ATT0011_CDRL_A001.pdf

PDF 107 KB Posted

Attached to
TEIS IV
Solicitation number
W9128Z19R0002
Issued by

About this file

CDRL-CONTRACTOR PROGRESS STATUS

View the file

Other files

File Type Posted
PROGRAMS-FRONT&BACK__-IndustdryDayISEC-ACC_APG_Program_Final.pdf PDF
SIGN_IN_03_SKM_4750191002104700.pdf PDF
SIGN_IN_01_SKM_4750191002104400.pdf PDF
Power_Point_Slide-Industry_Final_Presentation.pdf PDF
SIGN_IN_02_SKM_4750191002104500.pdf PDF
SBA_OSBP_APG_Brochure_Trifold_2019_v18.pdf PDF
ISEC_HANDOUTS-USAISEC_v11Final_insert.pdf PDF
Q-n-A_Format.xlsx XLSX spreadsheet
DD_FORM_254_-SYSTEM_ERROR.docx DOCX document
DRAFT_W9128Z19R0002_Amendment_1.pdf PDF
ACCESS_PASS1.jpg JPG image
ATT0014_CDRL_A004_A1.pdf PDF
ACCESS_PASS-02.jpg JPG image
ATT019_TEIS_IV_-_Draft_Labor_Category_Descriptions_A1.pdf PDF
ATT0013_CDRL_A003_A1.pdf PDF
ATT0052_CDRL_TS24_Site_Survey_Report.pdf PDF
ATT0016_CDRL_A006.pdf PDF
ATT0066_Joint_VentureTeaming_Informaiton.xlsx XLSX spreadsheet
ATT0039_CDRL_SE011_eMASS_upload-download.pdf PDF
ATT0007_2.5_item_i_UFC_4-140-03.pdf PDF
ATT0019_TEIS_IV_Labor_Category_Descriptions.pdf PDF
ATT0054_CDRL_TS26_Project_Concurrence_Memo.pdf PDF
ATT0012_CDRL_A002.pdf PDF
ATT0049_CDRL_SE022_SCAR.pdf PDF
ATT0002_2.5_item_a_ISEC_OPSEC_Plan_2017.pdf PDF
ATT0015_CDRL_A005.pdf PDF
ATT0068_Cochise_County_AZ_WD_2015-5719_rev8.pdf PDF
ATT0050_CDRL_SE023_SCA-V_Rec_Memo.pdf PDF
ATT0043_CDRL_SE015_STIG_Compliance_Report.pdf PDF
ATT0021_Sample_Task_Cybersecurity_Pkg.pdf PDF
ATT0018_TEIS_IV_QASP.pdf PDF
ATT0023_1.6.1B_ESS_Network_Diagram.pdf PDF
ATT0004_2.5_item_c_18-033_USAISEC_VIS_Software_Design_Criteria_-_Final_14_Mar_18.pdf PDF
ATT0034_CDRL_SE005_In-Brief.pdf PDF
ATT0026_1.6.2B_ITV_CONOPS_Diagrams.pdf PDF
ATT0064_CONUS_High_CONUS_OCONUS_Labor_Rates.xlsx XLSX spreadsheet
ATT0013_CDRL_A003.pdf PDF
ATT0048_CDRL_SE021_Risk_Calculator.pdf PDF
ATT0033_CDRL_SE004_Test_Readiness_Review_Questionnaire.pdf PDF
ATT0045_CDRL_SE017_Documentation_Evaluation_Report.pdf PDF
ATT0031_CDRL_SE001_Weekly_Project_Report.pdf PDF
ATT0027_1.6.2C_ITV_Ports_and_Protocols_List.xls XLS spreadsheet
ATT0051_Sample_Task-Satellite_Communications.pdf PDF
ATT0042_CDRL_SE014_IAVA_Compliance_Report.pdf PDF
ATT0035_CDRL_SE006_Daily_Project_Report.pdf PDF
ATT0060_CDRL_TS08_Facility_Wiring_Design_Criteria_(FWDC).pdf PDF
ATT0037_CDRL_SE008_Post_Deployment_Meeting.pdf PDF
ATT0055_CDRL_TS27_Systems_Acceptance_Test_Plan.pdf PDF
ATT0062_Past_Performance_Information_Summary_(PART_B).pdf PDF
DRAFT_W9128Z19R0002.pdf PDF
Show 40 more

Latest 50 of 83 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A001
title: Contractor's Progress, Status, and Management Report
sub: Monthly Progress Report
auth:
ref: PWS paragraph 4.6.1
req_ofc: USAISEC
dd250: N/A
appcode: N/A
dist: Required
freq: Monthly
asof:
firstsub: See blk 16
subsub: See blk 16
addressee1: COR
draft1:
reg1: 1
repro1:
addressee2: TM
draft2:
reg2: 1
repro2:
addressee3: KO
draft3:
reg3: 1
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 3
total_repro: 0
remarks: General: The Contractor’s Progress, Status and Management Report provides a narrative description of what the Contractor accomplished during the reporting period, total price and staffing data by labor category for the reporting period, and an overview of activit

Date of first and subsequent submissions: The progress report for each active Task Order is due not later than 5 business days following the end of each reporting period. E-Mail addresses for distribution will be provided with the individual Task Order.

Format: All reports will be developed in Microsoft Word.

(a) Report shall be written for printing on 8 ½” X 11” standard letter size paper (portrait orientation) although necessary attachments, figures, and sketches may be submitted in a size/orientation that best displays the information being presented.

(b) Font shall be Arial, size 12.

(c) Each page beyond the first page shall have a header identifying the site name or report title and date of report.

(d) Report shall be grammatically correct.

(e) All attachments shall be identified and referenced in the text of the report.

Method of delivery: One (1) soft copy of the progress report shall be submitted via email to the Technical Monitor (TM), Contracting Officer's Representative (COR) and the Contracting Officer (KO) as an attachment, fully identified, and referenced in the subject line of the email message. The document shall not be locked or protected in any fashion that would prevent text to be copied or edited by the Government after delivery.

Title page:

(a) Title. The title shall identify the subject of the report, program name, or task.

(b) Name of contractor. The name and telephone number of the contractor preparing the report.

(c) Contract number. The procurement instrument identification number.

(d) Key person. The individual assigned to the task or who produced the report.

(e) Reporting period. The dates the reporting period begins and ends.

Content:

(a) Description of the progress made during the reporting period;

(b) Results, positive or negative, obtained related to previously-identified problem areas, with conclusions and recommendations.

group:
total_price:
prep_name:
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat: X
system:
ctr_no:
contr:
remarksb: (c) Any significant changes to the contractor’s organization or method of operation, to the project management network, or to the milestone chart.

(d) Problem areas affecting technical or scheduling elements, with background and any recommendations for solutions beyond the scope of the contract.

(e) Problem areas affecting cost elements, with background and any recommendations for solutions.

(f) Cost curves showing actual and projected conditions throughout the contract.

(g) Any cost incurred for the reporting period and total contractual expenditures as of reporting date.

(h) Person-hours expended for the reporting period and cumulatively for the contract (for cost-reimbursable type task orders only).

(i) Any task-related trips and significant results.

(j) Record of all significant telephone calls and any commitments made by telephone.

(k) Summary of Engineering Change Proposal (ECP) status (if any), including identification of proposed ECPs, and approved and implemented ECPs.

(l) Contract schedule status.

(m) Plans for activities for the following reporting period.

(n) Appendices for any necessary tables, references, photographs, illustrations and charts.

(o) All mandatory training certificates/briefings for all assigned personnel, as required in the Security section of the task order Performance Work Statement, Sexual Assault and Sexual Harassment (SHARP) base contract and in accordance with AR 530-1 Chapter 6, shall be submitted within 15 days after award, or as specified in the PWS. In addition, any changes in personnel will require the mandatory training certificates be submitted with the applicable monthly report thereafter.

Page2: 2
Reset:
prep_date:
app_by:
app_date:
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it.