Amendment 0006.pdf
PDF 67 KB Posted
- Solicitation number
- W912BU-12-R-0040
About this file
Amendment 0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12R0040-SPECS-AM5.pdf | ||
| Amendment 0004.pdf | ||
| SITE VISIT .pdf | ||
| 12R0040-SPECS-AM3.pdf | ||
| 12R0040-SPECS-AM2.pdf | ||
| 12R0040-SPECS-AM1.pdf | ||
| 12R0040-SPECS.pdf | ||
| 12R0040-DWGS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
W912BU
Waste Water Treatment Plant Upgrade, Tobyhanna Army Depot, Tobyhanna, Pennsylvania
THIS AMENDMENT DOES NOT EXTEND THE PROPOSAL DUE DATE OF 11 SEPTEMBER 2012 AT 2:00PM EST.
(CONTINUED)
E5CTCMNE
U.S. Army Engineer District, Philadelphia Contracting Division-Room 643 Wanamaker Building, 100 Penn Square East Philadelphia, Pennsylvania 19107-3390
U.S. Army Engineer District, Philadelphia POC: Michele Evans Wanamaker Building, 100 Penn Square East Philadelphia, Pennsylvania 19107-3390
W912BU-12-R-0040
09/06/2012
07/27/2012
This page was intentionally left blank for duplex printing.
Amendment No. 0006
RFP W912BU‐12‐R‐0040
14. DESCRIPTION OF AMENDMENT (continued)
a. SPECIFICIATIONS:
(1) Section 44 40 00 – SEQUENTIAL BATCH REACTOR (SBR) SYSTEM: Please delete Section 44 40 00, page 3 in its entirety and substitute revised page 3, annotated Amendment No. 0006, attached hereto.
b. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0006. Failure to acknowledge all amendments may be cause for rejection of the offer.
Amendment No. 0006
RFP W912BU-12-R-0040
1. Equipment data sheets
2. Performance data including oxygen transfer calculations.
3. Headloss calculations and pressure requirements.
4. Descriptive literature and bulletins.
5. Operation data for a minimum of 3 SBR installations. (Text Deleted) Installations must be for systems of similar capacity and operating for a minimum of 5 years.
6. Customer contact for the 3 installations listed herein.
SD-06 Test Reports
Test Reports; G
SD-07 Certificates
Performance Certificate; G
SD-10 Operation and Maintenance Data.
Operation and Maintenance Manual;
Six complete copies of operating instructions outlining the step-by-step procedures required for system startup, normal operation, short- and long-term deactivation, and shutdown. An introduction and overall equipment description, purpose, functions, and simplified theory of operation shall be included in the beginning of the instructions. Instructions shall include the manufacturer's name, model number, service manual, parts list, and brief description of each piece of equipment and its basic operating features. Instructions shall include component layouts, simplified wiring, and control diagrams for the system as installed. Performance test data shall be reflected in the operating instructions.
Six complete copies of maintenance instructions listing routine maintenance procedures, calibration procedures, possible breakdowns and repairs and trouble shooting guides, prior to the start of the training course.
Each manual shall have an index listing the contents and tab separators between sections. Manuals shall be bound in sturdy three-ring, loose-leaf binders.
1.3 SCOPE OF WORK
All references to specific manufacturers' products/systems listed within this section are intended to indicate the basis of design only. Products/systems from other manufacturers that meet all requirements of the specification will be acceptable.
Furnish, deliver, and install a new and complete continuous flow SBR Treatment System including Digester Basin Equipment, Effluent Equalization Pumps, Tertiary DrumFilters and Control Integration.
The system shall include the necessary equipment and controls to provide an operating treatment system complete with air control valves, SBR and Digester blowers, SBR and Digester air diffusion equipment, decant mechanisms, waste sludge pumps, digested sludge pumps, effluent EQ pumps, Section 44 40 00 Page 3