13R0035_SPECS_VOL_1.pdf
PDF 29 MB Posted
- Attached to
- Edgewood Area Wastewater Treatment Plant Enhanced Nutrient Removal (ENR) Upgrade, Aberdeen Proving Ground
- Solicitation number
- W912BU-13-R-0035
About this file
Specs - Volume I - W912BU-13-R-0035
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMND0003_EA_WWTP.pdf | ||
| AMND0002_EA_WWTP.pdf | ||
| AMND0001_Rev_00815_-_WAGE_RATE.pdf | ||
| AMND0001_EAWWTP.pdf | ||
| AMND0001_EA_WWTP_Existing_Drawings.pdf | ||
| AMND0001_EA_WWTP_Attachments.pdf | ||
| 13R0035_DWGS.pdf | ||
| 13R0035_EA_WWTP.pdf | ||
| 13R0035_SPECS_VOL_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Edgewood Area WWTP Plant ENR Upgrade 90145005
PROJECT TABLE OF CONTENTS
VOLUME I
DIVISION 01 - GENERAL REQUIREMENTS
01 01 10 GENERAL CONDITIONS
01 05 00 JOB CONDITIONS
01 20 00 WARRANTY REQUIREMENT
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 51 00 TEMPORARY CONSTRUCTION ITEMS
01 56 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 62 35 RECYCLED / RECOVERED MATERIALS
01 72 00 AS_BUILT DRAWINGS - CADD
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 75 00 STARTING AND ADJUSTING
01 78 23 OPERATION AND MAINTENANCE DATA
01 80 00 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 01 00 UNEXPLODED ORDNANCE (UXO) DETECTION, PRELIMINARY
IDENTIFICATION AND REMOVAL COORDINATION
02 41 00 DEMOLITION
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 83 13.00 20 LEAD IN CONSTRUCTION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 01 30.71 CONCRETE REHABILITATION
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
03 45 33 PRECAST STRUCTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 05 19 POST-INSTALLED CONCRETE ANCHORS
05 12 00 STRUCTURAL STEEL
05 50 13 MISCELLANEOUS METAL FABRICATIONS
PROJECT TABLE OF CONTENTS Page 1
Edgewood Area WWTP Plant ENR Upgrade RFP No. W912BU-13-R-0035
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 73 01 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING
06 82 21 FIBERGLASS REINFORCED PLASTIC (FRP) CHEMICAL FILL BOX
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 BITUMINOUS DAMPPROOFING
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 22 00 ROOF AND DECK INSULATION
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 22 00 FIBERGLASS REINFORCED DOORS AND FRAMES
08 34 19.10 20 ROLLING SERVICE DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 60 45 SKYLIGHTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 83 13 ACOUSTICAL WALL TREATMENT
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 21 00 STANDARD FIBERGLASS RESIN TRANSFER MOLDED WALL LOUVERS
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 11 - EQUIPMENT
11 31 13 ELECTRIC KITCHEN EQUIPMENT
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
PROJECT TABLE OF CONTENTS Page 2
VOLUME II
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 10 00.00 10 VERTICAL PUMPS, MIXED-FLOW IMPELLER-TYPE
22 13 29 SANITARY SEWERAGE PUMPS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 23 00 REFRIGERANT PIPING
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 SWITCHGEAR
26 28 00.00 10 MOTOR CONTROL CENTERS AND PANELBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH
AUXILIARIES
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 01.00 10 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 55 53.00 10 EXTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSE
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
33 34 00 FORCE MAINS AND INVERTED SIPHONS; SEWER
PROJECT TABLE OF CONTENTS Page 3
33 40 00 STORM DRAINAGE UTILITIES
33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 16.53 VERTICAL LIFT GATES
DIVISION 40 - PROCESS INTEGRATION
40 05 00 COMMON WORK RESULTS FOR PROCESS INTEGRATION
40 05 13.96 WELDING PROCESS PIPING
40 05 13 PIPELINES, LIQUID PROCESS PIPING
40 05 23.07 PINCH VALVE AND ACTUATOR
40 95 00 PROCESS CONTROL
40 95 33.23 20 FIBER OPTIC (FO) OUTSIDE PLANT (OSP) MEDIA
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 23.19 MONORAIL HOISTS
41 22 23.20 DAVIT CRANES
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
43 11 00 FANS/BLOWERS/PUMPS; OFF-GAS
43 21 39 PUMPS: WATER, VERTICAL TURBINE
43 32 69 CHEMICAL FEED SYSTEMS
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
46 21 73 MECHANICALLY CLEANED SCREENING EQUIPMENT
46 23 00 GRIT REMOVAL AND HANDLING EQUIPMENT
46 41 11 TOP MOUNTED MIXERS
46 43 11 CHAIN AND FLIGHT CLARIFIER EQUIPMENT
46 51 21.01 COARSE BUBBLE DIFFUSERS
46 53 33 MOVING BED BIOLOGICAL REACTORS
46 53 43 DEEP BED DENITRIFICATION FILTERS
46 66 56 OPEN-CHANNEL DISINFECTION EQUIPMENT
46 71 10 SLUDGE MIXING EQUIPMENT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 01 01 10
GENERAL CONDITIONS
(10 Mar 06)
PART 1 GENERAL
1.1 INDEX
GC-1. POST ACCESS, PERSONAL IDENTIFICATION CARDS, SECURITY BADGING,
PROHIBITED ITEMS, AND OTHER SECURITY REQUIREMENTS
GC-2. AS-BUILT DATA
GC-3. DEPARTMENT OF AGRICULTURE QUARANTINE
GC-4. DISPOSAL OF WASTE MATERIAL
GC-5. EXCAVATION CLEARANCE
GC-6. FIRE PREVENTION AND PROTECTION
GC-7. FUEL BURNING EQUIPMENT
GC-8. HAZARDOUS AREA WORK PERMITS
GC-9. LYME DISEASE WARNING
GC-10. MARYLAND DEPARTMENT OF THE ENVIRONMENT (MDE) PERMITS
GC-11. RANGE BRIEFINGS
GC-12. REFRIGERANT MANAGEMENT
GC-13. SAFETY
GC-14. SUBMITTAL REGISTER AND PROGRESS SCHEDULES
GC-15. UNABSORBED OVERHEAD DELAY DAMAGES
GC-16. UTILITY OUTAGES
GC-17. WARRANTIES
GC-18. WATER SUPPLY
GC-19. WORKING HOURS
GC-20. WORKSITE APPEARANCE AND SECURITY
GC-21. ORDNANCE ITEMS
GC-22. UTILITY MARKINGS
GC-23. MATERIALS SHIPMENT
GC-24. PHOTOGRAPHY
SECTION 01 01 10 Page 1
GC-25. CONFIDENTIALITY
GC-26. ROAD CLOSURES
GC-27. EMERGENCIES
GC-1. POST ACCESS, PERSONAL IDENTIFICATION CARDS, SECURITY BADGING,
PROHIBITED ITEMS, AND OTHER SECURITY REQUIREMENTS:
a. RAPIDgate: All contractor personnel requiring repeated access to Edgewood Area of APG shall obtain a RAPIDgate identification card.
Contractor personnel with vehicles which do not require inspection may use the RAPIDgate ID card at the Maryland Route 24 gate or the personnel section of the Maryland 152 (Magnolia Road) gate. Individuals without either a government identification card or a RAPIDgate identification card must sign in daily at the MD Route 24 (Hoadley Road) Gate Visitor Center. All construction equipment, all deliveries and all vehicles requiring inspection must use the commercial entrance section of the Maryland 152 gate. All other gates will neither process daily entrance permits nor allow commercial vehicles, construction equipment or delivery access.
b. Vehicle Identification: Official Contractor vehicles identified by company placards or logos, construction trailers, and staging may be located or park in designated areas as shown on the site plan or as directed by the Contracting Officer.
c. Vehicle Registration: All vehicles are required to be registered.
Contractor vehicles must be identified by a sign or logo displayed on or painted on the vehicle. DD From 3626 is required for registration.
Vehicles may be registered at Building E4420 in the Edgewood area.
d. Illegal Aliens: No illegal aliens are permitted on post. Contractor personnel may include foreign nationals with valid work visa.
e. Searches: All vehicles and walk-in's are subject to search while on Government property.
f. Passes for Single-Day Contractors: One-day subcontractors such as concrete suppliers may obtain a pass on a daily basis.
g. Vehicle MDDOT Compliance: All contractor vehicles shall comply with Maryland Department of Transportation requirements, including tags, vehicle registration, vehicle safety, etc.
h. Seatbelts: WEARING OF SEAT BELTS IS MANDATORY AT ALL TIMES.
i. Speed Limits and Behavior Near Troops: The speed limit is 25 MPH unless otherwise posted. Lower limits are posted in certain locations.
The speed limit when approaching or passing troop formations is 10 MPH.
Passing troop formations in your lane of traffic is prohibited. All vehicles shall stop, slow down, or give right-of-way for troop traffic on post roads.
j. Motorcycle Requirements: Motorcyclists and passengers are required to wear a helmet, impact or shatter resistant goggles, wraparound glasses, or full-face shield properly attached to the helmet, sturdy footwear, long sleeved shirt or jacket, long trousers, full fingered gloves or mittens designed for use on a motorcycle and a brightly
SECTION 01 01 10 Page 2 colored, outer upper garment during the day and a reflective and high visibility outer garment during the hours of darkness and inclement weather. Motorcyclist must attend an approved motorcycle safety course and have an MSF card in their possession to enter the Installation.
k. Impact on Roadways: All work in or around roadways that will impact traffic requires a minimum of 30 days advance notification to Aberdeen Proving Ground. All work on Aberdeen Proving Ground that either impacts or has the potential to impact traffic flow or roadway safety will require traffic control in accordance with Sections GP-7.06 through Section GP-7.10 of the latest edition of the Maryland Department of Transportation State Highway Administration Standard Specifications for Construction and Materials and with Part 6 of the Manual on Uniform Traffic Control Devices (MUTCD). The MUTCD may be found on line at http://mutcd.fhwa.dot.gov/kno-millennium_06.14.01.htm.
l. Cell Phones: Use of non-hands free cell phones while operating a moving vehicle is prohibited.
m. Prohibited Items: Weapons, drugs, ammunition, explosives and other contraband items are prohibited at all times. Violators will be arrested and prosecuted.
GC-2. AS-BUILT DATA: See Section 01 72 00 AS_BUILT DRAWINGS-CADD
a. Exterior Work - New Buildings, Utilities, Roads, etc.
(1) As-built data shall be compiled from field surveys performed by a Registered Professional Land Surveyor. This work shall be tied into the installation monument system on Universal Transverse Mercator (UTM) datum. The as-built survey shall be shown on standard Directorate of Public Works (DPW) drawing sheets and signed by a Registered Professional Land Surveyor. Deliverables of these data shall consist of one set of hard copy drawings and digital files compatible with DPW's Computer Aided Design (CAD) system. This CAD system is the "Microstation" product of Bentley Systems, Inc. Compatible digital file format shall be .DGN.
These files are to be delivered on compact disk (CD).
(2) Information contained on the as-built drawings shall consist of but not be limited to:
- Building footprints
- Paving (roads, parking lots, hardstands, pads, walks, etc.)
- Fencing
- Utilities (water, sewer, storm drainage, steam, electric, telephone, fiber optics, gas or fuel, etc., and associated appurtenances)
- Structures (bridges, testing facilities, etc.)
- Prominent physical features.
(3) The limits of the as-built plans shall be from the point in which new work ties into existing features and infrastructure to and including the building or structure footprint.
(4) The information that is depicted on the as-built drawings shall have UTM coordinate values associated with the features respective location. UTM values are required at the following points:
SECTION 01 01 10 Page 3
- Corners of buildings
- Points of Tangent (PT),
- Points on Curve (POC),
- Points of Curve (PC),
- Points of Reverse Curve (PRC),
- Points of Compound Curve (PCC) on linear features
- Poles, transformer, manholes, valves, tees, hydrants, and any other appurtenances associated with utilities.
b. Interior Work:
(1) The contractor will be given one hard-copy set of full size prints of the contract drawings (in addition to those mentioned elsewhere) and if available, the drawings in electronic form on floppy disk or CD.
(2) During the life of the contract, the on site job superintendent shall maintain an as-built record of the contract, including any modifications performed, on the hard copy.
(3) After contract final inspection, the changes noted on the hard copy shall be incorporated into the digital data. Both the hard copies and floppy discs or CD's shall be turned over to the Contracting Officer's Representative (COR).
(4) Equipment Warranty Identification Tag: The contractor shall provide and install on each piece of equipment a self-adhesive warranty identification tag. The tag shall contain the following information: Installed by, Installers phone number, Manufacturer, Model Number, Serial Number, Contract Number, Government Project Manager, and the Contracting Officer's Representative (COR) with, phone numbers, Warranty expiration dates for the contractor and manufacturer, and the MAXIMO Identification Number. The contractor shall obtain the MAXIMO Identification Number from the COR. The contractor shall also submit a written report to the COR of the above information.
GC-3. DEPARTMENT OF AGRICULTURE QUARANTINE: See Section 01 56 10, ENVIRONMENTAL PROTECTION.
GC-4. DISPOSAL OF WASTE MATERIAL: See Section 01 56 10, ENVIRONMENTAL
PROTECTION.
GC-5. EXCAVATION CLEARANCES:
a. Contractor must obtain an approved Excavation Permit (EP), SSB Form 1247-R, from the Directorate of Public Works before starting any excavation work. The Point of Contact at DIO is the Chief, Construction Inspection Branch at 410 306-4991 or 4992 (phone). The contractor shall initiate the permit process by filling out the "EXCAVATOR SECTION" of the EP, and submitting through the COR.
Processing will normally require ten (10) workdays.
b. All damage to identified utilities shall be the fiscal responsibility of the contractor, to include any peripheral loss imposed on the organizations/tenants of Aberdeen Proving Ground (e.g.
damage to facilities, equipment, loss of productivity due to loss of any utility). The authorized representatives for DPW, and the
SECTION 01 01 10 Page 4
Directorate of Safety, Health, and Environment (DSHE) have the authority to stop any excavation that is either unsafe or unauthorized.
c. Should the contractor encounter unidentified utility lines, all excavation work shall stop, and the COR should be notified immediately. Excavation work shall not be permitted until the utilities are properly identified, and the COR issues a notice to proceed.
d. Permits will be good for 30 calendar days from date of issuance.
Contractor shall be responsible for obtaining renewals to maintain permit status.
GC-6. FIRE PREVENTION AND PROTECTION: The contractor shall comply with all fire prevention measures prescribed in the installation fire regulations, a copy of which is on file in the office of the COR. A written Hot-Work Permit shall be obtained by the contractor for use of open flame devices, such as blow torches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment from the Fire and Emergency Services Division (F&ESD), of the Directorate of Safety, Health, and Environment (DSHE); see Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS.
The contractor shall be liable for any fire damage to Government property attributable to negligence on the part of the contractor, including failure to comply with fire prevention measures prescribed by terms of this contract. Contractors may call the F&ESD at (410) 306-0572/0573 for on-site inspection, or report to Building E-5180 at the southwest corner of Hoadley and Blackhawk Roads, to receive specific fire instructions if in the Edgewood Area.
GC-7. FUEL BURNING EQUIPMENT: Fuel burning equipment under this contract such as boilers, furnaces, water heaters, generators, etc. will be supplied with Reasonably Available Control Technology (RACT), which reduces emission of nitrogen oxides (NOx). Manufacturers offer low NOx burners as optional items on their equipment. These low NOx burners shall be selected and their price included in the contractor's bid.
GC-8. HAZARDOUS AREA WORK PERMITS:
a. Where a work site is included in an area known, or suspected, to contain hazardous materials, a Hazardous Area Work Permit (HAWP) will be included in the specification after the section "Statement of Work". The contractor shall post a copy of the permit in full view at the work site. The contractor shall be responsible to inform all his personnel and assure they conform to the special requirements directed by the permit. This conformance shall be monitored by the installation DSHE. Non-conformance shall result in a work stoppage until the situation is corrected, at no expense to the Government. Continued instances of non-conformance may result in contract termination.
b. Hazardous materials include, but are not limited to, National Priority List (Comprehensive Environmental Response Compensation and Liability Act (CERCLA)), chemical surety materials, hazardous chemicals, carcinogens, asbestos, explosives, radioactive materials, etc. These hazardous materials may be encountered at work sites at Aberdeen Proving Ground.
c. When a HAWP is not included with the specification, the work site is in an area not known or suspected to contain hazardous materials.
However, during operations such as excavation or demolition, materials
SECTION 01 01 10 Page 5 may be uncovered which could be hazardous (e.g. asbestos). If contractor personnel should encounter materials, either known hazardous materials or unrecognized materials, they should stop work in that area immediately, and notify the Installation Safety Office at 410 306-1082for work in the Edgewood Area, and the COR. Work may be resumed after identification of the material, and notification of work constraints, if any, caused by the materials.
GC-9. LYME DISEASE WARNING: The contractor is responsible for ensuring that his or her personnel take all reasonable precautions to avoid contracting Lyme Disease, to include: using repellents, wearing personal protective clothing and avoiding the wear of abbreviated clothing such as shorts, cutoffs, short sleeve shirts, tee shirts and sandals in areas where tick borne diseases are endemic. Particular attention must be given to ticks and Lyme disease prevention when working in grassy and wooded areas on Aberdeen Proving Ground.
GC-10. MARYLAND DEPARTMENT OF ENVIRONMENT (MDE) PERMITS: Articles or processes requiring MDE permits to construct and/or operate, and that require shop drawings or manufacturer's data to obtain the permit, such as boilers, and incinerators, the following shall apply:
a. The contractor shall initiate the permit application. After completion of those portions pertaining to the equipment to be furnished under contract, the application shall be forwarded, through the COR, to DSHE for completion and submission to the MDE. The permit application shall be submitted within ten workdays of approval of the submittal for the equipment.
b. It is the contractor's responsibility to provide equipment or systems capable of construction and operation under MDE permit. The Government will not accept a system that does not meet the State of Maryland law.
c. If required, the Government will make available the following by the time the "Notice to Proceed" is issued:
(1) MDE approved soil erosion and sediment control plans and, if necessary, storm water management plan.
d. The contractor is responsible to comply with all provisions of the permit(s). Non-compliance shall result in the issuance of a stop-work order from the Contracting Officer, and work shall not be allowed to resume until corrective actions have been taken.
e. For further information, see Section 01 56 10, ENVIRONMENTAL PROTECTION, the applicable portions of paragraphs entitled "POLLUTION PREVENTION" and "ENVIRONMENTAL PERMITS" respectively.
GC-11. RANGE BRIEFINGS: If the work site is designated as one in a range area or in close proximity to a range area, the contractor will be briefed and provided with written instructions on range procedures prior to start of work (see Aberdeen Proving Ground Regulation (APGR) 385-1). This information will include safety requirements such as range clearance/control procedures, emergency procedures, communication requirements, etc. The contractor shall be responsible to disseminate these procedures to all contract and sub-contract personnel. Work shall be scheduled and coordinated with the applicable organization.
SECTION 01 01 10 Page 6
GC-12. REFRIGERANT MANAGEMENT: In line with federal environmental laws and regulations regarding the handling of chlorofluorocarbon (CFC) and hydrochlorofluorocarbon (HCFC) refrigerants, the following shall apply:
a. The contractor shall not intentionally vent any refrigerants to the atmosphere.
b. When performing work requiring the opening of existing air conditioning or refrigeration systems, the refrigerants shall be recovered using EPA-approved recovery or recovery/recycle equipment and storage vessels.
c. On systems to be reused after completion of work, the contractor shall install new or reclaimed refrigerant. All current systems using CFC refrigerants should, unless otherwise specified, be considered for modification to allow use of an alternative HCFC.
d. New or replacement air conditioning/refrigeration equipment shall be installed with specified HCFC refrigerants. No refrigerant shall be used having an Ozone Depletion Potential (ODP) equal to or greater than
0.05 (based on R-11 = 1.0).
e. Refrigerant recovered and not to be reused shall be properly labeled as "Recovered Refrigerant", with the type (R-11, R-12, etc.)
indicated, and turned over to the COR.
f. See also Section 01 56 10, ENVIRONMENTAL PROTECTION, applicable portions of paragraphs entitled "POLLUTION PREVENTION" and "SPECIFIC DISPOSAL METHODS" respectively.
GC-13. SAFETY:
a. All operations performed must be in accordance with OSHA 29 CFR 1910 and 1926, and the Code of Maryland (COMAR), including the High Voltage Act. In those instances where Army regulations are more stringent, the Army regulations shall apply. Applicable Army Safety Regulations include, but are not limited to:
(1) AR 385-10, The Army Safety Program;
(2) AMCR 385-100, Safety Manual;
(3) APGR 385-4, The APG Safety and Occupational Health Program;
and
(4) EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual.
Regulations are maintained in the Directorate of Safety, Health and Environment (DSHE) Installation Safety Division (ISD) library, Building 4304 (Aberdeen Area) and are available for review upon request.
b. In accordance with contractual requirements, each contractor must appoint a safety representative/competent person to ensure compliance with safety regulations and to act as liaison between the contractor and ISD. ISD personnel will be available for regulatory compliance advice on any particular safety problem that may arise during normal course of operation.
SECTION 01 01 10 Page 7
c. Before work under the contract is started, the contractor's safety representative shall report to the ISD located on the First Floor of Building 4304 (Aberdeen Area) for familiarization with safety requirements. The safety representative shall maintain an accurate record of and shall report to the ISD exposure data and accidents resulting in death, traumatic injury, occupational disease and/or damage to property, materials, supplies and equipment incident to work performed under the contract.
d. The Contracting Officer shall notify the contractor of any noncompliance with the foregoing provisions and action to be taken.
The contractor shall, after receipt of such notices, immediately correct the conditions. Such notice, when delivered to the contractor or his representative at the site of work, shall be deemed to be sufficient for this purpose. If the contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The contractor shall not make any part of the time lost due to any such stop order subject of claim for excess costs or damages.
e. Confined space work shall not be performed without appropriate monitoring and approval of an entry permit under provisions of 29 CFR
1910.146 and APG Regulation 385-4.
f. Work requiring control of hazardous energy shall be performed IAW 29 CFR 1910.147 and APG Regulation 385-4.
GC-14. SUBMITTAL REGISTER AND PROGRESS SCHEDULES: The Contractor shall prepare a submittal register of all items required under the contract. The contractor shall prepare a schedule in accordance with Contract Clause entitled "Schedule For Construction Contracts" (FAR 52.236-15) which shows milestones and intervals for contract completion. The register and schedule shall be delivered to the Contracting Officer within ten calendar days after the contractor's receipt of "Notice to Proceed".
GC-15. UNABSORBED OVERHEAD DELAY DAMAGES:
a. Compensation for unabsorbed overhead incurred in a delay during which the contractor is forced to stand by, whether calculated by the Eichleay Formula or any other method, is not automatic. During any such delay, it is the duty of the contractor to seek out new contracts or additional work opportunities to mitigate delay damages. To substantiate entitlement to unabsorbed overhead damages, the contractor must first demonstrate the nature of the delay that made it impractical to mitigate delay damages by undertaking new work.
b. In submitting any claim for delay damages for unabsorbed overhead, regardless of length of delay, the contractor must list all work performed during the delay period. This list shall include date of each contract or agreement, the period of performance and any other information required by the Contracting Officer.
c. In submitting any claim for delay damages for unabsorbed overhead, the contractor must prove all opportunities, prime or sub-contract, bonded or unbonded, it could have undertaken but for the delay. The parties to this contract agree that if no additional work opportunities arise during any delay period in excess of 14 days, under absorption of overhead would be caused by lack of opportunity and not the delay under this contract. In the absence of opportunity to take on additional
SECTION 01 01 10 Page 8 work, the contractor will be entitled to no additional unabsorbed overhead costs under this contract.
d. In the event new work opportunities do arise during a compensable delay, the contractor will provide notice to the Contracting Officer of such new contracts or other additional work opportunities as they become available during the delay period. The Government will be liable for no unabsorbed overhead costs that arise during the delay period in the absence of an opportunity to adjust the performance schedule to enable avoidance of such costs.
GC-16. UTILITY OUTAGES:
a. General: All utility service outages shall be at the convenience of the Government, and will normally be scheduled during off-duty hours or weekends. Outages shall be requested in writing to the Contracting Officer no less than three weeks (21 days) in advance. Give location, type of utility, date, time and duration of requested outage. Request will identify the individual who will be responsible for the outage.
Requests without an identified responsible party will not be processed.
b. Electrical: Work on high voltage primary lines shall be accomplished while lines are de-energized and grounds are in place.
If, due to extenuating circumstances, this is not practical, permission may be requested through the COR, in writing, to allow work while energized or hot. If permitted, contractor shall be subject to all OSHA requirements for equipment and worker protection.
GC-17. WARRANTIES: Before final acceptance, the contractor shall provide to the COR a list showing all products and installed equipment that are covered by warranties, and the length of time the warranty is in effect.
See Section 01 20 00 WARRANTY REQUIREMENT.
GC-18. WATER SUPPLY: A vacuum breaker or appropriate backflow prevention device shall separate any temporary or permanent connection to the potable water supply. The vacuum breaker shall be in accordance with the National Plumbing Code and the American Water Works Association. See Section 01 56 10, ENVIRONMENTAL PROTECTION, Water and/or Sewer Lines, for additional information.
GC-19. WORKING HOURS: Unless otherwise specified, work under the contract shall be performed during the hours from 7:30 a.m. to 5:00 p.m., local time, Mondays through Fridays, except federal holidays. Every other Friday is a scheduled Regular Day Off (RDO). On workday Fridays the hours are from 7:30 a.m. to 4:00 p.m. Prior to performing work during hours other than those specified, the contractor shall obtain the permission of the Contracting Officer or his authorized representative. Normally, requests for permission to work during hours other than those specified should be submitted no less than 24 hours prior to the time the contractor desires to perform such work.
GC-20. WORKSITE APPEARANCE AND SECURITY: Contractor shall maintain worksite in a reasonably neat appearance. This shall be done by daily cleanups of the worksite. Contractor is responsible to secure all tools and materials at the close of business. The Contractor shall protect all construction materials from exposure to the elements. The Contractor shall ensure that, at the end of the work shift, the building exterior doors/windows are secure to prevent access to the building interior. This requirement applies to all jobsites, including those within restricted
SECTION 01 01 10 Page 9 areas of APG.
GC-21. ORDNANCE ITEMS:
a. It is not the intent of this contract to require Unexploded Ordnance (UXO) clearance activities by the contractor.
b. If a suspected ordnance item is encountered during the contractor's construction activities, CONTRACTOR PERSONNEL SHALL NOT APPROACH, TOUCH, OR MOVE THE SUSPECTED ORDNANCE ITEM. The contractor shall immediately evacuate all contractor personnel at least 300 feet from the suspect item and contact government emergency personnel. The contractor shall mark the items position sufficiently to allow location of the item by responding units. If an item is unknown, the contractor shall treat it as ordnance, evacuate and initiate notification.
c. On government telephone systems (436 prefixes) dial 911. Radio notification procedures and additional telephone numbers are provided on the EMERGENCY RANGE CARD that will be issued to select contractor personnel as identified by the contractor.
GC-22. UTILITY MARKINGS: Prior to any excavation the Contractor shall contact the installation/DPW and the One-Call Service, a minimum of 5 days and 48 hours, respectively, requesting utility location markings. The Contractor shall not proceed with any excavation until all utilities, including abandoned utilities, have been marked to the satisfaction of the Contracting Officer. Prior to requesting the marking of utilities, the contractor shall stake out proposed excavations and limits of work with white lines ("White Lining"). It is the Contractor's responsibility to ensure that all permits excavation or otherwise, including DPW permits) are current and up-to-date without expiration. In addition to the above requirements the Contractor shall:
a. Visually survey and verify that all utility markings are consistent with existing appurtenances such as manholes, valve boxes, poles, pedestals, pad-mounted devices, gas meters, etc. prior to any excavation.
b. Hand dig test holes to verify the depth and location of all utilities prior to any mechanical excavation within the limits of work. Other non-damaging methods for utility verification, as indicated in (d) below, may be considered subject to Approval by the Contracting Officer. Also, verify that any abandoned utilities are not active.
c. Preserve all utility markings for the duration of the project to the furthest extent possible.
d. When excavation is performed within 2 feet of any utility line, a non-damaging method of excavation shall be used. The non-damaging method shall be hand digging. Other non-damaging methods, such as soft digging, vacuum excavation, pneumatic hand tools, may be considered subject to approval by the Contracting Officer.
e. Regardless of the type of excavation, the Contractor shall notify the Contracting Officer a minimum of 72 hours prior to any excavation activity. Failure to notify the Contracting Officer can result in the issuance of a "Stop Work" order, which shall not be justification for contract delay or time extension. The Government reserves the right to
SECTION 01 01 10 Page 10 have personnel present on site during any type of excavation.
f. The Contractor's Quality Control system manager shall ensure that all excavation requirements herein are met at the time of the preparation phase of quality control, and that the excavation procedures are reviewed during the preparatory phase meeting. This preparatory phase of control shall also establish and document contingency plans and actions to be followed in the event that existing utilities are damaged or interrupted. Locations of shut off or isolation devices along with other safety features shall be established and their operation reviewed.
g. Any work other than excavation in the vicinity of a utility, that could damage or interrupt a utility, such as, exterior or interior work near transformers, power lines, poles, above ground gas lines, gas meters, etc., shall be done with extreme care. The Contractor shall specifically note during the preparatory phase of quality control, the construction techniques to be used to preclude damaging or interrupting any utility. This preparatory phase of control shall also establish and document contingency plans and actions to be followed in the event that existing utilities are damaged or interrupted. Locations of shut off or isolation devices along with other safety features shall be established and their operation reviewed.
h. The Contractor shall complete a risk assessment, using the attached checklist, at least one week prior to the start of any excavation or other work in the vicinity of a utility. The risk assessment shall be submitted for government approval prior to any excavation or other work in the vicinity of a utility. A risk assessment shall be completed for each definable feature of work encountering utilities and shall include all utilities anticipated to be encountered.
GC-23. MATERIALS SHIPMENT: Identify all materials being shipped to APG by contractor's name and contract number. Drivers shall be provided with a contact name and phone number so they can contact that individual to arrange delivery access and escort. When possible, schedule deliveries after 9:00 AM. Pre-coordination of deliveries and meting the delivery at the gate will expedite the process. Delivery drivers accessing secure areas must be U.S. citizens.
GC-24. PHOTOGRAPHY: No cameras or other devices with imaging capability such as cell phones, binoculars, etc., are permitted in restricted areas and no pictures are permitted anywhere on APG unless the photographer possess a camera pass or is accompanied by an individual possessing a camera pass. All photography requires pre-coordination with either the garrison security office or the appropriate tenant security office. All photography is subject to any restrictions imposed by the respective security office and they must clear all pictures prior to use or release.
Camera passes are available through the Contracting Officer.
GC-25. CONFIDENTIALITY: All activities at Aberdeen Proving Ground and all work related to this project are considered privileged information and will not be discussed outside of the performance of duties related to the project. No information will be released to anyone not directly related to the performance of work without advance coordination and approval of the Contracting Officer and the appropriate security and public affairs office. Upon completion of the project, all contract documents will be returned to the government or destroyed in a manner that will prevent dissemination of any project related information.
SECTION 01 01 10 Page 11
GC-26. ROAD CLOSURES: Certain road or segments of roads are closed on certain days and times for troop activities. Obey all signs, barricades and road guards. See also Section 01 05 00, JOB CONDITIONS.
GC-27. SPEED LIMITS:
a. The speed limit is 25 MPH unless otherwise posted. Lower limits are posted in certain locations. The speed limit when approaching or passing troop formations is 10 MPH. Passing troop formations in your lane of traffic is prohibited.
b. Radar and other enforcement devices are frequently used.
c. Tickets will be issued to violators and can mean both fines and points. Tickets may be appealed before a Federal magistrate.
d. All areas are high risk for wildlife/vehicle accidents-use caution especially in early mornings or late evenings.
GC-27. EMERGENCIES:
a. Commercial emergency telephone numbers are:
Edgewood Area: 911
Or dial 911 on either government or commercial lines. On commercial lines, be certain to tell the 911 Operator that you are in the Edgewood Area of Aberdeen Proving Ground.
b. Report the following information:
1. Location where emergency exists (name or number of building or other location information).
2. Describe emergency.
3. Give name of person reporting.
c. Non-Emergency numbers:
Police: Edgewood Area: 410-436-2222
Fire or Ambulance: Edgewood Area: 410-436-4451 or 410-436-4452.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 01 10 Page 12
SECTION 01 05 00
JOB CONDITIONS
07/06
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Location
The work shall be located at the Edgewood Area of Aberdeen Proving Ground, MD, approximately as indicated, The exact location will be shown by the Contracting Officer.
1.2 LAYOUT OF WORK
LAYOUT OF WORK: (APR 1984) The Contractor shall lay out his work and shall be held responsible for all measurement's in connection therewith. The Contractor shall furnish, at his own expense, all stakes, templates, platforms, equipment, tools, and materials and labor as may be required in laying out any part of the work. The Contractor will be held responsible for the execution of the work to such lines and grades as may be established or indicated by the Contracting Officer. It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed, by the Contractor or through his negligence, prior to their authorized removal, they may be replaced by the Contracting Officer at his discretion. The expense of replacement will be deducted from any amounts due or to become due the Contractor. (CENAB)
1.3 PHYSICAL DATA: (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation or conclusion drawn from the data or information by the Contractor. (CENAB)
1.3.1 Transportation Facilities
Insert transportation facilities information for this project from the following lists.)
ABERDEEN PROVING GROUND, MD.
The facility is off Interstate 95 and U.S. Route 40 and is accessed by public transportation, motor freight and ConRail system.
1.3.2 Explorations
The physical conditions indicated on the drawings and in the specifications are the result of site investigations by surveys auger borings. Foundation exploration logs are inserted at the end of this Section.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When
SECTION 01 05 00 Page 1 used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Shut Down Utility Services; G AO.
Prior approval for service/utility interruptions.
Advance Notice
When changes and/or relocations are required.
Checklist; G AO
A Risk Assessment for excavation and other work in the vicinity of utilities.
Control Records
The recording for which all materials and equipment specified to be salvaged and turned over to the Government.
SD-06 Test Reports
Summarization
A "summarization of Airborne Asbestos Sampling Results" report of airborne asbestos monitoring.
SD-07 Certificates
Operations Statement
Written proof that the boilers have been properly installed and are operating satisfactorily in accordance with the manufacturer's instructions.
1.5 UTILITIES
1.5.1 Availability of Utilities Including Lavatory Facilities: (JUN 1980)
It shall be the responsibility of the Contractor to provide all utilities he may require during the entire life of the contract. He shall make his own investigation and determinations as to the availability and adequacy of utilities for his use for construction purposes and domestic consumption.
He shall install and maintain all necessary supply lines, connections, piping, and meters if required, but only at such locations and in such manner as approved by the Contracting Officer. Before final acceptance of work under this contract, all temporary supply lines, connections and piping installed by the Contractor shall be removed by him in a manner satisfactory to the Contracting Officer. (CENAB)
1.5.2 Interruption of Utilities: (1972)
a. No utility services including wastewater treatment plant unit processes shall be interrupted by the Contractor to make connections, to relocate, or for any purpose without approval of the Contracting Officer.
SECTION 01 05 00 Page 2
b. Request for permission to shut down utility services including wastewater treatment plant unit processes shall be submitted in writing to the Contracting Officer not less than 21 days prior to proposed date of interruption. The request shall give the following information:
c. Nature of Utility (Gas, L.P. or H.P., Water, Etc.)
d. Size of line and location of shutoff.
e. Buildings and services affected.
f. Hours and date of shutoff.
g. Estimated length of time service will be interrupted.
h. Services will not be shut off until receipt of approval of the proposed hours and date from the Contracting Officer.
i. Shutoffs which will cause interruption of Government work operations as determined by the Contracting Officer shall be accomplished during regular non-work hours or on non-work days of the Using Agency without any additional cost to the Government.
j. Operation of valves on water mains or wastewater process pipelines will be by Government personnel. Where shutoff of water lines interrupts service to fire hydrants or fire sprinkler systems, the Contractor shall arrange his operations and have sufficient material and personnel available to complete the work without undue delay or to restore service without delay in event of emergency.
k. Flow in gas mains which have been shut off shall not be restored until the Government inspector has determined that all items serviced by the gas line have been shut off. (CENAB)
1.5.3 Alterations to Utilities: (AUG 1968)
Where changes and relocations of utility lines are noted to be performed by others, the Contractor shall give the Contracting Officer in writing advance notice at least thirty days of the time that the change or relocation is required. In the event that, after the expiration of thirty days after the receipt of such notice by the Contracting Officer, such utility lines have not been changed or relocated and delay is occasioned to the completion of the work under this contract, the Contractor will be entitled to a time extension equal to the period of time lost by the Contractor after the expiration of said thirty day period. Any modification to existing or relocated lines required as a result of the Contractor's method of operation shall be made wholly at the Contractor's expense and no additional time will be allowed for delays incurred by such modifications. (CENAB)
1.5.4 Utility Markings
The Contractor shall contact the installation/DPW and the One-Call Service, a minimum of 5 days and 48 hours, respectively, prior to any excavation requesting utility location markings. The Contractor shall not proceed with any excavation until all utilities, including abandoned utilities, have been marked to the satisfaction of the Contracting Officer. Prior to requesting the marking of utilities, the Contractor shall stake out proposed excavations and limits of work with white lines ("White Lining").
SECTION 01 05 00 Page 3
It is the Contractor's responsibility to ensure that all permits (excavation or otherwise, including DPW permits) are current and up-to-date without expiration. In addition to the above requirements the Contractor shall:
a) Visually survey and verify that all utility markings are consistent with existing appurtenances such as manholes, valve boxes, poles, pedestals, pad-mounted devices, gas meters, etc.
prior to any excavation.
b) Hand dig test holes to verify the depth and location of all utilities prior to any mechanical excavation within the limits of work. Other non-damaging methods for utility verification, as indicated in (d) below, may be considered subject to approval by the Contracting Officer. Also, verify that any abandoned utilities are not active.
c) Preserve all utility markings for the duration of the project to the furthest extent possible.
d) When excavation is performed within 2 feet of any utility line, a non-damaging method of excavation shall be used. The non-damaging method shall be hand digging. Other non-damaging methods, such as, soft digging, vacuum excavation, pneumatic hand tools, may be considered subject to approval by the Contracting Officer.
e) Regardless of the type of excavation, the Contractor shall notify the Contracting Officer a minimum of 72 hours prior to any excavation activity. Failure to notify the Contracting Officer can result in the issuance of a "Stop Work" order, which shall not be justification for contract delay or time extension. The Government reserves the right to have personnel present on site during any type of excavation.
f) The Contractor's Quality Control System Manager shall ensure that all excavation requirements herein are met at the time of the preparatory phase of quality control, and that the excavation procedures are reviewed during the preparatory phase meeting.
This preparatory phase of control shall also establish and document contingency plans and actions to be followed in the event that existing utilities are damaged or interrupted. Locations of shut off or isolation devices along with other safety features shall be established and their operation reviewed.
g) Any work other than excavation in the vicinity of a utility, that could damage or interrupt a utility, such as, exterior or interior work near transformers, power lines, poles, above ground gas lines, gas meters, etc., shall be done with extreme care. The Contractor shall specifically note during the preparatory phase of quality control, the construction techniques to be used to preclude damaging or interrupting any utility. This preparatory phase of control shall also establish and document contingency plans and actions to be followed in the event that existing utilities are damaged or interrupted. Locations of shut off or isolation devices along with other safety features shall be established and their operation reviewed.
h) The Contractor shall complete a risk assessment, using the attached checklist, at least one week prior to the start of any excavation
SECTION 01 05 00 Page 4 or other work in the vicinity of a utility. The risk assessment shall be submitted for government approval prior to any excavation or other work in the vicinity of a utility. A risk assessment shall be completed for each definable feature of work encountering utilities and shall include all utilities anticipated to be encountered.
1.6 DISPOSAL OF EXISTING MATERIAL AND EQUIPMENT: (DEC 1975)
1.6.1 Off-Site Disposal
All removed, dismantled or demolished material and/or equipment including rubble, scrap and debris not specified or indicated to be Government salvaged, reinstalled under this contract or otherwise retained for disposal on Government land will become the property of the Contractor and shall be promptly removed from the site and disposed of by the Contractor at his own expense and responsibility. Off-site disposal shall be coordinated and approved by the DSHE-EMD (Directorate of Safety, Health and Environment - Environmental Management Division) though the Contracting Officer. No burning of debris and rubbish on Government property will be permitted at any time. (CENAB)
1.6.2 Disposal of Spoil (Fill Material)