This document is a Formal External Inspection Report for Tank 512T1 (512T2) at the Army Depot in Tooele, Utah, prepared by Austin Brockenbrough & Associates, LLP under Contract No. W9128F-12-D-0006, Delivery Order No. 0007 for the U.S. Army Corps of Engineers Omaha District. The inspection was conducted on August 12th, 2015 and focused on a 15,000-gallon horizontal cylindrical double-wall steel tank manufactured by ISOM Brothers in 1998, currently storing Mogas fuel.
The inspection revealed several recommended repairs totaling $16,200, including resolving facility numbering discrepancies, sealing hairline cracks in the concrete foundation, replacing corroded level control valve bolting, addressing issues with the interstice emergency vent, replacing the cloudy clock gauge, repairing non-operable level alarms, addressing coating failures, installing an anti-siphon valve on the water draw-off, and adding a tank isolation valve. Additionally, site upgrades of $17,000 were recommended, including installing a second fire hydrant, managing vegetation growth, and replacing bronze valves with steel flanged valves. Despite these recommendations, the tank was found to be fully serviceable with no mandatory repairs requiring immediate attention.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J.1_Tooele Tank 5129A Final Report 2020.pdf | ||
| J.2_Tooele Tank 5129B Final Report 2020.pdf | ||
| J.3_Tooele Tank 5129C Final Report 2020.pdf | ||
| J.5_Toolele-Fac 512T1 (Tank 512-A2)-FINAL-2015.pdf | ||
| Attachment E - Inspection Telecon Briefing Template.docx | DOCX document | |
| Attachment B_TOD.xlsx | XLSX spreadsheet | |
| Solicitation - W9128F25QA009.pdf | ||
| SCA WD 2015 5489_Tooele Utah REV 25.gov.pdf | ||
| Attachment H - STI External Inspection Template.docx | DOCX document | |
| Attachment C - Tank Data Sheet.xlsx | XLSX spreadsheet | |
| Attachment D - Monthly Contractors Progress Management and Status Report.xlsx | XLSX spreadsheet | |
| SP-POL-CMP-INSPECT-FY25-TOD_PWS.pdf | ||
| Attachment A - General Installation Security Requirements.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TANK 512T1 (512T2) STI SP001
FORMAL EXTERNAL INSPECTION REPORT
Army Depot Tooele, Utah
A/E Contract No. W9128F-12-D-0006; Delivery Order No. 0007
Submitted to:
U.S. Army Corps of Engineers Omaha District
1616 Capital Avenue; Omaha, NE 68102
11 October 2015
Submitted by:
1011 Boulder Springs Drive, Suite 200; Richmond, Virginia 23225 Phone: 804.592.3900 Fax: 804.592.3901 www.brockenbrough.com
Job No. 15-002.24
SPCC Mandated Shop-Built AST Inspections Tooele Army Depot
Table of Contents page ii
TABLE OF CONTENTS
EXECUTIVE SUMMARY ................................................................................................................................... i
A. General Project Information
1. STI SP001 In-Service Inspections
2. Site Information
3. Previous Inspections
B. Tank Construction and Appurtenances
1. Tank Construction
2. Tank Supports and Foundation
3. Secondary Containment
4. Tank Coating System
5. Tank Appurtenances
a. Venting
b. Gauging
c. Stairs and Platforms
d. Grounding and Bonding
e. Other Appurtenances
6. Tank Piping System
7. Fire Protection Systems:
C. Findings and Recommendations
1. Mandatory Repairs
2. Recommended Repairs
a. Facility Numbering
b. Foundation
c. Bolting
d. Interstice Emergency Vent
e. Clock Gauge
f. Level Alarms
g. Coatings
h. Tank Sizing
i. Water Draw-off
j. Valves
3. Other Noted Items
a. Access Manholes
4. Recommended Site Upgrades
a. Fire Hydrants
b. Vegetation
c. Piping
D. Inspection Photographs
E. Tank Configuration Sketch
Appendix ‘1’ – STI Formal External Inspection Checklist
Appendix ‘2’ – STI Monthly and Annual Checklists
General Project Information page 3
A. General Project Information
1. STI SP001 In-Service Inspections
This project will perform in-service inspection of various tanks at facilities throughout the United
States. The basis of this inspection is a formal external inspection recommended in STI SP001
“Standard for the Inspection of Aboveground Storage Tanks”. Additional consideration is given to
Federal, State, and Local regulations as well as applicable Military Criteria and general industry standards. Unless otherwise noted, all inspections will be conducted while the tanks and associated piping systems remain in service.
For Tank 512T1, an STI SP001 Formal External Inspection was performed.
2. Site Information
On August 12th, 2015 Brockenbrough performed a site visit to Tooele Army Depot located near
Tooele, Utah to perform inspections of two aboveground storage tanks located at the GOV Fuel
Station. Tooele Army Depot (TEAD) is a premier active joint ammunition storage site. Tooele is responsible for shipping, storing, receiving, inspecting, demilitarization, and maintaining training and war reserve conventional ammunition. Tooele’s Ammunition Equipment and Manufacturing
Directorate (AEMD) designs and manufacturer’s ammunition peculiar equipment (APE) used in maintenance and demilitarization of munitions for all forces under the Department of Defense.
3. Previous Inspections
There were no previous formal inspections found to have been performed on Tank 512T1.
Tank Construction and Appurtenances page 4
B. Tank Construction and Appurtenances
1. Tank Construction
The manufacturer's data plate indicates the tank is a UL Listed "Insulated Secondary Containment
Aboveground Tank for Flammable Liquids, Protected Type". The UL Nameplate was present and fully readable. The tank measures 9' diameter by 42' long.
2. Tank Supports and Foundation
Tank rests on two steel saddles bearing on a concrete slab. The saddles were found to be in good condition. Numerous hairline cracks were observed in the concrete slab under the saddles.
3. Secondary Containment
The tank is a double wall protected tank.
4. Tank Coating System
The tank is carbon steel, with an exterior coating that is unknown. The interior coating of the tank is also unknown.
5. Tank Appurtenances
a. Venting
The primary containment is vented by a 2" OPW Model 623V pressure/vacuum vent. The capacity listed on the Clay and Bailey primary containment emergency vent is adequate. The vapor return piping from the cam lock connection at the truck delivery station is connected to a Tee in the tank vent riser and does not appear to obstruct the vent riser. The capacity listed on the Morrison Fig. 244 interstice emergency vent is also adequate.
b. Gauging
The tank’s Veeder Root ATG is installed through a 4-inch threaded coupling and is operable.
Manual test of the interstitial space leak detection alarm reveals it is operable. Manual gauging may be performed though a 4-inch threaded pipe nozzle piped to a 2-inch brass fire hydrant type pipe cap projecting through the ladder landing grating. There is also a 3-inch gauge hatch mounted on the 24-inch manhole cover. The Morrison Brothers mechanical clock gauge appears to be reading and sized correctly, however the paint overspray makes the clock gauge face cloudy.
c. Stairs and Platforms
Access to the top of the tank is provided by a caged ladder with a top landing leading to a catwalk over one side of the top of the tank.
Tank Construction and Appurtenances page 5
d. Grounding and Bonding
There is a ground cable connected to one of the tank’s saddles.
e. Other Appurtenances
The tank also has a submersible turbine issue pump mounted through a 4-inch threaded pipe nozzle with an anti-siphon device on the outlet of the issue pump, an interstitial monitoring system installed through a 2-inch threaded pipe nozzle, and a receipt level control valve installed through a 4-inch threaded pipe nozzle.
6. Tank Piping System
Fuel is received through 3-inch coated carbon steel piping from the nearby delivery point. Fuel is issued from the tank to the GOV fuel station through 2-inch coated carbon steel piping. The
2-inch coated carbon steel issue piping to the GOV fuel station transitions to underground in a pit located between Tanks 512T1 and 512T2.
7. Fire Protection Systems:
There is only one fire hydrant noted within the vicinity of this tank.
Tank Construction and Appurtenances page 6
Table B-1: General Tank Construction Data
Item Description
Owner U.S. Army
Tank Identification Facility 512T1 (Locally identified as Tank 512T2)
Location Tooele Army Depot GOV Gas Station, Tooele, Utah
Manufacturer ISOM Brothers Inc.
Design Standard Manufacturer's data plate indicates the tank is a UL Listed "Insulated Secondary Containment Aboveground Tank for Flammable Liquids, Protected Type"
Year Built 1998
Current Product Stored Mogas specific gravity: 0.7 to 0.77 vapor pressure: 7.8 to 15 psia at
100F, flash point: -50F, Class I combustible liquid
Dimensions 9' diameter by 42' long (horizontal cylindrical)
Storage Capacity 15,000 gallons nominal capacity
Cleaning, Inspection, or Repair
No record of previous cleaning, inspection, or repairs.
Foundation The tank is supported by two steel saddles, each bearing on a concrete slab.
RPB/Leak Detection Double wall tank with leak sensor.
Shell Construction Double wall lap welded steel.
Stairs/Ladders Ladder to landing above south end of tank provides access to catwalk above west side of tank.
Manholes (1) 24” manhole on top of tank shell (level alarm, gauge hatch, and float pilot installed through cover)
Interior Coating System Unknown
Exterior Coating System Unknown, but likely the original factory coating.
Level Gauging ATG is Veeder Root. Morrison Brothers mechanical clock gauge on top of tank shell.
Overfill Protection/Level Alarms
Veeder Root ATG alarms: Operator could not confirm.
Scully level alarms: High-high, High and Low level alarms.
Hydraulic level control valve, and overfill prevention valve in fill drop tube.
Piping 3" coated carbon steel from remote delivery truck connections ; 2" coated carbon steel to dispensers.
Venting/Vapor Emission Controls
2" OPW P/V vent Model 623V. Morrison 10” Fig. 244 interstice emergency vent. Clay and Bailey 10” primary containment emergency vent.
Strapping Tables Strapping tables provided by calibration contractor.
Water Draw-Off/Product Recover System
A water draw off nozzle on top of tank shell connected to fixed, hand-operated pump.
Secondary Containment Double wall tank.
Fire Protection System Only one fire hydrant found within the general tank vicinity.
Findings and Recommendations page 7
C. Findings and Recommendations
Tank 512T1 was found to be in generally fair condition. The tank is fully serviceable, with no mandatory deficiencies noted that require immediate repair. There were several items observed, however, that are not in full compliance with the Federal State, and Local regulations or Military Criteria. These noted deficiencies are listed below, with repair recommendations and order of magnitude repair cost estimates. For basis of the cost estimate, it is assumed that the repairs will be completed by local action such as the Reoccurring Maintenance and Minor Repair program.
1. Mandatory Repairs
Mandatory repairs represent items that require immediate attention, in order to prevent imminent risk to system operators, equipment integrity, or the adjacent environment. If these repairs cannot be completed within a two month period, the tank should be removed from service until the repairs are completed. For this particular tank, no mandatory repairs are required.
(No Mandatory Repairs Required)
2. Recommended Repairs
Recommended repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment. These items may be required by Federal, State and Local Codes or by Military
Criteria.
Total Cost of Recommended Repairs: $16,200
a. Facility Numbering
Real property numbering for the Facility appears to be the reverse of that for the Army Corps of Engineers and possibly DLA. The Facility has this 15,000 gallon Mogas tank listed as 512T2, and has marked up the strapping charts to agree. The disconnect, regarding the property numbers between the Facility, USACE, and DLA should be resolved, and the records corrected, including the strapping charts, to indicate the correct facility numbers. Currently the tanks are not labeled to indicate the facility numbers or tank numbers. After the discrepancy in property numbers is resolved, the tanks should be labeled with the correct property and tank numbers.
Estimated Cost: $2,000
b. Foundation
There are numerous hairline cracks in the concrete pad under the (2) support saddles. The hairline cracks in the concrete pad under the (2) support saddles should be sealed to prevent moisture from penetrating the concrete and resulting in further deterioration.
Estimated Cost: $1,000
c. Bolting
The level control valve bolting is corroded. The level control valve bolting should be replaced with corrosion resistant bolting.
Findings and Recommendations page 8
Estimated Cost: $1,000
d. Interstice Emergency Vent
The interstice emergency vent cover will not close properly due to excessive fill material in the interstice. Failure of the interstice emergency vent cover to properly close could result in wasps or other insects nesting in the interstice. Failure of the interstice emergency vent cover to properly close could also allow rain water to enter the interstice resulting in corrosion of the primary and secondary containment. Remove the excessive fill material in the interstice at the emergency vent to allow the emergency vent cover to properly close.
Estimated Cost: $200
e. Clock Gauge
The face of the Morrison clock gauge is cloudy, possible due to paint overspray. Replace the clock gauge.
Estimated Cost: $1,000
f. Level Alarms
The independent high level alarm is not operable. Repair the independent high level alarm.
Estimated Cost: $1,000
g. Coatings
There is some corrosion where the coating has generally failed on the ladder and landing that provides access to the galvanized catwalk. In addition, the shell coating is stained under the corroded 4-inch by 2-inch reducer on the gauge port, as well as under the corroded level control valve bolts, emergency vent covers, and pump. Replace the coating on the ladder and landing that provides access to the galvanized catwalk. Coat the new level control valve bolts.
Repair the coating on the corroded gauge port reducer, emergency vent covers, and pump.
Repair the shell coating under the corroded appurtenances.
Estimated Cost: $3,000
h. Water Draw-off
The tank’s water draw-off nozzle is not equipped with an anti-siphon device. NFPA 30 -
22.11.4.3 requires means to prevent the release of liquid from the tank by siphon flow.
Provide an anti-siphon valve on the water draw-off nozzle.
Estimated Cost: $500
i. Valves
There is no tank isolation valve on the receipt nozzle. NFPA 30 – 22.13.1 requires each connection to an aboveground tank through which liquid can normally flow, be provided with
Findings and Recommendations page 9 a valve as close as practical to the shell. Provide a ball valve upstream of and adjacent to the receipt level control valve.
Estimated Cost: $5,000
j. Level Alarm System
While the tank has Scully high-high, high and low level alarms independent of the ATG system, the operator could not confirm the Veeder Root ATG System is programed with level alarms.
UFC 3-460-01, Table 8-1 item (I) requires ATG actuated high, high-high, low, and low-low level alarms. These four alarm points should be programmed into the ATG system by a qualified
SPAWAR Contractor in order to meet the requirements of the UFC.
Estimated Cost: $1,500
3. Other Noted Items
Other noted items represent minor non-critical deficiencies that are not recommended for repair due to a prohibitive cost to benefit ratio or other reasons. If these repairs are deemed necessary by the stakeholders, replacing the tank should be considered.
a. Access Manholes
UFC 3-460-01, Table 8-1.a requires all tanks of this configuration over 5,000 gallons to have two 36-inch access manholes. One of these manholes is required to include an internal ladder.
This repair is not recommended as the benefit of providing the new manholes and ladder does not justify the cost of the repair. The existing 24-inch manhole appears to be adequate for the
Activity’s operational needs.
b. Tank Sizing
The capacity of Tank 512T1, called Tank 512T2 by the facility and used by the facility to store
Mogas, is 15,000 gallons. The capacity of Tank 512T2, called tank 512T1 by the facility and used by the facility to store Diesel, is 12,000 gallons. UFC 3-460-01 7-3.3 requires vehicle fueling stations to comply with NFPA 30A Code for Motor Fuel Dispensing Facilities and Repair
Garages. NFPA 30A Paragraph 4.3.2.3 prohibits storing Class I liquid motor fuels (Mogas) in tanks with a maximum capacity larger than 12,000 gallons, unless such tanks are installed in a vault; but allows tanks storing Class II liquid motor fuels (Diesel) with maximum capacity up to
15,000 gallons. To comply with NFPA 30A, and the UFC, either reinstall Tank 512T1 in a vault or switch the service of the tanks so that the 15,000 gallon tank will be used to store diesel and the 12,000 gallon tank us used to store Mogas. The vapor return from the dispensers would also need to be routed to the other tank. The military may also consider cleaning and inspecting the tanks in preparation for the change in service. Alternatively, the authority having jurisdiction may issue a waiver of the NFPA 30 requirement to limit the capacity for the
Mogas tank.
Findings and Recommendations page 10
4. Recommended Site Upgrades
Site Upgrades are recommended upgrades to the site, which would still need to be addressed even if the tank were repaired or replaced. These items may be required by Federal, State and Local
Codes or by Military Criteria.
Total Cost of Site Upgrades: $17,000
a. Fire Hydrants
There is only one fire hydrant in the vicinity. A second fire hydrant is located approximately
340 feet from the tank. However, UFC 3-460-01 2-15.2.1 requires two fire hydrants within 300 feet of the tank. Provide a second fire hydrant within 300 feet of the tank.
Estimated Cost: $10,000
b. Vegetation
There is sage brush growing, against and under the tank. NFPA 30 - 21.6.6.3 requires that areas around tank storage facilities be kept free of weeds, trash, and other unnecessary combustible materials. While a local work order #10004252766 to cut brush has been issued, the vegetation may be expected to return, if measures are not taken to prevent it. Cutting back the vegetation around the tanks should be added to the regular maintenance schedule.
Estimated Cost: $0
c. Piping
The 3-inch remote receipt valve, basket strainer, and check valve over the delivery truck secondary containment pad are threaded bronze/brass and located approximately 30 feet from the tank. The receipt valve is a gate valve. NFPA 30 does not allow low melting point materials to be used above secondary containment near important structures. UFC 3-460-01, Chapter 7 does not allow gate valves, low melting point materials, or threaded connections in fuel piping. Replace the remote spill box receipt valve with a flanged steel ball valve. Replace the receipt basket strainer with flanged steel basket strainer. Replace the receipt check valve with a steel flanged check valve.
Estimated Cost: $7,000
Inspection Photographs page 11
D. Inspection Photographs
Overview of the Fueling Facility, Showing the Truck Delivery Point Area and the Tanks
Overview of Tank 512T1, Locally Identified as Tank 512T2
Mogas Diesel
Inspection Photographs page 12
Top of Tank and Appurtenances
Tank Saddle, Concrete Foundation Pad, and Grounding Cable
Inspection Photographs page 13
Tank Appurtenances Including the Interstitial Leak Detection, Issue Pump and Water Draw-off
Tank Appurtenances Including the Vapor Return Piping connected to Pressure/Vacuum Vent, Capped Gauging Port (Through the Access Platform), Plugged Nozzle and Capped Nozzle
Inspection Photographs page 14
Interstitial Emergency Vent in Foreground and Primary Emergency Vent in Background
Excessive Interstitial Fill Prevents Closure of Emergency Vent Cover
Inspection Photographs page 15
Manufacturer’s Data Plate is Present and Fully Readable
Fill Nozzle with a Level Control Valve in the Drop Tube, Hydraulic level Control Valve, and No Tank Isolation Valve on Nozzle
Tank Configuration Sketch
E. Tank Configuration Sketch
STI External Inspection Checklist
Appendix ‘1’ – STI Formal External Inspection Checklist
Project Name : :
Project Site : :
Project Location : :
Tank Facility No. : :
Local Tank ID No. : :
Inspection Date : :
Design : UL
# Horizontal Vertical
Manufacturer : :
Dimensions : : Useable =
Construction Date : : N/A :
Construction : Bare Steel Single-Wall Insulated
Coated Steel # Double-Wall Galvanic or
Concrete Double-Bottom
Plastic/Fiberglass Lined : 1998
Secondary
Containment : Earthen Dike Steel Dike
CRDM : N/A Yes
Release Prevention
Barrier : N/A Yes
Interior Coating : :
Piping : Issue : Size -
Material -
Connection Type -
Issue to -
Submitted to
Brockenbrough Job No.Tooele, Utah 15-002.20
AC 15008
Tooele Army Depot GOV Gas Station
Date Installed: Leak sensing probe
N/A
Synthetic Liner Other
Receipt : Size -
API
Rectangular
Other
Unknown
SWRI
Mogas
General Inspection Information
ISOM Brothers Inc.
9' diameter by 42' long
Concrete
Type:
Date Installed
Connection Type -
Exterior Coating Unknown
Overfill Protection / Level Alarms:
Veeder Root ATG with no known alarms; Scully high-high, high, and low level alarms; hydraulic level control valve, and overfill prevention valve in fill drop tube.
Unknown coated carbon steel threaded
GOV Fuel Station dispensers Receipt from -
STI SP001 FORMAL EXTERNAL INSPECTION (FEI) CHECKLIST
3" coated carbon steel threaded remote truck connections
2"
Impressed Current
Product
Date Installed: Type:
Other
Nominal =
Material -
Inspector Certification Number
SPCC Mandated Shop-Built AST Inspections
August 12th, 2015
512T1
512T2
15,000 gallons unknown
Cathodically Protected (Check one below)
Last Repair/Reconstruction Last Change of Service
Omaha District USACE
W9128F-12-D-0006Contract No.
Mike O'Connor
Capacity
Prior Inspection Date
Inspector Name
NA
Tank Specifications
Saddle pads are stitch welded to tank shell, but no corrosion was observed.
Pad plates between the supports and shell are in good condition
Cracking or spalling
Settlement
Cracking
A
A
A
A
A
A
X
A
Secured properly on foundation or grade
Corrosion or coating failure
Record AST data and check for accuracy against actual conditions
Review prior inspections, repairs and alterations data
Degradation
Ground slopes away from tank
7.1.3 Past Records
Soil resting against/covering side of tank
Exposed rebar
STI SP001 FORMAL EXTERNAL INSPECTION (FEI) CHECKLIST
A
NOTE: "A" IN THE STATUS COLUMN MEANS ACCEPTABLE; "X" IN THE STATUS COLUMN MEANS AN ITEM IS UNACCEPTABLE AND THERE IS A COMMENT.
Inspect against applicable industry standards
7.1.7 Tank Supports
Welds are in good condition
Water drains away from tank
A
A
ITEM
7.1 General
7.1.6 Tank Foundation
7.1.4 AST Nameplate Data
7.1.5 AST Fabrication
X
Check for :
Wash-out or voids
TASK STATUS COMMENTS
See photo. Per data plate E-vent capacity required is: 482,000 CFH pimary; 527,000 CFH secondary/annular (interstice)
Check for :
Manufacturer's data plate indicates tank is UL Listed "Insulated Secondary Containment
Aboveground Tank for Flammable Liquids, Protected Type"
NA
A
A
A
The tank is supported by two steel saddles, each bearing down on a concrete slab.
Numerous hairline cracks in concrete pad under (2) support saddles
Paint overspray makes Morrison Brothers mechanical clock gauge face cloudy.
Clock gauge appears to be reading and sized correctly.
Scully high level alarm not operable.
STI SP001 FORMAL EXTERNAL INSPECTION (FEI) CHECKLIST
Check for :
Stress or leakage A
A
Adequate size and capacity?
Pressure/ vacuum vent poppets
Other moving vent components
Degradation
TASK STATUS
Operable and in good condition?
Verify that the primary tank level gauge and secondary tank interstitial gauges move freely and the floats, guides, and attachments are in working order.
Veeder Root ATG is operable but with no known alarms. Manual test of interstitial space leak detection alarm reveales it is operable.
X
7.1.9.1 Piping and Piping
Connections
A
Corrosion on gauge port 4" x 2" reducer , LCV bolts, E-vent covers, and pump .
7.1.12 Tank Shell & Head X
Corrosion X
7.1.10 Tank Grounding &
Bonding
7.1.11 Stairways, Handrails, and Platforms
A Liquid level gauge length sized correctly for tank diameter?
Alarms are operable?
Strap secured and in good condition?
Check for :
A
A
A
X
Corrosion
Rusted bolted connections
Verify that components are moving freely and vent passageways are not obstructed for :
Broken welds
7.1.9.2 Vents (Normal/
Emergency) and
Pressure/Vacuum Devices
X
A
Emergency vent covers
X
ITEM
Bent members A
Coating Failure?
7.1.9.3 Tank Gauges
Corrosion on ladder, landing posts, and landing handrails.
Tank coating is in overall good condition, but there is some stained coating under corroded gauge port, LCV bolts, E-vent covers, and pump.
Interstice emergency vent will not close due to excessive insulation material in the interstice.
A
2" OPW P/V vent Model 623V, OK. Capacity listed on the Morrison Fig. 244 interstice emergency vent is 808,350 CFM and is adequate to satisfy the calculated required interstice emergency venting capacity of 519,660 CFH and the required interstice emergency venting capacity listed on the manufacturer's data plate of 527,000 CFH. The capacity of listed on the
Clay and Bailey emergency vent mounted on primary containment is 572,338 CFH and is adequate to satisfy the the required primary emergency venting capacity of 432,000 CFH listed on the manufacturer's data plate.
Cracking
Check shell and ancillary equipment for:
A
Exterior Corrosion
Check shell plates and welds for : .
TASK
Stress
Mechanical damage
7.3 Horizontal AST / 7.4 Vertical AST or Rectangular AST
A
A
A
A
A
A
ITEM
A
A
STATUS COMMENTS
7.3.1 / 7.4.1 Tank Shell, Heads, or Roof Dents A
Pinholes
Buckling
Distortion
Bulging
Distortion
STI SP001 FORMAL EXTERNAL INSPECTION (FEI) CHECKLIST
Check if leak detection equipment/ method is operating?
For leak detection equipment, check for:
7.5 Double-Wall AST or Double-Bottom AST
ITEM TASK STATUS COMMENTS
STI SP001 FORMAL EXTERNAL INSPECTION (FEI) CHECKLIST
7.5.1 Leak Detection
Equipment / Method
Double-Wall ASTs do not require UT readings
7.5.3 Tank thickness
measurement:
Leaks or presence of liquid in interstice?
The window is clean and clear in sight leak gauges
The wire gauges of electronic gauges for tightness and corrosion
A
N/A
Activate the test button, if applicable
Interstice dry.
A
7.5.2 Leaks
A
Leak sensing probe was tested and found to be working properly.
7) No tank isolation valve on receipt and no isolation valves either side of receipt level control valve.
8) No anti-siphon valve on water draw-off.
9) Lighting inadequate; however, facility is not manned at night.
5) No tank identification label.
6) Valves at remote spill box over secondary containment delivery truck pad are bronze.
STI SP001 FORMAL EXTERNAL INSPECTION (FEI) CHECKLIST
Additional Comments:
2) Corrosion on WDO piping, ATG Riser, E-vent covers, and pump (VTP mounted on top of tank).
3) No spill control slab under low point drain. Although some States require spill control under low point drains, research of applicable Codes and Standards does not indicate it is required in Utah.
4) Facility's tank designations are the reverse of the SOW. Per the facility, the 15k gal Mogas tank is Tank 512-T2 and and 12k gal diesel tank is Tank M512-T1.
1) Brush growing around and against tank. Some brush growing out of expansion joints of slab under tank. Local work order #10004252766 to cut brush issued.
STI Monthly and Annual Checklists
Appendix ‘2’ – STI Monthly and Annual Checklists
AST INSPECTION STANDARD 29 SEPTEMBER 2011
STI SP001 Monthly Inspection Checklist
General Inspection Information:
Inspection Date: Retain Until Date: (36 months from inspection date)
Prior Inspection Date: Inspector Name:
Tanks Inspected (ID #’s):
Inspection Guidance:
For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures.
The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a Certified
Inspector. It shall be performed by an owner’s inspector who is familiar with the site and can identify changes and developing problems.
Upon discovery of water in the primary tank, secondary containment area, interstice, or spill container, remove promptly or take other corrective action. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly.
(*) designates an item in a non-conformance status. This indicates that action is required to address a problem.
Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified Inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section.
Retain the completed checklists for 36 months.
In the event of severe weather (snow, ice, wind storms) or maintenance (such as painting) that could affect the operation of critical components
(normal and emergency vents, valves), an inspection of these components is required as soon as the equipment is safely accessible after the event.
Item Task Status Comments
1.0 Tank Containment
1.1 Containment
structure
Check for water, debris, cracks or fire hazard
�Yes* �No �N/A
1.2 Primary tank Check for water �Yes* �No
1.3 Containment
drain valves Operable and in a closed position
�Yes �No* �N/A
1.4 Pathways and
entry
Clear and gates/doors operable
�Yes �No* �N/A
2.0 Leak Detection
2.1 Tank Visible signs of
leakage �Yes* �No
2.2 Secondary
Containment
Visible signs of leakage from tank into secondary containment
�Yes* �No
2.3 Surrounding soil Visible signs of
leakage
�Yes* �No �N/A
2.4 Interstice Visible signs of
leakage
�Yes* �No �N/A
AST INSPECTION STANDARD 30 SEPTEMBER 2011
3.0 Tank Equipment
3.1 Valves a. Check for leaks. �Yes* �No �N/A
b. Tank drain valves must be kept locked.
�Yes* �No �N/A
3.2 Spill
containment boxes on fill pipe
a. Inspect for debris, residue, and water in the box and remove.
�Yes* �No �N/A
b. Drain valves must be operable and closed.
�Yes* �No �N/A
3.3 Liquid level
equipment
a. Both visual and mechanical devices must be inspected for physical damage.
�Yes �No* �N/A
b. Check that the device is easily readable
�Yes �No* �N/A
3.4 Overfill
equipment
a. If equipped with a "test" button, activate the audible horn or light to confirm operation.
This could be battery powered. Replace the battery if needed
�Yes �No* �N/A
b. If overfill valve is equipped with a mechanical test mechanism, actuate the mechanism to confirm operation.
�Yes �No* �N/A
3.5 Piping
connections
Check for leaks, corrosion and damage
�Yes* �No
4.0 Tank Attachments and Appurtenances
4.1 Ladder and
platform structure
Secure with no sign of severe corrosion or damage?
�Yes �No* �N/A
5.0 Other Conditions
5.1 Are there other conditions that should
be addressed for continued safe operation or that may affect the site spill prevention plan?
�Yes* �No
AST INSPECTION STANDARD 31 SEPTEMBER 2011
Additional Comments:
AST INSPECTION STANDARD 32 SEPTEMBER 2011
STI SP001 Annual Inspection Checklist
General Inspection Information:
Inspection Date: Retain Until Date: (36 months from inspection date)
Prior Inspection Date: Inspector Name:
Tanks Inspected (ID #’s):
Inspection Guidance:
For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures.
The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a Certified
Inspector. It shall be performed by an owner’s inspector who is familiar with the site and can identify changes and developing problems.
Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or spill container. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly.
In order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules, a facility must regularly test liquid level sensing devices to ensure proper operation (40 CFR 112.8(c)(8)(v)).
(*) designates an item in a non-conformance status. This indicates that action is required to address a problem.
Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified Inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section.
Retain the completed checklists for 36 months.
Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists.
Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.
1.0 Tank Containment
1.1 Containment
structure
Check for:
• Holes or cracks in containment wall or floor
• Washout
• Liner degradation
• Corrosion
• Leakage
• Paint failure
• Tank settling
�Yes* �No �N/A
2.0 Tank Foundation and Supports
2.1 Foundation Settlement or
foundation washout?
�Yes* �No
2.2 Concrete pad
or ring wall
Cracking or spalling? �Yes* �No �N/A
AST INSPECTION STANDARD 33 SEPTEMBER 2011
2.3 Supports Check for corrosion, paint failure, etc.
�Yes* �No �N/A
2.4 Water
drainage
Water drains away from tank?
�Yes �No* �N/A
2.5 Tank
grounding
Strap secured and in good condition?
�Yes �No* �N/A
3.0 Cathodic Protection
3.1 Gavlvanic
cathodic protection system
Confirm system is functional, includes the wire connections for galvanic systems
�Yes �No* �N/A
3.2 Impressed
current system
a. Inspect the operational components (power switch, meters, and alarms).
�Yes �No* �N/A
b. Record hour meter, ammeter and voltmeter readings.
�Yes �No* �N/A
4.0 Tank Shell, Heads, Roof
4.1 Coating Check for coating
failure �Yes* �No
4.2 Steel
condition
Check for:
• Dents
• Buckling
• Bulging
• Corrosion
• Cracking
�Yes* �No
4.3 Roof slope Check for low points
and standing water
�Yes* �No �N/A
5.0 Tank Equipment
5.1 Vents Verify that
components are moving freely and vent passageways are not obstructed for:
• Emergency vent covers
• Pressure/vacuum vent poppets
• Other moving vent components
�Yes* �No
AST INSPECTION STANDARD 34 SEPTEMBER 2011
5.2 Valves Check the condition of
all valves for leaks, corrosion and damage.
�Yes* �No
5.2.1 Anti-siphon, check and gate valves
Cycle the valve open and closed and check for proper operation.
�Yes �No* �N/A
5.2.2 Pressure
regulator valve
Check for proper operation. (Note that there may be small, 1/4 inch drain plugs in the bottom of the valve that are not visible by looking from above only)
�Yes �No* �N/A
5.2.3 Expansion
relief valve
Check that the valve is in the proper orientation. (Note that fuel must be discharged back to the tank via a separate pipe or tubing.)
�Yes �No* �N/A
5.2.4 Solenoid
valves
Cycle power to valve to check operation.
(Electrical solenoids can be verified by listening to the plunger opening and closing. If no audible confirmation, the valve should be inspected for the presence and operation of the plunger.)
�Yes �No* �N/A
5.2.5 Fire and
shear valves
a. Manually cycle the valve to ensure components are moving freely and that the valve handle or lever has clearance to allow valve to close completely.
�Yes �No* �N/A
b. Valves must not be wired in open position.
�Yes �No* �N/A
AST INSPECTION STANDARD 35 SEPTEMBER 2011
c. Make sure fusible element is in place and correctly positioned.
�Yes �No* �N/A
d. Be sure test ports are sealed with plug after testing is complete and no temporary test fixture or component remains connected to valve.
�Yes �No* �N/A
5.3 Interstitial
leak detection equipment
Check condition of equipment, including:
• The window is clean and clear in sight leak gauges.
• The wire connections of electronic gauges for tightness and corrosion
• Activate the test button, if applicable.
�Yes �No* �N/A
5.4 Spill
containment boxes on fill pipe
a. If corrosion, damage, or wear has compromised the ability of the unit to perform spill containment functions, replace the unit.
�Yes* �No �N/A
b. Inspect the connections to the AST for tightness, as well as the bolts, nuts, washers for condition and replace if necessary.
�Yes* �No �N/A
c. Drain valves must be operable and closed
�Yes* �No �N/A
5.5 Strainer a. Check that the
strainer is clean and in good condition.
AST INSPECTION STANDARD 36 SEPTEMBER 2011
5.5 Strainer b. Access strainer
basket and check cap and gasket seal as well as bolts.
�Yes �No* �N/A
5.6 Filter a. Check that the filter
is in good condition and is within the manufacturer’s expected service life.
Replace, if necessary.
�Yes �No* �N/A
b. Check for leaks and decreased fuel flow
�Yes �No* �N/A
5.7 Flame
arrestors
Follow manufacturer’s instructions. Check for corrosion and blockage of air passages.
�Yes* � No �N/A
5.8 Leak detector
for submersible pump systems
Test according to manufacturer's instructions and authority having jurisdiction (AHJ).
Verify leak detectors are suited and properly installed for aboveground use.
�Yes �No* �N/A
5.9 Liquid level
equipment
a. Has equipment been tested to ensure proper operation?
�Yes �No* �N/A
b. Does equipment operate as required?
�Yes �No* �N/A
c. Follow manufacturer’s instructions
�Yes �No* �N/A
5.10 Overfill
equipment
a. Follow manufacturer’s instructions and regulatory requirements for inspection and functionality verification.
�Yes �No* �N/A
b. Confirm device is suited for above ground use by the manufacturer
AST INSPECTION STANDARD 37 SEPTEMBER 2011
6.0 Insulated Tanks
6.1 Insulation Check condition of
insulation for:
• Missing sections
• Areas of moisture
• Mold
• Damage
�Yes* � No �N/A
6.2 Insulation
cover or jacket
Check for damage that will allow water intrusion
�Yes* No �N/A
7.0 Miscellaneous
7.1 Electrical
wiring and boxes
Are they in good condition?
�Yes �No* �N/A
7.2 Labels and
tags
Ensure that all labels and tags are intact and readable.
Additional Comments:
1011 Boulder Springs Drive, Suite 200 Richmond, Virginia 23225
Phone: 804-592-3900 Fax: 804-592-3901 www.brockenbrough.com
File details come from the government source that posted it. Updated .