863-B670-01_R3 Vents Sounds Overflows Fills - Revision.pdf
PDF 201 KB Posted
- Attached to
- 3270 Ensley Dry Dock W912BU21B0003
- Solicitation number
- W912BU21B0003
About this file
This solicitation is for a new floating dry dock to replace an existing dry dock at the U.S. Army Corps of Engineers Ensley Engineering Yard in Memphis, Tennessee. The dry dock specifications include a length of 168 feet, beam of 77 feet, width between wing walls of 60 feet, wing wall depth of 31 feet, pontoon deck depth of 9 feet, maximum lift capacity draft of 8 feet, and maximum ballast draft of 26 feet. The solicitation is organized into CLINs 0001 and 0002, with CLIN 0001 consisting of four phases for planning and scheduling, engineering, construction and testing, and delivery. Key dates include a 30 day period for phase 0001AA, 90 days for phase 0001AB, 330 days for phase 0001AC, and 45 days for phase 0001AD. Delivery of the completed dry dock is required afloat at the Ensley Engineering Yard. The solicitation also provides contracting officer notes regarding the process for questions and amendments.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .