Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 09b0034Amend5.pdf | ||
| 09b0034amend4specs.pdf | ||
| 09b0034Amend4dwgs.pdf | ||
| 09B0034-AMEND3.pdf | ||
| 09B0034-AMEND2.pdf | ||
| 09b0034-DWGS-AMEND1.pdf | ||
| W912BU09B0034-SPECS.PDF | ||
| 09b0034dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
THIS AMENDMENT DOES NOT EXTEND THE BID OPENING DATE OF 21 AUGUST 2009 AT 11:00 A.M.
CONTINUED ON NEXT PAGE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
MODIFICATION OF CONTRACTS/ORDER
NO.
E. IMPORTANT: Contractor
15B. CONTRACTOR/OFFEROR
is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
is extended, B.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-
TRACT ORDER NO. IN ITEM 10A.
2. AMENDMENT/MODIFICATION NO.
6. ISSUED BY
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) is required to sign this document and return
15A. NAME AND TITLE OF SIGNER (Type or print)
PAGE OF PAGES 1. CONTRACT ID CODE
5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
7. ADMINISTERED BY (If other than Item 6)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY
16C. DATE SIGNED
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10B. DATED (SEE ITEM 13)
CODE CODE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
is not ex-copies to the issuing office.
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
(Signature of person authorized to sign) (Signature of Contracting Officer)
USAPPC V2.00
10A.
30-105-02
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: RYAN ANNIBALI
WANAMAKER BUILDING, 100 PENN SQUARE EAST
PHILADELPHIA, PENNSYLVANIA 19107-3390
US ARMY ENGINEER DISTRICT, PHILADELPHIA
WANAMAKER BUILDING, 100 PENN SQUARE EAST
PHILADELPHIA, PENNSYLVANIA 19107-3390
CODE
FACILITY CODE z
0001 8/11/2009
W912BU-09-B-0034
22 July 2009
RECOVERY - COAT AND REPAIR BULKHEAD POINT PLEASANT CANAL
This page was intentionally left blank for duplex printing.
14. DESCRIPTION OF AMENDMENT (continued)
a. WAGE RATES: Please delete Section 00815 WAGE RATES in its entirety and substitute revised Section 00815 WAGE RATES, dated 7/24/09, annotated Amendment No. 0001, attached hereto.
b. CONTRACT DRAWINGS: Please delete drawing number 61831and substitute revised drawing of the same number with revision date of 7 August 2009, attached hereto.
c. Please indicate receipt of this amendment on Standard Form 1442(SOLICITATION, OFFER, AND AWARD) as Amendment No. 0001. Failure to acknowledge all amendments may be cause for rejection of the bid.
General Decision Number: NJ080065 07/24/2009 NJ65
State: New Jersey
Construction Type: Heavy
County: Ocean County in New Jersey.
HEAVY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 04/24/2009 1 05/01/2009 2 07/03/2009 3 07/17/2009 4 07/24/2009
ASBE0089-004 07/01/2008
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 38.02 24.98
PAID HOLIDAYS:
The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.
CARP0006-013 05/01/2009
Rates Fringes
CARPENTER (Including Form Work)............................$ 39.45 49.75%
The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
* CARP0454-009 07/01/2009
Rates Fringes
PILEDRIVERMAN....................$ 37.55 26.63
PAID HOLIDAYS:
New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the
Amendment No. 0001
IFB W912BU-09-0034
Section 00815 Page 1 first work day after the holiday.
CARP0715-007 05/01/2009
Rates Fringes
Millwright.....................$ 40.27 49.75%
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
ELEC0400-007 06/01/2006
Rates Fringes
Electrician & Cable Splicer......$ 45.67 46%
ENGI0825-021 07/01/2009
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 42.02 22.50
GROUP 2.....................$ 40.43 22.50
GROUP 3.....................$ 38.52 22.50
GROUP 4.....................$ 36.89 22.50
GROUP 5.....................$ 35.18 22.50
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.
PAID HOLIDAYS:
New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided
1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.
DEFINITION OF GROUPS:
GROUP 1:
Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);
Elevating Grader; Excavator; Front End Loader (5 cu. yd.
and over); Piledriver (length of boom, including length of
Amendment No. 0001
Section 00815 Page 2 leads, shall determine premium rate applicable)
GROUP 2:
Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);
Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom
GROUP 3:
Asphalt Spreader; Bulldozer; Compressor(2 or 3) (in Battery) (within 100 ft.); Crusher; Forklift; Front End Loader (1
cu. yd. and over but less than 2 cu. yd.); Lull; Mechanic;
Paver, Asphalt; Roller, Blacktop; Tractor;
GROUP 4:
Broom; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Roller, Grade; Pump
GROUP 5:
Oiler
* IRON0011-014 07/01/2009
Northern Third of County
Rates Fringes
IRONWORKER
Reinforcing.................$ 34.34 35.60 Structural, Ornamental and Rigger......................$ 37.14 35.60
IRON0068-018 07/01/2009
Middle Third of County
Rates Fringes
IRONWORKER
Reinforcing.................$ 32.35 34.85 Structural, Ornamental and Rigger......................$ 34.35 34.85
IRON0350-010 07/01/2009
Southern Third of County
Rates Fringes
Ironworkers:
Reinforcing.................$ 32.97 31.75 Structural, Ornamental and Rigger......................$ 33.97 31.75
LABO0172-009 03/01/2009
Rates Fringes
Laborers:
Common or General Laborer;
Amendment No. 0001
Section 00815 Page 3
Landsacpe Laborer, Power Tool Operator...............$ 29.45 19.40 Pipelayer...................$ 30.15 19.40
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is required to wear Level A, B or C personal protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, where the worker is not required to wear Level A, B, or C personal protection: $1.00 per hour additional.
New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the worker works three days for the same employer within a period of ten working days consisting of five working days before and five working days after the day upon which the holiday falls or is observed.
LABO0222-013 05/01/2009
Rates Fringes
LABORER
MASON TENDER:
Cement/Concrete.............$ 28.55 19.42
* PAIN0711-023 05/01/2009
Rates Fringes
Painters:
Work on bridges (Major Bridges Designed for Commercial Navigation)......$ 46.50 19.13
PAIN0711-024 11/01/2008
Rates Fringes
Painters:
New Construction Brush and roller...........$ 34.47 16.14 Spray......................$ 37.92 16.14 Steel......................$ 35.81 16.30 Repaint work, on projects on which no major alterations occur.
Brush and roller...........$ 26.67 13.80 Spray......................$ 29.34 13.80 Steel......................$ 27.74 13.93
PLAS0592-036 11/01/2008
Rates Fringes
Amendment No. 0001
Section 00815 Page 4
CEMENT MASON/CONCRETE FINISHER...$ 35.75 23.13
PLUM0009-025 07/01/2009
OCEAN COUNTY (north of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, continuing along State Highway Route 72 until it reaches the Burlington County line):
PIPEFITTER.......................$ 43.53 26.65
PLUM0322-012 05/01/2009
OCEAN COUNTY (south of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, continuing along State Highway Route 72 until it reaches the Burlington County line)
PIPEFITTER.......................$ 41.97 26.79
TEAM0469-008 05/01/2008
Rates Fringes
Truck drivers:
Dump Truck; Flatbed Truck...$ 33.00 19.185 Off the Road Truck; Pickup Truck.......................$ 32.85 19.185
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.
New Year's Day, President's Day, Decoration Day, Independence
Amendment No. 0001
Section 00815 Page 5
Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.
VACATION PAY CREDIT:
Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in he matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
Amendment No. 0001
Section 00815 Page 6
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Amendment No. 0001