W912BU-18-B-0004-Amendment-4.pdf

PDF 801 KB Posted

Attached to
Water Supply System Upgrades, Tobyhanna Army Depot
Solicitation number
W912BU-18-B-0004_
Issued by

About this file

Amendment 0004 to address RFIs, new Wage Determinations and extend the Bid Opening Date to 29 JAN 2019 at 11:00 A.M.

View the file

Other files

File Type Posted
TYAD_Wells_Formal_Abstract.pdf PDF
W912BU-18-B-0004_0005.pdf PDF
W912BU-18-B-0004_0003.pdf PDF
W912BU-18-B-0004_0002.pdf PDF
Wells_Site_Visit_Attendance_12-4-18.xlsx XLSX spreadsheet
RFI_Spreadsheet.xls XLS spreadsheet
W912BU-18-B-0004_0001.pdf PDF
FIRST_PAGE_CORRECTION.pdf PDF
W912BU18B0004-DwgsPart1.pdf PDF
W912BU18B0004V1-Specs.pdf PDF
W912BU18B0004-DwgsPart2.pdf PDF
W912BU18B0004V2-Specs.pdf PDF
W912BU-18-B-0004(1).pdf PDF
W912BU18B0004V3-Specs(1).pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This Amendment is being issued to address Requests for Information (RFIs) submitted in response to this solicitation as w ell as to update the Wage Determinations associated w ith the contemplated w ork.

Failure to acknow ledge all amendments may result in your bid being considered non-responsive.

The Bid Opening date w ill be 29 January, 2019 at 11:00 AM.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BU18B0004

X 9B. DATED (SEE ITEM 11)

23-Nov-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jan-2019

CODE

CONTR DIV-CONTRACTS BR

USACE, PHILA DISTRICT

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

This page was intentionally left blank for duplex printing.

Amendment No. 0004

IFB W912BU-18-B-0004

14. DESCRIPTION OF AMENDMENT (continued)

a. REQUESTS FOR INFORMATION (RFI) WITH RESPONSES: RFI’s with responses, annotated Amendment No. 0004, are attached to this amendment.

b. SECTION 00 73 46 - WAGE RATES: Please delete Section 00 73 46 in its entirety and substitute revised Section 00 73 46, annotated Amendment No.

0004, attached hereto.

c. TECHNICAL SPECIFICATIONS:

(1) Section 01 11 00 – SUMMARY OF WORK: Please delete Section 01 11 00 in its entirety, and substitute revised Section 01 11 00, annotated Amendment No. 0004, attached hereto.

(2) Section 40 95 00 – PROCESS CONTROL: Please delete Section 40 95 00 in its entirety, and substitute revised Section 40 95 00, annotated Amendment No. 0004, attached hereto.

(3) Appendix D – Wells 1, 3, 4, and 5, Pump Test Data: Please insert new Appendix D, in Volume 3 of the specifications, annotated Amendment No.

0004, attached hereto.

d. Indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0004. Failure to acknowledge all amendments may be cause for rejection of the bid.

IFB W912BU-18-B-0004

WATER SUPPLY SYSTEM UPGRADES

TOBYHANNA ARMY DEPOT

REQUESTS FOR INFORMATION WITH RESPONSES

RFI# Discipline Spec Sect/Dwg Description Response

1 ELECTRICAL

Can we utilize parking bushings and dead break elbows in the vaults for our splices or do they have to be spliced. Bid per the plans and specs

2 ELECTRICAL E-13

Is there a preferred security system Integrator for the ICIDS III, or a contracted supplier whos services are currently being used on site.

There is not a preferred security system Integrator nor has a contracted supplier been identified.

3 ELECTRICAL E-7

Is there any output or monitoring of the Power Logic 800 Metering system or is it self contained ?

It is a self-containing metering system.

4 ELECTRICAL E-18 Are we replacing meters for Well 6 and building 54?

Replacement of meters at well 6 and building 54 is not included in the SOW.

5 ELECTRICAL E-9,10

What is the available shutdown time for well 6 and building 52 for service upgrades. See Amendment No. 0004.

6 ELECTRICAL E-12 Site lighting schedule. Only pole descriptions Refer to Lighting Fixture Schedule Tag C on E-12.

7 ELECTRICAL E-12

Can 12 ton UL listed direct buried compression grounding connectors be substituted as a alternative to the cadweld connectors. Bid per the plans and specs

8 ELECTRICAL E-7 Will a alternate Generator meeting spec be allowed.

Bid per the plans and specs.

Basis of Design Generator or Approved Equal, meeting requirements of Spec Section 26 32 14, is acceptable as indicated in note 2.

9 C-6

Can you please clarify the scope of work at well site ON- 1/5 with regards to the demolition of Tanks 217A & Tank AO841? Plan notes seem to indicate that the demolition of these tanks are part of this contract, but other notes indicate that this may be part of another contract. Please advise

Wells shall be abandoned in accordance with Note 1.

Demolition of well houses, tanks and other infrastructure are NIC.

Refer to Note 2. The same applies to other well to be abandoned under this contract.

Information related to efforts to restore the site is required for PADEP permit purposes.

If the demolition of the tanks referenced in question

(1) is part of this contract, can you please provide a demolition “scope of work”? It would also be helpful if you could provide some information on the existing tanks such as composition of structure, height of structure etc. Please advise. Refer to response to RFI 9.

Can you provide CAD files for the civil drawings so we can calculate the required grading using our software system?

CAD files are provided to the successful bidder after award.

12 Mechanical

Typically an inline check valve is installed on the drop pipe for the submersible well pump installations.

This would be in addition to the integral check valve installed in the pump. I see nothing in the written spec or any of the drawings. Does the engineer wish to include one?

Bid per the plans and specs.

13 Mechanical

Is there a probe tube to be installed with the submersible well pumps? Typically 1” PVC pipe is included (to serve as a conduit for transducers, water level indicators, etc) Bid per the plans and specs.

14 General

Can you provide any information of the wells to be abandoned? Names, depths, diameters, existing pumps.

See Amendment No. 0004.

RFI - Page 1

Section 00 73 46 Page 1

SECTION 00 73 46

WAGE RATES

Section 00 73 46 Page 2

General Decision Number: PA190018 01/04/2019 PA18

Superseded General Decision Number: PA20180040

State: Pennsylvania

Construction Type: Heavy Sewer/Water Treating Plant

Counties: Adams, Berks, Bradford, Carbon, Columbia, Cumberland, Dauphin, Juniata, Lackawanna, Lancaster, Lebanon, Lehigh, Luzerne, Lycoming, Monroe, Montour, Northampton, Northumberland, Perry, Pike, Schuylkill, Snyder, Sullivan, Susquehanna, Tioga, Union, Wayne, Wyoming and York Counties in Pennsylvania.

SEWAGE AND WATER TREATMENT PLANT PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019

BOIL0013-004 03/01/2018

Rates Fringes

BOILERMAKER......................$ 45.89 33.39

Section 00 73 46 Page 3

BRPA0005-002 04/29/2018

CARBON and LEHIGH COUNTIES

Rates Fringes

BRICKLAYER.......................$ 32.14 17.81

BRPA0005-004 05/01/2017

MONROE AND NORTHAMPTON COUNTIES

Rates Fringes

Marble & Tile Setter.............$ 29.20 16.38

BRPA0005-014 05/01/2017

ADAMS, BRADFORD, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA,

LANCASTER, LEBANON, LYCOMING, MONTOUR, NORTHUMBERLAND, PERRY,

SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES

Rates Fringes

Marble & Tile Setter.............$ 29.27 14.55

BRPA0005-015 04/30/2017

ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, LEBANON, PERRY, UNION,

AND YORK counties

Bricklayer, Stonemason...........$ 32.54 14.55

BRPA0005-019 04/30/2017

LACKAWANNA, LUZERNE, PIKE, SUSQUEHANNA, WAYNE, AND WYOMING

COUNTIES

Bricklayer, Stonemason...........$ 33.82 15.05

BRPA0005-020 05/01/2017

LACKAWANNA, LUZERNE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING

Marble & Tile Setter.............$ 31.03 14.00

Section 00 73 46 Page 4

BRPA0005-026 04/30/2017

BERKS COUNTY

Rates Fringes

BRICKLAYER.......................$ 34.11 13.68

BRPA0005-027 05/01/2017

BERKS COUNTY

Rates Fringes

Marble & Tile Setter.............$ 30.14 13.68

BRPA0005-036 04/30/2017

COLUMBIA, MONTOUR, NORTHUMBERLAND, JUNIATA, MIFFLIN,

SCHUYLKILL, SNYDER AND SULLIVAN COUNTIES

Bricklayer, Stonemason...........$ 31.04 16.18

BRPA0005-053 04/30/2017

BRADFORD, TIOGA, LYCOMING AND UNION COUNTIES

Rates Fringes

BRICKLAYER.......................$ 32.77 14.83

BRPA0005-054 05/01/2017

Rates Fringes

TERRAZZO FINISHER................$ 30.39 15.96

TERRAZZO WORKER/SETTER...........$ 30.63 17.92

BRPA0005-073 05/01/2017

CARBON AND LEHIGH COUNTIES

Rates Fringes

Marble & Tile Setter.............$ 28.15 17.43

BRPA0005-074 04/30/2017

MONROE and NORTHAMPTON COUNTIES

Section 00 73 46 Page 5

BRICKLAYER.......................$ 32.77 16.38

CARP0076-008 05/01/2011

MONTOUR, NORTHUMBERLAND, SNYDER AND UNION COUNTIES

Rates Fringes

Carpenter & Soft Floor Layer.....$ 27.03 11.43

CARP0076-009 05/01/2011

COLUMBIA, SCHUYLKILL, and lower part of Luzerne county; In Carbon county Banks, Lausanne, Lehigh, Packer, Kidder Townships and that part of Penn Forest Township, North of Route 903

Carpenter & Soft Floor Layer.....$ 27.03 11.43

CARP0167-004 05/01/2018

BERKS, CARBON, LANCASTER, LEHIGH and NORTHAMPTON COUNTIES

Rates Fringes

CARPENTER........................$ 33.99 25.54

CARP0179-007 05/01/2018

BERKS, CARBON, LANCASTER, LEHIGH and NORTHAMPTON COUNTIES

Rates Fringes

PILEDRIVERMAN....................$ 43.45 34.47

* CARP0191-001 05/01/2011

YORK COUNTY

Rates Fringes

CARPENTER........................$ 27.03 11.43

CARP0219-007 05/01/2018

CARBON (Townships: East Penn, Lower Towamensing, Mahoning, Franklin, Towamensing, Penn Forest. Everything south of Route 903 and east to the Kidder Township Line. Boroughs: Hauto, Nesquehoning, Lansford, Summit Hill, Jim Thorpe, Weissport, Bownmanstown, Palmerton, Lehighton, and Parryville) , LEHIGH

AND NORTHAMPTON COUNTIES

Section 00 73 46 Page 6

MILLWRIGHT.......................$ 41.62 29.79

* CARP0261-004 05/23/2011

LACKAWANNA, MONROE, PIKE, SUSQUEHANNA, WAYNE, AND WYOMING (East of Susquehanna River) COUNTIES

Carpenter & Soft Floor Layer.....$ 25.60 12.85

CARP0287-007 05/01/2008

ADAMS, CUMBERLAND, DAUPHIN, JUNIATA, LEBANON, LANCASTER, AND

YORK (New Cumberland Army Depot and Harrisburg Airport)

Carpenter & Soft Floor Layer.....$ 24.77 8.69

* CARP0443-001 05/01/2018

ADAMS, BRADFORD, CARBON (Banks, Lausanne, Lehigh, Packer, Kidder Twps., and part of Penn Forest Township north of Route

903), COLUMBIA, CUMBERLAND, DAUPHIN, JUANIATA, LACKAWANNA,

LANCASTER, LEBANON, LUZERNE (lower part of), LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY,PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING, YORK (New Cumberland Army Depot and Harrisburg State Airport) COUNTIES

MILLWRIGHT.......................$ 34.41 18.64

CARP0492-003 06/01/2015

BERKS

Rates Fringes

Carpenter & Soft Floor Layer.....$ 28.16 15.02

CARP0492-004 05/01/2015

BERKS COUNTY

Rates Fringes

MILLWRIGHT.......................$ 34.00 17.05

CARP0514-003 06/01/2017

Section 00 73 46 Page 7

LUZERNE (Except Black Creek, Butler, Dennison, Foster, Freeland, Hanle, Hazleton, Hollenback, Nespeck, the lower part of Salem, and Sugarloaf), SULLIVAN, Red Rock Air Base), and WYOMING (West of the Susquehanna River) COUNTIES

Carpenter & Soft Floor Layer.....$ 28.88 15.65

CARP0514-006 06/01/2017

BRADFORD, LYCOMING, SULLIVAN (Except Red Rock Air Force Base), AND TIOGA COUNTIES

Carpenter & Soft Floor Layer.....$ 28.88 15.65

CARP0600-003 05/01/2015

LEHIGH, MONROE (Except Tobyhanna Army Depot), AND NORTHAMPTON

CARPENTER........................$ 32.14 24.09

CARP1823-004 05/01/2015

Rates Fringes

FLOOR LAYER: Carpet.............$ 31.47 24.69

CARP2274-003 05/01/2018

Adams, Bradford, Columbia, Cumberland, Dauphin, Juniata, Lackawanna, Lebanon, Luzerne, Lycoming, Monroe, Montour, Northumberland, Perry, Pike, Schuylkill, Snyder, Sullivan, Susquehanna, Tioga, Union, Wayne, Wyoming and York

CARPENTER........................$ 30.75 15.96

PILEDRIVERMAN....................$ 30.75 15.96

ELEC0081-006 06/01/2018

BRADFORD (Area East of the Susquehanna River); LACKAWANNA;

LUZERNE (Area East of a line following the Susquehanna River South to the City of Pittson, East and South on the limits of Pittson but excluding it, to U.S. Highway 11, East on 11 to Dupont Burough and Highway 215, and Southeast on 215. Also the

Section 00 73 46 Page 8 portion of Luzerne County South and East of a line following Thornhurst Road, Southwest to State Highway 115 and Southeast on 115 to Monroe County line); MONROE (Barrett, Coolbaugh, Paradise, Price, and Tobyhanna Townships); PIKE COUNTY (Except Delaware, Lehman, and Porter Townships); SUSQUEHANNA,WAYNE, AND WYOMING (East of the Susquehanna River)

ELECTRICIAN......................$ 39.78 3%+17.25

ELEC0102-006 05/29/2017

MONROE (Remainder of County), NORTHAMPTON (Remainder) AND PIKE (Delaware, Lehman, and Porter) COUNTIES

ELECTRICIAN......................$ 55.93 56.50%

ELEC0143-006 06/01/2018

BERKS (Bethel, Marion, and Tulpehocken Townships); CUMBERLAND;

DAUPHIN; JUNIATA; LANCASTER (That portion Northwest of a line extending from the Susquhanna River to the intersection of State Highways 441 and 241 along 241 to the Borough of Elizabethtown, around the limits of Elizabethtown on the West and North Side, including the Masonic Homes in Elizabethtown, continiuing along State Highway 241 to Lebanon County and that portion North of the Pennsylvania Turnpike, including all buildings on the Turnpike from Lebanon County line to West Cocalico Township); LEBANON; PERRY; SCHUYLKILL (Pine Grove and Tremont Townships); AND SNYDER (South of U.S. Highway 522) YORK County (Franklin, Carrol, Monogham and Fairview Twps.)

ELECTRICIAN......................$ 30.60 23.34

ELEC0163-004 06/01/2018

BRADFORD AND WYOMING (West of the Susquehanna River) Columbia County (Berwick Borough only in Briar Creek Township),Lackawanna County: (That portion of Lehigh, west of Highway 215 (Dupont Thornhurst Road) and north of the Thornhurst Stoddartsville Road; Luzerne County: Fairmont, Ross, Lake, Dalla, Nescopeck, Denison, Hollenbach, Black Creek, Sugarloaf, Hazel, Butler, Foster, Franklin, Exeter, Kingston, Jackson, Lehman, Plymouth, Hunlock, Union, Huntington, Salem, Conyngham, Newport, Slocum, Dorrance, Hanover, Rice, Wright, Fairview, White Haven, Wilkes Barre and Plains Townships in their entirety; that portion of Pittston, Jenkins and Bear Creek Townships, south and west of a line following U.S.

Section 00 73 46 Page 9

Highway 11 from the city of Pittston to State Highway 315 to the Dupont Thornhurst Road, and south on that road to Lackawanna County; all of Buck Township, except that portion south and east of a line following the Thornhurst Stoddartsville Road from Lackawanna County to State Highway 115 and continuing on 115 to Monroe County. Also included are the cities of Wilkes Barre, Nanticoke, Hazleton and Pittston, but the Borough of Duryea and Avoca are excluded; Monroe County:

That portion of Tobyhanna and Tunkhannock Townships west of State Highway 115; Sullivan County: That portion east of a line drawn south on U.S. Highway 220 from the Bradford Sullivan County line to the Nordmont Emmens Road, and south of this road to the Columbia County line. Dushore Borough is included, but Laporte Borough is excluded.

ELECTRICIAN......................$ 35.36 20.46

ELEC0229-001 06/04/2018

ADAMS AND YORK (except Carroll, Fairview, Franklin, and Monaghan Townships) COUNTIES

ELECTRICIAN......................$ 32.92 18.20

ELEC0375-007 06/01/2018

BERKS (Hereford, Longswamp, and Washington Townships; and the portion of Maxatowney Township East of Sacony Creek);(NORTHAMPTON (Allen, Hanover, Lehigh Townships Boroughs of Bath, Freemansburg, Hellertown and the City of Bethlehem, the portion of moore Township of State Highway 946 and West of State Highway 987. City of Bethlehem; the portion of Moore Township South of State Highway 946 and West of State Highway

987. East Allen Township except the part North of Bath Borough and East of State Highway 987 and Lower Saucon Township West of a line following the Hecktown-Butztown Road. South from Lower Nazareth Township through Butrztown and continuing to Middleton, along alternate U.S. Highway 22 to the Eastern boundary of the Borough of Freemansburg, along this boundary in a Southerly direction to the Bethlehem City line between Bethlehem and Lower Saucon Township to the Northern boundary of Hellertown and Lower Saucon Township to State Highway 412 to Bucks County),LEHIGH & CARBON COUNTIES

ELECTRICIAN......................$ 40.78 18.56

ELEC0607-005 09/01/2017

Section 00 73 46 Page 10

COLUMBIA (Except Berwick Borough); MONTOUR; NORTHUMBERLAND (Remainder); SCHUYLKILL (Remainder); SNYDER (North of Hwy 522);

AND UNION (East Buffalo, Lewisburg, and Union Twps.) COUNTIES

ELECTRICIAN......................$ 32.15 23.16

ELEC0743-006 09/01/2018

BERKS COUNTY (Remainder)

Rates Fringes

ELECTRICIAN......................$ 36.02 22.18

ELEC0743-009 09/01/2018

REMAINDER OF LANCASTER COUNTY

Rates Fringes

ELECTRICIAN......................$ 36.02 22,18

ELEC0812-002 06/01/2018

TIOGA COUNTY

Rates Fringes

ELECTRICIAN......................$ 34.24 19.18

ELEC0812-006 06/01/2018

BRADFORD (Armenia and Canton Townships); AND SULLIVAN (The portion West of the line drawn South of U.S. Highway #220, from Bradford-Sullivan County line to the Dushore Borough, then West, South and East around the western limits of Dushore and West around the eastern limits of Laports back to highway #220;

hence South on highway #220 to Nordmont-Emmans Road, (marked "55" on the 1931 Department of highway may of Sullivan County;)

then in a southerly direction to the Sullivan-Columbia County Line, Laporte Borough in this jurisdicition. COUNTIES

ELECTRICIAN

Bradford County.............$ 34.24 19.18 Sullivan County.............$ 32.27 19.12

ELEC0812-007 06/01/2018

LYCOMING; NORTHUMBERLAND (Delaware, Lewis and Turbot Townships, Section 00 73 46 Page 11 and the Borough of Milton); AND UNION (Except East Buffalo and Union Townships and Lewisburg Borough) COUNTIES

ELECTRICIAN

LYCOMING COUNTY.............$ 32.27 19.12

NORTHUMBERLAND AND UNION

COUNTIES....................$ 32.27 19.12

* ENGI0542-013 05/01/2018

BUILDING CONSTRUCTION:

LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND

WYOMING COUNTIES

Power equipment operators:

GROUP 1.....................$ 36.01 24.80+A

GROUP 1a....................$ 38.26 25.46+A

GROUP 2.....................$ 35.73 24.71+A

GROUP 2a....................$ 37.98 25.38+A

GROUP 3.....................$ 33.01 23.90+A

GROUP 4.....................$ 31.86 23.58+A

GROUP 5.....................$ 31.41 23.45+A

GROUP 6.....................$ 30.54 23.18+A

FOOTNOTE:

A - PAID HOLIDAYS: Washington 's Birthday, Good Friday, Memorial Day, Labor Day, Presidential Election Day, Veterans Day; Thanksgiving Day and Christmas Day.

***TOXIC/HAZARDOUS WASTE REMOVAL***

Add 20% to basic hourly rate for all classifications

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Machines doing hook work, any machine handling machinery, cable spinning machines, helicopters, lulltype forklift with boom attachment, concrete boom. truck, machines similar to the above including remote control equipment.

GROUP 1a: Machines doing hook work; Machines handling machinery; All types of cranes 15 ton and over factory rating; Cableways; Draglines 15 ton and over factory rating; HIgh Rail/Burro Crane 15 ton and over factory rating; Rail Loader (Wiinch Boom Type) 15 ton and over factory rating; Machines similar to above, including remote control equipment.

Section 00 73 46 Page 12

GROUP 2: All types of cranes (except cranes doing hook work) backhoes, cableways, draglines, keystones, shovels, derricks, trench shovels, trenching machines, hoist with two towers, pavers 21E and over, overhead cranes, building hoists (double drum) gradalls, mucking machines in tunnels, front end loaders, tandem scrapers, pippin type backhoes, boat captains, batch plant operators concrete drills, self-contained rotary drills, fork lifts, 20ft, lift and over, scrapers, tournapulls, spreaders, bulldozers and tractors, rollers (high grade finishing), mechanic-welder, motor patrols, concrete pumps, grease truck, directionall drill machines 8" and up, skid steer, hydraulic pipe pusher 8" and up, hydro ax, environmental recycling machine and grinder type machines, lull type lifts masonry tenders, shear attached to machines, grease truck, concreate placer machine, machines similar to the above including remote control equipment.

GROUP 2a: Crawler backhoes and crawler gradalls over one cubic yard factory rating; Hydraulic backhoes over one cubic yard factory rating; Equipment 15 ton and over factory rating; Concrete Pumps 97 feet or Boom length or less (150 yard pour or less); Machines similar to above, including remote control equipment.

GROUP 3: Conveyors, building hoist (single drum), high or low pressure boilers, well drillers, asphalt plant engineers, ditch witch type trencher, core drill operators, forklift trucks under 20ft. lift, fine grade machines, directional drill machine 7" or less, hydraulic pipe pusher 7" or less, skid-steer forklift, machines with concrete mixer attachment, machines similar to the above including remote control equipment, miscellaneous equipment operator.

GROUP 4: Welding machines, well points, compressors, pumps, heaters, farm tractors, form line graders, road finishing machines, concrete breaking machines, rollers, seaman pulverzing mixer, power boom, seeding spreader, tireman (for power equipment), grout pump 4" and up, power broom, power sweeper, seeding spreader (self-propelled) machines similar to the above including remote control equipment.

GROUP 5: Fireman

GROUP 6: Oilers and deck hands (personnel boats)

* ENGI0542-014 05/01/2018

BUILDING CONSTRUCTION:

ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN,

JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR,

NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER,

SULLIVAN, TIOGA, UNION, AND YORK COUNTIES

Section 00 73 46 Page 13

Power equipment operators:

GROUP 1.....................$ 36.01 24.80+A

GROUP 1a....................$ 38.26 25.46+A

GROUP 2.....................$ 35.73 24.71+A

GROUP 2a....................$ 37.98 25.38+A

GROUP 3.....................$ 33.01 23.90+A

GROUP 4.....................$ 31.86 23.58+A

GROUP 5.....................$ 31.41 23.45+A

GROUP 6.....................$ 30.54 23.18+A

FOOTNOTE: A - PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day, provided the employee works the day before and the day after the holiday

***TOXIC/HAZARDOUS WASTE REMOVAL***

Add 20 per cent to basic hourly rate for all classifications

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Machines doing hook work, any machine handling machinery, cable spinning machines, helicopters, machines similar to the above, all types of cranes, cableways, and draglines .

GROUP 1a: Machines doing hook work; Machines handling machinery; All types of cranes 15 ton and over factory rating; Cableways; Draglines 15 ton and over factory rating; High Rail/Burro Crane 15 ton and over factory rating; Rail Loader (Winch Boom Type) 15 and over factory rating; Machines similar to above, including remote control equipment.

GROUP 2: Backhoes, keystones, shovels, derricks, trench shovels, trenching machines, hoist with two towers, pavers 21E and over, overhead cranes, building hoists (double drum) gradalls, mucking machines in tunnels, front end loaders, tandem scrapers, pippin type backhoes, boat captains, batch plant operators concrete drills, self-contained rotary drills, fork lifts, 20ft, lift and over, scrapers, tournapulls, spreaders, bulldozers and tractors, rollers (high grade finishing), mechanic-welder, motor patrols, concrete pumps, grease truck, machines similar to the above.

GROUP 2a: Crawler backhoes and crawler gradalls over one cubic yard factory rating; Hydraulic backhoes over one cubic yard factory rating; Equipment 15 and over factory rating; Concrete Pumps 92 feet of Boom length or less (150 yard pour or less); Machines similar to above, including

Section 00 73 46 Page 14 remote control equipment.

GROUP 3: Conveyors, building hoist (single drum), high or low pressure boilers, well drillers, asphalt plant engineers, ditch witch type trencher, core drill operators, forklift trucks under 20ft. lift, fine grade machines, machines similar to the above.

GROUP 4: Welding machines, well points, compressors, pumps, heaters, farm tractors, form line graders, road finishing machines, concrete breaking machines, rollers, seaman pulverzing mixer, power boom, seeding spreader, tireman (for power equipment), machines similar to the above.

GROUP 5: Fireman.

GROUP 6: Oilers and deck hands (personnel boats)

IRON0404-006 07/01/2018

ADAMS, BERKS, CUMBERLAND, DAUPHIN,JUANITA, LANCASTER, LEBANON,

LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY,

SCHUYLKILL, SNYDER, UNION and YORK COUNTIES

Ironworkers:.....................$ 32.03 29.13

IRON0404-017 07/01/2018

BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, MONROE, PIKE,

SULLIVAN, TIOGA, SUSQUEHANNA, WAYNE and WYOMING COUNTIES

IRONWORKER.......................$ 32.57 29.13

LABO0130-004 05/01/2017

LACKAWANNA, PIKE, SUSQUEHANNA, WAYNE AND WYOMING (Northern part) COUNTIES

LABORER (Building)...............$ 21.15 16.88

LABO0130-013 05/01/2017

LUZERNE (Northern Part), SULLIVAN and WYOMING (Southern Part)

Section 00 73 46 Page 15

LABORER (Building)...............$ 20.80 16.88

LABO0130-014 05/01/2017

LUZERNE (Southern Part), COLUMBIA COUNTIES

Rates Fringes

LABORER (Building)...............$ 21.02 16.88

LABO0158-002 05/01/2018

HEAVY CONSTRUCTION:

Rates Fringes

Laborers:

GROUP 1.....................$ 20.96 16.79

GROUP 2.....................$ 27.58 16.79

GROUP 3.....................$ 24.57 16.79

GROUP 4.....................$ 24.92 16.79

GROUP 5.....................$ 25.59 16.79

GROUP 6.....................$ 25.01 16.79

GROUP 7.....................$ 25.30 16.79

GROUP 8.....................$ 25.78 16.79

LABORERS CLASSIFICATIONS

GROUP 1: Flag person

GROUP 2: Hazardous/Toxic/Asbestos Waste Handler, Lead Paint Handler

GROUP 3: concrete pitman, puddlers, highway guide rail right of way and property fence slab reinforcement placers, Laborers, landscaper, seeders, planters, magazine tenders, laser beam men for pipe laying and paving machines,, railroad trackman, signalman, asphalt rakers, asphalt tamper, lute or screed man, pneumatic and electric tool operators, jackmammers, paving breakers, concrete saws, whacker vibrator, chainsaw, highway concrete block layers, sheet hammer, pipe layers, Walk Behind Rollers, Walk Behind Trencher

GROUP 4: Caisson-open air below 8 feet, cofferdam open air below 8 feet where excavations for circular caissons and cofferdams 8 ft and below level of natural grade adjacent to starting point, form setters (road) wagon drill diamond point drill, gunite nozzle operators, walk behind rollers and concrete rubbers, blaster.

GROUP 5: Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and welding in Conjunction wth Rebar, and Concrete Surfacer.

Section 00 73 46 Page 16

FREE AIR TUNNELS AND ROCK SHAFTS

GROUP 6: Outside labers in conjuction with tunnels and rock shafts

GROUP 7: Chuck tenders, muckers, nippers, miners, inside laborers

GROUP 8: Miners, drillers, blasters, pneumatic shield operators, lining, spotting and timber workmen, rebar steel placer, bonding and securing, welders, and concrete surfacers

LABO1174-004 05/01/2017

CARBON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES

Rates Fringes

LABORER (Building)...............$ 25.39 22.29

LABO1174-016 05/01/2017

BERKS, LEBANON and SCHUYLKILL COUNTIES

Rates Fringes

LABORER (Building)...............$ 21.57 15.04

LABO1180-004 05/01/2016

CUMBERLAND, DAUPHIN, JUNIATA, NORTHUMBERLAND (South of the Susquehanna River), PERRY, AND SNYDER COUNTIES

LABORER (Building)...............$ 20.21 12.93

LABO1180-012 05/01/2016

BRADFORD, LYCOMING, MONTOUR, NORTHUMBERLAND (Northern part), TIOGA, AND UNION COUNTIES

Laborers: (Builder)..............$ 20.22 12.93

LABO1180-019 05/01/2017

ADAMS, LANCASTER and YORK COUNTIES

Section 00 73 46 Page 17

LABORER (Building)...............$ 21.39 13.33

PAIN0021-005 05/01/2018

BERKS, CARBON, LEBANON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES

Rates Fringes

Painters:

Brush, Roller...............$ 28.02 18.33 Structural Steel............$ 29.02 18.33

PAIN0021-023 05/01/2018

BRADFORD, COLUMBIA, LACKWANNA,LUZERNE, LYCOMING, MONTOUR,

NORTHUMBERLAND, PIKE, SHUYLKILL, SNYDER, SULLIVAN,

SUSQUEHANNA,TIOGA, UNION, WAYNE, AND WYOMING COUNTIES

Painters:

Brush and Roller............$ 27.67 18.80 Spray.......................$ 28.67 18.80 Structural Steel............$ 28.67 18.80

PAIN0057-020 06/01/2018

JUNIATA COUNTY

Rates Fringes

Painters:

Commercial Brush & Roller...$ 28.00 19.12 Industrial Brush & Roller...$ 32.50 19.12 Spray.......................$ 28.00 19.12

PAIN0411-003 05/01/2017

ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES

Rates Fringes

Painters:

Bridge......................$ 31.35 13.20 Industrial..................$ 25.60 13.20

PLAS0592-003 06/01/2018

PIKE and MONROE (Except Tobyhanna) COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 33.43 12.30

PLASTERER........................$ 33.51 12.30

Section 00 73 46 Page 18

PLAS0592-006 06/01/2018

COLUMBIA COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 33.43 12.30

PLASTERER........................$ 33.51 12.30

PLAS0592-018 05/01/2018

Rates Fringes

Cement Mason/Concrete Finisher Adams, Lancaster and York Counties....................$ 29.00 21.30

PLASTERER

Adams, Berks (Portions of), Lancaster, and Lebanon Counties............$ 29.00 21.30

PLAS0592-026 05/01/2014

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

BERKS (Northeastern part lying North of a line starting from the Southern boundary line of Lehigh County continuing through Huffs Church, Fredericksville, Dryville, Lyon Station, Kutztown, Krumsville, and Stoney run in Berks County to the Lehigh County line).........$ 26.60 20.15

REMAINDER OF BERKS COUNTY...$ 35.05 11.05

PLASTERER

BERKS COUNTY................$ 23.48 19.45

PLUM0420-004 05/01/2018

BERKS, LEHIGH, AND NORTHAMPTON COUNTIES

Rates Fringes

Steamfitter......................$ 48.43 33.92

PLUM0520-008 05/01/2018

COLUMBIA (REMAINDER OF COUNTY), CUMBERLAND, DAUPHIN, JUNIATA,

LANCASTER, LEBANON (WEST OF ROUTE 501), MONTOUR,

NORTHUMBERLAND, PERRY, SNYDER, YORK, BRADFORD COUNTY (WESTERN

HALF), SULLIVAN, TIOGA AND UNION COUNTIES

Section 00 73 46 Page 19

Plumber and Steamfitter..........$ 36.87 25.09

PLUM0524-006 06/01/2018

CARBON, COLUMBIA (BERWICK TOWNSHIP), BRADFORD (EASTERN PART),

LUZERNE, LACKAWANNA, MONROE, SCHUYLKILL, SUSQUEHANNA, WAYNE,

WYOMING, AND PIKE COUNTIES

Plumber and Steamfitter..........$ 42.39 20.52

PLUM0690-007 05/01/2018

BERKS, LEHIGH, LEBANON (East of Route 501), AND NORTHAMPTON

PLUMBER..........................$ 44.39 30.30

ROOF0030-008 05/01/2017

REMAINING COUNTIES

Rates Fringes

Roofers:

Composition.................$ 36.15 29.76+A

FOOTNOTE (Composition Roofer only);

A. PAID HOLIDAY: Election Day

ROOF0030-010 06/01/2018

BRADFORD, LACKAWANNA, LUZERNE (North of Interstate 80 with the exception of White Haven Twp.) MONROE (Tobyhanna Army Depot only), PIKE, SULLIVAN, TIOGA, WAYNE, AND WYOMING COUNTIES

ROOFER...........................$ 28.50 19.58

SHEE0019-009 06/01/2018

ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON,

LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES

Section 00 73 46 Page 20

Sheet metal worker...............$ 34.78 35.83

FOOTNOTE: PAID HOLIDAY: Election Day

SHEE0044-003 05/01/2018

BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMNING,

MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER,

SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES

Sheet metal worker...............$ 30.63 23.24

TEAM0229-004 05/01/2018

Rates Fringes

TRUCK DRIVER (ADAMS, BERKS,

CARBON, COLUMBIA, CUMBERLAND,

DAUPHIN, JUNIATA, LACKAWANNA,

LANCASTER, LEBANON, LEHIGH,

LUZERNE, LYCOMING, MONROE,

MONTOUR, NORTHAMPTON,

NORTHUMBERLAND, PERRY, PIKE,

SCHUYLKILL, SNYDER, SULLIVAN,

SUSQUEHANNA, UNION, WAYNE,

WYOMING, AND YORK COUNTIES)

GROUP 1.....................$ 35.32 0.00

GROUP 2.....................$ 35.39 0.00

GROUP 3.....................$ 35.88 0.00

Truck drivers: (BRADFORD AND

TIOGA COUNTIES)

GROUP 1.....................$ 22.21 13.11

GROUP 2.....................$ 22.28 13.11

GROUP 3.....................$ 22.77 13.11

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1: Stake Body Truck (Single Axle, Dumpster)

GROUP 2: Dump Trucks, Tandem and Batch Trucks, SEmi-Trailers, Agitator Mixer Trucks, REady-Mix and Dumpcrete type vehicles, Asphalt Distributors (when used for transportation), Stake Body Truck (Tandem)

GROUP 3: Euclid type off-highway equipment - Back or Belly Dump Trucks and Double-Hitched equipment, Straddle (Ross) Carrier, Low-Bed Trailers

Section 00 73 46 Page 21

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Section 00 73 46 Page 22

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

Section 00 73 46 Page 23

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The contract includes all work required to upgrade the existing water supply system in accordance with the plans and specifications, and provisions of PADEP Construction Permit No. 4516510. Existing test wells indicated on the drawings shall be made permanent. Existing supply wells identified for decommissioning and well head protection of existing well to remain in service is also required. Work includes construction support related to Munitions and Explosives of Concern (MEC), construction of water supply distribution piping, precast well houses and foundations, treatment system upgrades, and all related mechanical, electrical, communications, instrumentation and controls, site work and restoration. The paragraphs below provide additional detail related to the Structural/Architectural, Mechanical, Instrumentation and Electrical work and is not intended as a comprehensive list of requirements. Refer to individual sections of the specification inclusive of site and civil sections, as well as administrative requirements in addition to the summary of items included herein.

The work includes incidental related work and the following:

1.1.1.1 Civil/Structural/Architectural Work

Furnish and install: pre-engineered well house buildings on concrete foundations; reinforced concrete foundations for the 6 new emergency generators. At building 52, furnish and install concrete curbing, fencing,concrete slab above the new underground waste storage tank and other site features.

1.1.1.2 Mechanical Work

Furnish and install at new well houses: stainless steel submersible well pumps, stainless steel piping, and appurtenences; heating and ventilating equipment; as well as piping between well houses. Furnish and install at Building 52: New bathroom; water treatment systems; water pressure booster system, and all other piping and appurtenances as indicted.

1.1.1.3 Instrumentation Work

Furnish and install at new wells: flow meters; submersible pressure transducers; control panels; prgrammable logic controlls and antennas.

Furnish and install at Building 52: control panel and sump high level switch. Furnish and install at storage tanks 28 and 29: level sensors and pressure transducer/transmitter. In addition, modify Well No. 6 control system at the WWTP to add control for Well No. 2 and new wells WS-1, WS-2, WS-3 and WS-4. Also, perform system integration of all instrumentation, control panels and WWTP central system programming modifications.

Section 01 11 00 Page 1

1.1.1.4 Electrical Work

Furnish and install: emergency generators and automatic transfer switches, conduit and conductiors for new equipment, and fiber and copper cables for new wells, existing well 6 and building 52. Also furnish and install intrusion detection systems and lighting as indicated.

1.1.2 Location

The work is located at the Tobyhanna Army Depot, Tobyhanna Pennsylvania.

1.2 SHUTDOWN LIMITATIONS

Well #6 may be off-line for a maximum of 24 hours. Interruption of power to Building 52 feed pumps shall be limited to a single work day. The SCADA system panel must remain online.

1.3 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract.

Arrange the construction sequence, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways with the Contracting Officer, prior to start of work.

1.4 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before work started.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

Section 01 11 00 Page 2

SECTION 40 95 00

PROCESS CONTROL

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI INCITS 154 (1988; R 2004) Office Machines and Supplies - Alphanumeric Machines - Keyboard Arrangement

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING

ENGINEERS (ASHRAE)

ASHRAE FUN IP (2017) Fundamentals Handbook, I-P Edition

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C37.90 (2005; R 2011) Standard for Relays and Relay Systems Associated With Electric Power Apparatus

IEEE C37.90.1 (2013) Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus

IEEE C62.41.1 (2002; R 2008) Guide on the Surges Environment in Low-Voltage (1000 V and Less) AC Power Circuits

IEEE C62.41.2 (2002) Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits

IEEE Stds Dictionary (2009) IEEE Standards Dictionary: Glossary of Terms & Definitions

INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)

IEC 61131-3 (2013) Programmable Controllers - Part 3:

Programming Languages

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI C12.1 (2008) Electric Meters Code for Electricity Metering

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA 250 (2014) Enclosures for Electrical Equipment

Section 40 95 00 Page 1

(1000 Volts Maximum)

NEMA ICS 1 (2000; R 2015) Standard for Industrial Control and Systems: General Requirements

NEMA ICS 2 (2000; R 2005; Errata 2008) Industrial Control and Systems Controllers, Contactors, and Overload Relays Rated 600 V

NEMA ICS 3 (2005; R 2010) Medium-Voltage Controllers Rated 2001 to 7200 V AC

NEMA ICS 4 (2015) Application Guideline for Terminal Blocks

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14) National Electrical Code

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)

NIST SP 250 (1991) Calibration Services Users Guide

TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)

TIA-232 (1997f; R 2012) Interface Between Data Terminal Equipment and Data Circuit-Terminating Equipment Employing Serial Binary Data Interchange

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

47 CFR 15 Radio Frequency Devices

UNDERWRITERS LABORATORIES (UL)

UL 1059 (2001; Reprint Oct 2011) Standard for Terminal Blocks

UL 508 (1999; Reprint Oct 2013) Industrial Control Equipment

1.2 DEFINITIONS

Definitions, Symbols, and engineering unit abbreviations shall conform to IEEE Stds Dictionary, as applicable.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Section 40 95 00 Page 2

Control Panels Wiring Diagrams; G Control Panels Layout Drawings; G

SD-03 Product Data

Performance Verification Test (Pvt); G Factory Test Procedure; G Field Instruments; G Control Drawings; G

SD-06 Test Reports

Factory Test Report; G Testing, Adjusting And Commissioning; G Performance Verification Test(Pvt); G Endurance Test; G

SD-07 Certificates

Control And Sensor Wiring

SD-08 Manufacturer's Instructions

Installation

SD-10 Operation and Maintenance Data

Training Manual; G,RO Instrumentation And Control System; G

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

The process instrumentation and control system shall be used to monitor…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.