AMENDMENT 0003 EXTND RSPNS DATE.pdf

PDF 17 KB Posted

Attached to
SINGLE AWARD W912BU-10-P-0178 ELECTRICAL DREDGE EQUIPMENT IMPROVEMENTS MCFARLAND MDC 2802-0009 (Best Value)
Solicitation number
W912BU-10-T-0027
Issued by

About this file

EXTEND RESPONSE DATE BY FOURTEEN (14) DAYS from 16APR10 to 30APR10

View the file

Other files

File Type Posted
333-F040-01 -- TECHNICAL SPECIFICATIONS- REV_A.pdf PDF
AMENDMENT 0002 DRWNG Q_A.pdf PDF
333-F506-03_1M16.pdf PDF
W912BU-10-T-0027 0001.pdf PDF
333-F255-01_Rev0_02-22-10.pdf PDF
F798-01_Rev0_02-22-10 UPS System.pdf PDF
333-F720-01_Rev0_02-22-10.pdf PDF
333-F510-04_PT STBD_Rev0_02-22-10.pdf PDF
9-7-232 ARRANGEMENT OF BRIDGE DECK AND ABOVE.tif TIF image
2802-333-F735-01_Rev0_02-22-10.pdf PDF
333-F506-04_1M.pdf PDF
9-7-1211 SCHEMATIC HYDRAULIC PIPING OF CLUTCH AND BRAKE CONTROL FOR DRAG PIPE WINCHES.TIF TIF image
333-F040-01 -- TECHNICAL SPECIFICATIONS.pdf PDF
333-F506-07_Rev0_02-22-10.pdf PDF
333-F506-05_1M.pdf PDF
333-F506-03_1M11.pdf PDF
9-7-1173 DRAGARM HOISTING LAYOUT.TIF TIF image
9-7-1112A ARRANGEMENT OF DRAGHEAD DAVIT.TIF TIF image
333-F720-02_Rev0_02-22-10.pdf PDF
333-F780-01_Rev0_02-22-10(drag_arm_hoist_scada_system).pdf PDF
333-F720-03_Rev0_02-22-10.pdf PDF
9-7-230 ARRANGEMENT OF HOLD AND MAIN DECK.pdf PDF
9-7-1114 ARRANGEMENT OF TRUNNION DAVIT.TIF TIF image
9-7-536 ARRANGEMENT OF DRAGTENDERS HOUSE.TIF TIF image
9-7-229 OUTBOARD AND INBOARD PROFILE.tif TIF image
333-F510-01_Rev0_02-22-10_Sheet3.pdf PDF
333-F490-01 -- LIST OF SENSORS.pdf PDF
333-F510-03_PT STBD_Rev0_02-22-10.pdf PDF
9-7-1191 ARRANGEMENT OF DRAG PIPE WINCHES.TIF TIF image
333-F780-02_1.pdf PDF
333-F506-06_0.pdf PDF
333-F510-02_Rev0_02-22-10.pdf PDF
9-7-231 ARRANGEMENT OF UPPER DECK FORECASTLE DECK AND BOAT DECK.tif TIF image
333-F506-08_Rev0_02-22-10.pdf PDF
W912BU-10-T-0027.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: EDWARD A. BODDIE

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W25PHS00689018

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The response date is extended by fourteen (14) days from 16 APR 2010 to 30 APR 2010.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Apr-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-10-T-0027

X 9B. DATED (SEE ITEM 11)

15-Mar-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Apr-2010

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE E5CTSEAB

FACILITY CODECODE

EMAIL:TEL:

W912BU-10-T-0027

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 16-Apr-2010 03:00 PM to 30-Apr-2010 03:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .