Q051: Page 25 of 34, W912BU18R00170001, Conform Copy, 2. “Proposal Submission

Requirements”, Volume III, Price still shows maximum page limit of 25.

A051: There is no page limitation on Volume III, “Price.”

Q052: In Q&A #033, offerors are instructed to use the RFP. Will the government please update the conformed RFP to reflect the response in Q&A #010?

A052: Amendment #1 and the Conform Copy of the RFP have been revised.

Q053: Pgs 4-6 of 34, CLINs 0003, 005, 0007, 0009, 0011 – Contractor Travel and PWS 1.6.11.

These CLINs are classified as COST CLINs. The Unit is designated as “Each”, and the CLIN appears to request/require an Estimated Cost. In the Q&A, specifically A018: “Additional (cost)

CLINs for travel have been established in order to facilitate payment for reimbursable travel required for training, conferences, etc. IAW PWS paragraph 1.6.11. These CLINs for travel are

“not separately priced” (NSP); offerors will not provide prices for these CLINs within Volume III, “Price”. Should these CLINs be populated with “NSP” in the Unit Price?

A053: Yes.

Q054: Page 18 of 75, W912BU18R00170001_Conform_Copy, Q&A #001; Volume II, Section 1, bullet #4. The referenced Q&A indicates that the Pre-Award Monitor’s contact has been deleted.

The requirement is still in the Conformed RFP. Will the Government please update the Conformed

RFP to reflect the Q&A response?

A054: Amendment #1 and the Conform Copy have been revised.

Q055: Page 19 of 75, W912BU18R00170001_Conform_Copy, Q&A #014; Volume II, Section 4.

Q&A 014 indicates the Letter of Commitment is removed. The requirement is still in the

Conformed RFP. Will the Government please update the Conformed RFP to reflect the Q&A response?

A055: Amendment #1 and the Conform Copy have been revised.

Q056: Page 20 of 75, W912BU18R00170001_Conform_Copy, Q&A #016; Volume II, bullet #12.

Q&A 014 indicates the “Hard” dates are removed from the RFP. The requirement is still in the

A056: Amendment #1 and the Conform Copy have been revised.

Q057: Q&A #001 and 035, Volume II, The Past Performance Questions is not included as an attachment to Amendment 0001. Would the Government please release the PPQ for offerors to ensure timely response from the POCs?

A057: The PPQ is attached. Offerors should include as many additional pages as needed to describe their relevant past performance.

Q058: Q&A # 044, PWS 1.4.1.1, Amendment 0001, PWS 1.4.1.1 does not conform to the

Government’s response. Will the Government please update the Conformed RFP PWS to reflect the Q&A response?

A058: Amendment #1 and the Conform Copy have been revised.

Q059: Pgs 4-6 of 34, Amendment 0001, CLINs 0003, 005, 0007, 0009, 0011 – Contractor Travel and PWS 1.6.11 These CLINs are classified as COST CLINs. The Unit is designated as “Each”, and the CLIN appears to request/require an Estimated Cost. In the Q&A, specifically A018:

“Additional (cost) CLINs for travel have been established in order to facilitate payment for reimbursable travel required for training, conferences, etc. IAW PWS paragraph 1.6.11. These

CLINs for travel are “not separately priced” (NSP); offerors will not provide prices for these

CLINs within Volume III, “Price”. Should these CLINs be populated with “NSP” in the Unit

Price?

A059: Yes.

Q060: Page 18 of 75 W912BU18R00170001_Conform_Copy Q&A #001; Volume II, Section 1, bullet #4. The referenced Q&A indicates that the Pre-Award Monitor’s contact has been deleted.

The requirement is still in the Conformed RFP. Will the Government please update the Conformed

RFP to reflect the Q&A response?

A060: Amendment #1 and the Conform Copy have been revised.

Q061: Page 19 of 75, W912BU18R00170001_Conform_Copy, Q&A #014; Volume II, Section 4.

Q&A 014 indicates the Letter of Commitment is removed. The requirement is still in the

A061: Amendment #1 and the Conform Copy have been revised.

Q062: Page 20 of 75, W912BU18R00170001_Conform_Copy, Q&A #016; Volume II, bullet #12.

Q&A 014 indicates the “Hard” dates are removed from the RFP. The requirement is still in the

A062: Amendment #1 and the Conform Copy have been revised.

Q063: Q&A #001 and 035, Volume II, The Past Performance Questions is not included as an attachment to Amendment 0001. Would the Government please release the PPQ for offerors to ensure timely response from the POCs?

A063: Attached.

Q064: Q&A #044, PWS 1.4.1.1, Amendment 0001, PWS 1.4.1.1 does not conform to the

Government’s response. Will the Government please update the Conformed RFP PWS to reflect the Q&A response?

A064: Amendment #1 and the Conform Copy have been revised.

Q065: Page 17 of 75, Tab 3-Sub-factor 3, 4th bullet and PWS Appendix A. Please confirm the data in Appendix A is the most up-to-date information bidders shall use to respond the 4th bullet requirement in Sub-factor 3.

A065: Amendment #2 includes a revised Appendix A.