14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THIS AMENDMENT DOES NOT EXTEND THE BID OPENING DATE OF 01 SEPTEMBER 2009 AT 1:00 P.M. EST.

CUTOFF FOR ALL QUESTIONS IS 25 AUGUST 2009 AT 2:00 P.M. EST.

CONTINUED ON NEXT PAGE.

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

MODIFICATION OF CONTRACTS/ORDER

NO.

E. IMPORTANT: Contractor

15B. CONTRACTOR/OFFEROR

is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

is extended, B.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

2. AMENDMENT/MODIFICATION NO.

6. ISSUED BY

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is required to sign this document and return

15A. NAME AND TITLE OF SIGNER (Type or print)

PAGE OF PAGES 1. CONTRACT ID CODE

5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

7. ADMINISTERED BY (If other than Item 6)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10B. DATED (SEE ITEM 13)

CODE CODE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

is not ex-copies to the issuing office.

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

(Signature of person authorized to sign) (Signature of Contracting Officer)

USAPPC V2.00

10A.

30-105-02

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: RYAN ANNIBALI

WANAMAKER BUILDING, 100 PENN SQUARE EAST

PHILADELPHIA, PENNSYLVANIA 19107-3390

US ARMY ENGINEER DISTRICT, PHILADELPHIA

WANAMAKER BUILDING, 100 PENN SQUARE EAST

PHILADELPHIA, PENNSYLVANIA 19107-3390

CODE

FACILITY CODE

0004 08/21/2009

W912BU-09-B-0034

22 July 2009

RECOVERY - COAT AND REPAIR BULKHEAD POINT PLEASANT CANAL

THIS PAGE IS INTENTIONALLY LEFT BLANK

14. DESCRIPTION OF AMENDMENT (continued)

a. REQUESTS FOR INFORMATION WITH RESPONSES: Requests for Information With Responses below in bold included herein are FOR INFORMATION ONLY.

(1) Please verify the minimum coating film thickness specified in section 09 90 00, 3.3.4. Once the expense of the preparation and repair has taken place there could be considerable benefit to applying more than 12 mils. Double that amount is recommended by some manufacturers.

Response: Bid in accordance with the IFB.

(2) Specification section 09 90 00, 3.3.2, states that the air temperature and surface temperature must not be less than 45° F during coating. Specification section 00800 SC-12, discusses time extensions based on severe weather days with temperatures below 32° F. These conflict with each other and there will be a substantial period of time that coatings can not be applied. Please consider recalculation of anticipated lost work days (below 45°) and provide a no work period or extend the performance period to account for a higher number of lost days. Artificial heat is not an adequate solution because of the ability of steel to conduct cold from adjacent mediums.

Response: Bid in accordance with the IFB.

(3) Specification section 00800 SC-1 allows 30 extra calendar days to complete the project for each option added. Section SC-3 allows you to work 6 days of the week.

Thirty calendar days equals 25 work days and this is not a reasonable amount of time to deploy a cofferdam, repair and coat 1,000 feet of wall economically and in accordance with the other specifications.

Response: Bid in accordance with Section 00800, annotated Amendment No. 0004, attached hereto.

(4) Specification section 00700, 52.225-9, incorporates "Buy American Act." Due to the uniqueness of this project and the need to utilize high tech coating materials will you please list coating materials as an exemption to this clause? The material cost is a small amount of the overall bid. An exemption would simplify evaluation of the bids.

Response: Please follow the Buy American Act Clauses which are included in the Invitation for Bid. If you are using a product that is foreign produced, state the country and the associated dollar amounts and make it a part of your bid package.

An exemption will not be granted as part of this procurement.

(5) The plans indicate no coating required under the route 88 bridge because of an existing concrete abutment, but upon inspection of the site i found steel sheet piles under the bridge. Please clarify this requirement.

Is it the intent to achieve complete coverage of the existing sheets? It is common practice in coating projects to skip small strips at extremely difficult locations such as start and stop point at the beginning and end of a wall and at sharp deflection points. I also saw a cluster of wires entering the water thru the wall near the bridge, such an obstacle would be all but impossible to dewater in a coffer dam.

Response: This section of bulkhead will be replaced under another contract. Refer to Section 01 11 00, paragraph "Coordination of Work". The submerged cables are outside the limits of work. Bulkhead coating and repairs shall be to the extent indicated on the drawings. Bid according to the IFB.

a. BID SCHEDULE: Please delete the Bid Schedule in its entirety and substitute revised Bid Schedule, annotated Amendment No. 0004, attached hereto.

b. CONTRACT CLAUSES: Please delete page 00700-66 in its entirety and substitute revised page 00700-66, annotated Amendment No. 0004, attached hereto.

c. SPECIAL CLAUSES: Please delete Section 00800 in its entirety and substitute revised Section 00800 SPECIAL CLAUSES, annotated Amendment No. 0004, attached hereto.

d. TECHNICAL SPECIFICATIONS:

(1) Section 01 11 00, SUMMARY OF WORK – Please delete Section 01 11 00 in its entirety and substitute revised section of the same number, annotated Amendment No.

0004, attached hereto.

(2) Section 09 90 00, BULKHEAD CLEANING AND PROTECTIVE COATING – Please delete pages 7 and 8 in their entirety and substitute revised pages of the same numbers, annotated Amendment No. 0004, attached hereto.

e. CONTRACT DRAWINGS:

(1) Please delete drawings 61826, 61830 and 61831, and substitute revised drawings of the same numbers with the latest revision date of 21 August 2009, attached hereto.

(2) Please add new drawings 55388, 55389, 55390, 55391 and 55392 dated 21 August 2009, attached hereto.

f. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0004. Failure to acknowledge all amendments may be cause for rejection of the bid.

Amendment No. 0004

IFB W912BU-09-B-0034

00010-3

BID SCHEDULE

(To be attached to SF 1442)

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

Base Bid

1 Recovery - Mobilization and Demobilization ------ Job L.S. $

2 Recovery – Bulkhead Coating 4,000 LF $ $

3 Recovery – Steel Plate Repair 500 SF $ $

4 Recovery – Emergency Ladder And Sign Plate 2 EA $ $

Total Base Bid $

Option 1

5 Recovery – Bulkhead Coating 3,000 LF $ $

6 Recovery – Steel Plate Repair 300 SF $ $

7 Recovery – Emergency Ladder And Sign Plate 1 EA $ $

Total Option 1 $

Option 2

8 Recovery – Bulkhead Coating 1,923 LF $ $

9 Recovery – Steel Plate Repair 200 SF $ $

10 Recovery – Emergency Ladder And Sign Plate 1 EA $ $

Total Option 2 $

TOTAL ESTIMATED BID AMOUNT $

NOTE: The Contractor must bid on all items.

This page was intentionally left blank for duplex printing.

W912BU-09-B-0034 00700-66

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

The Contractor shall promptly furnish additional security required to protect the Government and persons supplying labor or materials under this contract if--

(a) Any surety upon any bond, or issuing financial institution for other security, furnished with this contract becomes unacceptable to the Government.

(b) Any surety fails to furnish reports on its financial condition as required by the Government;

(c) The contract price is increased so that the penal sum of any bond becomes inadequate in the opinion of the Contracting Officer; or

(d) An irrevocable letter of credit (ILC) used as security will expire before the end of the period of required security.

If the Contractor does not furnish an acceptable extension or replacement ILC, or other acceptable substitute, at least 30 days before an ILC's scheduled expiration, the Contracting officer has the right to immediately draw on the ILC.

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

E5CTCRRA

Typewritten Text

SECTION 00800

SPECIAL CLAUSES

INDEX

PARA TITLE

SC-1 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

SC-2 LIQUIDATED DAMAGES - CONSTRUCTION

SC-3 CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS

SC-4 PHYSICAL DATA

SC-5 LAYOUT OF WORK

SC-6 DAMAGE TO WORK

SC-7 PERFORMANCE OF WORK BY THE CONTRACTOR

SC-8 ENVIRONMENTAL LITIGATION

SC-9 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

SC-10 CERTIFICATES OF COMPLIANCE

SC-11 PERFORMANCE EVALUATION OF CONTRACTOR

SC-12 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

SC-13 INSURANCE REQUIREMENTS

Section00800 Page 1

SPECIAL CLAUSES

SC-1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence base bid work under this contract within 14 calendar days after the Contractor receives the notice to proceed for the work (b) prosecute the work diligently, and (c) complete the work ready for use not later than 210 calendar days after the date the Contractor receives the notice to proceed. The Contracting Officer has the right to award Options 1 and 2 within 90 days of Notice to Proceed for the Base Bid. If awarded, the contract duration will be extended 90 days for Option 1 and 60 days for Option 2. The time stated for completion shall include final cleanup of the premises.(FAR 52.211-10)

SC-2 LIQUIDATED DAMAGES - CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,350.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed.

These liquidated damages are in addition to excess costs of repurchase under the Termination clause. (FAR 52.211-12)

SC-3 CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS

a. Upon obtaining the drawings and specifications, the Contractor shall:

(1) Immediately check the specifications and all drawings;

(2) Compare the specifications and all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies; and

(4) Be responsible for any errors which might have been avoided by complying with this paragraph.

b. Large scale drawings shall, in general, govern small scale drawings.

Figures marked on drawings shall, in general, be followed in preference to scale measurements.

c. Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the contractor from performing such omitted or misdescribed details of the work, but shall be performed as if fully and correctly set forth and described in the drawings and specifications.

d. The work shall conform to the specifications and the contract drawings identified on the following, all of which are available in the office of the District Engineer, U.S. Army Engineer District, Philadelphia, Room 643, Wanamaker Building, 100 Penn Square East, Philadelphia, PA 19107. Drawings are titled: "Recovery, Coat and Repair Bulkhead, Point Pleasant Canal, New Jersey Intracoastal Waterway, New Jersey" and have the drawing numbers, subtitles, and dates as indicated on Drawing No. 61826. (DFARS 252.236-7001)

Section00800 Page 2

SC-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (FAR 52.236-4)

a. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by topographic surveys conducted during dates indicated, soil borings, as-built drawings and field inspections.

b. Weather Conditions. The climate of the area is referred to as "continental" by climatologists, characterized by cold winters and moderately hot summers. Complete weather records and reports may be obtained from the local U.S. Weather Bureau Office nearest to the work site. The Contractor shall satisfy himself as to the hazards likely to arise from weather conditions during the construction period.

c. Transportation Facilities. The work site is accessible from US 301. The Contractor shall be responsible for all investigations of load carrying capacities of bridges and roadways.

e. Survey Controls. Survey control descriptions within the project limits of work is included in Section 00830.

f. Magnitude of the Contract Work. The estimated value of the contract work is between $1,000,000 and $5,000,000.

g. Hours of Work. Unless otherwise specified, the Contractor shall be permitted to perform the contract work between the hours of 7:00 am and 7:00 pm, Monday through Saturday. Federal holidays (New Year's Day, Martin Luther King Jr's Birthday, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day) that fall within the work week will not be considered as work days. The Contractor shall provide at least a 24 hour advanced notification to establish when on-site work will commence and prior to restarting on-site work following any stoppage of work. Notification shall be provided by phone, or person, or in writing, and shall be given directly to the Contracting Officer.

SC-5 LAYOUT OF WORK (APR 1965 OCE)

The Contractor shall lay out its work from Government-established survey controls, the description of which are included in Section 00830, SURVEY CONTROL. The Contractor shall be responsible for all measurements in connection therewith. The Contractor shall furnish, at its own expense, such stakes, templates, platforms, equipment,range markers and labor as may be required in laying out any part of the work from the triangulation stations and bench marks established by the Government. The Contractor shall be responsible for executing the work to such lines and grades as may be established or indicated by the Contracting Officer. It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through its negligence prior to their authorized removal, they may be replaced by the Contracting Officer at his discretion. The expense of replacement will be deducted from any amounts due or to become due to the Contractor. (CENAP)

Section00800 Page 3

SC-6 DAMAGE TO WORK

The responsibility for damage to any part of the permanent work shall be as set forth in the clause of the contract entitled "Permits and Responsibilities". However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood or hurricane, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment pursuant to Contract Clause entitled "Changes," will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices. Except as herein provided, damages to all work (including temporary construction), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense regardless of the cause of such damage. (CENAP)

SC-7 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least twenty (20) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government. (FAR 52.236-1)

SC-8 ENVIRONMENTAL LITIGATION (1974 NOV OCE)

a. If the performance of all or any part of the work is suspended, delayed, or interrupted due to an order of a court of competent jurisdiction as a result of environmental litigation, as defined below, the Contracting Officer, at the request of the Contractor, shall determine whether the order is due in any part to the acts or omissions of the Contractor or a Subcontractor at any tier not required by the terms of the contract. If it is determined that the order is not due in any part to acts or omissions of the Contractor or a Subcontractor at any tier other than as required by the terms of this contract, such suspension, delay, or interruption shall be considered as if ordered by the Contracting Officer in the administration of this contract under the terms of the SUSPENSION OF WORK clause of this contract. The period of such suspension, delay, or interruption shall be considered unreasonable, and an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) as provided in that clause, subject to all the provisions thereof.

b. The term "environmental litigation", as used herein, means a lawsuit alleging that the work will have an adverse effect on the environment or that the Government has not duly considered, either substantively or procedurally, the effect of the work on the environment. (CENAP)

SC-9 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 1995)

a. This clause does not apply to terminations. See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.

Section00800 Page 4

b. Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by the Contractor or sub-contractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial or series for which the Government can determine both ownership and operating costs from the Contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment from the Contractor's accounting records, costs for the equipment shall be based upon the applicable provisions of EP 1110-1-8, "Construction Equipment Ownership and Operating Expense Schedule," Region II. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule.

For forward pricing, the schedule in effect at the time of negotiations shall apply. For retrospective pricing, the schedule in effect as of the time work was performed shall apply.

c. Equipment rental costs are allowable, subject to the provisions of FAR 31.205(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

d. When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. This data shall be submitted on Standard Form 1411, "Contract Pricing Proposal Cover Sheet."

(EFARS 52.231-5000)

Note #1: The small purchase threshold is $100,000.

Note #2: By submitting cost or pricing data, the Contractor grants to the Contracting Officer or an authorizing representative the right to examine those books, records, documents and other supporting data that will permit evaluation of the proposed equipment costs. This right shall extend for two years after expiration of contract performance. After price agreement the Contractor shall certify that the equipment costs or pricing data submitted are accurate, complete and current.

SC-10 CERTIFICATES OF COMPLIANCE

Any certificates required for demonstrating proof of compliance of materials with specifications requirements shall be executed in triplicate copies. Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies.

Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.

(CENAP)

Section00800 Page 5

SC-11 PERFORMANCE EVALUATION OF CONTRACTOR

a. As a minimum, the Contractor's performance will be evaluated upon final acceptance of the work. However, interim evaluation may be prepared at any time during contract performance when determined to be in the best interest of the Government.

b. The format for the evaluation will be DD 2626, and the Contractor will be rated either outstanding, above average, satisfactory, marginal, or unsatisfactory in the areas of Contractor Quality Control, Timely Performance, Effectiveness of Management, Compliance with Labor Standards, and Compliance with Safety Standards. The Contractor will be advised of any unsatisfactory rating, either in an individual element or in the overall rating, prior to completing the evaluation, and all Contractor comments will be made a part of the official record. Performance Evaluation Reports will be available to all DOD Contracting offices for their future use in determining Contractor responsibility, in compliance with DFARS 236.201(c)(1). (CENAP)

SC-12 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (OCT 1989)

a. This clause specifies the procedure for determination of time extensions for unusually severe weather in accordance with the Contract Clause entitled: "Default (Fixed-Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities. For the purpose of this contract, unusually severe weather is defined as daily precipitation equal to or exceeding 0.5 inches and/or maximum daily temperature not exceeding 32 degrees F.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

7 4 2 2 2 2 2 2 2 2 2 3

c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor shall record on the daily CQC report, the occurrence of adverse weather and resultant impact to normal scheduled work. Actual adverse weather days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.

The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of

Section00800 Page 6 each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b.

above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the contract clause entitled: "Default (Fixed Price Construction)". (ER 415-1-15)

SC-13 INSURANCE REQUIREMENTS

Evidence of the following insurance shall be provided to the Contracting Officer prior to commencement of work and shall be maintained throughout the period of performance:

a. General Liability Insurance (Comprehensive form of policy): Bodily Injury Liability - $500,000 per occurrence.

b. Automobile Liability Insurance (Comprehensive form of policy): Bodily Injury Liability - $200,000 per person and $500,000 per accident. Property Damage Liability - $20,000 per accident.

c. Workmen's Compensation and Employer's Liability Insurance: Compliance with applicable workmen's compensation and occupational disease statutes is required. Employer's liability coverage in the minimum amount of $100,000 is also required."

-- End of Special Clauses --

Section00800 Page 7

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 SCOPE OF SECTION

The work covered by these specifications consists of furnishing all labor, materials, plant and equipment and performing all operations required to clean, repair, and apply a coating system to a portion of the existing steel sheetpile bulkhead along the Point Pleasant Canal, connecting the Manasquan River and Barnegat Bay, located in Ocean County, New Jersey.

1.2 DESCRIPTION OF WORK

The major items of work to be performed under this contract include, but are not limited to, the following:

a. Remove existing coating from approximately 4,000 linear feet of steel sheetpile bulkhead under the Base Bid with Options for additional 3,000 linear feet (Option 1) and 1,923 linear feet (Option 2) for a total length of 8,923 linear feet.

b. Repair holes in the bulkhead with steel cover plates in areas under the Base Bid and Options.

c. Remove and replace emergency ladders and sign plates under Base Bid and Options.

d. Apply new coating and patch areas cleaned and repaired under the Base Bid and Options.

#.1 RESTRICTIONS ON WORK

1.3 Coordination of Work

The Contractor is advised that a new steel sheetpile bulkhead will be under construction at the Route 88 bridge abutments on both east and west sides of the canal during some portion of this contract. It is the Contractor's responsibility, with the assistance of the COR, to schedule the work of this contract to avoid conflict with on-going work.

1.4 Work from the Water

All coating removal and new coating operations shall be completed from the water. Areas for support equipment and personnel on the land-side of the bulkhead is nonexistent in most areas.

1.5 Working Barges

Barges may be secured to bulkhead. Alternately, anchors or spuds may be used. The Contractor is advised of the presence of utilities on the bottom of the canal. It is the Conractor's responsibility to confirm and mark the location of all utilities crossing the canal in the area prior to start of work.

Section01 11 00 Page 1

1.6 Dry Environment

All coating removal operations and new coating application operations shall be completed in the dry. Underwater coating removal or underwater application of new coating system is prohibited.

#.1 Use of Canal Water

The use of canal water for any purpose is prohibited.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

Section01 11 00 Page 2

3.3.6 Drying Time Prior to Immersion

The minimum drying period after final coat, prior to immersion, shall be as recommended by the coating system's manufacturer. Minimum drying periods shall be increased twofold if the drying temperature is below 65 degrees F .

The date and time of day of coating and recoating shall be recorded on the Contractor's daily quality control sheets.

3.3.7 Protection of Coated Surfaces

Where shelter and/or heat are provided for coated surfaces during inclement weather, such protective measures shall be maintained until the coating film has dried and discontinuance of the measures is authorized. Items that have been coated shall not be handled, worked on, or otherwise disturbed until the coat is fully dry and hard.

3.4 INSPECTION

The Contractor shall inspect, document, and report all work phases and operations on a daily basis. As a minimum the daily report shall contain the following:

a. Inspections performed, including the area of the structure involved and the results of the inspection.

b. Surface preparation operations performed, including the area of the structure involved, the mode of preparation, the kinds of solvent, abrasive, or power tools employed, and whether contract requirements were met.

c. Thinning operations performed, including thinners used, batch numbers, and thinner/coating volume ratios.

d. Application operations performed, including the area of the structure involved, mode of application employed, ambient temperature, substrate temperature, dew point, relative humidity, type of coating with batch numbers, measuring surface profile, elapsed time between surface preparation and application, elapsed time for recoat, condition of underlying coat, number of coats applied, and if specified, measured dry film thickness or spreading rate of each new coating.

3.5 TESTING

At a minimum, the Contractor shall conduct the following tests, as part of Quality Control:

Standard Test Frequency

ASTM D 4417, Method B Surface Profile 7 tests/10 linear feet at 1-foot increments from the top of bulkhead.

ASTM D 1186 Dry Film Thickness 1 test/10 linear feet

All testing shall be recorded on the daily Contractor Construction Quality Control Reports required under Section 01 45 01 CONTRACTOR QUALITY CONTROL.

3.6 MEASUREMENT AND PAYMENT

The work specified in this section for cleaning and coating the existing

Section09 90 00 Page 7 steel sheet pile bulkhead, to the extent and in the locations indicated on the contract drawings, will be measured for payment by the linear foot of bulkhead cleaned and coated. All costs in connection therewith shall be included in the contract unit price for Base Bid and Option Bid Items "Bulkhead Coating." Included in this Price Item is the costs in connection with patching small holes in the bulkhead.

-- End of Section --

Section09 90 00 Page 8

SF30
Description of Amendment/RFIs
Bid Schedule
00700 Contract Clause
00800 Special Clauses
01 11 00-Summary of Work
09 90 00-Bulkhead Cleaning and Protective Coating