ATT0055_CDRL_TS27_Systems_Acceptance_Test_Plan.pdf

PDF 107 KB Posted

Attached to
TEIS IV
Solicitation number
W9128Z19R0002
Issued by

About this file

CDRL TS27 SYSTEMS ACCEPTANCE TEST PLAN

View the file

Other files

File Type Posted
PROGRAMS-FRONT&BACK__-IndustdryDayISEC-ACC_APG_Program_Final.pdf PDF
SIGN_IN_03_SKM_4750191002104700.pdf PDF
SIGN_IN_01_SKM_4750191002104400.pdf PDF
Power_Point_Slide-Industry_Final_Presentation.pdf PDF
SIGN_IN_02_SKM_4750191002104500.pdf PDF
SBA_OSBP_APG_Brochure_Trifold_2019_v18.pdf PDF
ISEC_HANDOUTS-USAISEC_v11Final_insert.pdf PDF
Q-n-A_Format.xlsx XLSX spreadsheet
DD_FORM_254_-SYSTEM_ERROR.docx DOCX document
DRAFT_W9128Z19R0002_Amendment_1.pdf PDF
ACCESS_PASS1.jpg JPG image
ATT0014_CDRL_A004_A1.pdf PDF
ACCESS_PASS-02.jpg JPG image
ATT019_TEIS_IV_-_Draft_Labor_Category_Descriptions_A1.pdf PDF
ATT0013_CDRL_A003_A1.pdf PDF
ATT0052_CDRL_TS24_Site_Survey_Report.pdf PDF
ATT0016_CDRL_A006.pdf PDF
ATT0066_Joint_VentureTeaming_Informaiton.xlsx XLSX spreadsheet
ATT0039_CDRL_SE011_eMASS_upload-download.pdf PDF
ATT0007_2.5_item_i_UFC_4-140-03.pdf PDF
ATT0019_TEIS_IV_Labor_Category_Descriptions.pdf PDF
ATT0054_CDRL_TS26_Project_Concurrence_Memo.pdf PDF
ATT0012_CDRL_A002.pdf PDF
ATT0049_CDRL_SE022_SCAR.pdf PDF
ATT0002_2.5_item_a_ISEC_OPSEC_Plan_2017.pdf PDF
ATT0015_CDRL_A005.pdf PDF
ATT0068_Cochise_County_AZ_WD_2015-5719_rev8.pdf PDF
ATT0050_CDRL_SE023_SCA-V_Rec_Memo.pdf PDF
ATT0043_CDRL_SE015_STIG_Compliance_Report.pdf PDF
ATT0021_Sample_Task_Cybersecurity_Pkg.pdf PDF
ATT0018_TEIS_IV_QASP.pdf PDF
ATT0023_1.6.1B_ESS_Network_Diagram.pdf PDF
ATT0004_2.5_item_c_18-033_USAISEC_VIS_Software_Design_Criteria_-_Final_14_Mar_18.pdf PDF
ATT0034_CDRL_SE005_In-Brief.pdf PDF
ATT0026_1.6.2B_ITV_CONOPS_Diagrams.pdf PDF
ATT0064_CONUS_High_CONUS_OCONUS_Labor_Rates.xlsx XLSX spreadsheet
ATT0013_CDRL_A003.pdf PDF
ATT0048_CDRL_SE021_Risk_Calculator.pdf PDF
ATT0011_CDRL_A001.pdf PDF
ATT0033_CDRL_SE004_Test_Readiness_Review_Questionnaire.pdf PDF
ATT0045_CDRL_SE017_Documentation_Evaluation_Report.pdf PDF
ATT0031_CDRL_SE001_Weekly_Project_Report.pdf PDF
ATT0027_1.6.2C_ITV_Ports_and_Protocols_List.xls XLS spreadsheet
ATT0051_Sample_Task-Satellite_Communications.pdf PDF
ATT0042_CDRL_SE014_IAVA_Compliance_Report.pdf PDF
ATT0035_CDRL_SE006_Daily_Project_Report.pdf PDF
ATT0060_CDRL_TS08_Facility_Wiring_Design_Criteria_(FWDC).pdf PDF
ATT0037_CDRL_SE008_Post_Deployment_Meeting.pdf PDF
ATT0062_Past_Performance_Information_Summary_(PART_B).pdf PDF
DRAFT_W9128Z19R0002.pdf PDF
Show 40 more

Latest 50 of 83 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: TS27
title: Systems Acceptance Test Plan
sub:
auth: N/A
ref: Sample Task 2 para 3.1.1.3, 3.2.4
req_ofc: HQUSAISEC ELIE-ISE-TS
dd250:
appcode:
dist:
freq:
asof:
firstsub:
subsub:
addressee1: Government
draft1:
reg1:
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 0
total_repro: 0
remarks: Date of first and subsequent submissions: System Acceptance Test Plans (draft) shall be delivered as specified in the Government issued Project Notification (PN) Form. Delivery of the FINAL test plan shall be 15 days after receipt of comments from the Government, unless otherwise specified in the Project Notification. If comments are not provided within 10 business days following delivery of the DRAFT document without prior notification of delay from the TM, the DRAFT will become the FINAL deliverable. Note that depending on the scope of the technical report, more than one draft may be required.

All test plans shall be developed in Microsoft Word using 12 pt. Times New Roman font.

Test plans shall provide sufficient and accurate details for conducting Acceptance Testing (AT) of new equipment or systems. The test plans shall be clearly written so that an on-site test team can follow the steps in the testing process without difficulty. The steps shall be clearly enough written to ensure repeatability by various test personnel. The test plan shall include a title page followed by the following sections:

1. TEST OBJECTIVES: This section shall provide a brief overview of what the test plan is intended to accomplish

2. TEST REQUIREMENTS AND SPECIFICATIONS

2.1 Requirements: Identifies specific requirements that must be adhered to in conducting the AT.

2.2 Specifications: Provides specifications on what is required to pass AT. Note that this is not intended to be a listing of manufacturer’s specifications.

3. TEST EQUIPMENT AND MATERIALS REQUIRED: Provides a listing of all test equipment and unique materials required to conduct acceptance testing.

4. SPECIAL CONSIDERATIONS: Should include any information that may aid in completion of the test plan. This may include any anomalies that have been noted and the work-around or equipment specific information that may be counter intuitive or contradictory to normal operation.

5. REFERENCES. List references that are relevant to conducting the test procedures (e.g., technical manuals (TM), DISA circulars, commercial specifications, etc.).

6. TEST PROCEDURES. Documents the step by step procedures to be followed in conducting an AT. Each particular type of test should be documented in its own subsection (6.1, 6.2, etc.). There is no limit to the number of subsections which may be included but each subsection should provide details on only that type of test. This section should include the following:

group:
total_price:
prep_name: GOVERNMENT
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat:
system:
ctr_no:
contr:
remarksb: - Detailed technical configurations

- Component programming parameters

- Programming parameters of other systems components to be interfaced

- Configuration parameters for test equipment

- Detailed pass/fail criteria

- Sketches, tables, figures, and screen shots as necessary to clarify test procedures

Note that references to TMs when documenting specific test procedures are not acceptable. The test plan should be a standalone document that provides all the information necessary to conduct an AT. However, the TM should not be regurgitated as part of the test plan. Since qualified engineers and technicians will be conducting the AT, steps should start at a technically appropriate level. For example, if a computer control system is being tested, it is not necessary to describe the steps to be taken in order to access the Windows Control Panel.

Test data sheets shall be included at the end of the test plan and numbered sequentially. If a test plan is particularly large or complex and has many distinct tests under section 6, test data sheets may be included with the individual section and numbered accordingly. However, this is to be the exception and should only be done based on prior coordination and approval by the Government.

Page2: 2
Reset:
prep_date:
app_by:
app_date:
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it.