This file is a price schedule for barge and bucket repair services solicited by the Department of the Army Corps of Engineers, Omaha District, under Solicitation W9128F26QA017. The schedule contains two line items: a Base Bid for welding repair of Barge 600's spud well in a confined space, and Option 1 for repairs to two ESCO buckets.

The Base Bid requires comprehensive spud well repair work including removal and proper disposal of lead-based paint, creation of an access opening in the bulkhead wall, welding of damaged and leaking areas, and installation of steel reinforcement consisting of ½-inch by 6-inch angle iron at spud well corners and ½-inch by 6-inch flat steel reinforcement plates, with all work performed in compliance with the Performance Work Statement and applicable safety regulations. Option 1 encompasses reinforcement and wear plate installation on two existing ESCO buckets, including installation of AR450 or AR500 wear plates at cutter bit locations, wear strips on back and bottom surfaces, new side-cutter bits, weld-on corner wear shoe protectors, hard-facing material to rebuild bucket teeth for ESCO U-45 compatibility, and complete welding of all components according to heavy equipment repair standards. The price schedule is currently a blank template with zero values populated for unit prices and total amounts for both line items.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

BID SCHEDULE
Item NoDescriptionQuantityUnitUnit PriceTotal Amount
1Base Bid – Welding Repair of Barge 600 Spud Well (Confined Space). Provide all labor, materials, equipment, and supervision necessary to repair and reinforce the existing leaking spud well inside the confined space of Barge 600, in accordance with the Performance Work Statement (PWS) and contract drawings.

Work includes removal and proper disposal of all lead-based paint in the work area in compliance with all applicable local, state, and federal laws and regulations. Contractor shall cut an access opening in the bulkhead wall to allow access to the spud well, perform all required repairs, and reinstall and fully weld the access panel to restore the bulkhead to its original condition.

Repairs shall include welding of damaged and leaking areas and installation of steel reinforcement consisting of ¾-inch × 6-inch angle iron at the spud well corners and ¾-inch × 6-inch flat steel reinforcement plates, as shown on the contract drawings. All reinforcement shall be fully welded. All work shall be performed in a confined space and completed in full compliance with the PWS.1Job$ - 0$ - 0
2Option 1 – ESCO Bucket Repairs.

Provide all labor, materials, equipment, and supervision necessary to perform reinforcement, weld repairs, and wear plate installation on two (2) existing ESCO buckets, in accordance with the Performance Work Statement (PWS).

Work includes fully reinforcing both buckets and installing new wear materials to extend service life and protect against further deterioration. Contractor shall install AR450 or AR500 wear plates on the bucket sides at the cutter bit locations and install wear strips on the back and bottom of each bucket. Installation shall include new side-cutter bits, weld-on corner wear shoe protectors, and reinforcement along the side corners and bottom.

Hard-facing material shall be applied as required to rebuild and properly fit bucket teeth on the existing shanks to accept ESCO U-45 bucket teeth on both buckets, ensuring correct engagement and restoration of original functionality.

All worn side bits, materials to be replaced, and any components that interfere with installation of new wear plates shall be removed. Contractor shall install all new replacement components and fully weld all wear plates and attachments in accordance with standard welding practices for heavy equipment repair.

Completed work shall result in fully reinforced buckets with renewed wear surfaces, improved durability, and protection of the underlying structure. All work shall be performed in accordance with the PWS. 2 Each $ - 0 $ - 0

Total contract cost - Base and Options 1: $ - 0