Amd 0002 for W9128F26QA017 - MRPO Barge and Excavator Bucket Repair.pdf

PDF 4 MB Posted

Attached to
Barge & Bucket Repair for the Missouri River Project Office
Solicitation number
W9128F26QA017
Issued by

About this file

This is Amendment 0002 to Solicitation W9128F26QA017, issued by the U.S. Army Corps of Engineers Omaha District on February 27, 2026. The amendment updates the Performance Work Statement (PWS) for MRPO Barge and Excavator Bucket Repair services. The effective date is February 27, 2026, with a requisition number of W9128F and contracting office located at 1616 Capitol Avenue, Omaha, Nebraska. The amendment specifies that the receipt of offers is not extended, and offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation through completion of items 8 and 15, acknowledgment on each copy of the offer submitted, or separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt may result in rejection of the offer.

The amendment updates the contract documents, specifically replacing the February 9, 2026 version of Attachment 1 (PWS – MRPO Barge and Excavator Bucket Repair FINAL) with an updated version dated February 27, 2026. The remaining attachments—including the Price Schedule (Attachment 2), Drawings Welding Repair Sheet (Attachment 3), Wage Determination WD #2015-5005 Rev 27 (Attachment 4), and MRPO Bucket Details drawings (Attachment 5)—remain unchanged. The amendment states that the purpose is to update paragraph 1.4 within the PWS, with the due date for quotes remaining March 3, 2026, and all other terms and conditions remaining unchanged.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

List of Contract Documents, Exhibits, or Attachments

The attachments table has changed from:

Identifi er

Document Name

Document Description Reference Identifier

Date Line Item

Page N umbers

Docum ent Type

Provid ed Under Separa te Cover

0001 Attachment 1

PWS - MRPO

Barge and Excavator Bucke Repair

FINAL

Performance Work Statement 09 Feb

Attach ment

No

0002 Attachment 2

BID

SCHEDULE -

Barge and Bucket Repair

Price Schedule 09 Feb

Attach ment

No

0003 Attachment 3

- Drawings Welding Repair Sheet

Drawings 09 Feb

Attach ment

No

0004 Attachment 4 Service Contract Act

WD # 2015-

5005 Rev 27

Wage Determination 09 Feb

Attach ment

No

0005 MRPO Bucket Details

Drawings Attachme nt 5 - Bucket Drawing

09 Feb

Attach ment

No

To:

Identifi er

Document Name

Document Description Reference Identifier

Date Line Item

Page N umbers

Docum ent Type

Provid ed Under Separa te Cover

0001 PWS - MRPO

Barge and Excavator

Performance Work Statement Attachme nt 1 - Perf ormance Work Stat ement

27 Feb

Attach ment

No

W9128F26QA0170002

Bucke Repair, Dated 27 Feb

Updated 27 Feb

0002 Attachment 2

BID

SCHEDULE -

Barge and Bucket Repair

Price Schedule 09 Feb

Attach ment

No

0003 Attachment 3

- Drawings Welding Repair Sheet

Drawings 09 Feb

Attach ment

No

0004 Attachment 4 Service Contract Act

WD # 2015-

5005 Rev 27

Wage Determination 09 Feb

Attach ment

No

0005 MRPO Bucket Details

Drawings Attachme nt 5 - Bucket Drawing

09 Feb

Attach ment

No

The following contract documents were added:

PWS - MRPO Barge and Excavator Bucke Repair, Dated 27 Feb 2026

The following contract documents were deleted:

Attachment 1 PWS - MRPO Barge and Excavator Bucke Repair FINAL

W9128F26QA0170002

IDCode: J
Page: 1
Pages: 3
AmendNo: 0002
EffDate: 27 FEB 2026
ReqNo:
ProjNo:
IssCode: W9128F
AdmCode:
IssuedBy: W071 ENDIST OMAHA

KO CONTRACTING OFFICE, 1616 CAPITOL AVENUE

OMAHA, NE 68102-4901

UNITED STATES

GRANT HIBBS, EMAIL: GRANT.M.HIBBS@USACE.ARMY.MIL TELEPHONE: (816) 389-3503

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W9128F26QA017
SolDate: 11 FEB 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to update paragraph 1.4 within the PWS. The due date for quotes remains 3 March 2026. All other terms and conditions remain unchanged.
ContNameTitle:
CoNameTitle: NADINE CATANIA
ContDate:
CODate: 27 FEB 2026