970/D1970M (2019) Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection
ASTM D5385/D5385M (1993; R 2014; E 2014) Standard Test Method for Hydrostatic Pressure Resistance of Waterproofing Membranes
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
ASTM E154/E154M (2008a; R 2013; E 2013) Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, on Walls, or as Ground Cover
1.2 SUMMARY
Section Includes:
1. Modified bituminous sheet waterproofing.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Show locations and extent of waterproofing and details of substrate joints and cracks, expansion joints, sheet flashings, penetrations, inside and outside corners, tie-ins with adjoining waterproofing, and other termination conditions.
1. Include setting drawings showing layout, sizes, sections, Section 07 13 26 Page 1 profiles, and joint details of pedestal-supported concrete pavers.
C. Samples: For each exposed product and for each color and texture specified.
1.5 INFORMATIONAL SUBMITTALS
A. Sample warranties.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by waterproofing manufacturer.
1.7 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to furnish replacement waterproofing material for waterproofing that does not comply with requirements or that fails to remain watertight within specified warranty period.
1. Warranty Period: 10 years from date of Substantial Completion.
PART 2 PRODUCTS
2.1 MODIFIED BITUMINOUS SHEET WATERPROOFING
A. Modified Bituminous Sheet Waterproofing: Self-adhesive, cold-applied composite sheet consisting of a thickness of 0.6 mm (0.024 in.) of synthetic non-asphaltic adhesive and 0.2 mm (0.008 in.) of multi-layer cross-laminated, high density polyethylene film. Provide membrane covered with a release sheet which is removed during installation. No special adhesive or heat shall be required to form laps.
1. Physical Properties:
a. Tensile Strength, Membrane: 1000 psi (6.89 MPa) minimum;
ASTM D412, Die C, modified.
b. Ultimate Elongation: 150 percent minimum; ASTM D412, Die C, modified.
c. Low-Temperature Flexibility: Pass at minus 25 deg F (minus 32 deg C); ASTM D1970/D1970M.
d. Crack Cycling: Unaffected after 100 cycles of 1/8-inch (3-mm) movement; ASTM C836/C836M.
e. Puncture Resistance: 100 lbf (445 N) minimum; ASTM E154/E154M.
f. Water Absorption: 0.1 percent weight-gain maximum after 48-hour immersion at 70 deg F (21 deg C); ASTM D570.
g. Water Vapor Permeance: 0.1 perm (2.9 ng/Pa x s x sq. m) maximum; ASTM E96/E96M, Water Method.
h. Hydrostatic-Head Resistance: 200 feet (60 m) minimum;
ASTM D5385/D5385M.
2. Sheet Strips: Self-adhering, non-asphaltic strips of same material and thickness as sheet waterproofing.
2.2 AUXILLARY MATERIALS
A. Furnish auxiliary materials recommended by waterproofing manufacturer for intended use and compatible with sheet waterproofing.
Section 07 13 26 Page 2
1. Furnish liquid-type auxiliary materials that comply with VOC limits of authorities having jurisdiction.
B. Primer: Liquid solvent-borne primer recommended for substrate by sheet-waterproofing material manufacturer.
C. Surface Conditioner: Liquid, waterborne surface conditioner recommended for substrate by sheet-waterproofing material manufacturer.
D. Liquid Membrane: Elastomeric, two-component liquid, cold fluid applied, of trowel grade or low viscosity.
E. Substrate Patching Membrane: Low-viscosity, two-component, modified asphalt coating.
F. Metal Termination Bars: Aluminum bars, approximately 1 by 1/8 inch (25 by 3 mm), predrilled at 9-inch (229-mm) centers.
2.3 INSULATION DRAINAGE PANELS
A. Insulation: Comply with Section 072100 "Thermal Insulation" for general building insulation, including insulation drainage panels.
PART 3 EXECUTION
3.1 PREPARATION
A. Clean, prepare, and treat substrates according to manufacturer's written instructions. Provide clean, dust-free, and dry substrates for waterproofing application.
B. Mask off adjoining surfaces not receiving waterproofing to prevent spillage and overspray affecting other construction.
3.2 INSTALLATION OF MODIFIED BITUMINOUS SHEET-WATERPROOFING
A. Install modified bituminous sheets according to waterproofing manufacturer's written instructions.
B. Apply primer to substrates at required rate and allow it to dry. Limit priming to areas that will be covered by sheet waterproofing in same day.
Reprime areas exposed for more than 24 hours.
C. Apply and firmly adhere sheets over area to receive waterproofing.
Accurately align sheets and maintain uniform 2-1/2-inch- (64-mm-) minimum lap widths and end laps. Overlap and seal seams, and stagger end laps to ensure watertight installation.
1. When ambient and substrate temperatures range between 25 and 40 deg F (minus 4 and plus 5 deg C), install self-adhering, modified bituminous sheets produced for low-temperature application. Do not use low-temperature sheets if ambient or substrate temperature is higher than 60 deg F (16 deg C).
D. Horizontal Application: Apply sheets from low to high points of decks to ensure that laps shed water.
E. Apply continuous sheets over already-installed sheet strips, bridging
Section 07 13 26 Page 3 substrate cracks, construction, and contraction joints.
F. Seal edges of sheet-waterproofing terminations with mastic.
G. Install sheet-waterproofing and auxiliary materials to tie into adjacent waterproofing.
H. Repair tears, voids, and lapped seams in waterproofing not complying with requirements. Slit and flatten fishmouths and blisters. Patch with sheet waterproofing extending 6 inches (150 mm) beyond repaired areas in all directions.
I. Immediately install protection course with butted joints over waterproofing membrane.
1. Board insulation may be used in place of a separate protection course to vertical applications when approved by waterproofing manufacturer and installed immediately.
3.3 INSTALLATION OF MOLDED-SHEET DRAINAGE-PANELS
A. Place and secure molded-sheet drainage panels, with geotextile facing away from wall or deck substrate, according to manufacturer's written instructions. Use adhesive or another method that does not penetrate waterproofing. Lap edges and ends of geotextile to maintain continuity.
Protect installed molded-sheet drainage panels during subsequent construction.
1. For vertical applications, install board insulation before installing drainage panels.
3.4 INSTALLATION OF INSULATION DRAINAGE-PANELS
A. Install insulation drainage panels over waterproofed surfaces. Cut and fit to within 3/4 inch (19 mm) of projections and penetrations.
B. Ensure that drainage channels are aligned and free of obstructions.
C. On vertical surfaces, set insulation drainage panels in adhesive or tape applied according to manufacturer's written instructions.
D. On horizontal surfaces, loosely lay insulation drainage panels according to manufacturer's written instructions. Stagger end joints and tightly abut insulation units.
3.5 PROTECTION, REPAIR, AND CLEANING
A. Do not permit foot or vehicular traffic on unprotected membrane.
B. Protect installed insulation drainage panels from damage due to UV light, harmful weather exposures, physical abuse, and other causes. Provide temporary coverings where insulation is subject to abuse and cannot be concealed and protected by permanent construction immediately after installation.
C. Correct deficiencies in or remove waterproofing that does not comply with requirements; repair substrates, reapply waterproofing, and repair sheet flashings.
Section 07 13 26 Page 4
D. Clean spillage and soiling from adjacent construction using cleaning agents and procedures recommended in writing by manufacturer of affected construction.
-- End of Section --
Section 07 13 26 Page 5
SECTION 07 21 00
THERMAL INSULATION
01/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C578 (2018) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C1029 (2015) Standard Specification for Spray-Applied Rigid Cellular Polyurethane Thermal Insulation
ASTM C1289 (2018a) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM C1320 (2016) Standard Practice for Installation of Mineral Fiber Batt and Blanket Thermal Insulation for Light Frame Construction
ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building Materials
1.2 SUMMARY
A. Section Includes:
1. Extruded polystyrene foam-plastic board insulation.
2. Polyisocyanurate foam-plastic board insulation.
3. Mineral-wool blanket insulation.
1.3 ACTION SUBMITTALS
A. Product Data: For the following:
1. Extruded polystyrene foam-plastic board insulation.
2. Polyisocyanurate foam-plastic board insulation.
3. Mineral-wool blanket insulation.
B. Sustainable Design Submittals: Recycled content documentation in accordance with 01 33 29 SUSTAINABILITY REPORTING.
Section 07 21 00 Page 1
1.4 INFORMATIONAL SUBMITTALS
A. Installer's Certification: Listing type, manufacturer, and R-value of insulation installed in each element of the building thermal envelope.
1. Sign, date, and post the certification in a conspicuous location on Project site.
B. Product test reports.
C. Research reports.
PART 2 PRODUCTS
2.1 EXTRUDED POLYSTYRENE FOAM-PLASTIC BOARD INSULATION
A. Extruded Polystyrene Board Insulation, Type IV: ASTM C578, Type IV, 25-psi (173-kPa) minimum compressive strength; unfaced
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Dow Chemical Company (The).
b. Kingspan Insulation Limited.
c. Owens Corning.
2. Flame-Spread Index: Not more than 25 when tested in accordance with ASTM E84.
3. Smoke-Developed Index: Not more than 450 when tested in accordance with ASTM E84.
4. Labeling: Provide identification of mark indicating R-value of each piece of insulation 12 inches (305 mm) and wider in width.
2.2 POLYISOCYANURATE FOAM-PLASTIC BOARD INSULATION
A. Polyisocyanurate Board Insulation, Foil Faced: ASTM C1289, foil faced, Type I, Class 1 or 2.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Carlisle Coatings & Waterproofing Inc.
b. Dow Chemical Company (The).
c. Firestone Building Products.
d. Johns Manville; a Berkshire Hathaway company.
2. Labeling: Provide identification of mark indicating R-value of each piece of insulation 12 inches (305 mm) and wider in width.
2.3 MINERAL-WOOL BLANKET INSULATION
A. Mineral-Wool Blanket Insulation, Unfaced: ASTM C665, Type I (blankets without membrane facing); consisting of fibers; passing ASTM E136 for combustion characteristics.
Section 07 21 00 Page 2
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Johns Manville; a Berkshire Hathaway company.
b. Rockwool International.
c. Thermafiber, Inc.; an Owens Corning company.
2. Flame-Spread Index: Not more than 25 when tested in accordance with ASTM E84.
3. Smoke-Developed Index: Not more than 50 when tested in accordance with ASTM E84.
4. Labeling: Provide identification of mark indicating R-value of each piece of insulation 12 inches (305 mm) and wider in width.
2.4 ACCESSORIES
A. Insulation for Miscellaneous Voids:
1. Glass-Fiber Insulation: ASTM C764, Type II, loose fill; with maximum flame-spread and smoke-developed indexes of 5, per ASTM E84.
2. Spray Polyurethane Foam Insulation: ASTM C1029, Type II, closed cell, with maximum flame-spread and smoke-developed indexes of 75 and 450, respectively, per ASTM E84.
B. Insulation Anchors, Spindles, and Standoffs: As recommended by manufacturer.
C. Adhesive for Bonding Insulation: Product compatible with insulation and air and water barrier materials, and with demonstrated capability to bond insulation securely to substrates without damaging insulation and substrates.
D. Eave Ventilation Troughs: Preformed, rigid fiberboard or plastic sheets designed and sized to fit between roof framing members and to provide ventilation between insulated attic spaces and vented eaves.
PART 3 EXECUTION
3.1 INSTALLATION, GENERAL
A. Comply with insulation manufacturer's written instructions applicable to products and applications.
B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.
C. Install insulation with manufacturer's R-value label exposed after insulation is installed.
D. Extend insulation to envelop entire area to be insulated. Fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.
E. Provide sizes to fit applications and selected from manufacturer's
Section 07 21 00 Page 3 standard thicknesses, widths, and lengths. Apply single layer of insulation units unless multiple layers are otherwise shown or required to make up total thickness or to achieve R-value.
3.2 INSTALLATION OF SLAB INSULATION
A. On vertical slab edge and foundation surfaces, set insulation units using manufacturer's recommended adhesive according to manufacturer's written instructions.
B. On horizontal surfaces, loosely lay insulation units according to manufacturer's written instructions. Stagger end joints and tightly abut insulation units.
1. If not otherwise indicated, extend insulation a minimum of 24 inches (610 mm) in from exterior walls.
3.3 INSTALLATION OF FOUNDATION WALL INSULATION
A. Butt panels together for tight fit.
B. Adhesive Installation: Install with adhesive or press into tacky waterproofing or dampproofing according to manufacturer's written instructions.
3.4 INSTALLATION OF INSULATION IN FRAMED CONSTRUCTION
A. Blanket Insulation: Install in cavities formed by framing members according to the following requirements:
1. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill the cavities, provide lengths that will produce a snug fit between ends.
2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.
3. Maintain 3-inch (76-mm) clearance of insulation around recessed lighting fixtures not rated for or protected from contact with insulation.
4. Attics: Install eave ventilation troughs between roof framing members in insulated attic spaces at vented eaves.
5. For wood-framed construction, install blankets according to
ASTM C1320.
B. Miscellaneous Voids: Install insulation in miscellaneous voids and cavity spaces where required to prevent gaps in insulation using the following materials:
1. Glass-Fiber Insulation: Compact to approximately 40 percent of normal maximum volume equaling a density of approximately 2.5 lb/cu. ft. (40 kg/cu. m).
2. Spray Polyurethane Insulation: Apply according to manufacturer's written instructions.
Section 07 21 00 Page 4
Section 07 21 00 Page 5
SECTION 07 25 00
WEATHER BARRIERS
01/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E1677 (2011) Standard Specification For Air Barrier (AB) Material Or System For Low-Rise Framed Building Walls
1.2 SUMMARY
A. Section Includes:
1. Building wrap.
2. Flexible flashing.
3. Drainage material.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.4 INFORMATIONAL SUBMITTALS
A. Evaluation Reports: For water-resistive barrier and flexible flashing, from ICC-ES.
PART 2 PRODUCTS
2.1 WATER-RESISTIVE BARRIER
A. Building Wrap: ASTM E1677, Type I air barrier; with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, when tested according to ASTM E84; UV stabilized; and acceptable to authorities having jurisdiction.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Dow Chemical Company (The).
b. DuPont de Nemours, Inc.
Section 07 25 00 Page 1
c. TYPAR.
2. Water-Vapor Permeance: Not less than 20 perms (1150 ng/Pa x s x
sq. m) per ASTM E96/E96M, Desiccant Method (Procedure A).
B. Building-Wrap Tape: Pressure-sensitive plastic tape recommended by building-wrap manufacturer for sealing joints and penetrations in building wrap.
2.2 FLEXIBLE FLASHING
A. Rubberized-Asphalt Flashing: Composite, self-adhesive, flashing product consisting of a pliable, rubberized-asphalt compound, bonded to a high-density polyethylene film, aluminum foil, or spunbonded polyolefin to produce an overall thickness of not less than 0.030 inch (0.8 mm).
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Carlisle Coatings & Waterproofing Inc.
b. Fiberweb, Clark Hammerbeam Corp.
c. GCP Applied Technologies Inc.
d. TYPAR.
PART 3 EXECUTION
3.1 WATER-RESISTIVE BARRIER INSTALLATION
A. Cover sheathing with water-resistive barrier as follows:
1. Cut back barrier 1/2 inch (13 mm) on each side of the break in supporting members at expansion- or control-joint locations.
2. Apply barrier to cover vertical flashing with a minimum 4-inch (100-mm) overlap unless otherwise indicated.
B. Building Wrap: Comply with manufacturer's written instructions and warranty requirements.
1. Seal seams, edges, fasteners, and penetrations with tape.
2. Extend into jambs of openings and seal corners with tape.
3.2 FLEXIBLE FLASHING INSTALLATION
A. Apply flexible flashing where indicated to comply with manufacturer's written instructions.
1. Lap seams and junctures with other materials at least 4 inches (100 mm) except that at flashing flanges of other construction, laps need not exceed flange width.
2. Lap flashing over water-resistive barrier at bottom and sides of openings.
3. Lap water-resistive barrier over flashing at heads of openings.
Section 07 25 00 Page 2
Section 07 25 00 Page 3
SECTION 07 46 46
VAPOR RETARDERS
01/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D3833/D3833M (1996; R 2011) Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM D4397 (2016) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
ASTM E154/E154M (2008a; R 2013; E 2013) Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, on Walls, or as Ground Cover
1.2 SUMMARY
A. Section Includes:
1. Polyethylene vapor retarders.
B. Related Requirements:
1. Section 033000 "Cast-in-Place Concrete" for under-slab vapor retarders.
2. Section 072100 "Thermal Insulation" for vapor retarders integral with insulation products.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples: For fiber-cement siding and soffit including related accessories.
1.4 INFORMATIONAL SUBMITTALS
A. Product test reports.
PART 2 PRODUCTS
2.1 POLYETHYLENE VAPOR RETARDERS
A. Polyethylene Vapor Retarders: ASTM D4397, 6-mil- (0.15-mm-) thick sheet, with maximum permeance rating of 0.1 perm (5.7 ng/Pa x s x sq.m).
Section 07 26 00 Page 1
1. Puncture resistance: Maximum load no less than 40 pounds when tested according to ASTM E154/E154M REV A.
2.2 PRESSURE SENSITIVE TAPE
A. As recommended by manufacturer of vapor retarder(s). Match water vapor permeance rating for each vapor retarder specified. Provide tape in accordance with ASTM D3833/D3833M.
PART 3 EXECUTION
3.1 INSTALLATION
A. Install vapor retarders over prepared grade. Lap joints a minimum of 12 inches (305 mm) and seal with manufacturer's recommended tape.
B. Extend vapor retarders to extremities of areas to protect from vapor transmission. Secure vapor retarders in place with adhesives, vapor retarder fasteners, or other anchorage system as recommended by manufacturer. Extend vapor retarders to cover miscellaneous voids in insulated substrates, including those filled with loose-fiber insulation.
C. Seal vertical joints in vapor retarders over framing by lapping no fewer than two studs and sealing with vapor-retarder tape according to vapor-retarder manufacturer's written instructions. Locate all joints over framing members or other solid substrates.
D. Seal joints caused by pipes, conduits, electrical boxes, and similar items penetrating vapor retarders with vapor-retarder tape to create an airtight seal between penetrating objects and vapor retarders.
E. Repair tears or punctures in vapor retarders immediately before concealment by other work. Cover with vapor-retarder tape or another layer of vapor retarders.
3.2 INSTALLATION OF VAPOR RETARDERS IN CRAWL SPACES
A. Install vapor retarders over prepared grade. Lap joints a minimum of 12 inches (305 mm) and seal with manufacturer's recommended tape. Install second layer over pathways to equipment.
B. Extend vapor retarder over footings and seal to foundation wall or grade beam with manufacturer's recommended tape.
1. Extend vapor retarder vertically minimum 16 inches (406 mm) above top of footing.
C. Seal around penetrations such as utilities and columns in order to create a monolithic, airtight membrane at grade surface, perimeter, and all vertical penetrations.
Section 07 26 00 Page 2
SECTION 07 27 10.00 10
BUILDING AIR BARRIER SYSTEM
08/19
PART 1 GENERAL
1.1 SUMMARY
This Section specifies the construction and quality control of the installation of an air barrier system. Construct the air barrier system indicated, taking responsibity for the means, methods, and workmanship of the installation of the air barrier system. The air barrier must be contiguous and connected across all surfaces of the enclosed air barrier envelope indicated. The maximum leakage requirements of individual air barrier components and materials are specified in the other specification sections covering these items.
This section also defines the maximum allowable leakage of the final air barrier system. The workmanship must be adequate to meet the maximum allowable leakage requirements of this specification. Test the assembled air barrier system to demonstrate that the building envelope is properly sealed and insulated.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referenced within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D4541 (2017) Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
ASTM E2178 (2013) Standard Test Method for Air Permeance of Building Materials
ASTM E2357 (2017) Standard Test Method for Determining Air Leakage of Air Barrier Assemblies
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 285 (2012) Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Non-Load-Bearing Wall Assemblies Containing Combustible Components
1.3 DEFINITIONS
The following terms as they apply to this section:
Section 07 27 10.00 10 Page 1
1.3.1 Air Barrier Accessory
Products designated to maintain air tightness between air barrier materials, air barrier assemblies and air barrier components, to fasten them to the structure of the building, or both (e.g., sealants, tapes, backer rods, transition membranes, fasteners, strapping, primers).
1.3.2 Air Barrier Assembly
The combination of air barrier materials and air barrier accessories that are designated and designed within the environmental separator to act as a continuous barrier to the movement of air through the environmental separator.
1.3.3 Air Barrier Component
Pre-manufactured elements such as windows, doors, dampers and service elements that are installed in the environmental separator.
1.3.4 Air Barrier Envelope
The combination of air barrier assemblies and air barrier components, connected by air barrier accessories that are designed to provide a continuous barrier to the movement of air through an environmental separator. There may be more than one air barrier envelope in a single building. Also known as Air Barrier System.
1.3.5 Air Barrier Material
A building material that is designed, tested and/or produced to provide the primary resistance to airflow through an air barrier assembly of a wall system.
1.3.6 Air Barrier System
Same as AIR BARRIER ENVELOPE.
1.3.7 Air Leakage Rate
The rate of airflow (CFM) driven through a unit surface area (sq.ft.) of an assembly or system by a unit static pressure difference (Pa) across the assembly. (example: 0.25 CFM/sq.ft. @ 75 Pa)
1.3.8 Air Leakage
The total airflow (CFM) driven through the air barrier system by a unit static pressure difference (Pa) across the air barrier envelope. (example:
6500 CFM @ 75 Pa)
1.3.9 Air Permeance
The tested rate of airflow (CFM) through a unit area (sq.ft.) of a material driven by unit static pressure difference (Pa) across the material (example:
0.004 CFM/sq.ft. @ 75 Pa) as established by ASTM E2178.
1.3.10 Environmental Separator
The parts of a building that separate the controlled interior environment
Section 07 27 10.00 10 Page 2 from the uncontrolled exterior environment, or that separate spaces within a building that have dissimilar environments. Also known as the Control Layer.
1.3.11 Vapor Permeance
Vapor permeance is separated into three classes based on the water vapor permeance of a material as tested via ASTM E96/E96M
Class I Vapor Barrier/Retarder 0.1 perm or less
Class II Vapor Barrier/Retarder 0.1 perm to 1.0 perm
Class III Vapor Barrier/Retarder 1.0 perm to 10 perm
1.4 PREPARATORY PHASE OR PRECONSTRUCTION CONFERENCE
Organize pre-construction conferences between the air barrier inspector and the sub-contractors involved in the construction of or penetration of the air barrier system to discuss where the work of each sub-contractor begins and ends, the sequence of installation, and each sub-contractor's responsibility to ensure airtight joints, junctures, penetrations and transitions between materials. Discuss the products, and assemblies of products specified in the different sections to be installed by the different sub-contractors.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Air Barrier System Shop Drawings; G, Manufacturer produced warranted air barrier system
SD-03 Product Data
Air Barrier System Product Data; G
SD-04 Samples
Material Samples For Air Barrier System; G
SD-06 Test Reports
Testing and Inspection; G
1.6 AIR BARRIER ENVELOPE SURFACE AREA AND LEAKAGE REQUIREMENTS
The building air barrier systems must meet the following leakage requirements. The allowable leakage rate must not exceed 2.0 air changes per hour at a differential test pressure of 50 Pa. Also comply with the requirements of 01 33 29 SUSTAINABILITY REPORTING.
Section 07 27 10.00 10 Page 3
PART 2 PRODUCTS
2.1 AIR BARRIER
Provide air barrier system of compatible parts from one or several manufacturers coordinated by the contractor or provide a single warranted system provided by a primary manufacturer. The air barrier system as part of a tested exterior wall assembly must meet the conditions of acceptance as tested in accordance with NFPA 285. Materials used for roof assembly air barrier must conform to the appropriate UL and FM wind and fire requirements for the specified roof assemblies.
If a complete air barrier system from a single manufacturer is utilized, weather warranted on not warranted, the air barrier system must conform to
ASTM E2357.
Materials in the following categories as used in the air barrier system or assembly of the exterior wall system are tested and are required to conform to ASTM E2178: Self-adhered sheet membranes, fluid applied membranes, spray polyurethane foam, mechanically fastened commercial building wrap, factory bonded membranes to sheathing, and adhesive backed commercial building wrap and accessory products.
Other materials used as an air barrier such as concrete, glass, wood, metal or gypsum board may or may not conform to ASTM E2178 but are acceptable provided that when integrated into the air barrier system or assemblies that they are not subject to material or environmental induced degradation in their final produced state and once incorporated in the permanent construction.
All materials used must be identifiable through manufacturer testing data and/or literature to be compatible with all the attached or adjoining materials or substrates used in the system.
Provide Air Barrier System Shop Drawings, Material Samples for Air Barrier System and Air Barrier System Product Data.
PART 3 EXECUTION
3.1 QUALITY CONTROL
3.1.1 Documentation and Reporting
Document the entire installation process on daily job site reports. These reports include information on the Installer, substrates, substrate preparation, products used, ambient and substrate temperature, the location of the air barrier installation, the results of the quality control procedures, and testing results.
3.1.2 Quality Control Testing And Inspection
Conduct the following tests and inspections as applicable in the presence of the Contracting Officer during installation of the air barrier system, and submit quality control reports as indicated below.
a. Provide a Daily Report of Observations with a copy to the Contracting Officer.
b. Inspect to assure continuity of the air barrier system throughout the
Section 07 27 10.00 10 Page 4 building enclosure and that all gaps are covered, the covering is structurally sound, and all penetrations are sealed allowing for no infiltration or exfiltration through the air barrier system.
c. Inspect to assure structural support of the air barrier system to withstand design air pressures.
d. Inspect to assure masonry surfaces receiving air barrier materials are smooth, clean, and free of cavities, protrusions and mortar droppings, with mortar joints struck flush or as required by the manufacturer of the air barrier material.
e. Inspect and test to assure site conditions for application temperature, and dryness of substrates are within guidelines.
f. Inspect to assure substrate surfaces are properly primed if applicable and in accordance with manufacturer's instructions. Priming must extend at least 2 inches beyond the air barrier material to make it obvious that the primer was applied to the substrate before the air barrier material.
g. Inspect to assure laps in materials are at least a 2-inch minimum, shingled in the correct direction or mastic applied in accordance with manufacturer's recommendations, and with no fishmouths.
h. Inspect to assure that a roller has been used to enhance adhesion.
Identify any defects such as fishmouths, wrinkles, areas of lost adhesion, and improper curing. Note the intended remedy for the deficiencies.
i. Measure application thickness of liquid applied materials to assure that manufacturer's specifications for the specific substrate are met.
j. Inspect to assure that the correct materials are installed for compatibility.
k. Inspect to assure proper transitions for change in direction and structural support at gaps.
l. Inspect to assure proper connection between assemblies (membrane and sealants) for cleaning, preparation and priming of surfaces, structural support, integrity and continuity of seal.
m. Perform adhesion tests for fluid-applied and self-adhered air barrier membranes to assure that the manufacturer's specified adhesion strength properties are met. Determine the bond strength of coatings to substrate in accordance with ASTM D4541.
n. Provide cohesion tests for spray polyurethane foam (SPF). Perform the tests in accordance with the specification sections which specify these materials. Perform adhesion tests as follows: Using a coring tool remove a sample and determine the relative adhesion quality of the foam. If the foam is hard to remove and leaves small bits of foam on the substrate it is called cohesive foam failure and is considered the best adhesion. If the foam comes away from the substrate with some force but is clean, it is called a mechanical bond. If it comes away easily from the substrate, the adhesion is poor. Cohesive foam failure and a good mechanical bond are acceptable.
Section 07 27 10.00 10 Page 5
o. Provide written test reports of all tests performed.
3.2 REPAIR AND PROTECTION
Upon completion of inspection, testing, sample removal and similar services, repair damaged construction and restore substrates, coatings and finishes. Protect construction exposed by or for quality control service activities, and protect repaired construction.
Section 07 27 10.00 10 Page 6
SECTION 07 31 13
ASPHALT SHINGLES
08/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D41/D41M (2011; R 2016) Standard Specification for Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing
ASTM D226/D226M (2017) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
ASTM D1970/D1970M (2019) Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection
ASTM D3161/D3161M (2019) Standard Test Method for Wind-Resistance of Steep Slope Roofing Products (Fan-Induced Method)
ASTM D4586/D4586M (2007; E 2012; R 2012) Asphalt Roof Cement, Asbestos-Free
ASTM D4869/D4869M (2016a) Standard Specification for Asphalt-Saturated Organic Felt Underlayment Used in Steep Slope Roofing
ASTM D6380/D6380M (2003; E 2013; R 2013) Standard Specification for Asphalt Roll Roofing (Organic Felt)
U.S. DEPARTMENT OF ENERGY (DOE)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)
UNDERWRITERS LABORATORIES (UL)
UL 790 (2004; Reprint Jul 2014) Standard Test Methods for Fire Tests of Roof Coverings
1.2 DEFINITIONS
1.2.1 Top Lap
That portion of shingle overlapping shingle in course below.
Section 07 31 13 Page 1
1.2.2 Head Lap
The triple coverage portion of top lap which is the shortest distance from the butt edge of an overlapping shingle to the upper edge of a shingle in the second course below.
1.2.3 Exposure
That portion of a shingle exposed to the weather after installation.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Shingles
Energy Star Label for Asphalt Shingle; S
SD-04 Samples
Color Charts; G
SD-08 Manufacturer's Instructions
Application
SD-11 Closeout Submittals
Manufacturer's Warranty
Contractor's Warranty
1.4 DELIVERY AND STORAGE
Deliver materials in the manufacturer's unopened bundles and containers bearing the manufacturer's brand name. Keep materials dry, completely covered, and protected from the weather. Store according to manufacturer's written instructions. Store roll goods on end in an upright position or in accordance with manufacturer's recommendations. Immediately before laying, store roofing felt for 24 hours in an area maintained at a temperature not lower than 50 degrees F.
1.5 WARRANTIES
Warranties must begin on the date of Government acceptance of the work.
1.5.1 Manufacturer's Warranty
Furnish the asphalt shingle manufacturer's standard 30 year warranty for the asphalt shingles. The warranty must run directly to the Government.
Section 07 31 13 Page 2
1.5.2 Contractor's Warranty
Provide warranty for 5 years that the asphalt shingle roofing system, as installed, is free from defects in workmanship. When repairs due to defective workmanship are required during the Contractor's warranty period, the Contractor must make such repairs within 72 hours of notification.
When repairs are not performed within the specified time, emergency repairs performed by others will not void the warranty.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Shingles
Mineral granule-surfaced asphalt shingles, self-sealing, square tab, strip, architectural shingles weighing not less than 225 pounds per 100 square feet.
Shingles must meet the fire resistance requirements of UL 790 for Class A and the wind resistance requirements of ASTM D3161/D3161M, Class F. .
Shingle color must be in accordance with COLOR SCHEDULE - Provide color charts. Provide asphalt shingle that is Energy Star labeled. Provide data identifying Energy Star label for asphalt shingle product.
2.1.2 Mineral-Surfaced Asphalt Roll Roofing
ASTM D6380/D6380M.
2.1.3 Smooth-Surfaced Asphalt Roll Roofing
ASTM D6380/D6380M, Type II.
2.1.4 Underlayment
Asphalt-saturated felt conforming to ASTM D4869/D4869M or ASTM D226/D226M, Type II, number 30, without perforations or other material specified by the shingle manufacturer for use as underlayment.
2.1.4.1 Leak Barrier Underlayment
Self-adhering leak barrier or ice dam underlayment must comply with ASTM D1970/D1970M for sealability around nails.
2.1.5 Self-Adhering Membrane
Self-adhering rubberized asphaltic membrane, a minimum of 40 mils thick, and recommended by the shingle manufacturer for use as eaves flashing.
2.1.6 Nails for Applying Shingles and Asphalt-Saturated Felt
Aluminum or hot-dipped galvanized steel or equivalent corrosion resistant with sharp points and flat heads 3/8 to 7/16 inch in diameter. Shank diameter of nails must be a minimum of 0.105 inch and a maximum of 0.135 inch with garb or otherwise deformed for added pull-out resistance. Nails must be long enough to penetrate completely through or extend a minimum of 3/4 inch into roof deck, whichever is less, when driven through materials to be fastened.
Section 07 31 13 Page 3
2.1.7 Asphalt Roof Cement
ASTM D4586/D4586M, Type II.
2.1.8 Asphalt Primer
ASTM D41/D41M.
2.1.9 Ventilators
2.1.9.1 Ridge Vent Filtered , 12 inch width
Shingle over low profile ridge vent designed with external baffle to deflect wind and weather over the vent, with external baffle to create low pressure over the vent openings to "pull" air from the attic. Internal weather filter to protect the attic from wind driven rain, snow, dust and insects.
PART 3 EXECUTION
3.1 VERIFICATION OF CONDITIONS
Do not install building construction materials that show visual evidence of biological growth.
Ensure that roof deck is smooth, clean, dry, and without loose knots. Roof surfaces must be firm and free from loose boards, large cracks, and projecting ends that might damage the roofing. Vents and other projections through roofs must be properly flashed and secured in position, and projecting nails must be driven flush with the deck.
3.2 SURFACE PREPARATION
Cover knotholes and cracks with sheet metal nailed securely to sheathing.
Flash and secure vents and other roof projections, and drive projecting nails firmly home.
3.3 APPLICATION
Apply roofing materials as specified herein unless specified or recommended otherwise by shingle manufacturer's written instructions .
3.3.1 Underlayment
Provide for roof slopes 4 inches per foot and greater. Apply one layer of shingle underlayment to roof deck. Lay underlayment parallel to roof eaves, starting at eaves. Provide minimum 2 inch head laps, 4 inch end laps, and 6 inch laps from both sides over hips and ridges. Nail sufficiently to hold until shingles are applied. Turn up vertical surfaces a minimum of 4 inches.
3.3.2 Drip Edges
Provide metal drip edges as specified in Section 07 62 00 FLASHING AND SHEET METAL applied directly on the wood deck at eaves and over the underlayment at rakes. Extend back from edge of deck a minimum of 3 inches, and secure with nails spaced a maximum of 4 inches o.c. along inner edge.
Section 07 31 13 Page 4
3.3.3 Starter Strip
Apply starter strip at eaves, using 9 inch wide strip of mineral-surfaced roll roofing of a color to match shingles. Optionally, use a row of shingles with tabs removed and trimmed to ensure that joints are not exposed at shingle cutouts. Apply starter strip along eaves, overhanging the metal drip edge at eaves and rake edges 1/4 inch to 3/8 inch; fasten in a line parallel to and 3 to 4 inches above eave edge. Place nails so top of nail is not exposed in cutouts of first course of shingles. When roll roofing is provided, seal tabs of first course of shingles with asphalt roof cement.
3.3.4 Shingle Courses
Start first course with full shingle, and apply succeeding courses with joints staggered at thirds or halves. Butt-end joints of shingles must not align vertically more often than every fourth course. Apply shingle courses as follows:
a. Fastening: Do not drive fasteners into or above the factory-applied adhesive unless adhesive is located 5/8 inch or closer to top of cutouts. Place fasteners so they are concealed by shingle top lap and penetrate the head lap.
b. Shingles applied with nails: Nominal 5 inch exposure. Apply each shingle with minimum of four nails. Place one nail 1 inch from each end, and evenly space nails on a horizontal line a minimum of 5/8 inch above top of cutouts.
3.3.5 Hips and Ridges
Form with 9 by 12 inch individual shingles or with 12 by 12 inch shingles cut from 12 by 36 inch strip shingles. Bend shingles lengthwise down center with equal exposure on each side of hip or ridge. Lap shingles to provide a maximum 5 inch exposure, and nail each side in unexposed area 5-1/2 inches from butt and 1 inch in from edge.
3.3.6 Valleys
3.3.6.1 Open Sheet Metal Valleys
Corrosion-resistant metal valley flashing must be centered and placed vertically in the valley over the smooth-surfaced roll roofing, or specialty underlayment. Valley flashing must be a minimum of 24 inches (610
mm) wide, complying with 2018 IRC Table R905.2.8.2. Before installing and fastening flashing in place with metal cleats:
a. Install single layer of 36 inch wide, asphalt-saturated felt, centered on valley and extending entire length of valley over felt underlayment.
b. Cut regular shingle courses on each roof on true line 2 inches from valley centerline at top of valley, and increase width between lines by 1 inch for each 8 feet of valley length, continuing to eaves.
c. Apply 2 inch band of asphalt roof cement over flashing, along and under side of shingles adjoining valley.
d. Press shingles tightly into cement, and nail in normal manner, except apply nails not closer than 5 inches to valley centerline. Do not
Section 07 31 13 Page 5 drive nails through valley flashing.
e. Provide a 4 inch band of asphalt roof cement for fastening shingle tabs down along open metal gutters.
3.3.7 Flashing
3.3.7.1 Eave Flashing
Provide for roof slopes 4 inches per foot and greater. Provide eave flashing strips consisting of smooth-surfaced roll roofing. Flashing strips must overhang metal drip edge 1/4 inch to 3/8 inch and extend up the slope far enough to cover a point 12 inches inside interior face of exterior wall. Where overhangs require flashings wider than 36 inches, locate laps outside exterior wall face. Laps must be at least 2 inches wide and cemented with asphalt roof cement over entire length of lap. Lap end 12 inches and cement.
3.3.7.2 Stepped Flashing
For sloping roofs which abut vertical surfaces, provide stepped metal flashing as specified in Section 07 62 00 FLASHING AND SHEET METAL.
3.3.7.3 Vent and Stack Flashing
Apply shingles up to point where vent or stack pipe projects through roof, and cut nearest shingle to fit around pipe. Before applying shingles beyond pipe, prepare flange of metal pipe vent flashing as specified in Section 07 62 00 FLASHING AND SHEET METAL, by applying a 1/8 inch thick coating of asphalt roof cement on bottom side of flashing flange. Slip flashing collar and flange over pipe, and set coated flange in 1/16 inch coating of asphalt roof cement. After applying flashing flange, continue shingling up roof. Lap lower part of flange over shingles. Overlap flange with side and upper shingles. Fit shingles around pipe, and embed in 1/16 inch thick coating of asphalt roof cement where shingles overlay flange.
Section 07 31 13 Page 6
SECTION 07 46 33
ALUMINUM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .