333-F490-01 -- LIST OF SENSORS.pdf

PDF 11 KB Posted

Attached to
SINGLE AWARD W912BU-10-P-0178 ELECTRICAL DREDGE EQUIPMENT IMPROVEMENTS MCFARLAND MDC 2802-0009 (Best Value)
Solicitation number
W912BU-10-T-0027
Issued by

About this file

RFQ W912BU-10-T-0027 Contract Drawing

View the file

Other files

File Type Posted
AMENDMENT 0003 EXTND RSPNS DATE.pdf PDF
333-F040-01 -- TECHNICAL SPECIFICATIONS- REV_A.pdf PDF
AMENDMENT 0002 DRWNG Q_A.pdf PDF
333-F506-03_1M16.pdf PDF
W912BU-10-T-0027 0001.pdf PDF
333-F255-01_Rev0_02-22-10.pdf PDF
F798-01_Rev0_02-22-10 UPS System.pdf PDF
333-F720-01_Rev0_02-22-10.pdf PDF
333-F510-04_PT STBD_Rev0_02-22-10.pdf PDF
9-7-232 ARRANGEMENT OF BRIDGE DECK AND ABOVE.tif TIF image
2802-333-F735-01_Rev0_02-22-10.pdf PDF
333-F506-04_1M.pdf PDF
9-7-1211 SCHEMATIC HYDRAULIC PIPING OF CLUTCH AND BRAKE CONTROL FOR DRAG PIPE WINCHES.TIF TIF image
333-F040-01 -- TECHNICAL SPECIFICATIONS.pdf PDF
333-F506-07_Rev0_02-22-10.pdf PDF
333-F506-05_1M.pdf PDF
333-F506-03_1M11.pdf PDF
9-7-1173 DRAGARM HOISTING LAYOUT.TIF TIF image
9-7-1112A ARRANGEMENT OF DRAGHEAD DAVIT.TIF TIF image
333-F720-02_Rev0_02-22-10.pdf PDF
333-F780-01_Rev0_02-22-10(drag_arm_hoist_scada_system).pdf PDF
333-F720-03_Rev0_02-22-10.pdf PDF
9-7-230 ARRANGEMENT OF HOLD AND MAIN DECK.pdf PDF
9-7-1114 ARRANGEMENT OF TRUNNION DAVIT.TIF TIF image
9-7-536 ARRANGEMENT OF DRAGTENDERS HOUSE.TIF TIF image
9-7-229 OUTBOARD AND INBOARD PROFILE.tif TIF image
333-F510-01_Rev0_02-22-10_Sheet3.pdf PDF
333-F510-03_PT STBD_Rev0_02-22-10.pdf PDF
9-7-1191 ARRANGEMENT OF DRAG PIPE WINCHES.TIF TIF image
333-F780-02_1.pdf PDF
333-F506-06_0.pdf PDF
333-F510-02_Rev0_02-22-10.pdf PDF
9-7-231 ARRANGEMENT OF UPPER DECK FORECASTLE DECK AND BOAT DECK.tif TIF image
333-F506-08_Rev0_02-22-10.pdf PDF
W912BU-10-T-0027.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROXIMITY SWITCHES AND OTHER SENSORS

TRUNNION

Clutch disengaged (LS) Brake engaged (LS) Davit in latch position (LS) Davit in breasted-in position (LS) Block-to-block (LS) Approaching block-to-block (LS) Seated (LS) Approaching Seated (LS) Hydraulic pressure switch (PS)

BALL JOINT

Clutch disengaged (LS) Brake engaged (LS) Davit in latch position (LS) Davit in breasted-in position (LS) Block-to-Block (LS) Approaching block-to-block (LS)

DRAGHEAD

Clutch disengaged (LS) Brake engaged (LS) Slow speed gear ratio (LS) Davit in latch position (LS) Davit in breasted-in position (LS) Block-to-block (LS) Approaching block-to-block (LS) Swell comp position (ROT) Swell com pressure (PS)

Draghead out of position (INC)

LS: Limit Switch – Non-contact inductive proximity switch PS: Pressure Sensor – Pressure transducer rated to the full system operating pressure similar to Danfoss MB5100.

ROT: Rotary position encoder INC: Inclinometer similar to SPECTROTILT. Used to measure draghead wire angle and determine (along with draghead depth) if draghead has begun to drift under the ships hull.

File details come from the government source that posted it. Updated .