This document is an STI (Steel Tank Institute) In-Service Inspection Report for Diesel Tank 5129A located at Tooele Depot in Utah, conducted by the US Army Corps of Engineers Omaha District on July 27, 2020. The inspection evaluated the integrity of a 12,000-gallon horizontal, double-wall, UL 2085 steel tank manufactured in 1996 by Perkins Welding Works, which currently stores diesel fuel.

The comprehensive inspection identified minor issues requiring attention, including approximately 20% coating failures and the need to install facility number labeling per UFC 3-460-01 standards. The tank's infrastructure was generally found to be in good condition, with coated carbon steel supports, a concrete slab foundation, and various appurtenances such as a 36-inch manway, water draw port, high-level shutoff valve, and Ronan automatic tank gauging system. The report recommends recoating the tank to slow corrosion and adding a manual gauge, with no mandatory repairs identified. The next external inspection is recommended for July 27, 2025.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers

OmahaDistrict
STIIn‐Service

Inspection Report

TooeleDepot
DieselTank5129A

US Army Corps of Engineers Center of Expertise for Petroleum, Oils and Lubricants

USACEPOL‐MCX
27July2020

STI In-Service Inspection Report Tooele Depot, Tooele UT

Table of Contents

ACRONYMS AND ABBREVIATIONS

GENERAL SUMMARY

INSPECTION DATE

STATE REGULATIONS

PREVIOUS INSPECTION DATES

RECOMMENDED FUTURE INSPECTION DATES

GENERAL TANK INFORMATION

A. GENERAL PROJECT INFORMATION

1. STI SP001 Inspection

2. Site Information

B. TANK INSPECTION COMMENTS

1. Tank Construction

2. Tank Foundation

3. Tank Appurtenances

4. Tank Coating

5. Tank Piping System

6. Fire Protection System

7. Secondary Containment

C. FINDINGS AND RECOMMENDATIONS

1. MANDATORY REPAIRS per STI SP001, UFC 3-460-01, NFPA 30, or NFPA 30A

2. REQUIRED REPAIRS to Fully Comply with STI SP001, UFC 3-460-01, NFPA 30, or NFPA 30A

3. RECOMMENDED REPAIRS as Part of Regular Maintenance

APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS

TANK CONFIGURATION DIAGRAM

APPENDIX B: STI SP001 FORMAL EXTERNAL INSPECTION CHECKLIST

TANK ID Diesel Tank

1.0 Tank Containment

2.0 Tank Foundation and Supports

3.0 Cathodic Protection

4.0 Tank Shell, Heads, Roof

5.0 Tank Equipment

6.0 Insulated Tanks

APPENDIX C: STI SP001 MONTHLY INSPECTION CHECKLIST

1.0 Tank Containment

2.0 Leak Detection

3.0 Tank Equipment

4.0 Tank Attachments and Appurtenances

5.0 Other Conditions

APPENDIX E: PHOTOGRAPHS

ACRONYMS AND ABBREVIATIONS

API American Petroleum Institute

ASME American Society of Mechanical Engineers

ASNT American Society of Non-Destructive Testing

ATG Automatic Tank Gauge

BBL Barrel

CFR Code of Federal Regulations

CP Cathodic Protection

DFT Dry Film Thickness

HLA High Level Alarm

HLCS High Level Control Shutoff

HHLA High-High Level Alarm

LLA Low Level Alarm

LLLA Low-Low Level Alarm

MFL Magnetic Flux Leakage

MT Magnetic Particle Testing

NACE National Association of Corrosion Engineers

NDT Non-Destructive Testing

NFPA National Fire Protection Association

PSI Pounds per Square Inch

PT Penetrant Testing

P/V Pressure/Vacuum

RP Recommended Practice

PST Product Saver Tank

RT Radiography Testing

STI Steel Tank Institute

TML Thickness Measurement Location

TRV Thermal Relief Valve

UFC Unified Facilities Criteria

UFGS Unified Facilities Guide Specifications

ULS Ultra Low Sulfur

UT Ultrasonic Testing

VT Visual Testing

GENERAL SUMMARY

Tank 5129A is located at Tooele Depot in Tooele, UT and is a welded, steel, horizontal UL 2085 tank for flammable liquids which currently stores Diesel. The Tank Manufacture is Perkins Welding Works. The installation date is 1996. The in-service inspection was performed July 27, 2020. The results of this inspection will provide recommendations for repairs and upgrades which are required to comply with applicable industry and military standards. The testing and inspection was performed in accordance with the applicable sections of the Fifth Edition of SP001. Contained in this report is a detailed account of the tank inspection, a summary of the non-destructive testing, and the conclusions derived from the inspection and testing.

INSPECTION DATE

Inspection Date: 27 July 2020 Equipment Used:

Manufacturer: Dakota Ultrasonic’ s Model Number: CMX DL Calibration Method: Zeroing Procedure, Multi-step Thickness gauge

Inspector(s):

John Hester API 653/STI SP 001/NDE Level II

STATE REGULATIONS

State Regulation for STI In-Service Tank Inspections N/A State Regulation for STI Out-of-Service Tank Inspections N/A

NOTE: If there are no state regulations for tank inspections then N/A shall reside in-place of the number of years between inspections. If state regulations reside, the recommended future inspections dates shall be based on whichever is more stringent between the STI inspector’s calculations and the State regulations.

PREVIOUS INSPECTION DATES

Inspection Date: 28 August 2009

RECOMMENDED FUTURE INSPECTION DATES

STI Out-of-Service (Internal) Inspection Date: N/A (Per STI OOS is not required for Category 1 AST) STI In-Service (External) Inspection Date: 27 July 2025

John Hester Robert and Company API 653 No. 88616 SP001 STI No. AST 2092 ASNT NDT Level II No. 164397

GENERAL TANK INFORMATION

ITEM DESCRIPTION

Owner US Army

Location Tooele Depot

Facility Number 5129A

Tank Number Diesel Tank

State / Country Utah

City Tooele

Inspection Date 27 July 2020

Tank Manufacturer Perkins Welding Works

Design Standard UL 2085

Date of Construction 1996

Tank Contents Diesel

Tank Serial Number M170017

Tank Diameter 9’

Tank Length 33’

Product Height 9’

Tank Capacity 12,000 gallons

Tank Foundation Carbon steel saddles on Concrete slab

Tank Construction Double wall welded carbon steel

Interior Coating System Epoxy Coating

Exterior Coating System Epoxy Coating

Level Gauging Ronan ATG

Venting 2‐ inch primary and 8‐inch primary emergency and 8‐inch interstice

Strapping Charts 1/16th inch

Overfill Protection High Level shut off

Piping (Size and Material)

Receipt 3‐inch Carbon steel

Issue 3‐inch Carbon steel

Water Draw‐Off 1‐inch Carbon steel port only

Level Alarms LLA, HLA, HHLA

Secondary Containment Coated Welded Steel 110% capacity

A. GENERAL PROJECT INFORMATION

1. STI SP001 Inspection STI Standard SP001 In-Service inspection of Diesel Tank was completed on July 27, 2020 to evaluate the tank’s integrity, collect data, and establish a data base for future inspections and evaluations.

2. Site Information Tooele ground product facility consists of three 12,000-gal fuel tanks storing Mogas and Diesel. The facility is supplied by commercial truck.

B. TANK INSPECTION COMMENTS

1. Tank Construction The Diesel Tank is a 12,000-gallon aboveground horizontal, double wall, steel storage tank 33’ and long 9’ in diameter.

2. Tank Foundation Poured concrete slab

3. Tank Appurtenances

a. Venting

The Diesel Tank has a primary 2-inch pressure/vacuum vent.

b. Emergency Venting

8-inch emergency vent for primary and 8-inch interstice vent.

c. Manways

1 36-inch manway

d. Water Draw‐Off

1 inch water draw port with hand pump installed.

e. High Level Shutoff Valve

Magnatrol solenoid operated high-level shutoff.

f. Level Alarms

High Level, High High level, Low Level

g. Gauging

Ronan tank monitor system

h. Pumps

Submersible turbine pump.

i. Stairs and Platforms

Coated Carbon steel for support frame and platform treads with ladder access

j. Grounding and Bonding

Tank has a ground on saddle

4. Tank Coating Epoxy coated interior and exterior

5. Tank Piping System All pipes are coated carbon steel and in good condition

6. Fire Protection System None

7. Secondary Containment Coated welded carbon Steel with no containment drain valve installed

C. FINDINGS AND RECOMMENDATIONS

1. MANDATORY REPAIRS per STI SP001, UFC 3‐460‐01, NFPA 30, or NFPA 30A Mandatory repairs represent items that require immediate attention, in order to prevent imminent risk to system operators, equipment integrity, or the adjacent environment. The tank should remain out of service until these repairs are completed.

No Mandatory repairs at this time

2. REQUIRED REPAIRS to Fully Comply with STI SP001, UFC 3‐460‐01, NFPA 30, or NFPA 30A Recommended repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment. These items may be required by Federal, State and Local Codes or by Military Criteria.

a. Title:ApplyFacilityNumberLabeling
OBSERVATION:The tank does not have all the required labeling mandated by UFC 3-460-1. UFC 3-

460-1 2-18 states each tank shall be marked with the following: "per MIL-STD-161 Tank number, Facility number, No smoking on class 1 tanks. And “confined Space” on roof manhole/ladder hach".

REFERENCE:UFC3‐460‐1SECTION2‐17
RECOMMENDATION:INSTALLLABELINGTOINCLUDEFACILITYNUMBER
b. Title:ManualGauge
OBSERVATION:The tank does not have a clock gauge installed.
REFERENCE:UFC3‐460‐01
RECOMMENDATION:ADDMANUALGAUGE

3. RECOMMENDED REPAIRS as Part of Regular Maintenance Recommended repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment.

a. Title:Coatingfailures
OBSERVATION:The tank ha approximately 20% coating failures
REFERENCE:UFC3‐460‐01
RECOMMENDATION:RECOATTANKASNEEDEDTOSLOWCORROSIONRATE

APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS

TANK CONFIGURATION DIAGRAM

APPENDIX B: STI SP001 FORMAL EXTERNAL INSPECTION CHECKLIST

OWNER INFORMATION

FACILITY INFORMATION

INSTALLER INFORMATION

Tooele Depot, UT Tooele Depot, UT Unknown

Name Name Name

Unknown

Number and Street Number and Street Number and Street

Tooele Depot Tooele Depot Unknown

City, State, Zip Code City, State, Zip Code City, State, Zip Code

TANK ID Diesel Tank

SPECIFICATION:

Design: UL SWRI Horizontal Vertical Rectangular

API Other

Unknown

Manufacturer: Pekins Contents: Diesel Construction Date: 1996 Last Repair/Reconstruction Date: unknown

Dimensions: 9’ D 33’ L Capacity: 12,000 Gallons Last Change of Service Date: N/A

Construction: Bare Steel Catholically Protected (Check one: A. Galvanic or B. Impressed Current)Date Installed: _______________

Coated Steel Concrete Plastic/Fiberglass Other

Double-Bottom Double-Wall Lined Date Installed: _______________

Containment: Earthen Dike Steel Dike Concrete Synthetic Liner Other Coated

CRDM: Date Installed: unknown Type: Elevated AST

Release Prevention Barrier: Date Installed: unknown Type: Coated Steel Containment

Inspection Date: July 27, 2020 Retain Until Date: July 27, 2023 (36 months from inspection date)

Prior Inspection Date: N/A Inspector Name: John Hester STI Cert# AST 2092, ASNT Level II Cert # 164397

Tanks Inspected (ID #’s): Tank 5129A

Inspection Guidance:

For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures.

The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a Certified Inspector. It shall be performed by an owner’s inspector who is familiar with the site and can identify changes and developing problems.

Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or spill container.

Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly.

In order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules, a facility must regularly test liquid level sensing devices to ensure proper operation (40 CFR 112.8(c)(8)(v)).

(*) designates an item in a non‐conformance status. This indicates that action is required to address a problem.

Non‐conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified

Inspector, or a tank manufacturer who will determine the corrective action. Note the non‐conformance and corresponding corrective action in the comment section.

Retain the completed checklists for 36 months.

Complete this checklist on an annual basis supplemental to the owner monthly‐performed inspection checklists.

Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.

Item Task StatusComments
1.0TankContainment

1.1Containment structure

Check for:

Holes or cracks in containment wall or floor

Washout Liner degradation Corrosion Leakage Paint failure Tank settling

Yes* No

N/A

2.0 Tank Foundation and Supports

2.1 Foundation

Settlement or foundation washout?

Yes* No

N/A

Concrete Slab

2.2 Concrete

pad or ring wall

Cracking or spalling?

2.3 Supports Check for

corrosion, paint failure, etc.

2.4 Water

drainage

Water drains away from tank?

Yes No

Item Task Status Comments

2.5 Tank

grounding

Strap secured and in good condition?

Yes No

N/A

One grounding strap

3.0 Cathodic Protection

3.1 Gavlvanic

cathodic protection system

Confirm system is functional, includes the wire connections for galvanic systems

3.2 Impressed

current system

a. Inspect the operational components (power switch, meters, and alarms).

b. Record hour meter, ammeter and voltmeter readings.

4.0 Tank Shell, Heads, Roof

4.1 Coating Check for coating

failure

Yes No

N/A

Minor coating failure

4.2 Steel

condition

Check for:

Dents Buckling Bulging Corrosion Cracking

4.3 Roof slope Check for low

points and standing water

5.0 Tank Equipment

5.1 Vents Verify that

components are moving freely and vent passageways are not obstructed for:

Emergency vent covers Pressure/vacuum vent poppets Other moving vent components

Item Task Status Comments

5.2 Valves Check the

condition of all valves for leaks, corrosion and damage.

5.2.1 Anti-

siphon, check and gate valves

Cycle the valve open and closed and check for proper operation.

5.2.2 Pressure

regulator valve

Check for proper operation. (Note that there may be small, 1/4 inch drain plugs in the bottom of the valve that are not visible by looking from above only)

5.2.3 Expansion

relief valve

Check that the valve is in the proper orientation.

(Note that fuel must be discharged back to the tank via a separate pipe or tubing.)

5.2.4 Solenoid

valves

Cycle power to valve to check operation.

(Electrical solenoids can be verified by listening to the plunger opening and closing. If no audible confirmation, the valve should be inspected for the presence and operation of the plunger.)

Item Task Status Comments

5.2.5 Fire and

shear valves

a. Manually cycle the valve to ensure components are moving freely and that the valve handle or lever has clearance to allow valve to close completely.

Tank does not have a fire or shear valve

b. Valves must not be wired in open position.

N/A

c. Make sure fusible element is in place and correctly positioned.

N/A

d. Be sure test ports are sealed with plug after testing is complete and no temporary test fixture or component remains connected to valve.

5.3 Interstitial

leak detection equipment

Check condition of equipment, including:

The window is clean and clear in sight leak gauges.

The wire connections of electronic gauges for tightness and corrosion

Activate the test button, if applicable.

Item Task Status Comments

5.4 Spill

containmen t boxes on fill pipe

a. If corrosion, damage, or wear has compromised the ability of the unit to perform spill containment functions, replace the unit.

b. Inspect the connections to the AST for tightness, as well as the bolts,nuts, washers for condition and replace if necessary.

N/A

c. Drain valves must be operable and closed

5.5 Strainer a. Check that the

strainer is clean and in good condition.

5.5 Strainer b. Access strainer

basket and check cap and gasket seal as well as bolts.

5.6 Filter a. Check that the

filter is in good condition and is within the manufacturer’s expected service life. Replace, if necessary.

Tank uses a filter at the dispensers

b. Check for leaks and decreased fuel flow

5.7 Flame

arrestors

Follow manufacturer’s instructions. Check for corrosion and blockage of air passages.

Item Task Status Comments

5.8 Leak

detector for submersible pump systems

Test according to manufacturer's instructions and authority having jurisdiction (AHJ).

Verify leak detectors are suited and properly installed for aboveground use.

5.9 Liquid level

equipment

a. Has equipment been tested to ensure proper operation?

Yes No

N/A

Tank does not have a manual guage

b. Does equipment operate as required?

Yes No

N/A

c. Follow manufacturer’s instructions

Yes No

N/A

5.10 Overfill

equipment

a. Follow manufacturer’s instructions and regulatory requirements for inspection and functionality verification.

b. Confirm device is suited for above ground use by the manufacturer

6.0 Insulated Tanks

6.1 Insulation

Check condition of insulation for:

Missing sections

Areas of moisture

Mold Damage

6.2 Insulation

cover or jacket

Check for damage that will allow water intrusion

Item Task Status Comments

7.0 Miscellaneous

7.1 Electrical

wiring and boxes

Are they in good condition?

7.2 Labels and

tags

Ensure that all labels and tags are intact and readable.

Tank needs facility number labeling installed.

APPENDIX C: STI SP001 MONTHLY INSPECTION CHECKLIST

Inspection Date: July 27 2020 Retain Until Date: July 27 2023 (36 months from inspection date)

Prior Inspection Date: N/A Inspector Name: John Hester STI Cert# AST 2092, ASNT Level II Cert # 164397

Tanks Inspected (ID #’s): Tank 5129A

Inspection Guidance:

For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures.

The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a Certified Inspector. It shall be performed by an owner’s inspector who is familiar with the site and can identify changes and developing problems.

Upon discovery of water in the primary tank, secondary containment area, interstice, or spill container, remove promptly or take other corrective action. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly.

(*) designates an item in a non‐conformance status. This indicates that action is required to address a problem.

Non‐conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified

Inspector, or a tank manufacturer who will determine the corrective action. Note the non‐conformance and corresponding corrective action in the comment section.

Retain the completed checklists for 36 months.

In the event of severe weather (snow, ice, wind storms) or maintenance (such as painting) that could affect the operation of critical components (normal and emergency vents, valves), an inspection of these components is required as soon as the equipment is safely accessible after the event.

Item Task StatusComments
1.0TankContainment

1.1 Containment

structure

Check for water, debris, cracks or fire hazard

Yes No

Vegetation growth in containment

1.2 Primary tank Check for water

1.3 Containment

drain valves

Operable and in a closed position

1.4 Pathways

and entry

Clear and gates/doors operable

2.0 Leak Detection

2.1 Tank Visible signs of

leakage

2.2 Secondary

Containment

Visible signs of leakage from tank into secondary containment

Item Task Status Comments

2.3 Surrounding

soil

Visible signs of leakage

2.4 Interstice Visible signs of

leakage

3.0 Tank Equipment

3.1 Valves a. Check for leaks.

Yes No

N/A

Issue control valve

b. Tank drain valves must be kept locked.

Yes No

N/A

3.2 Spill

containment boxes on fill pipe

a. Inspect for debris, residue, and water in the box and remove.

N/A

b. Drain valves must be operable and closed.

Yes No

N/A

3.3 Liquid level

equipment

a. Both visual and mechanical devices must be inspected for physical damage.

b. Check that the device is easily readable

Yes No

N/A

3.4 Overfill

equipment

a. If equipped with a "test" button, activate the audible horn or light to confirm operation. This could be battery powered.

Replace the battery if needed

N/A

Item Task Status Comments

b. If overfill valve is equipped with a mechanical test mechanism;

actuate the mechanism to confirm operation.

N/A

3.5 Piping

connections

Check for leaks, corrosion and damage

N/A

4.0 Tank Attachments and Appurtenances

4.1 Ladder and

platform structure

Secure with no sign of severe corrosion or damage?

Yes No

N/A

Coated carbon steel support structure and platform

5.0 Other Conditions

5.1 Are there other conditions that

should be addressed for continued safe operation or that may affect the site spill prevention plan?

APPENDIX E: PHOTOGRAPHS

E.1: Tank North View E.2: Tank South View

E.3: Tank East View E.4: Tank West View

E.5: Tank Saddle E.6: Tank Water Draw

E.7: Grounding Strap E.8: Name Plate

E.9: Fill Stand E.10: Issue Piping

E.11: Top Viewing East E.12: Pump

E.13: 36‐inch Manway E.14: Primary Vent

E.15: 8” Interstice Emergency Vent E.16: 8” Emergency Vent

E.17: Interstice Probe E.18: Receipt Line

E.19: Coating Failure E.20: Gauging Hatch

E.21: ATG E.22: Dispenser