RFI_Spreadsheet.xls

XLS spreadsheet 23 KB Posted

Attached to
Water Supply System Upgrades, Tobyhanna Army Depot
Solicitation number
W912BU-18-B-0004_
Issued by

About this file

RFI SUBMISSION FORM

View the file

Other files

File Type Posted
TYAD_Wells_Formal_Abstract.pdf PDF
W912BU-18-B-0004_0005.pdf PDF
W912BU-18-B-0004-Amendment-4.pdf PDF
W912BU-18-B-0004_0003.pdf PDF
W912BU-18-B-0004_0002.pdf PDF
Wells_Site_Visit_Attendance_12-4-18.xlsx XLSX spreadsheet
W912BU-18-B-0004_0001.pdf PDF
FIRST_PAGE_CORRECTION.pdf PDF
W912BU18B0004-DwgsPart1.pdf PDF
W912BU18B0004V1-Specs.pdf PDF
W912BU18B0004-DwgsPart2.pdf PDF
W912BU18B0004V2-Specs.pdf PDF
W912BU-18-B-0004(1).pdf PDF
W912BU18B0004V3-Specs(1).pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FORMAT FOR SUBMITTING REQUESTS FOR INFORMATION
IFB W912BU-18-B-0004
WATER SUPPLY SYSTEM UPGRADES
TOBYHANNA ARMY DEPOT
Sample Questions
Spec Sect/
RFI#DisciplineDrawingDescription
1ArchitecturalS-401AArea A Footing Step: Between column line 10 and 10.4 and Column line A in Area A, there is a footing step indicated dropping the top of the footer from -2-0’ to -5’-4”. The typical top of footing elevation is -2’ below top of slab. Can you please indicate where the top of footing will step back up from 5’-4” to -2’-0”?<--Note: Entire comment on one line please.

File details come from the government source that posted it.