863-B720-01_R3 AC Electrical One Line - Revision.pdf

PDF 675 KB Posted

Attached to
3270 Ensley Dry Dock W912BU21B0003
Solicitation number
W912BU21B0003
Issued by

About this file

This solicitation is for a new floating dry dock to replace an existing dry dock at the U.S. Army Corps of Engineers Ensley Engineering Yard in Memphis, Tennessee. The dry dock specifications include a length of 168 feet, beam of 77 feet, width between wing walls of 60 feet, wing wall depth of 31 feet, pontoon deck depth of 9 feet, maximum lift draft of 8 feet, and maximum ballast draft of 26 feet. The solicitation is organized into four phases for planning and scheduling, engineering, construction and testing, and delivery. The projected schedule allocates 30 days for phase one, 90 days for phase two, 330 days for phase three, and 45 days for phase four. Offerors must register in the System for Award Management and qualified service-disabled veteran or veteran-owned small businesses must register in the VetBiz Vendor Information Pages database. The last day for questions is seven days before the solicitation closes.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .