This is a Request for Proposal (RFP) for the Garrison Dam Spillway Stoplog Seal Modification project, solicitation number W9128F25RA050, issued by the U.S. Army Corps of Engineers Engineering District in Omaha. The contract is a 100% small business set-aside with an estimated construction cost between $1,000,000 and $5,000,000. The project involves modifying 8 stoplogs fabricated in 2016, which will require hauling them from the Garrison Project crest structure to a steel fabrication shop for measurement, minor weld modifications, milling, partial painting, and installation of new seals and springs.
The contract will have a performance period from September 1, 2025 to April 26, 2027, with a 10-calendar day lead time and 600 calendar days for completion after receipt of the Notice to Proceed. The solicitation requires electronic submission of proposals by July 29, 2025 at 2:00 PM local time. A mandatory site visit is scheduled for July 9, 2025 at 1:00 PM at 597 Garrison Dam Road in Riverdale, North Dakota. The contract will be awarded on a best value-tradeoff basis using a firm fixed-price structure, with performance and payment bonds required. Contractors must submit proposals electronically and comply with all specified requirements and representations.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
I
I
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
I
► I □ □ I
Section 00 00 00 - Procurement and Contracting Requirements
Garrison Dam Spillway Stoplog Seal Modification
W9128F25RA050
Section 00 01 15 - List of Drawing Sheets
Identifier Attachment Name
Attachment Description Reference Identifier
Date Line Item
# Of Pages
Provided Under Separate Cover
Att 0001 - 00 22 00 Evaluation Criteria
Evaluation Criteria and Submission Requirements 00 22
10 Jun
21 No
Att 0002 - Price Schedule Spillway Seals Mods
Price Schedule 24 Jun
2 No
DB Wage Determination
ND20250047
05.30.2025
Wage Determination 10 Jun
9 No
0004 AT OPSEC ATOPSEC Requirements 13 Jun
2 No
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
Additional Information/Notes
See Attachment 0002 Price Schedule
Item Supplies/Service Quantity Unit Unit Price Amount
Garrison Dam Stoplog Seals Modification
The Specification documents provide for the extended description of the Scope of Work.
The Price Schedule is included in Attachment 0002 that details the expected work CLINS
Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Option CLIN Line Item 0004
See attachment 0002 for Price Schedule
Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Option CLIN Line Item 0005
See attachment 0002 for Price Schedule
Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Option CLIN Line Item 0006
See attachment 0002 for Price Schedule
Pricing Arrangement: Firm Fixed Price
1 Job
Section 00 21 00 - Instructions
INSRUCTIONS TO OFFERORS (RFP)
1. SOLICITATION RESTRICTIONS
1.1. GENERAL CONTRACTOR
This solicitation is "Best Value-Tradeoff" Unrestricted Request for Proposals.
1.2. ESTIMATED CONSTRUCTION COST
The estimated construction cost of this project is greater between $1,000,000 and $5,000,000.
1.3. SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS
See FAR 52.215-1 INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISTION, subparagraph "(c) Submission, modification, revision, and withdrawal of proposals." Below for acceptable methods.
1.4. SUBMISSION DEADLINE
Contractors shall submit their proposals via email to the following individuals by no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recently issued SF 30 as applicable:
Karen Caskey, Contract Specialist: karen.L.caskey@usace.army.mil Nadine Catania, Contract Officer: nadine.L.catania@usace.army.mil
Each email shall contain the following solicitation number in the subject line: W9128F25RA050.
Files over 20 megabytes (MB) shall be separated into smaller file sizes and sent via separate emails with each email marked to identify which number the email is relative to the total number of emails submitted (i.e.,"email one of four"). Once all the emails submitted have been received the Government will confirm receipt via responsive email.
Proposals received after the date and time stated within Block 13 of the SF1442, or Block 14 of the most recently issued SF 30 as applicable, will be considered late and will not be considered for award. To avoid rejection of a proposal, the offeror must make every effort to ensure its electronic submission is virus-free. Proposals, or portions thereof, submitted with the presence of a virus.
Do not assume submission will be instantaneous. File size and number of files submitted shall be considered. Contractor /Teammate/Subcontractors should allow adequate time for submission completion because the entire proposal (i.e., Contractor's submission and all teammate/subcontractor(s)independent submissions) must be received by the due date and time specified in Block 13 of SF 1442, or SF 30 as applicable.
2. COPIES OF SOLICITATION DOCUMENT AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the U.S. General Services Administration website at:
https://sam.gov/
It shall be the Offeror's responsibility to check the website for any amendments. The Offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
A list of interested vendors (potential offerors and subcontractors) is available on the sam.gov web site listed above (registration required).
3. OFFEROR'S QUESTIONS AND COMMENTS
3.1. SITE VISIT
The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
A site visit is scheduled for 9 July 2025 at 1:00 pm local time.
Participants will meet at:
597 Garrison Dam Road
Riverdale, ND 58565
Mercer County
Contractors shall submit to Nadine the name, email address and company represented for each attendee attending the site visit Catania and Karen Caskey via email at Nadine.L.Catania@usace.army.mil and Karen.L.Caskey@usace.army.mil, respectively.
Contractors shall submit this information by 4:00pm (Central Time) on 8 July 2025.
3.2. BIDDER INQUIRY
Solicitation questions and/or comments must be submitted via Bidder Inquiry in ProjNet at: https://www.projnet.org/projnet/.
All Bidder Inquiries must be submitted no later than in order for inquiries to be given 4:00pm Central Time on 18 July 2025 consideration or actions taken prior to the receipt of offers. All timely questions and approved answers will be made available through ProjNet.
The Bidder Inquiry system is to be used to ask and receive answers to all non-proprietary questions. In the event the Bidder Inquiry method is unavailable, and issue resolution is unsuccessful, inquiries may be submitted via email to the Contract Specialist listed below. Inquiries considered proprietary by the prospective vendor may also be submitted via email.
Contract Specialist - Primary POC: Karen Caskey, Contract Specialist karen.L.caskey@usace.army.mil
Contracting Officer: Nadine Catania Nadine.L.Catania@usace.army.mil
To submit and review Bidder Inquiries, prospective offerors will need to use the Bidder Inquiry Key and instructions listed below. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via ProjNet email notification after an answer to the comment/question has been processed by the Government technical team.
Solicitation Number is: W9128F25RA050 Bidder Inquiry Key is: 9TI677-BSB9WK
a. Registration for ProjNet Bidder Inquiry Access
If you are already registered, go to (b) Entering Bidder Inquiries in ProjNetBidder Inquiry System below.
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency: This should be marked as USACE.
3. Key: Enter the Bidder Inquiry Key listed above.
4. Email: Enter the email address you would like to use for communication.
5. Click Continue - A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User - Once this is completed you are now registered within ProjNet and are currently logged into the system.
b. Entering Bidder Inquiries in ProjNet Bidder Inquiry System
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency: This should be marked as USACE.
4. Key: Enter the Bidder Inquiry Key listed above.
5. Email: Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
8. Follow online screen instructions to enter specific bidder inquiries for the project.
c. Offerors are requested to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
d. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
4. PLAN HOLDERS LIST
For viewing a list of interested vendors (i.e., Plan Holders List) and receiving notifications or email of changes regarding a solicitation, U.S. General Services Administration has these features available (https:// sam.gov/). For this solicitation, go to https://sam.gov/ and register as a vendor or enter username and password to login.
If you wish for General Contractors, Subcontractors, Suppliers, Plan Rooms or Print Shops to have the ability to contact you, click on "Add me to Interested Vendors" for the solicitation.
5. GENERAL DESCRIPTION OF WORK
Scope of project includes all work required for the Garrison Stoplog Seal Modifications at the Garrison Dam in Riverdale, ND.
Work shall be in accordance with Request for Proposal documents issued with this solicitation.
6. PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION, AND CONTRACT AWARD
The Contracting Officer has established a Source Selection Board to conduct an evaluation of each proposal received in response to this Solicitation. The evaluation will be based exclusively on the merits and content of the proposal and any subsequent discussion required. The identities of the SSB personnel are confidential, and any attempt by the proposers to contact these individuals is prohibited.
See Section 00 22 00, SUPPLEMENTARY INSTRUCTIONS, PROPOSAL SUBMISSION, AND EVALUATION.
7. FEDERAL, STATE AND LOCAL TAXES
The bidder is responsible for investigating applicable federal, state, and local taxes and any specific exemptions that may exist and includes applicable Value-Added Taxes (VAT), sales, use, and excise taxes. See 52.229-3 Federal, State, and Local in Section 00 72 00 (General Conditions).
8. PARTNERING WITH USACE
The Government is committed to working with partners to build enduring relationships through trust, transparency, and shared values in order to reach successful contract completion. In accordance with 15 U.S.C. 644(w), solicitation notices posted at the GPE for construction contracts anticipated to be awarded to a small business pursuant to part 19 shall include certain information regarding the agency's definitization of equitable adjustments for change orders under construction contracts. The following link provides this information https://www.usace.army.mil/Business-With-Us/Partnering/.
-- End of Section --
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.204-7 System for Award Management. Nov 2024 52.204-16 Commercial and Government Entity Code Reporting. Aug 2020 52.204-22 Alternative Line Item Proposal. Jan 2017 52.214-34 Submission of Offers in the English Language. Apr 1991 52.214-35 Submission of Offers in U.S. Currency. Apr 1991 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. May 2014 52.225-10 Notice of Buy American Requirement-Construction Materials. May 2014 52.232-28 Invitation to Propose Performance-Based Payments. Mar 2000
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements. Nov 2023 252.204-7024 Notice on the Use of the Supplier Performance Risk System. Mar 2023 252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors. Jan 2023
FAR Clauses Incorporated by Full Text
52.215-1 Instructions to Offerors-Competitive Acquisition. (Nov 2021)
Instructions to Offerors-Competitive Acquisition (Nov 2021)
(a) Definitions. As used in this provision-
Discussions are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.
In writing, "writing," or "written" means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
Proposal modification is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
Proposal revision is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
Time, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals.
(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show-
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, revision, and withdrawal of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)
(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and-
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall-
(1) Mark the title page with the following legend:
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed-in whole or in part-for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of-or in connection with-the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award.
(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
(2) The Government may reject any or all proposals if such action is in the Government's interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.
(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial products, the make and model of the product to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether sourceselection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
(End of provision)
52.216-1 Type of Contract. (Apr 1984)
Type of Contract (Apr 1984)
The Government contemplates award of a contract resulting from this solicitation.Firm Fixed Price
(End of provision)
52.233-2 Service of Protest. (Sep 2006)
Service of Protest (Sept 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that (a) are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Civil Works .Contracting Officer at 1616 Capitol Ave Omaha, NE 68102-4901
The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.(b)
(End of provision)
52.252-1 Solicitation Provisions Incorporated by Reference. (Feb 1998)
Solicitation Provisions Incorporated by Reference (Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov
(End of provision)
52.252-3 Alterations in Solicitation. (Apr 1984)
Alterations in Solicitation (Apr 1984)
Portions of this solicitation are altered as follows:
_n/a__
(End of clause)
52.252-5 Authorized Deviations in Provisions. (Nov 2020)
Authorized Deviations in Provisions (Nov 2020)
The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the (a) addition of "(DEVIATION)" after the date of the provision.
The use in this solicitation of any (48 CFR Chapter ) provision with an authorized deviation is indicated by the addition of (b) DFARS 2 "(DEVIATION)" after the name of the regulation.
(End of provision)
DFARS Clauses Incorporated by Full Text
252.215-7008 Only One Offer. (Dec 2022)
ONLY ONE OFFER (DEC 2022)
(a) Cost or pricing data requirements. After initial submission of offers, if the Contracting Officer notifies the Offeror that only one offer was received, the Offeror agrees to-
(1) Submit any additional cost or pricing data that is required in order to determine whether the price is fair and reasonable (10 U.S.C. 3705) or to comply with the statutory requirement for certified cost or pricing data (10 U.S.C. 3702 and FAR 15.403-3); and
(2) Except as provided in paragraph (b) of this provision, if the acquisition exceeds the certified cost or pricing data threshold and an exception to the requirement for certified cost or pricing data at FAR 15.403-1(b)(2) through (5) does not apply, certify all cost or pricing data in accordance with paragraph (c) of DFARS provision 252.215-7010, Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data, of this solicitation.
(b) Canadian Commercial Corporation. If the Offeror is the Canadian Commercial Corporation, certified cost or pricing data are not required. If the Contracting Officer notifies the Canadian Commercial Corporation that additional data other than certified cost or pricing data are required in accordance with DFARS 225.870-4(c), the Canadian Commercial Corporation shall obtain and provide the following:
(1) Profit rate or fee (as applicable).
(2) Analysis provided by Public Works and Government Services Canada to the Canadian Commercial Corporation to determine a fair and reasonable price (comparable to the analysis required at FAR 15.404-1).
(3) Data other than certified cost or pricing data necessary to permit a determination by the U.S. Contracting Officer that the proposed price is fair and reasonable ____[U.S. Contracting Officer to provide description of the data required in accordance with FAR 15.403-3(a)(1) with the notification].
(4) As specified in FAR 15.403-3(a)(4), an offeror who does not comply with a requirement to submit data that the U.S. Contracting Officer has deemed necessary to determine price reasonableness or cost realism is ineligible for award unless the head of the contracting activity determines that it is in the best interest of the Government to make the award to that offeror.
(c) Subcontracts. Unless the Offeror is the Canadian Commercial Corporation, the Offeror shall insert the substance of this provision, including this paragraph (c), in all subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.
(End of provision)
Section 00 22 00 - Supplementary Instructions
See Attachment 0001 for Evaluation Criteria and Basis for Award
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.217-5 Evaluation of Options. Jul 1990
Section 00 45 00 - Representations and Certifications
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.204-8 Annual Representations and Certifications (Jan 2025)
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/Dev Variation Effective Date 252.204-7007 Alternate A., Annual Representations and Certifications (Oct 2024) Alternate A (Oct 2024)
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.
Nov 2021
52.204-29 Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures. Dec 2023 52.209-7 Information Regarding Responsibility Matters. Oct 2018 52.209-13 Violation of Arms Control Treaties or Agreements-Certification. Nov 2021 52.236-28 Preparation of Proposals-Construction. Oct 1997
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.203-7005 Representation Relating to Compensation of Former DoD Officials. Sep 2022 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls. Oct 2016
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services-Representation.
May 2021
252.225-7055 Representation Regarding Business Operations with the Maduro Regime. May 2022
252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region- Representation.
Jun 2023
Section 00 70 00 - Conditions of the Contract
Number Title Effective Date Alternate/Dev Variation Effective Date
52.225-9 Buy American-Construction Materials (Oct 2022)
52.232-8 Discounts for Prompt Payment (Feb 2002)
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.203-3 Gratuities. Apr 1984 52.203-5 Covenant Against Contingent Fees. May 2014 52.203-7 Anti-Kickback Procedures. Jun 2020
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity.
May 2014
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. May 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Jun 2020 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded
Jan 2025
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. Oct 2018 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.215-1 Instructions to Offerors-Competitive Acquisition. (Alternate I) Nov 2021 Alternate I Oct 1997 52.215-2 Audit and Records-Negotiation. Jun 2020 52.222-3 Convict Labor. Jun 2003 52.222-7 Withholding of Funds. May 2014 52.222-50 Combating Trafficking in Persons. Nov 2021 52.222-54 Employment Eligibility Verification. Jan 2025 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021 52.228-11 Pledges of Assets (DEVIATION 2020-O0016) Feb 2021 Deviation 2020-O0016 Apr 2020 52.232-23 Assignment of Claims. May 2014 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.236-2 Differing Site Conditions. Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984 52.236-5 Material and Workmanship. Apr 1984 52.236-6 Superintendence by the Contractor. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.236-8 Other Contracts. Apr 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
Apr 1984
52.236-10 Operations and Storage Areas. Apr 1984 52.236-11 Use and Possession Prior to Completion. Apr 1984 52.236-12 Cleaning Up. Apr 1984 52.236-13 Accident Prevention. Nov 1991 52.236-14 Availability and Use of Utility Services. Apr 1984 52.236-15 Schedules for Construction Contracts. Apr 1984 52.236-21 Specifications and Drawings for Construction. Feb 1997
52.242-13 Bankruptcy. Jul 1995 52.242-14 Suspension of Work. Apr 1984 52.243-4 Changes. Jun 2007 52.249-2 Termination for Convenience of the Government (Fixed-Price). Apr 2012 52.249-10 Default (Fixed-Price Construction). Apr 1984
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
(DEVIATION 2024-O0013 REVISION 1)
May 2024 Deviation 2024-O0013 May 2024
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
Jun 2023
252.232-7010 Levies on Contract Payments. Dec 2006 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023
FAR Clauses Incorporated by Full Text
52.204-1 Approval of Contract. (Dec 1989)
Approval of Contract (Dec 1989)
This contract is subject to the written approval of the and shall not be binding until so approved.Contracting Officer
(End of clause)
52.211-10 Commencement, Prosecution, and Completion of Work. (Apr 1984)
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within calendar days after the date the Contractor receives the notice to 10 proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 600 calendar days from issuance of the Notice
.* The time stated for completion shall include final cleanup of the premises.to Proceed
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
(End of clause)
52.211-12 Liquidated Damages-Construction. (Sep 2000)
Liquidated Damages-Construction (Sept 2000)
If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the (a) Government in the amount of for each calendar day of delay until the work is completed or accepted.$543.00
If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These (b) liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.217-7 Option for Increased Quantity-Separately Priced Line Item. (Mar 1989)
Option for Increased Quantity-Separately Priced Line Item (Mar 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 300 days after Notice to Proceed
. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise has been issued agree.
(End of clause)
52.219-14 Limitations on Subcontracting (DEVIATION 2021-O0008) (Oct 2022) Deviation 2021-O0008 (Feb 2023)
LIMITATIONS ON SUBCONTRACTING (FEB 2023) (DEVIATION 2021-O0008)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) , as used in this clause, means a first-tier subcontractor, including an independent contractor, that--Definition. Similarly situated entity
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) This clause applies only to--Applicability.
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4) Orders expected to exceed the simplified acquisition threshold and that are--
(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);
(5) Orders, regardless of dollar value, that are--
(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b) (2)(i)(F); or
(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) An independent contractor shall be considered a subcontractor.Independent contractors.
(e) By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract Limitations on subcontracting.
assigned a North American Industry Classification System (NAICS) code for--
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding certain other direct costs and certain work performed outside the United States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. The following services may be excluded from the 50 percent limitation:
(i) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code 562910), cloud computing services, or mass media purchases.
(ii) Work performed outside the United States on awards made pursuant to the Foreign Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause--
[Contracting Officer check as appropriate.]
X By the end of the base term of the contract and then by the end of each subsequent option period; or
By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(1) In a joint venture comprised of a small business protege and its mentor approved by the Small Business Administration, the small business protege shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protege in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
(End of clause)
52.219-28 Postaward Small Business Program Rerepresentation. (Alternate I) (Jan 2025) Alternate I (Mar 2020)
Alternate I . As prescribed in (c)(2), substitute the following paragraph (h)(1) for paragraph (h)(1) of the basic clause:(Mar 2020) 19.309
(h)(1) The Contractor represents its small business size status for each one of the NAICS codes assigned to this contract.
NAICS Code Small business concern (yes/no)
52.228-15 Performance and Payment Bonds-Construction (Deviation 2020-O0016) (Jun 2020) Deviation 2020-O0016 (Apr 2020)
PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION (APR 2020) (DEVIATION 2020-O0016)
(a) Definitions. As used in this clause-
Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is $150,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25, except that no seal is required). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment bonds (Standard Form 25A, except that no seal is required). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of the Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.
treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
(End of clause)
52.232-5 Payments under Fixed-Price Construction Contracts.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .