W912BU18B0004V1-Specs.pdf
PDF 5 MB Posted
- Solicitation number
- W912BU-18-B-0004_
About this file
W912BU18B0004V1-Specs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TYAD_Wells_Formal_Abstract.pdf | ||
| W912BU-18-B-0004_0005.pdf | ||
| W912BU-18-B-0004-Amendment-4.pdf | ||
| W912BU-18-B-0004_0003.pdf | ||
| W912BU-18-B-0004_0002.pdf | ||
| Wells_Site_Visit_Attendance_12-4-18.xlsx | XLSX spreadsheet | |
| RFI_Spreadsheet.xls | XLS spreadsheet | |
| W912BU-18-B-0004_0001.pdf | ||
| FIRST_PAGE_CORRECTION.pdf | ||
| W912BU18B0004-DwgsPart1.pdf | ||
| W912BU18B0004-DwgsPart2.pdf | ||
| W912BU18B0004V2-Specs.pdf | ||
| W912BU-18-B-0004(1).pdf | ||
| W912BU18B0004V3-Specs(1).pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB W912BU-18-B-0004
US Army Corps of Engineers
Philadelphia District
Water Supply System Upgrades
Tobyhanna Army Depot Tobyhanna, Pennsylvania
Volume 1 of 3 General Requirements
Construction Solicitation and Specifications
19 November 2018
This page was intentionally left blank for duplex printing.
19 November 2018
IFB NO. W912BU-18-B-0004
PHILADELPHIA DISTRICT
CORPS OF ENGINEERS
INVITATION FOR BIDS
WATER SUPPLY SYSTEM UPGRADES
TOBYHANNA ARMY DEPOT,
TOBYHANNA, PENNSYLVANIA
I. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL OPPORTUNITY
CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS
SOLICITATION.
II. BIDDERS ARE REQUIRED TO COMPLETE THE REPRESENTATIONS AND
CERTIFICATIONS PORTION OF SECTION 00 45 00 OF THIS SOLICITATION AND
SUBMIT THIS WITH THEIR PROPOSAL.
III. A SITE VISIT IS SCHEDULED FOR 29 NOVEMBER 2018 AT 10 AM. THE SITE
VISIT WILL DEPART FROM THE TOBYHANNA ARMY DEPOT VISITOR’S CENTER
LOCATED AT THE SCRANTON ACCESS CONTROL POINT. PROSPECTIVE OFFERORS
ARE ENCOURAGED TO ARRIVE A MINIMUM OF 15 MINUTES PRIOR TO THE
SCHEDULED START TIME IN ORDER TO SIGN IN AND BOARD GOVERNMENT
FURNISHED TRANSPORTATION TO THE PROJECT SITE. CONTRACTORS WILL NOT
BE ALLOWED TO USE PERSONAL VEHICLES TO ACCESS THE SITE. ATTENDEES
SHOULD EMAIL JOE DURKIN BY 26 NOVEMBER 2018 AT
JOSEPH.A.DURKIN@USACE.ARMY.MIL TO BE ADDED TO THE SITE VISIT LIST.
THE PHYSICAL ADDRESS FOR TYAD IS:
11 HAP ARNOLD BLVD
TOBYHANNA ARMY DEPOT
TOBYHANNA, PA 18466
Section 00 10 00 Page 4
BIDDING SCHEDULE
(To be attached to SF 1442)
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount_____
1. Water Supply System Upgrades 1 JOB L.S. $___________
TOTAL ESTIMATED AMOUNT $______________
I FB W912BU- 18- B- 0004
SECTI ON 00 50 05
PRE- AWARD SURVEY SUBMI TTAL REQUI REMENTS
PART 1 GENERAL
1. 1 DEFI NI TI VE RESPONSI BI LI TY CRI TERI A
Awar d of t hi s Cont r act wi l l be made as a whol e t o t he l owest r esponsi ve and r esponsi bl e Bi dder whose bi d conf or ms t o al l r equi r ement s of t he speci f i cat i ons. Subsequent t o t he bi d openi ng, t he appar ent l ow Bi dder shal l submi t Pr e- Awar d Sur vey I nf or mat i on t hat demonst r at es compl i ance wi t h t he r equi r ement s set f or t h i n t hi s sect i on as a pr econdi t i on t o r ecei v i ng awar d.
1. 2 GENERAL PRE- AWARD SURVEY I NFORMATI ON
Compl et e t he pr e- awar d sur vey i nf or mat i on sheet s at t ached t o t hi s sect i on, and submi t t o t he Cont r act i ng Of f i cer wi t hi n 5 cal endar days af t er bi d opening.
PART 2 PRODUCTS ( Not Appl i cabl e)
PART 3 EXECUTI ON ( Not Appl i cabl e)
- - End of Sect i on - -
Sect i on 00 50 05 Page 1
US ARMY CORPS OF ENGINEERS
PHILADELPHIA DISTRICT
PRE-AWARD SURVEY
A. GENERAL INFORMATION
1) Name of Firm: ___________________________________________________________________
Address: __________________________________________________________________________
Phone: _____________________________________ Fax:__________________________________
Email: ____________________________________________________________________________
CAGE CODE:
If your company has more than one CAGE Code, please list all that apply.
2) Location where accounts are kept (if different than item 1 above): ____________________________
3) Type of Firm (Please check one):
Sole Proprietorship [ ] Partnership [ ] Corporation [ ] Joint Venture [ ] Other
Date Organized: ____________________________________
Date Incorporated: __________________________________
State of Incorporation: _______________________________
4) Attach list of Name of Officers.
Please check "Yes" or "No" for each of the following:
Have current officers of your firm ever been indicted? Yes [ ] No [ ]
Are any of your officers currently under indictment? Yes [ ] No [ ]
If you have answered "Yes" to either of the above, please attach an explanation.
5) Has your firm been terminated for default on any contracts in the past six years? Yes [ ] No [ ] (If yes, please attach an explanation)
00 50 05 Page 2
B. PROPOSED SCHEDULE
Submit a preliminary schedule depicting your project plan from start to final completion. The schedule you submit will be used to determine your ability to successfully perform the project within the time frame stated in the specifications.
IAW FAR 52.236-15, Schedules for Construction Contracts, you will be required to submit a fully loaded schedule within five days after work commences on the awarded contract.
C. PERFORMANCE AND PAYMENT BOND INFORMATION
1) Performance & Payment Bonds will be furnished by:
Name of Company: _______________________________________________________________
Phone No: _____________________________________________________________________
2) Firm's bonding capacity as authorized by your Insurance Company:
Single Project: ___________________________________________________________________
Aggregate Basis: _________________________________________________________________
D. BANKING INFORMATION
Name of Bank: ___________________________________________________________________
Address: ________________________________________________________________________
Account Representative: ____________________________________________________________
Phone No: ________________________________ E-mail: _______________________________
Authorized Credit Line: ________________________________________________
If additional banks are utilized, please provide this information for each.
E. INSURANCE INFORMATION
Name of Insurance Company: ______________________________________________________
Type of Insurance Provided: _______________________________________________________
Insurance Agency: _______________________________________________________________
Address: _______________________________________________________________________
Agent: _________________________________________________________________________
Phone No: ______________________________ Email: _________________________________
If more than one insurance company is utilized, please provide this formation for each.
00 50 05 Page 3
F. FINANCIAL DATA
Please provide the last two certified public accountant's financial statements.
G. SAFETYDATA
Please check "Yes" or "No" for each of the following:
1. Does your firm have a Standard Operating Procedure for Safety?
Yes [ ] No [ ] If yes, please provide a copy.
Does your firm have a Policy Letter dealing with Safety?
Yes [ ] No [ ] If yes, please provide a copy.
2. What was your accident rate for last year? _____________________
3. What is your accident rate to date for this year? ____________________
H. QUALITY CONTROL DATA
Please check "Yes" or "No" for each of the following:
1. Does your firm have a Standard Operating Procedure for Quality Control?
Yes [ ] No [ ] If yes, please provide a copy.
2. Does your firm have a Policy Letter dealing with Quality Control?
Yes [ ] No [ ] If yes, please provide a copy.
I. EQUIPMENT DATA
Please provide the following data for each piece of construction equipment (including equipment you will rent or lease), intended to be used on the project. Do not include consumables.
Make Year Mfg.
Description Purchase Price (if equipment is owned) Size Book Value (if equipment is owned) Model Number Unpaid Balance (if equipment is owned)
J. EXPERIENCE DATA
1. Please provide the following data for all major projects in progress or completed with the past three years.
Also, provide the same data for Corps of Engineer projects completed within the last five years. Those projects containing work similar in nature to that involved under this solicitation are to marked with an asterisk (*).
Name and Address of Owner Point of Contact and Telephone Number Project Location Type of Work performed by your firm Indicate whether you performed as a prime or subcontractor Name of Architect/Engineer in charge for Owner Address of Architect/Engineer Contract or Subcontract Amount Approximate date completed or, if not completed provide percent complete
00 50 05 Page 4
Were time extensions necessary? Were penalties imposed? Were liens, claims or stop work orders filed?
2. How many years have you been in business as a contractor? ________________________________
3. How many years experience in the type of work involved in the subject solicitation do you have
a) as prime contractor? ___________________________________
b) as a subcontractor? ___________________________________
K. KEY PROJECT PERSONNEL
Please provide resumes for each of the following key personnel to be assigned to this project:
Project Engineer, Superintendent, Quality Control Manager/Technician, Safety Technician, Office Engineer
(Signature of Person Supplying Data)
(Print or Type Name and Title of Person Supplying Data)
(Phone No.)
(Email Address)
00 50 05 Page 5
SECTION 00 73 46
WAGE RATES
Section 00 73 46 Page 1
General Decision Number: PA180040 10/12/2018 PA40
Superseded General Decision Number: PA20170040
State: Pennsylvania
Construction Type: Heavy Sewer/Water Treating Plant
Counties: Adams, Berks, Bradford, Carbon, Columbia, Cumberland, Dauphin, Juniata, Lackawanna, Lancaster, Lebanon, Lehigh, Luzerne, Lycoming, Monroe, Montour, Northampton, Northumberland, Perry, Pike, Schuylkill, Snyder, Sullivan, Susquehanna, Tioga, Union, Wayne, Wyoming and York Counties in Pennsylvania.
SEWAGE AND WATER TREATMENT PLANT PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above mentioned types of contracts entered into by the federal government that are subject to the Davis Bacon Act itself, but it does not apply to contracts subject only to the Davis Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2) (60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 02/23/2018 2 04/13/2018 3 04/20/2018 4 05/04/2018 5 05/11/2018 6 05/18/2018 7 06/01/2018 8 06/08/2018 9 06/22/2018 10 06/29/2018
Section 00 73 46 Page 2
11 08/03/2018 12 08/10/2018 13 08/17/2018 14 08/24/2018 15 08/31/2018 16 09/07/2018 17 10/05/2018 18 10/12/2018
BOIL0013 004 03/01/2018
Rates Fringes
BOILERMAKER......................$ 45.89 33.39
BRPA0005 002 04/29/2018
CARBON and LEHIGH COUNTIES
Rates Fringes
BRICKLAYER.......................$ 32.14 17.81
BRPA0005 004 05/01/2017
MONROE AND NORTHAMPTON COUNTIES
Rates Fringes
Marble & Tile Setter.............$ 29.20 16.38
BRPA0005 014 05/01/2017
ADAMS, BRADFORD, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA,
LANCASTER, LEBANON, LYCOMING, MONTOUR, NORTHUMBERLAND, PERRY,
SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES
Rates Fringes
Marble & Tile Setter.............$ 29.27 14.55
BRPA0005 015 04/30/2017
ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, LEBANON, PERRY, UNION,
AND YORK counties
Rates Fringes
Section 00 73 46 Page 3
Bricklayer, Stonemason...........$ 32.54 14.55
BRPA0005 019 04/30/2017
LACKAWANNA, LUZERNE, PIKE, SUSQUEHANNA, WAYNE, AND WYOMING
COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 33.82 15.05
BRPA0005 020 05/01/2017
LACKAWANNA, LUZERNE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING
COUNTIES
Rates Fringes
Marble & Tile Setter.............$ 31.03 14.00
BRPA0005 026 04/30/2017
BERKS COUNTY
Rates Fringes
BRICKLAYER.......................$ 34.11 13.68
BRPA0005 027 05/01/2017
BERKS COUNTY
Rates Fringes
Marble & Tile Setter.............$ 30.14 13.68
BRPA0005 036 04/30/2017
COLUMBIA, MONTOUR, NORTHUMBERLAND, JUNIATA, MIFFLIN,
SCHUYLKILL, SNYDER AND SULLIVAN COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 31.04 16.18
BRPA0005 053 04/30/2017
Section 00 73 46 Page 4
BRADFORD, TIOGA, LYCOMING AND UNION COUNTIES
Rates Fringes
BRICKLAYER.......................$ 32.77 14.83
BRPA0005 054 05/01/2017
Rates Fringes
TERRAZZO FINISHER................$ 30.39 15.96
TERRAZZO WORKER/SETTER...........$ 30.63 17.92
BRPA0005 073 05/01/2017
CARBON AND LEHIGH COUNTIES
Rates Fringes
Marble & Tile Setter.............$ 28.15 17.43
BRPA0005 074 04/30/2017
MONROE and NORTHAMPTON COUNTIES
Rates Fringes
BRICKLAYER.......................$ 32.77 16.38
CARP0076 008 05/01/2011
MONTOUR, NORTHUMBERLAND, SNYDER AND UNION COUNTIES
Rates Fringes
Carpenter & Soft Floor Layer.....$ 27.03 11.43
CARP0076 009 05/01/2011
COLUMBIA, SCHUYLKILL, and lower part of Luzerne county; In Carbon county Banks, Lausanne, Lehigh, Packer, Kidder Townships and that part of Penn Forest Township, North of Route 903
Rates Fringes
Carpenter & Soft Floor Layer.....$ 27.03 11.43
CARP0076 010 05/01/2013
Section 00 73 46 Page 5
COLUMBIA, MONTOURS, NORTHUMBERLAND, SCHUYLKILL, SNYDER, UNION,
the lower part of Luzerne county,(CARBON COUNTY, Banks, Louisanna, Lehigh, Packer, Kidder Twps, and part of Penn. of Penn Forest Township north of Route 903
Rates Fringes
MILLWRIGHT.......................$ 32.16 15.59
CARP0076 011 05/01/2013
COLUMBIA, MONTOUR, NORTHUMBERLAND, SCHUYLKILL, SNYDER, UNION,
the lower part of Luzerne county, Carbon County, Banks, Lusanna, Lehigh, Packer, Kidder townships, and part of Penn Forest
Rates Fringes
MILLWRIGHT.......................$ 32.16 15.59
CARP0167 004 05/01/2018
BERKS, CARBON, LANCASTER, LEHIGH and NORTHAMPTON COUNTIES
Rates Fringes
CARPENTER........................$ 33.99 25.54
CARP0179 007 05/01/2018
BERKS, CARBON, LANCASTER, LEHIGH and NORTHAMPTON COUNTIES
Rates Fringes
PILEDRIVERMAN....................$ 43.45 34.47
CARP0191 001 05/01/2011
YORK COUNTY
Rates Fringes
CARPENTER........................$ 27.03 11.43
MILLWRIGHT.......................$ 26.56 13.02
CARP0219 007 05/01/2018
CARBON (Townships: East Penn, Lower Towamensing, Mahoning, Section 00 73 46 Page 6
Franklin, Towamensing, Penn Forest. Everything south of Route 903 and east to the Kidder Township Line. Boroughs: Hauto, Nesquehoning, Lansford, Summit Hill, Jim Thorpe, Weissport, Bownmanstown, Palmerton, Lehighton, and Parryville) , LEHIGH
AND NORTHAMPTON COUNTIES
Rates Fringes
MILLWRIGHT.......................$ 41.62 29.79
CARP0261 004 05/23/2011
LACKAWANNA, MONROE, PIKE, SUSQUEHANNA, WAYNE, AND WYOMING (East of Susquehanna River) COUNTIES
Rates Fringes
Carpenter & Soft Floor Layer.....$ 25.60 12.85
MILLWRIGHT.......................$ 25.50 9.55
CARP0287 007 05/01/2008
ADAMS, CUMBERLAND, DAUPHIN, JUNIATA, LEBANON, LANCASTER, AND
YORK (New Cumberland Army Depot and Harrisburg Airport)
Rates Fringes
Carpenter & Soft Floor Layer.....$ 24.77 8.69
CARP0287 008 05/01/2008
ADAMS, CUMBERLAND, DAUPHIN, JUANIATA, LANCASTER, LEBANON,
PERRY, YORK (New Cumberland Army Depot and Harrisburg State Airport) COUNTIES
Rates Fringes
MILLWRIGHT.......................$ 26.56 13.02
CARP0492 003 06/01/2015
BERKS
Rates Fringes
Carpenter & Soft Floor Layer.....$ 28.16 15.02
Section 00 73 46 Page 7
CARP0492 004 05/01/2015
BERKS COUNTY
Rates Fringes
MILLWRIGHT.......................$ 34.00 17.05
CARP0514 003 06/01/2017
LUZERNE (Except Black Creek, Butler, Dennison, Foster, Freeland, Hanle, Hazleton, Hollenback, Nespeck, the lower part of Salem, and Sugarloaf), SULLIVAN, Red Rock Air Base), and WYOMING (West of the Susquehanna River) COUNTIES
Rates Fringes
Carpenter & Soft Floor Layer.....$ 28.88 15.65
CARP0514 006 06/01/2017
BRADFORD, LYCOMING, SULLIVAN (Except Red Rock Air Force Base), AND TIOGA COUNTIES
Rates Fringes
Carpenter & Soft Floor Layer.....$ 28.88 15.65
CARP0514 007 06/01/2008
BRADFORD, LYCOMING, SULLIVAN, TIOGA, LUZERNE (Except Block Creek, Butler, Dennison, Foster, Hazle, Hollenbback, Nescopeck, Sugarloaf and lower part of Salem Township and Wyoming including all areas west of Susquehanna River and Red Rock Air Force Base.
Rates Fringes
MILLWRIGHT.......................$ 26.56 13.02
CARP0600 003 05/01/2015
LEHIGH, MONROE (Except Tobyhanna Army Depot), AND NORTHAMPTON
COUNTIES
Section 00 73 46 Page 8
CARPENTER........................$ 32.14 24.09
CARP1823 004 05/01/2015
Rates Fringes
FLOOR LAYER: Carpet.............$ 31.47 24.69
CARP2274 003 05/01/2018
Adams, Bradford, Columbia, Cumberland, Dauphin, Juniata, Lackawanna, Lebanon, Luzerne, Lycoming, Monroe, Montour, Northumberland, Perry, Pike, Schuylkill, Snyder, Sullivan, Susquehanna, Tioga, Union, Wayne, Wyoming and York
Rates Fringes
CARPENTER........................$ 30.75 15.96
PILEDRIVERMAN....................$ 30.75 15.96
ELEC0081 006 06/01/2018
BRADFORD (Area East of the Susquehanna River); LACKAWANNA;
LUZERNE (Area East of a line following the Susquehanna River South to the City of Pittson, East and South on the limits of Pittson but excluding it, to U.S. Highway 11, East on 11 to Dupont Burough and Highway 215, and Southeast on 215. Also the portion of Luzerne County South and East of a line following Thornhurst Road, Southwest to State Highway 115 and Southeast on 115 to Monroe County line); MONROE (Barrett, Coolbaugh, Paradise, Price, and Tobyhanna Townships); PIKE COUNTY (Except Delaware, Lehman, and Porter Townships); SUSQUEHANNA,WAYNE, AND WYOMING (East of the Susquehanna River)
Rates Fringes
ELECTRICIAN......................$ 39.78 3%+17.25
ELEC0102 006 05/29/2017
MONROE (Remainder of County), NORTHAMPTON (Remainder) AND PIKE (Delaware, Lehman, and Porter) COUNTIES
Rates Fringes
Section 00 73 46 Page 9
ELECTRICIAN......................$ 55.93 56.50%
ELEC0143 006 06/01/2018
BERKS (Bethel, Marion, and Tulpehocken Townships); CUMBERLAND;
DAUPHIN; JUNIATA; LANCASTER (That portion Northwest of a line extending from the Susquhanna River to the intersection of State Highways 441 and 241 along 241 to the Borough of Elizabethtown, around the limits of Elizabethtown on the West and North Side, including the Masonic Homes in Elizabethtown, continiuing along State Highway 241 to Lebanon County and that portion North of the Pennsylvania Turnpike, including all buildings on the Turnpike from Lebanon County line to West Cocalico Township); LEBANON; PERRY; SCHUYLKILL (Pine Grove and Tremont Townships); AND SNYDER (South of U.S. Highway 522) YORK County (Franklin, Carrol, Monogham and Fairview Twps.)
Rates Fringes
ELECTRICIAN......................$ 30.60 23.34
ELEC0163 004 06/01/2018
BRADFORD AND WYOMING (West of the Susquehanna River) Columbia County (Berwick Borough only in Briar Creek Township),Lackawanna County: (That portion of Lehigh, west of Highway 215 (Dupont Thornhurst Road) and north of the Thornhurst Stoddartsville Road; Luzerne County: Fairmont, Ross, Lake, Dalla, Nescopeck, Denison, Hollenbach, Black Creek, Sugarloaf, Hazel, Butler, Foster, Franklin, Exeter, Kingston, Jackson, Lehman, Plymouth, Hunlock, Union, Huntington, Salem, Conyngham, Newport, Slocum, Dorrance, Hanover, Rice, Wright, Fairview, White Haven, Wilkes Barre and Plains Townships in their entirety; that portion of Pittston, Jenkins and Bear Creek Townships, south and west of a line following U.S.
Highway 11 from the city of Pittston to State Highway 315 to the Dupont Thornhurst Road, and south on that road to Lackawanna County; all of Buck Township, except that portion south and east of a line following the Thornhurst Stoddartsville Road from Lackawanna County to State Highway 115 and continuing on 115 to Monroe County. Also included are the cities of Wilkes Barre, Nanticoke, Hazleton and Pittston, but the Borough of Duryea and Avoca are excluded; Monroe County:
That portion of Tobyhanna and Tunkhannock Townships west of State Highway 115; Sullivan County: That portion east of a line drawn south on U.S. Highway 220 from the Bradford Sullivan County line to the Nordmont Emmens Road, and south of this road to the Columbia County line. Dushore Borough is included, but Laporte Borough is excluded.
Section 00 73 46 Page 10
ELECTRICIAN......................$ 35.36 20.46
ELEC0229 001 06/04/2018
ADAMS AND YORK (except Carroll, Fairview, Franklin, and Monaghan Townships) COUNTIES
Rates Fringes
ELECTRICIAN......................$ 32.92 18.20
ELEC0375 007 06/01/2018
BERKS (Hereford, Longswamp, and Washington Townships; and the portion of Maxatowney Township East of Sacony Creek);(NORTHAMPTON (Allen, Hanover, Lehigh Townships Boroughs of Bath, Freemansburg, Hellertown and the City of Bethlehem, the portion of moore Township of State Highway 946 and West of State Highway 987. City of Bethlehem; the portion of Moore Township South of State Highway 946 and West of State Highway
987. East Allen Township except the part North of Bath Borough and East of State Highway 987 and Lower Saucon Township West of a line following the Hecktown Butztown Road. South from Lower Nazareth Township through Butrztown and continuing to Middleton, along alternate U.S. Highway 22 to the Eastern boundary of the Borough of Freemansburg, along this boundary in a Southerly direction to the Bethlehem City line between Bethlehem and Lower Saucon Township to the Northern boundary of Hellertown and Lower Saucon Township to State Highway 412 to Bucks County),LEHIGH & CARBON COUNTIES
Rates Fringes
ELECTRICIAN......................$ 40.78 18.56
ELEC0607 005 09/01/2017
COLUMBIA (Except Berwick Borough); MONTOUR; NORTHUMBERLAND (Remainder); SCHUYLKILL (Remainder); SNYDER (North of Hwy 522);
AND UNION (East Buffalo, Lewisburg, and Union Twps.) COUNTIES
Rates Fringes
Section 00 73 46 Page 11
ELECTRICIAN......................$ 32.15 23.16
ELEC0743 006 09/01/2018
BERKS COUNTY (Remainder)
Rates Fringes
ELECTRICIAN......................$ 36.02 22.18
ELEC0743 009 09/01/2018
REMAINDER OF LANCASTER COUNTY
Rates Fringes
ELECTRICIAN......................$ 36.02 22,18
ELEC0812 002 06/01/2018
TIOGA COUNTY
Rates Fringes
ELECTRICIAN......................$ 34.24 19.18
ELEC0812 006 06/01/2018
BRADFORD (Armenia and Canton Townships); AND SULLIVAN (The portion West of the line drawn South of U.S. Highway #220, from Bradford Sullivan County line to the Dushore Borough, then West, South and East around the western limits of Dushore and West around the eastern limits of Laports back to highway #220;
hence South on highway #220 to Nordmont Emmans Road, (marked "55" on the 1931 Department of highway may of Sullivan County;)
then in a southerly direction to the Sullivan Columbia County Line, Laporte Borough in this jurisdicition. COUNTIES
Rates Fringes
ELECTRICIAN
Bradford County.............$ 34.24 19.18 Sullivan County.............$ 32.27 19.12
ELEC0812 007 06/01/2018
LYCOMING; NORTHUMBERLAND (Delaware, Lewis and Turbot Townships, and the Borough of Milton); AND UNION (Except East Buffalo and Union Townships and Lewisburg Borough) COUNTIES
Section 00 73 46 Page 12
ELECTRICIAN
LYCOMING COUNTY.............$ 32.27 19.12
NORTHUMBERLAND AND UNION
COUNTIES....................$ 32.27 19.12
* ENGI0542 013 05/01/2018
BUILDING CONSTRUCTION:
LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND
WYOMING COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 36.01 24.80+A
GROUP 1a....................$ 38.26 25.46+A
GROUP 2.....................$ 35.73 24.71+A
GROUP 2a....................$ 37.98 25.38+A
GROUP 3.....................$ 33.01 23.90+A
GROUP 4.....................$ 31.86 23.58+A
GROUP 5.....................$ 31.41 23.45+A
GROUP 6.....................$ 30.54 23.18+A
FOOTNOTE:
A PAID HOLIDAYS: Washington 's Birthday, Good Friday, Memorial Day, Labor Day, Presidential Election Day, Veterans Day; Thanksgiving Day and Christmas Day.
***TOXIC/HAZARDOUS WASTE REMOVAL***
Add 20% to basic hourly rate for all classifications
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Machines doing hook work, any machine handling machinery, cable spinning machines, helicopters, lulltype forklift with boom attachment, concrete boom. truck, machines similar to the above including remote control equipment.
GROUP 1a: Machines doing hook work; Machines handling machinery; All types of cranes 15 ton and over factory rating; Cableways; Draglines 15 ton and over factory
Section 00 73 46 Page 13 rating; HIgh Rail/Burro Crane 15 ton and over factory rating; Rail Loader (Wiinch Boom Type) 15 ton and over factory rating; Machines similar to above, including remote control equipment.
GROUP 2: All types of cranes (except cranes doing hook work) backhoes, cableways, draglines, keystones, shovels, derricks, trench shovels, trenching machines, hoist with two towers, pavers 21E and over, overhead cranes, building hoists (double drum) gradalls, mucking machines in tunnels, front end loaders, tandem scrapers, pippin type backhoes, boat captains, batch plant operators concrete drills, self contained rotary drills, fork lifts, 20ft, lift and over, scrapers, tournapulls, spreaders, bulldozers and tractors, rollers (high grade finishing), mechanic welder, motor patrols, concrete pumps, grease truck, directionall drill machines 8" and up, skid steer, hydraulic pipe pusher 8" and up, hydro ax, environmental recycling machine and grinder type machines, lull type lifts masonry tenders, shear attached to machines, grease truck, concreate placer machine, machines similar to the above including remote control equipment.
GROUP 2a: Crawler backhoes and crawler gradalls over one cubic yard factory rating; Hydraulic backhoes over one cubic yard factory rating; Equipment 15 ton and over factory rating; Concrete Pumps 97 feet or Boom length or less (150 yard pour or less); Machines similar to above, including remote control equipment.
GROUP 3: Conveyors, building hoist (single drum), high or low pressure boilers, well drillers, asphalt plant engineers, ditch witch type trencher, core drill operators, forklift trucks under 20ft. lift, fine grade machines, directional drill machine 7" or less, hydraulic pipe pusher 7" or less, skid steer forklift, machines with concrete mixer attachment, machines similar to the above including remote control equipment, miscellaneous equipment operator.
GROUP 4: Welding machines, well points, compressors, pumps, heaters, farm tractors, form line graders, road finishing machines, concrete breaking machines, rollers, seaman pulverzing mixer, power boom, seeding spreader, tireman (for power equipment), grout pump 4" and up, power broom, power sweeper, seeding spreader (self propelled) machines similar to the above including remote control equipment.
GROUP 5: Fireman
GROUP 6: Oilers and deck hands (personnel boats)
Section 00 73 46 Page 14
* ENGI0542 014 05/01/2018
BUILDING CONSTRUCTION:
ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN,
JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR,
NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER,
SULLIVAN, TIOGA, UNION, AND YORK COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 36.01 24.80+A
GROUP 1a....................$ 38.26 25.46+A
GROUP 2.....................$ 35.73 24.71+A
GROUP 2a....................$ 37.98 25.38+A
GROUP 3.....................$ 33.01 23.90+A
GROUP 4.....................$ 31.86 23.58+A
GROUP 5.....................$ 31.41 23.45+A
GROUP 6.....................$ 30.54 23.18+A
FOOTNOTE: A PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day, provided the employee works the day before and the day after the holiday
***TOXIC/HAZARDOUS WASTE REMOVAL***
Add 20 per cent to basic hourly rate for all classifications
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Machines doing hook work, any machine handling machinery, cable spinning machines, helicopters, machines similar to the above, all types of cranes, cableways, and draglines .
GROUP 1a: Machines doing hook work; Machines handling machinery; All types of cranes 15 ton and over factory rating; Cableways; Draglines 15 ton and over factory rating; High Rail/Burro Crane 15 ton and over factory rating; Rail Loader (Winch Boom Type) 15 and over factory rating; Machines similar to above, including remote control equipment.
GROUP 2: Backhoes, keystones, shovels, derricks, trench
Section 00 73 46 Page 15 shovels, trenching machines, hoist with two towers, pavers 21E and over, overhead cranes, building hoists (double drum) gradalls, mucking machines in tunnels, front end loaders, tandem scrapers, pippin type backhoes, boat captains, batch plant operators concrete drills, self contained rotary drills, fork lifts, 20ft, lift and over, scrapers, tournapulls, spreaders, bulldozers and tractors, rollers (high grade finishing), mechanic welder, motor patrols, concrete pumps, grease truck, machines similar to the above.
GROUP 2a: Crawler backhoes and crawler gradalls over one cubic yard factory rating; Hydraulic backhoes over one cubic yard factory rating; Equipment 15 and over factory rating; Concrete Pumps 92 feet of Boom length or less (150 yard pour or less); Machines similar to above, including remote control equipment.
GROUP 3: Conveyors, building hoist (single drum), high or low pressure boilers, well drillers, asphalt plant engineers, ditch witch type trencher, core drill operators, forklift trucks under 20ft. lift, fine grade machines, machines similar to the above.
GROUP 4: Welding machines, well points, compressors, pumps, heaters, farm tractors, form line graders, road finishing machines, concrete breaking machines, rollers, seaman pulverzing mixer, power boom, seeding spreader, tireman (for power equipment), machines similar to the above.
GROUP 5: Fireman.
GROUP 6: Oilers and deck hands (personnel boats)
IRON0404 006 07/01/2018
ADAMS, BERKS, CUMBERLAND, DAUPHIN,JUANITA, LANCASTER, LEBANON,
LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY,
SCHUYLKILL, SNYDER, UNION and YORK COUNTIES
Rates Fringes
Ironworkers:.....................$ 32.03 29.13
IRON0404 017 07/01/2018
BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, MONROE, PIKE,
SULLIVAN, TIOGA, SUSQUEHANNA, WAYNE and WYOMING COUNTIES
Section 00 73 46 Page 16
IRONWORKER.......................$ 32.57 29.13
LABO0130 004 05/01/2017
LACKAWANNA, PIKE, SUSQUEHANNA, WAYNE AND WYOMING (Northern part) COUNTIES
Rates Fringes
LABORER (Building)...............$ 21.15 16.88
LABO0130 013 05/01/2017
LUZERNE (Northern Part), SULLIVAN and WYOMING (Southern Part)
COUNTIES
Rates Fringes
LABORER (Building)...............$ 20.80 16.88
LABO0130 014 05/01/2017
LUZERNE (Southern Part), COLUMBIA COUNTIES
Rates Fringes
LABORER (Building)...............$ 21.02 16.88
LABO0158 002 05/01/2018
HEAVY CONSTRUCTION:
Rates Fringes
Laborers:
GROUP 1.....................$ 20.96 16.79
GROUP 2.....................$ 27.58 16.79
GROUP 3.....................$ 24.57 16.79
GROUP 4.....................$ 24.92 16.79
GROUP 5.....................$ 25.59 16.79
GROUP 6.....................$ 25.01 16.79
GROUP 7.....................$ 25.30 16.79
GROUP 8.....................$ 25.78 16.79
Section 00 73 46 Page 17
LABORERS CLASSIFICATIONS
GROUP 1: Flag person
GROUP 2: Hazardous/Toxic/Asbestos Waste Handler, Lead Paint Handler
GROUP 3: concrete pitman, puddlers, highway guide rail right of way and property fence slab reinforcement placers, Laborers, landscaper, seeders, planters, magazine tenders, laser beam men for pipe laying and paving machines,, railroad trackman, signalman, asphalt rakers, asphalt tamper, lute or screed man, pneumatic and electric tool operators, jackmammers, paving breakers, concrete saws, whacker vibrator, chainsaw, highway concrete block layers, sheet hammer, pipe layers, Walk Behind Rollers, Walk Behind Trencher
GROUP 4: Caisson open air below 8 feet, cofferdam open air below 8 feet where excavations for circular caissons and cofferdams 8 ft and below level of natural grade adjacent to starting point, form setters (road) wagon drill diamond point drill, gunite nozzle operators, walk behind rollers and concrete rubbers, blaster.
GROUP 5: Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and welding in Conjunction wth Rebar, and Concrete Surfacer.
FREE AIR TUNNELS AND ROCK SHAFTS
GROUP 6: Outside labers in conjuction with tunnels and rock shafts
GROUP 7: Chuck tenders, muckers, nippers, miners, inside laborers
GROUP 8: Miners, drillers, blasters, pneumatic shield operators, lining, spotting and timber workmen, rebar steel placer, bonding and securing, welders, and concrete surfacers
LABO1174 004 05/01/2017
CARBON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES
Rates Fringes
LABORER (Building)...............$ 25.39 22.29
Section 00 73 46 Page 18
LABO1174 016 05/01/2017
BERKS, LEBANON and SCHUYLKILL COUNTIES
Rates Fringes
LABORER (Building)...............$ 21.57 15.04
LABO1180 004 05/01/2016
CUMBERLAND, DAUPHIN, JUNIATA, NORTHUMBERLAND (South of the Susquehanna River), PERRY, AND SNYDER COUNTIES
Rates Fringes
LABORER (Building)...............$ 20.21 12.93
LABO1180 012 05/01/2016
BRADFORD, LYCOMING, MONTOUR, NORTHUMBERLAND (Northern part), TIOGA, AND UNION COUNTIES
Rates Fringes
Laborers: (Builder)..............$ 20.22 12.93
LABO1180 019 05/01/2017
ADAMS, LANCASTER and YORK COUNTIES
Rates Fringes
LABORER (Building)...............$ 21.39 13.33
PAIN0021 005 05/01/2018
BERKS, CARBON, LEBANON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES
Rates Fringes
Painters:
Brush, Roller...............$ 28.02 18.33 Structural Steel............$ 29.02 18.33
PAIN0021 023 05/01/2018
BRADFORD, COLUMBIA, LACKWANNA,LUZERNE, LYCOMING, MONTOUR,
Section 00 73 46 Page 19
NORTHUMBERLAND, PIKE, SHUYLKILL, SNYDER, SULLIVAN,
SUSQUEHANNA,TIOGA, UNION, WAYNE, AND WYOMING COUNTIES
Rates Fringes
Painters:
Brush and Roller............$ 27.67 18.80 Spray.......................$ 28.67 18.80 Structural Steel............$ 28.67 18.80
PAIN0057 020 06/01/2018
JUNIATA COUNTY
Rates Fringes
Painters:
Commercial Brush & Roller...$ 28.00 19.12 Industrial Brush & Roller...$ 32.50 19.12 Spray.......................$ 28.00 19.12
PAIN0411 003 05/01/2017
ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES
Rates Fringes
Painters:
Bridge......................$ 31.35 13.20 Industrial..................$ 25.60 13.20
PLAS0592 003 06/01/2018
PIKE and MONROE (Except Tobyhanna) COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 33.43 12.30
PLASTERER........................$ 33.51 12.30
PLAS0592 006 06/01/2018
COLUMBIA COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 33.43 12.30
PLASTERER........................$ 33.51 12.30
Section 00 73 46 Page 20
PLAS0592 018 05/01/2018
Cement Mason/Concrete Finisher Adams, Lancaster and York Counties....................$ 29.00 21.30
PLASTERER
Adams, Berks (Portions of), Lancaster, and Lebanon Counties............$ 29.00 21.30
PLAS0592 026 05/01/2014
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
BERKS (Northeastern part lying North of a line starting from the Southern boundary line of Lehigh County continuing through Huffs Church, Fredericksville, Dryville, Lyon Station, Kutztown, Krumsville, and Stoney run in Berks County to the Lehigh County line).........$ 26.60 20.15
REMAINDER OF BERKS COUNTY...$ 35.05 11.05
PLASTERER
BERKS COUNTY................$ 23.48 19.45
PLUM0420 004 05/01/2018
BERKS, LEHIGH, AND NORTHAMPTON COUNTIES
Rates Fringes
Steamfitter......................$ 48.43 33.92
PLUM0520 008 05/01/2018
COLUMBIA (REMAINDER OF COUNTY), CUMBERLAND, DAUPHIN, JUNIATA,
LANCASTER, LEBANON (WEST OF ROUTE 501), MONTOUR,
NORTHUMBERLAND, PERRY, SNYDER, YORK, BRADFORD COUNTY (WESTERN
HALF), SULLIVAN, TIOGA AND UNION COUNTIES
Rates Fringes
Section 00 73 46 Page 21
Plumber and Steamfitter..........$ 36.87 25.09
PLUM0524 006 06/01/2018
CARBON, COLUMBIA (BERWICK TOWNSHIP), BRADFORD (EASTERN PART),
LUZERNE, LACKAWANNA, MONROE, SCHUYLKILL, SUSQUEHANNA, WAYNE,
WYOMING, AND PIKE COUNTIES
Rates Fringes
Plumber and Steamfitter..........$ 42.39 20.52
PLUM0690 007 05/01/2018
BERKS, LEHIGH, LEBANON (East of Route 501), AND NORTHAMPTON
COUNTIES
Rates Fringes
PLUMBER..........................$ 44.39 30.30
ROOF0030 008 05/01/2017
REMAINING COUNTIES
Rates Fringes
Roofers:
Composition.................$ 36.15 29.76+A
FOOTNOTE (Composition Roofer only);
A. PAID HOLIDAY: Election Day
ROOF0030 010 06/01/2018
BRADFORD, LACKAWANNA, LUZERNE (North of Interstate 80 with the exception of White Haven Twp.) MONROE (Tobyhanna Army Depot only), PIKE, SULLIVAN, TIOGA, WAYNE, AND WYOMING COUNTIES
Rates Fringes
ROOFER...........................$ 28.50 19.58
SHEE0019 009 06/01/2018
ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON,
Section 00 73 46 Page 22
LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES
Sheet metal worker...............$ 34.78 35.83
FOOTNOTE: PAID HOLIDAY: Election Day
SHEE0044 003 05/01/2018
BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMNING,
MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER,
SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES
Rates Fringes
Sheet metal worker...............$ 30.63 23.24
* TEAM0229 004 05/01/2018
Rates Fringes
TRUCK DRIVER (ADAMS, BERKS,
CARBON, COLUMBIA, CUMBERLAND,
DAUPHIN, JUNIATA, LACKAWANNA,
LANCASTER, LEBANON, LEHIGH,
LUZERNE, LYCOMING, MONROE,
MONTOUR, NORTHAMPTON,
NORTHUMBERLAND, PERRY, PIKE,
SCHUYLKILL, SNYDER, SULLIVAN,
SUSQUEHANNA, UNION, WAYNE,
WYOMING, AND YORK COUNTIES)
GROUP 1.....................$ 35.32 0.00
GROUP 2.....................$ 35.39 0.00
GROUP 3.....................$ 35.88 0.00
Truck drivers: (BRADFORD AND
TIOGA COUNTIES)
GROUP 1.....................$ 22.21 13.11
GROUP 2.....................$ 22.28 13.11
GROUP 3.....................$ 22.77 13.11
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Stake Body Truck (Single Axle, Dumpster)
GROUP 2: Dump Trucks, Tandem and Batch Trucks, SEmi Trailers, Agitator Mixer Trucks, REady Mix and Dumpcrete type vehicles, Asphalt Distributors (when used
Section 00 73 46 Page 23 for transportation), Stake Body Truck (Tandem)
GROUP 3: Euclid type off highway equipment Back or Belly Dump Trucks and Double Hitched equipment, Straddle (Ross) Carrier, Low Bed Trailers
WELDERS Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
Section 00 73 46 Page 24
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198 005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non union rates. Example: SULA2012 007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG OH 0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
Section 00 73 46 Page 25
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
Section 00 73 46 Page 26 interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Section 00 73 46 Page 27
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRI CTI ONS
01 30 00 ADMI NI STRATI VE REQUI REMENTS
01 32 01 PROJECT SCHEDULE
01 32 33 CONSTRUCTI ON PHOTOGRAPHY
01 33 00 SUBMI TTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 35 53 ANTI TERRORI SM/ OPERATI ONS SECURI TY ( AT/ OPSEC)
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00 QUALI TY CONTROL
01 45 05 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 58 00 PROJECT AND SAFETY SI GNS
01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
01 78 24 FACI LI TY DATA REQUI REMENTS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 85 00 MUNI TI ONS AND EXPLOSI VES OF CONCERN ( MEC) REMOVAL AND
CONSTRUCTI ON SUPPORT
DI VI SI ON 03 - CONCRETE
03 30 00 CAST- I N- PLACE CONCRETE
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 90 00 PAI NTS AND COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 28 13 TOI LET ACCESSORI ES
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 34 45 PREFABRI CATED PRECAST CONCRETE BUI LDI NG
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBI NG, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 82 46. 00 40 ELECTRI C UNI T HEATERS
PROJECT TABLE OF CONTENTS Page 1
DI VI SI ON 26 - ELECTRI CAL
26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS
26 05 00. 00 40 COMMON WORK RESULTS FOR ELECTRI CAL
26 05 13. 00 40 MEDI UM- VOLTAGE CABLES
26 12 19. 00 40 PAD- MOUNTED, LI QUI D- FI LLED, MEDI UM- VOLTAGE TRANSFORMERS
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 28 21. 00 40 AUTOMATI C TRANSFER SWI TCHES
26 32 14. 00 10 DI ESEL- GENERATOR SET, STATI ONARY 15- 300 KW, STANDBY
APPLICATIONS
26 51 00. 00 40 I NTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM
27 13 23. 00 40 COMMUNI CATI ONS OPTI CAL BACKBONE CABLI NG
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 05 21 GEOGRI D SOI L REI NFORCEMENT
31 05 22 GEOTEXTI LES USED AS FI LTERS
31 10 00 CLEARI NG FOR CI VI L WORKS
31 32 11 SOI L SURFACE EROSI ON CONTROL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 11 16 SUBBASES FOR FLEXI BLE PAVI NG
32 11 26 BI TUMI NOUS BASE COURSE
32 12 10 BI TUMI NOUS TACK AND PRI ME COATS
32 12 21 BI TUMI NOUS ROAD- MI X SURFACE COURSE
32 15 00 AGGREGATE SURFACE COURSE
32 16 13 CONCRETE SI DEWALKS AND CURBS AND GUTTERS
32 17 24. 00 10 PAVEMENT MARKI NGS
32 31 13 CHAI N LI NK FENCES AND GATES
32 92 19 SEEDING
32 93 00 EXTERI OR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG
33 11 13 POTABLE WATER SUPPLY WELLS
33 40 00 STORM DRAI NAGE UTI LI TI ES
33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS
40 05 13 PI PELI NES, LI QUI D PROCESS PI PI NG
40 95 00 PROCESS CONTROL
DI VI SI ON 43 - PROCESS GAS AND LI QUI D HANDLI NG, PURI FI CATI ON, AND STORAGE
EQUIPMENT
43 21 39 PUMPS: WATER, SUBMERSI BLE MULTI - STAGE VERTI CAL TURBI NE
43 32 69 CHEMI CAL FEED SYSTEMS
43 41 45 UNDERGROUND STEEL SEWAGE TANK
PROJECT TABLE OF CONTENTS Page 2
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 WORK COVERED BY CONTRACT DOCUMENTS
1. 1. 1 Pr oj ect Descr i pt i on
The cont r act i ncl udes al l wor k r equi r ed t o upgr ade t he exi st i ng wat er suppl y syst em i n accor dance wi t h t he pl ans and speci f i cat i ons, and pr ovi s i ons of PADEP Const r uct i on Per mi t No. 4516510. Exi st i ng t est wel l s i ndi cat ed on t he dr awi ngs shal l be made per manent . Exi st i ng suppl y wel l s i dent i f i ed f or decommi ssi oni ng and wel l head pr ot ect i on of exi st i ng wel l t o r emai n i n ser vi ce i s al so r equi r ed. Wor k i ncl udes const r uct i on suppor t r el at ed t o Muni t i ons and Expl osi ves of Concer n ( MEC) , const r uct i on of wat er suppl y di st r i but i on pi pi ng, pr ecast wel l houses and f oundat i ons, t r eat ment syst em upgr ades, and al l r el at ed mechani cal , el ect r i cal , communi cat i ons, i nst r ument at i on and cont r ol s, s i t e wor k and r est or at i on.
The par agr aphs bel ow pr ovi de addi t i onal det ai l r el at ed t o t he St r uct ur al / Ar chi t ect ur al , Mechani cal , I nst r ument at i on and El ect r i cal wor k and i s not i nt ended as a compr ehensi ve l i s t of r equi r ement s. Ref er t o i ndi v i dual sect i ons of t he speci f i cat i on i ncl usi ve of s i t e and ci v i l sect i ons, as wel l as admi ni st r at i ve r equi r ement s i n addi t i on t o t he summar y of i t ems i ncl uded her ei n.
The wor k i ncl udes i nci dent al r el at ed wor k and t he f ol l owi ng:
1. 1. 1. 1 Ci v i l / St r uct ur al / Ar chi t ect ur al Wor k
Fur ni sh and i nst al l : pr e- engi neer ed wel l house bui l di ngs on concr et e f oundat i ons; r ei nf or ced concr et e f oundat i ons f or t he 6 new emer gency gener at or s. At bui l di ng 52, f ur ni sh and i nst al l concr et e cur bi ng, f enci ng, concr et e s l ab above t he new under gr ound wast e st or age t ank and ot her s i t e f eat ur es.
1. 1. 1. 2 Mechani cal Wor k
Fur ni sh and i nst al l at new wel l houses: st ai nl ess st eel submer si bl e wel l pumps, st ai nl ess st eel pi pi ng, and appur t enences; heat i ng and vent i l at i ng equi pment ; as wel l as pi pi ng bet ween wel l houses. Fur ni sh and i nst al l at Bui l di ng 52: New bat hr oom; wat er t r eat ment syst ems; wat er pr essur e boost er syst em, and al l ot her pi pi ng and appur t enances as i ndi ct ed.
1. 1. 1. 3 I nst r ument at i on Wor k
Fur ni sh and i nst al l at new wel l s: f l ow met er s; submer si bl e pr essur e t r ansducer s; cont r ol panel s; pr gr ammabl e l ogi c cont r ol l s and ant ennas.